SPECIFICATION NUMBER
STANDARD INSPECTION FORMAT FOR
Aker Powergas PAINTING AT SITE
ANNEXURE - 6 TO DOC.
NO. 1922-403-00-0306-A4-
Pvt. Ltd. 001
CLIENT :- IG PETROCHEMICALS LTD. SHEET NO. 1 OF 1
SURFACE PREPARATION AND COATING INSPECTION FORM
REPORT NO. : DATE :
PROJECT : IGPL PA-IV/MA-4 Project DAY :
SUBCONTRACTOR : SHIFT :
EQUIPMENT AREA : INSPECTOR :
SUBSTRATE : COATING SPEC. NO./ REV :
ENVIRONMENTAL CONDITIONS :
COATING WORK ACTIVITY
TIME
o
DRY BULB TEMP. C
WET BULB TEMP. oC
RELATIVE HUMIDITY %
o
DEW POINT C
SURFACE TEMP. oC
BLOTTER TEST
PRE-SURFACE PREPARATION :
SP - 1 : MASKING/ PROTECTION :
SURFACE DEFECTS :
SURFACE PREPARATION
METHOD :
ABRASIVE TYPE/ SIZE/ STORAGE :
CLEANLINESS SPEC. : ACTUAL :
PROFILE SPEC. : ACTUAL :
EQUIPMENT :
COATING MATERIALS AND MIXING
PRODUCT(S) :
BATCH NO(S)/ QUANTITIES/ EXPIRATION DATE :
THINNERS/ BATCH NO(S) THINNING RATION :
STORAGE :
MIXING : INDUCTION TIME :
MATERIAL TEMPERATURE : PLOT LIE EXPIRATION TIME :
COATING/ LINING APPLICATION : START TIME : FINISH TIME :
COAT : PRIMER / PRIMER T U / SECOND / SECOND T U / THIRD / THIRD T U / OTHER
METHOD : WFT. :
RECOAT TIME/ TEMP. CURE TIME/ TEMP. :
EQUIPMENT :
APPLIED COATING
VISUAL INSPECTION (FILM IMPERFECTIONS) :
DRY FILM THICKNESS : SPEC. : ACTUAL : METHOD :
HOLIDAY TEST : METHOD :
OTHER TEST : METHOD :
TOUCH UP AND REPAIR : METHOD :
COMMENTS INSPECTOR'S SIGNATURE :