1 GENERAL

1.1 Correct drawing titles, numbers and revision

1.2 Standard Holds List and action party (in brackets)

1.3 IOTDE standard title block and Job Number

1.4 IOTDE Disclaimer description block

1.5 Original Master Drawing Number listed

1.6 Typical notes & Specific Notes included and


numbers matching

1.7 In line with Standard drawing legend

1.8 SDC comments incorporated

1.9 IDC comments incorporated

1.10 Client comments incorporated

2 PLOT PLAN

2.1 Plant North, UTM North & Prevailing Wind


direction indicated.The relative angle between the
Plant North & UTM North directions indicated.

2.2 Plant Grade level and Datum level mentioned.

2.3 Piping Study of big bore lines & Process Critical


Lines is performed.

2.4 Equipments are located (Giving all the three


dimensions).

/conversion/tmp/activity_task_scratch/651509147.doc Rev - 0
SHEET 2 OF 3

CHECK LIST FOR PLOT PLAN Document No.


IOTDE-PIP-CL-001
Rev - 0
CHECK LIST YES NO N/A COMMENTS

2.5 If Equipments are to be located in existing plant,


location is checked to avoid fouling with existing
cable trenches, equipment foundation with existing
trenches / existing foundations

2.6 Plant roads and the road width indicated.

2.7 Safety distances if any are followed as per


applicable codes/DEP’s and ERD’s.

2.8 Equipment Sizes are indicated as per data sheets/


catalogue information/ vendor drawings

2.9 Passages, Maintenance spaces of machinery, Tube


removal/cleaning spaces of heat exchangers etc.
are kept clear.

2.10 Access for erection of equipment is studied.

2.11 Is prevailing wind direction considered in relation


to location of Gas plants, Buildings, Stacks, Flares,
Oil collection systems, Air cooler banks, and area
containing H2S etc?

2.12 Has a sterile area been provided around the Flare/


Vent stack? Has the extent of sterile area
indicated?

2.13 Building/ Pipe rack Colums are located, Levels of


Floor, Piperack tier, Platforms & floor type
identified.

2.14 Have interfaces for the future extension/


Equipments considered?

2.15 Stair case landing are located, Ladders are located.

2.16 Is sunshade requirement for equipment checked?

2.17 Column sizes are indicated as per civil drawing/ In


consultation with Civil.

2.18 Have the requirement of mechanical handling


device for the maintenance of equipment
considered? (Like EOT crane for Compressor/
Pump house).

2.19 Sleepers of Pipetrack are located & elevations are


defined.

2.20 Have the fire fighting requirements been checked?

Rev – 0
SHEET 3 OF 3

CHECK LIST FOR PLOT PLAN Document No.


IOTDE-PIP-CL-001
Rev - 0
CHECK LIST YES NO N/A COMMENTS

2.21 Orientation and location of nozzles are checked for


proprietary equipments, package units.

2.22 Match line continuation drawing numbers, co-


ordinates, North direction is checked.

2.23 Locate safety shower-eye wash & utility stations if


required

2.24 All the control panels, Analyser stations, sample


points are located