1 GENERAL

1.1 Correct drawing titles, numbers and revision

1.2 Standard Holds List and action party (in brackets)

1.3 IOTDE standard title block and Job Number

1.4 IOTDE Disclaimer description block

1.5 Drawing continuation flags match between drawings

1.6 Original Master/Reference Drawing Number listed

1.7 Plant North , UTM North & Wind dirn Indicated

1.8 Specific Notes included

1.9 In line with Standard drawing legend

1.10 Inter Discipline Check comments incorporated

1.11 Client comments incorporated

2 PIPING PLAN

2.1 Equipment locations are checked w.r.t. plot plan


(Giving all the three dimensions/co-ordinates).Plant
Equipment tags

2.2 Plant datum & Reference level indicated on drg.

2.3 Match lines & Continuation drg. nos co-ordinates


indicated on drg.

2.4 Piping up to 12” is shown by single line & => 14” is


shown by double line.

Rev - 0
SHEET 2 OF 3

CHECK LIST FOR PIPING GA Document No.


IOTDE-PIP-CL-002
Rev - 0
CHECK LIST YES NO N/A COMMENTS

2.5 Type of Reducer is indicated and orientation of flat


side in case of eccentric reducer is shown.

2.6 Orientation of Y Type strainers indicated on the drg.

2.7 Equipment nozzle schedule shown on drg. & Checked


with vendor drg/ data sheet

2.8 Pipes are not routed in access bays, crane/hoist


movement areas, and erection & maintenance
openings. All required access, maintenance, erection &
operation spaces eg.crane/hoist movement, Tube
bundle removal etc are marked.

2.9 Complete line designation, CL elevation, BOP, TOS,


flow arrow shown on drg.

2.10 Requirement of expansion loop, guides, anchor


support, other pipe supports, and support numbers is
checked & shown on drg along with legend.

2.11 Piping GA checked with P&ID & requirement of notes,


Insulation, slope requirements, No pocket
requirements, Spec break are checked, adhered to &
marked on the drg.

2.12 Accessibility of valves, Relief valves, bursting discs &


instruments is checked, necessary access platform,
cross overs are shown.

2.13 Have interfaces for the pipes future extension/


Equipments considered?

2.14 Hand wheel/ Gear/ Actuator orientation of valve is


shown on drg.

2.15 Electrical/ Instrument cable trenches are shown

2.16 Requirement of slopes, Insulation, shoe ht. Considered


while fixing BOP of pipes.

2.17 Column sizes & Orientation are indicated as per civil


drawing and drawn to scale.

2.18 Sleepers of Pipetrack are located & elevations are


defined. Sectional view, if required, is prepared.

2.19 Stair case landing are located, Ladders are located.

2.20 Upstream & down stream straight length requirement


of flow instruments is checked.

Rev - 0
SHEET 3 OF 3

CHECK LIST FOR PIPING GA Document No.


IOTDE-PIP-CL-002
Rev - 0
CHECK LIST YES NO N/A COMMENTS

2.21 Clearances between pipes, pipes & steel, pipes &


equipment, pipes & pedestal are checked & there is no
fouling.

2.22 Sample points & corrosion monitoring points are


located and access is provided.

2.23 Tie-ins are shown, Pre-shutdown; shut down


demarcation is shown on the drawing.

2.24 Ensure that the floor cutout information (Dia >


300mm) is passed on to Civil.