1. Reference documents :
NDT procedures
Tunisian Laws and regulations:
Décret N°62-129 du 18 avril 1962,
Law n° 2009-11 dated 2 March 2009, promulgating the code of security and prevention of the
hazards of fire, explosion and panic in the buildings
loi n° 66 27 du 30/04/1966 modifié par la loin n ° 94 29 du 21/02/1994 et la loi n° 96 62 du
15/07/1996 :(1) ART 152
Loi n° 94-9 du 31 janvier 1994, relative à la responsabilité et au contrôle technique dans le
domaine de la construction
American National Standards Institute (ANSI) American
Society of Mechanical Engineers (ASME)
ANSI/ASME B16.11 Forged Fittings, Socket-Welding and Threaded
ANSI/ASME B16.20 Metallic Gaskets for Pipe Flanges - Ring joint, Spiral Wounds and
Jacketed
ANSI/ASME B16.21 Non-metallic Flat Gaskets for Pipe Flanges
ANSI/ASME B16.25 Buttwelding Ends
ASME Boiler and Pressure Vessel Code
Section V Non-destructive Examination
Section VIII Boiler and Pressure Vessels - Divisions 1 & 2
Section IX Welding and Brazing Qualifications
ASME B31.3 Chemical Plant and Petroleum Refinery Piping
ASME B31.1 Power Piping
American Petroleum Institute
API 601 Metallic Gaskets for Refinery Piping (Double Jacketed Corrugated and
Spiral Wound)
AFC Drawings
Approved WPS
2. General :
The purpose of this method statement is to ensure that the methods and procedures shall be carried
out for the fabrication of piping as per the technical/control specification.
This Standard covers the minimum requirements and acceptance criteria for:
Fabrication of piping (both in site and/or at Workshops as assemblies/sub-assemblies).
Certification and records keeping.
It is to be used together with ASME B31.3 Chemical Plant and Petroleum Refinery Piping Code, all
government statutory requirements and referenced standards.
A- GENERAL:
Ensure that key personnel involved in piping fabrication understand fully the requirement
mentioned in this procedure.
Code: DO-TEC-130Eng
PROCEDURE Revision: 02
PIPING PREFABRICATION Edition: 12/15
Page : 4/11
All storage, traceability, identification, tolerances, welding, inspection and testing shall be
carried out as stipulated within the specifications, procedures and codes.
The Engineering drawings and documents received shall be clearly understood to find out the
service, material specification, size, thickness, NDT requirements, pipe routings quantity etc.
line wise and area wise
Ensure that the documents received bear the stamp “Issued for Construction” and are of latest
revision.
Make sure that all the Quality Control and Pre – Construction formalities, approvals, and
preparations are done sufficiently in advance to start the construction activity as per the
schedule
Piping General Arrangement drawings will be provided showing equipment location and piping
configuration. These drawings shall be adhered to for the erection and installation of pipe
spools.
Fabrication of pipe spools shall be in accordance with the Piping Isometric drawings which will
be provided for all lines size DN 50 and above.
Small bore piping DN 40 and below shall be field run in accordance with the General
Arrangement drawings.
Pipe support location plans may be provided for complex piping systems but generally
pipe supports will be located on General Arrangement drawings and Isometric drawings.
Where pipe supports need to be manufactured detail drawings will be provided.
Only qualified welders that have been approved by Company shall be used for any piping
welding.
The electrodes or wire to be utilized for piping welding will be as stipulated in each W.P.S as
approved by Company.
The scope of this method statement is limited to Pre-fabrication for Carbon Steel, low
temperature carbon steel and Stainless Steel piping.
B- SAFETY:
SITE HSE INDUCTION
1) Activities on site area have to comply with Client Permit to Work Procedure and HSE procedures
2) Task Risk Assessment to be carried out in accordance to Task Risk Assessment Procedure.
All active site workers shall wear appropriate safety equipment and clothing to prevent electrocution and
burns.
3) When welding, flammable materials shall be removed from work area to avoid ignition and possibly
fire outbreak.
4) Only qualified welders, fitters and fitter mates shall be allowed to carry out welding, cutting and
grinding activities on site.
5) Welding and electrical cables shall be properly arranged to avoid damage and possible current
leakage.
Code: DO-TEC-130Eng
PROCEDURE Revision: 02
PIPING PREFABRICATION Edition: 12/15
Page : 5/11
Branch Connections:
1) Branch connection requirements shall be in accordance with Project Specifications.
2) The lateral offset of branches and connections from the centerline of run shall not exceed±
1.6mm.
3) All welded branch connection and other joints shall be full strength reinforced as indicated
on the drawings. Reinforcement material shall be made from the same pipe material as
specified by the relevant piping class and subject to the same specification requirements as
the piping to which it is attached.
4) All cuts shall be carefully beveled and accurately matched to form a suitable preparation
for welding and to permit full penetration of welds between the branch and the run pipe at all
points.
5) Details of reinforcement pad, if any, will be available on drawings provided by Client .
6) The Preheat zone shall extend at least 25mm (1in) beyond each edge of the weld. ASME
B31.3.
