You are on page 1of 10

Summary Daily Activity On August 2016

Friday, 19 August 2016


Crew Change
No. Sign Of Rank
1 Boy R. Togas Master
1 Received Food Stuf
2 Received Material Hand Carry By Mr. Cahyo M
1 Senter QINSUN ELM 630 for Gangway Ladder 2 Pcs
2 Lifeboy Light 4 Pcs
3 Solder Uap ( SMD Rework Station ) 1 Set
For Test Heat Detector
3 Visit Staf Management / Mr. Cahyo For Annual Inspection Preparation
Saturday, 20 August 2016
1 Workplace Inspection Minggu ke -3 Production Equipment at Main Deck
2 Closing Out Updated untuk Finding SKK Migas & Carsurin
Untuk FWT, Planning penempatan Fiber Penampungan di Wing Bridge P/S
Dan rencana penggantian jalur pipa air tawar dari E/R ke akomodasi.
Sunday, 21 August 2016
1 Safety Meeting
2 Review WPI
3 Boat Drill
4 Regular Meeting ke SG 101 / Perwakilan Deck & Engine
5 Pembagian Hadiah Lomba 17 Agustus
Monday, 22 August 2016
1 Cleaning WBT for Annual Inspection preparation
2 Pemasangan Tandon FW di Compass Deck / Cap.1800 Ltr.
Tuesday, 23 August 2016
1 Updated persiapan utk Class Survey ;
- Pengetesan utk semua system alarm serta Detector di Deck & Engine.
Wednesday, 24 August 2016
1 Routine maintenance Deck & Engine
Thursday, 25 August 2016
1 Perbaikan pada Selenoid Valve Hydraulic pada Control Box 1 & 3 di Main Deck
2 Check Sensor Gas Detector di AC Room , control Panel beradi di CCR.
Friday, 26 August 2016
Crew Change
No. Sign On Rank Sign Of
1 BAYU S OS
2 BINSAR B 3E LILIK W
1 Crew Change & Received Material
2 Pak Cahyo Of, Re-schedulle NK Surveyor Unfit MCU
3 Melanjutkan Bersihkan WBT & Pumping out use Widen Pump.
4 Instalasi Jalur Pipa FW untuk Tandon di Compass deck.
Saturday, 27 August 2016
1 Progress Pumping Out sisa air pada WBT untuk persiapan NK Inspection.
2 Mengganti Steam Valve utk Slop Tank
Sunday, 28 August 2016
1 Safety Meeting
2 Review WPI
3 Boat Drill
4 Regular Meeting ke SG 101 / Perwakilan Deck & Engine
Monday, 29 August 2016
1 Routine maintenance Deck & Engine
Tuesday, 30 August 2016
1 Progress Persiapkan WBT untuk di inspeksi.
2 Lifting material Sea Good
3 Maintenance stripping pump
4 Closing action tracker work place inspection & hazard card report
5 Continued Install PVC pipe for fresh water tank on the bridge
6 Continued fabrication cradle for tendon fresh water
Wednesday, 31 August 2016
1. Assist transferred Santos Rep
2. Assist transferred PEST Control by SKK MIGAS
3. Assist transferred Nalco personnel
4. Marking label on deck
5. Chipping & brushing main deck 7 port side area
6. Continued maintenance stripping pump
7. Closing action tracker work place inspection & hazard card report
8. House keeping

1. Maintenance of RO No.2
2. Continued Install PVC pipe for fresh water tank
3. Continued fabrication cradle for tendon fresh water
4. Maintenance of air Conditioner accommodation & provision condenser
5. Fabrication sea water pipe line for RO No.2
Summary Daily Activity On September 2016

