0% found this document useful (0 votes)
976 views1 page

Painting Inspection Report Template

This document is a standard inspection format for painting at a site. It includes sections to record environmental conditions, surface preparation details, coating material information, application details, and inspection results. Inspectors can use this form to document the painting process and ensure specifications are met.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
976 views1 page

Painting Inspection Report Template

This document is a standard inspection format for painting at a site. It includes sections to record environmental conditions, surface preparation details, coating material information, application details, and inspection results. Inspectors can use this form to document the painting process and ensure specifications are met.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Surface Preparation and Coating Inspection Form: This form outlines the essential details for conducting a standard inspection of surface preparation and coating application on site, including project information, environmental conditions, inspection results, and approval signatures.

SPECIFICATION NUMBER

STANDARD INSPECTION FORMAT FOR


Aker Powergas PAINTING AT SITE
ANNEXURE - 6 TO DOC.
NO. 1922-403-00-0306-A4-
Pvt. Ltd. 001
CLIENT :- IG PETROCHEMICALS LTD. SHEET NO. 1 OF 1
SURFACE PREPARATION AND COATING INSPECTION FORM

REPORT NO. : DATE :


PROJECT : IGPL PA-IV/MA-4 Project DAY :
SUBCONTRACTOR : SHIFT :
EQUIPMENT AREA : INSPECTOR :
SUBSTRATE : COATING SPEC. NO./ REV :
ENVIRONMENTAL CONDITIONS :
COATING WORK ACTIVITY
TIME
o
DRY BULB TEMP. C
WET BULB TEMP. oC
RELATIVE HUMIDITY %
o
DEW POINT C
SURFACE TEMP. oC
BLOTTER TEST
PRE-SURFACE PREPARATION :
SP - 1 : MASKING/ PROTECTION :
SURFACE DEFECTS :
SURFACE PREPARATION
METHOD :
ABRASIVE TYPE/ SIZE/ STORAGE :
CLEANLINESS SPEC. : ACTUAL :
PROFILE SPEC. : ACTUAL :
EQUIPMENT :
COATING MATERIALS AND MIXING
PRODUCT(S) :
BATCH NO(S)/ QUANTITIES/ EXPIRATION DATE :
THINNERS/ BATCH NO(S) THINNING RATION :
STORAGE :
MIXING : INDUCTION TIME :
MATERIAL TEMPERATURE : PLOT LIE EXPIRATION TIME :
COATING/ LINING APPLICATION : START TIME : FINISH TIME :
COAT : PRIMER / PRIMER T U / SECOND / SECOND T U / THIRD / THIRD T U / OTHER
METHOD : WFT. :
RECOAT TIME/ TEMP. CURE TIME/ TEMP. :
EQUIPMENT :
APPLIED COATING
VISUAL INSPECTION (FILM IMPERFECTIONS) :
DRY FILM THICKNESS : SPEC. : ACTUAL : METHOD :
HOLIDAY TEST : METHOD :
OTHER TEST : METHOD :
TOUCH UP AND REPAIR : METHOD :

COMMENTS INSPECTOR'S SIGNATURE :

SHEET NO.
1 OF 1
REPORT NO. :
DATE :
PROJECT :
IGPL PA-IV/MA-4 Project
DAY :
SUBCONTRACTOR :
SHIFT :
EQUIPMENT AREA :
INSPECT

You might also like