GENERAL

1. Correct drawing titles, numbers and revision

2. Standard Holds List and action party (in brackets)

3. MMC standard title block and Job Number

4. MMC Disclaimer description block

5. SDC comments incorporated

6. IDC comments incorporated

7. Client comments incorporated

ISOMETRICS

1. Check North Arrow and the orientation of the line


wrt North.

2. All items indicated on the lines such as Valves,


Instruments are indicated & complied with
PEFS.Also ensure that the sequence of items &
tappings are as per PEFS.

3. PEFS Notes are complied with.

4. Equipment number, nozzle no., nozzle orientation


and elevation are as per piping layout.

5. Hydrotest vents & drains are indicated.

6. Compliance with Piping specification is to be


ensured, spec breaks are properly indicated.

/conversion/tmp/activity_task_scratch/651509591.doc Rev. 0
PIP-CL-009

CHECK LIST FOR ISOMETRICS


SHEET 2 OF 2

CHECK LIST YES NO N/A COMMENTS REV

ISOMETRICS (CONT……)

7. Compliance with Piping Layout is to be ensured.

8. MTO & MESC nos. are checked with piping spec.

9. All special items such as special valves, extended


spindle valves are identified.

10. All the symbols are used as per Legend.

11. Valve handle orientation, ESD valve & control


valve actuator orientation is shown on drg.

12. Straight runs for flow instruments are complied.

13. All isolation valves for the instruments are shown.

14. End to end dimensions & end connection of in-line


instruments, ESD valves, Strainers,any special items
& control valves are verified. All the items with tag
nos. in PEFS are tagged.

15. Extra long bolts are considered for installation of


Relief valves, Spectacle blinds, Wafer type valves,
restriction orifices etc.

16. Line no., Design pressure, Design temp. Test


Pneumatic test pressure
Pressure, Insulation class., Insulation thickness &
is limited to 7 Barg.
Flow direction are indicated.

17. Pipe support welded attachments are shown on drg.

18. Reinforcing Pad details are shown on drg.

19. Orientation of tapping points for Orifice flanges are


indicated.

20. If line is stress critical, stress analysis results are


incorporated.

21. Weld points, Field welds & notes about dimensional


verification at site are incorporated on drawing.