Thursday, 1 September 2016


1 Normal Deck's maintenance
2 Continued maintenance of RO No.2
3 Continued maintenance of air Conditioner accommodation & provision condenser
Friday, 2 September 2016
1 Normal Deck's maintenance
2 Cleaning main deck port side area by fresh water
3 Transferred materials / food stuff from KST.51
4 Overhaul of S.W booster pump for R.O spare
Saturday, 3 September 2016
1 Weekly test LSA and FFA equipment
2 Cleaning main deck starboard side area by fresh water
3 Closing hazard card report
4 Continued install PVC pipe for tandem fresh water tank
5 Changed sea water booster pump for RO No.1 with spare
6 Tested running all of emergency safety device
Sunday, 4 September 2016
1 EHS and Security re induction to all crews
2 Review the workplace inspection & Hazard card report
3 Machinery space incident drill
4 Weekly meeting at Sea Good 101
Monday, 5 September 2016
1 Changed new nitrogen bottle for SDV system
2 Installed lifeboat remote control wire release
3 Lifted MALEO materials
4 Continued take in place & final check of PVC pipe line on deck
Tuesday, 6 September 2016
1 Normal Deck's maintenance
2 Check & maintenance toxic pump room alarm
3 Repaired of electric control panel for RO No.2
4 Fabrication of cover steel plate for fresh water jet pump
Wednesday, 7 September 2016
1 NK Surveyor (Sudarsono & Cahyo ) On Board
2 General Inspection for Deck & Engine
Deck
- Tour on deck and test Fire Hose & Monitor ( 3 Fire Hose + 1 Monitor )
use GS Pump & Emergency Fire Piump.
- Test High High Level Alarm & Mid Derrick & Provision Crane.
- Test Eductor System in Forcastle store deck.
- Test Gas Detector & Bilge Alarm di P/R
- Test Emergency Generator & Emergency Stop Cargo Pump
Engine
- Test Quick Closing Valve
- Emergency stop general system
- Test Safety device Boiler
- Test Low level Alarm Generator Engine
- Test Bilges E/R
Result :
Tidak ada Rekomendasi / Hanya Catatan adanya rembesan Oli pada bagian atas Mid Crane,
yang keesokan harinya sdh di lakukan perbaikan.
Thursday, 8 September 2016
1 Contuinued NK Inpection for all WBT Port & Starboard and APT, kecuali FPT
2 Aktivitas WBT Inspeksi selesai jam 16.00.
3 Endorse utk Certificate dibuat tgl 7 sept. Al;
- International Load Line Cert.
- Class Cert.
- Gear Book untuk Lifting Gear.
Friday, 9 September 2016
Crew Change
No. Sign On Rank Sign Of
1 ELIK B FITTER ALFIAN
2 DEDI B.W OS UDYANTO
1 NK Surveyor & Pa Cahyo Of.
2 Kondisi Rubber Packing utk cover WBT, hampir semuanya robek, dan rencana permintaan utk jenis
tevlon putih. (Next Request next Monthly Req.Nov.16)
Saturday, 10 September 2016
1 Workplace Inspection Minggu ke -3 Production Equipment at Main Deck
2 Weekly test LSA and FFA equipment
3 Collected garbage in to container
4 Workplace inspection
5 Check & test running of emergency Safety equipment
6 Normal maintenance at Main Deck
Sunday, 11 September 2016
1 EHS and Security re induction to all crews
2 Review the workplace inspection & Hazard card report
3 Chemical Handling Review Drill
4 Weekly meeting at Sea Good 101
Monday, 12 September 2016
1 Hari Raya Idhul Adha
2 Moslem Crews Sholat Ied, dgn Ustad Dari darat.
3 Makan Bersama Perayaan Idhul Adha
Tuesday, 13 September 2016
1 Fabrication of FW pipe line to deck
2 Continued overhaul of main air compressor No.1
Wednesday, 14 September 2016
Crew Change
No. Sign On Rank Sign Of
1 DENNY D C.OFF
2 AGUNG R 1/E
3 CENG UMAR 2.OFF ANDI. A.U
4 BOBY M. STWD H.SULE T.

