2. Scope
3. Responsibility
4. Accountability
6. Procedure
Note: The numbering of Equipments shall be done as per SOP titled
“Control of different equipment” (——–), numbering of Change Parts of
various equipments shall be done as per SOP titled “Control of Change
Parts” (———) and numbering of Dies and Punches shall be done as per
“Control of Dies and Punches” (———).
6.1. Equipment Numbering: Equipments fabricated in various
purposes shall be assigned unique ID. No. as per the steps discussed
below.
o The first three character shall be ‘EQ’ denoting equipment.
o The fourth character shall be ‘/’ (slash).
o The fifth and sixth character shall denote the department in which
equipment is installed. The codes for each department shall be as
follows:
FER : Fermentor
BİO : Biyoreaktor
PRT : Proses Tankı
MXT : Kariştirma Tankı
Bileşen/
Kısaltması
Cihaz7enstrüman adı
Tank Gövdesi TG
Hava Filtresi HF
Hijyenik Pompa HP
Gözetleme Camı GC
Aydınaltma lambası AL
Aydınlatma/ Gözetleme
AGC
Camı
Sparger
Yıkama Topu YT
Patlama Diski PD
Basınç Göstergesi BG
Check-valvf
Ceket Sirkülasyon
CSP
Pompası
Dozlama Pompası
Peristaltik Pompa
Kondenstop CSP
PLC/AI 8AI
4AQ
PLC /AO
AAQ
PLC/AI-RTD 8AIRTD
8AIRTD
PLC/DO CPU1215C
PLC/DI CPU1215
PLC/PROFIBUS PB
PLC/HMI HMI
Valf Adasi VI
PH-CO Transmitterr TR
Ph Sensörü pH
Oksijen Sensörü
Köpük Sensörü
DP sensör
Lot cell
Rotametre
İletkenlik Sensörü CO
Flow Switch F
Seviye Sensörü L
Elektirikli ısıtıcı
e.g. complete identification number of spoon to be used in Stores (RM and PM)
shall be numbered as SP001 and in-process SS storage bins to be used in Xeed
block shall be numbered as SB300.
8. Distribution
9. Reference:
10. History
Tank Gövdesi TG
Hava Filtresi HF
Hijyenik Pompa HP
Gözetleme Camı GC
Aydınaltma lambası AL
Sparger SPR
Yıkama Topu YT
Patlama Diski PD
Basınç Göstergesi BG