TECHNICAL REPORT

OPERATIONS DEPARTMENT
ACCOMPLISHMENTS

 Provision for Security office – DONE

 Clearing and deep cleaning of all electrical rooms – CONTINUOUS

 Materials Recovery Facility – DONE

 Provision for housekeeping storage under the escalator – DONE

 Preventive maintenance of all gensets and Auto Transfer Switches with components – Proposal signed
PROVISION FOR SECURITY OFFICE
CLEARING AND DEEP CLEANING OF EE
ROOMS
MATERIALS RECOVERY FACILITY
PROVISION FOR HOUSEKEEPING STORAGE
UNDER ESCALATOR
PENDING PROJECTS
SAINT FRANCIS STORAGE AREA, LITENG
 Minor renovation – lack of manpower

REPAINTING OF CEILING AND WALLS AT GERMANY 1 AND 2 – 95% DONE

PIPING OF NEW SET OF STORAGE TANKS – 95% DONE

INSTALLATION OF STAIR NOSING FOR BRIDGES – 90% DONE

REPLACEMENT OF PRESSURE TANK AT CLERGY HOUSE – LOAKAN – 80% DONE

PAINTING OF TRUSSES OF CANOPY AT PNB

INSTALLATION OF WATER LINE FROM BWD TO CISTERN TANK 2


UPCOMING PROJECTS
 Replacement of oil pump of PVM genset (blue)
 Ceiling and Lights Facelift - Outsource Interior Designer
 Power House enclosure
 Hazardous Waste hauling
 Upgrade, repair, installation of additional CCTV
 FDAS or Fire Detection Alarm System - Timeline: May 2024
 FPSS or Fire Protection Sprinkler System - Timeline: May 2024
 Interior Facelift and Repainting at Antipolo building – Outsource
UPCOMING PROJECTS

PUSO NG BAGUIO
 Ceiling Restoration
 FPSS or Fire Protection Alarm System – food-strip, 3 rd and 4th floor
 Water Proofing of Brick Wall
 Installation of LPG-Auto Detection and Alarm System c/o Fiesta Gas
PREVENTIVE MAINTENANCE

1. Escalators - every 2 months

2. Elevator - every 2 months

3. Generator set - Annually (waiting for the oil pump


for genset 2 PVM, blue)

4. Air conditioning units - Quarterly

5. Kitchen Ducts and Blowers - Quarterly

6. Exhaust and Fresh Air Ducts and Blowers - Annually

7. Electrical equipment - Annually