1 Warming up of Aux boiler for internal cargo transfer


2 Internal Cargo transferred COT 6C to COT 7C & 5C
3 Continued fabrication of FW pipe line to deck
4 Checked condition AC by knocking noice & renew oil compressor
Thursday, 15 September 2016
1 Normal Maintenance Deck & Engine
Friday, 16 September 2016
Crew Change
No. Sign On Rank Sign Of
1 DENNY D C.OFF
2 AGUNG R 1/E
3 CENG UMAR 2.OFF ANDI. A.U
4 BOBY M. STWD H.SULE T.
1 Normal maintenance Deck
2 Repair of air regulator pressure V/V for E/R service air line
3 Repair of thermo indicator V/V for ballast No.3
4 Replaced the booster pump RO No.2 with spare
5 Renewed 3 pipes fine filter drain V/V for RO No.1
Saturday, 17 September 2016
1 Reinstalled liferaft No.1 to stb cradle
2 Tested hydraulic valve system in CCR console
3 Weekly tested LSA/FFA and Gmdss equipment
4 Workplace inspection
5 Overhauled RO booster pump for spare
6 Weekly checked & running tested all safety device/machinery
Sunday, 18 September 2016
1 Berita Duka Meninggalnya Istri Pak Suaeb.
Special Trip - Ijin pulang.
2 EHS reinduction to all crew
3 Review the workplace inspection
4 Table top drill and video learn about " First Aid Injury "
5 Weekly EHS meeting at Sea Good 101
6 Received bunker HSD 50,000 ltr from Tegap Jaya
Monday, 19 September 2016
1 Corrective action for the workplace inspection in pump room
2 Changed booster pump of RO no.2
3 Put in gland packing of steam inlet V/V for WBTP
4 Checked and tagged all electrical equipment in accommodation
5 Checked / cleaned the main burner & automizer the auxiliary boiler
Tuesday, 20 September 2016
1 Assisted Engine Dept. to repair leakage operating handle fwd mooring winch spring
2 Corrective action for the workplace inspection in pump room
3 Overhauled the spare RO booster pump
4 Continued repaired leakage FW cooling pipe of M.A.C No.2
5 Checked and repaired hydraulic handle fwd mooring winch spring
Wednesday, 21 September 2016
1 Lifted and secured the end of export hose at port manifold area
2 Continued overhauled the spare RO booster pump
3 Continued repaired leakage FW cooling pipe of M.A.C No.2
4 Renewed compressor oil & cleaned condenser prov ref machine No.2
Thursday, 22 September 2016
1 Checked and renewed shackle the export hose chain and floating buoy connection
and released the export hose to sea buoy assisted by KST 51
2 Continued repaired leakage FW cooling pipe of M.A.C No.2
3 Running tested A/E No.2
4 Cleaned of S.W side tube for vacuum condenser
5 Assemble of booster PP for RO spare 1 set
Friday, 23 September 2016
1 Continued final coating pump room wall at bottom floor area
2 Continued cleaned S.W side tube for vacuum condenser
3 Repaired high pressure pump, cleaned membrane & changed filter 10u & 3u for RO No.2
4 Overhaul fresh water pump for A/E No.1
Saturday, 24 September 2016
1 Weekly tested LSA/FFA and Gmdss equipment
2 Final coating pump room wall at 3rd floor area
3 Tested High-High Level COT , Pump room bilge alarm and fire alarm
4 Continued overhaul FW cooling for A/E & checked driving gear
5 Continued replacement fine filter 10u & 3u for RO No.1
6 Transferred E/R garbage to deck container on lay down
7 Weekly checked & running tested all safety device/machinery
Sunday, 25 September 2016
1 EHS reinduction to all crew
2 Review the workplace inspection
3 Table top drill and video learn about " Fire extinguisher familirization "
4 Weekly EHS meeting at Sea Good 101
Monday, 26 September 2016
1 Transferred condensate oil ex. Maleo to COT 5C
2 Repaired booster pipe RO No.2
- Changed with new spare ( 1 set )
Tuesday, 27 September 2016
1 Repaired wall at gymnasium room
2 Repaired water drain at provision store entrance floor
3 Repaired leakage FW pipe at deck A locker
4 Repaired flushing tank , closet seat , cleaned up & painting common WC in upper
deck acc.
1. Cleaned flow meter SW & FW line for RO No.1
2. Cranked deflection of A/E No.3
Wednesday, 28 September 2016
1 Normal Maintenance
2 Continued cleaned & painted :
- Cyl. Head main engine
- Full injection PP
- Turbo charge
3 Fabricated the sea water inlet pipe for RO No.1
Thursday, 29 September 2016
1 Normal Maintenance
2 Continued fabrication SW inlet pipe for RO No.1
3 Checked & cleaned all magnetic contactor on boiler panel
Friday, 30 September 2016
1 Final coating pump room 3rd floor area
2 Continued maintenance spare Cyl. Head for A/E
- Lapped cyl. Head exhaust & intake V/V
3 Installed flow meter for supply FW to support vessel at poop deck
4 Checked & alignment blower fan bearing for AC accommondation
- Renewed V-Belt 3 pcs
Summary Daily Activity On November 2016

