You are on page 1of 2

Form Number TEC - 44

Maintenance and Repair Schedule Revision Number 00


Revision Date 2015.10.15

P.I.C :1/E, 2/E & 3/E WORKING PLAN FROM AUSTRALIA (PORT LINCOLN) TO AUSTRALIA (LOADING) VOY L011 PORT. 2022 JUNE 30 – JULY 30

NO. OBJECT TO BE INSPECTED INSPECTED ITEMS & PLACES INTERVAL PREVIOUS LAST MAINT' NEXT MAINT'
MAINT' DATE DATE DATE
PMS WORKING PLAN BY PMS SYSTEM

1 M/E CLEAN LANTERN & SCAV OF MAIN ENGINE


2 M/E INSPECTION SCAV PORT OF M/E
3 M/E CRANK SHAFT DEFLECTION OF M/E
4 M/E CHECK N2 HYD ACCUMULATOR PRESSURE OF M/E
5 M/E INSPECTION & CHECK OIL MISTDETECOR
6 M/E INSPECTION CRANK CHAMBER
7 M/E ELECTRIC INSPECTION OF PANEL CABINET CCU & ETC
8 M/E ELECTRIC CLEANING & CHECK TACHO PICK UP SENSOR
9 M/E SHAFT RENEW OIL INTERMEDIATED SHAFT BEARING
10 M/E SHAFT CLEANING ALLOY BRUSH & SENSOR SHAFT EARTING
DEVICE
11 COOLER CLEANING S.W SIDE STRAINER M/E L.O COOLER
12 COOLER CLEANING S.W SIDE STRAINER L.T GENERATOR
13 COOLER CLEANING S.W M/E JACKET COOLER BY CHEMICAL

14 FUEL OIL SYSTEM CLEANING M/E F.O AUTO BACK WASH & BOILER &
GENERATOR
15 FUEL OIL SYSTEM CLEANING M/E F.O VISCOSITY SENSOR
16 BOILER MAINTENANCE BOILER BURNER

■ SHEQ-2.5 Ch 4.1.1 , 4.2.1 , 4.3.1 , 4.4.1 / FILE NO. I-21 - 1/2 -


Form Number TEC - 44

Maintenance and Repair Schedule Revision Number 00


Revision Date 2015.10.15

NO. TYPE OF WORKING ADDITIONAL JOB PLACE DATE FINISH

1 WELDING MAKE SAFTY COVER STELL PLATE HACTH COVER DECK


CONTROL BOX
2 WELDING MAKE SHELTER OF CHEMICAL STORE CHEMICAL STORE

FABRICATE STAND PLATE OF SPECIAL TOOLS


3 WELDING E/R 3RD FLOOR
GENERATOR

4 WELDING FABRICATE HOLDER DRILL BOX E/R WORKSHOP


5 WELDING FABRICATED BRACKET FOR TOOLS BOX E/R WORKSHOP

6 WELDING FABRICATED BRACKET HANGING TOOLS SPANER E/R 3RD FLOOR

1St Engineer : C/E Engineer :

■ SHEQ-2.5 Ch 4.1.1 , 4.2.1 , 4.3.1 , 4.4.1 / FILE NO. I-21 - 2/2 -

You might also like