Flange Connections
1) Unless otherwise indicated on the drawings, the bolt holes of all flanges shall be offset to
vertical and horizontal centre lines. The maximum angular deviation of bolt holes shall not
exceed 1.5mm measured across the bolt pitch circle.
2) The flange faces shall be square to the pipeline in which they are fitted.
3) Shop fabrication of flanged spool pieces for connection to existing pipe work or equipment,
shall have the mating flange tack welded to the spool and an additional allowance of 150mm of
pipe shall also be provided for the correct field fitment.
4) The fit up of pipe ends and weld neck flanges shall be done to obtain uniform root opening.
The criteria given in related WPS shall be followed.
Cleaning of Spools
1) All pipes shall be internally cleaned by air blowing. In addition, for large diameters pipes
rag cleaning should be conducted if found practical.
Code: DO-TEC-130Eng
PROCEDURE Revision: 02
PIPING PREFABRICATION Edition: 12/15
Page : 8/11
2) All prefabricated pipe spools shall be visually inspected for cleanliness, and shall have
foreign material removed from the inside.
3) The piping ends shall be covered before and after inspection to prevent unauthorized
removal of the end cover prior to making the joint to the succeeding section of piping.
Welding
1) Welding procedures and welders shall be qualified as per Project Specifications and
relevant codes, prior to start of the welding.
2) Welding shall not be made when weather conditions are likely to impair the quality of the
weld metal or joint. In particular, welds shall not be made on surfaces which are wet due to
rain or condensation, etc. Wind shields and shelter shall be used wherever necessary.
3) Fit-up inspection shall be carried out by QC inspector.
4) Ensure that the edges are free from dirt, rust, oil, grease, paint etc.
5) Preheating, inter-pass temperature control requirements shall be followed as given in AFC
WPS.
6) For stainless steel welding back purging shall be done as given in AFC WPS. Prior to set up
all hoses and connections shall be checked for leakages. The weld groove containing the
purging gas in the chamber between the dams must be sealed from outside. All purging
materials shall be removed from pipe after welding.
7) Welding shall be done as per approved WPS for the particular piping. Preheating and
welding consumable shall be checked before starting of welding as indicated on procedure for
welding consumable control
8) Welding procedure shall be displayed at all welding stations.
9) Arc strikes shall be avoided, and if found shall be repaired and examined with either liquid
penetrant test or magneto test.
10) During welding, sections of pipe shall be adequately supported so that joints are relieved
of unnecessary stresses.
11) Each weld layer shall be cleaned before starting to weld next layer. The cleaned area
shall be free from slags.
12) All welds shall be visually examined externally for faults and irregularities. Any visual
defects like cracks, pores, spatters weld shall be removed by grinding before the next layer is
applied. The ends of weld layer shall be removed by grinding attack points of each weld.
Any possible weld excess layer to be removed by grinding.
13) Appearance of finished weld shall be as even as possible and free from spatter, under
cutting, cracks, excess reinforcement etc.
14) After welding, all flange faces shall be cleaned of weld spatter, arc strike or any other
defects or damage.
15) All welding shall be supervised and records maintained to ensure that each weld can be
subsequently identified with the individual welder concerned, the weld procedure used, and
electrodes used.
16) Welding record shall be maintained with proper identification of joint, welder etc. for all
joints and welding summary register should be updated.
Code: DO-TEC-130Eng
PROCEDURE Revision: 02
PIPING PREFABRICATION Edition: 12/15
Page : 9/11
17) Joint details like line number, joint number, welder ID, date of welding.
18) All welded joints shall be checked visually in daily basis. Only accepted joints shall be
reported on the daily welding report. In case there is any defect, repair shall be done in the
same day.
19) Welding repair shall be performed by qualified Welders and according to an approved
welding repair procedures.
Passivation
All stainless steel joints to be treated by passivation.
Temporary Attachments
Piping fabrication shall be achieved by use of clamps, jigs, fixtures, without welding to the pipe
or fitting.
Initial fitting up can be achieved using temporary bridge tacks across the groove
Heat Treatment
Pipe Heat Treatment shall be performed in accordance with the approved procedure for post
welding heat treatment
Inspection will be done in accordance with the Company specification and the approved quality
control plan for piping pre-fabrication
Daily welding reports to be prepared after performing a visual inspection for the joints weld
done. This report include details of isometric number, joint weld number and sizes, welders
stamp, material heat number and base material. Visual inspection report and NDT reports to
be issued on daily basis for CLIENT and Company review and approval.
Welding summary register to be shared with CLIENT , on weekly basis, for review
and to be registered into Aconex on weekly basis.
Weekly Inspection Plan to be shared to CLIENT on weekly basis. For Visual and RT
inspections, notification to be provided on weekly basis.
Welder performance shall be monitored for RT repairs, RT Progress and welder performance
on weekly basis and information shall be shared with CLIENT.
Code: DO-TEC-130Eng
PROCEDURE Revision: 02
PIPING PREFABRICATION Edition: 12/15
Page : 11/11
Penalty shots for RT repairs shall be taken within a week. A separate tracking register shall be
maintained for welds RT repairs and penalty for the entire project.