Saturday, 1 October 2016


1 Weekly tested LSA/FFA and GMDSS equipment
2 Final coating pump room bottom floor
3 Repaired No.5 cyl. inlet V/V guide for A/E No.2
4 Weekly tested safety device & emergency machineries
5 Repaired air service V/V in steering gear room
6 Replaced fine filter 10u for RO No.2
Sunday, 2 October 2016
1 EHS reinduction to all crew
2 Review the workplace inspection and observation cards report
3 Table top drill and video learn about " Main deck incident drill "
4 Weekly meeting at Sea Good 101
Monday, 3 October 2016
1 Checked / repaired hydraulic valve 03CO/04CO
2 Maintenance and running tested A/E No.2
3 Replaced fine filter 3u & 10u for RO No.1
Tuesday, 4 October 2016
1 Internal cargo transferred
2 Ballasted / deballasted WBT
3 Tested heating coil and steam valve for COT
4 Fabricated FW support on the top deck
5 Fabricated cover plate for air pipe vent No.2 FOT Port
6 Running up Aux. Boiler for internal transferred
7 Fabricated strainer cover plate for wastefel in E/R
Wednesday, 5 October 2016
Crew Change
No. Sign On Rank Sign Of
1 IHSANUDIN 3/OFF INDRA
2 UDIYANTO OS ANTONY
ELIK B FITTER
Remark : 23 Sep - 5 Oct. Elik B request for Temporary Off for attending his daughter Graduation
1 Internal cargo transferred
2 Ballasted WBT
3 Overhauled / replaced diaphragm wilden pump in pump room
4 Transferred support braket for fw tank to top deck accommodation
5 Replaced fine filter RO No.2
Thursday, 6 October 2016
1 Repaired leakage handle at forward mooring winch
2 Checked and rapaired FO 3 way valve Aux.Boiler
3 Cleaned LO cooller sea water tubes COPT and WBPT
4 Checked and cleaned main sea water pipe inlet to COPT LO cooler
5 Replaced alternator air filter A/E No.1 and 3
Friday, 7 October 2016
Crew Change
No. Sign On Rank Sign Of
1 HASAN C/CK MASRUDI
2 R. RISWANTO AB A.N HUDA
3 ALFIAN FITTER SAEFUL IMAM
4 HAEROJI MTM M. ADAM
1 Checked and repaired wilden pump
2 Tested handle at forward mooring winch
3 Cleaned vacum condenser sea water side tube
4 Maintenance Aux.Boiler and checked of furnace chamber
5 Cleaned membran RO No.1
6 Charged freon R.22 for AC accommodation and checked for leakage
7 Cleaned condenser sea water side tube AC accommodation
8 Renewed HP pump water seal HS RO No.1
Saturday, 8 October 2016
1 Installed additional fresh water line in Deck B toilet
2 Weekly tested Lifeboat engine and emergency fire pump
3 Installed fresh water service tank on compass deck
4 Workplace inspection in engine room
Sunday, 9 October 2016
1 Assist transferred SPJ personnel
2 EHS and Security reinduction to all crew
3 Review the workplace inspection and SPKK
4 Abandon ship drill and safety meeting
Monday, 10 October 2016
1 Assist transferred Santos and contractor personnel
2 Lifted , cleaned up and pressure tested the export hose
3 Painted poop deck area
4 Marked label in pump room
5 Assisted Seagood personnel during check the RO boom equipments
6 Repaired sunrod pipe boiler
7 Replaced fine filter RO No.1 and 2
8 Checked and tested deflection crank shaft A/E No.2
9 Changed booster pump RO No.1 with old spare 1 set
Tuesday, 11 October 2016
Cleaned barnacles , painting and released the export hose to the sea bouy assissted by KST 51
Debottoming PW from COT 7C to Slop Tk
Cleaned furnice chamber for boiler and assembled the main burner
Checked deflection crank shaft A/E No.2
Cleaned sea water inlet pipe RO No.1
Cleaned fresh water and LO cooler for main engine
Fabricated sea water pipe inlet RO No.1
Cleaned scupper plate for main air compressor No.1
Wednesday, 12 October 2016
Crew Change
No. Sign On Rank Sign Of
1 BOY R. TOGAS MASTER
2 MARTHEN K C/E
3 SAHONO MTM SUAEB
4 SUGENG BUDI P.2ND/CK ROCHIM
5 A. AFANDI BOSUN AANG
1 Normal Deck's Maintenance
2 Checked and cleaned sea water inlet pipe RO No.1 and 2 fabricate if needed
3 Weld repair of HP pump reducing pipe outlet RO No.2
4 Replaced electric cable power mooring deck ligth
5 Cleaned and painted quick closing valve stb FO tank No.2
Thursday, 13 October 2016