C&I MAINTNENANCE FOR JULY MONTH

• Maintenance activities High light ( Achievement)

Highlights
BTG Area

• Unit#1 running on CMC


• Gravimetric Feeder Current feedback commissioned in Unit#2
• 1BPE1 Hydraulic Servo cleaning done
• TDBFP 2A Main Control valve I/H calibration done
• Howell Makeup flow transmitter Calibration Done
• 14/16 Gravimetric Feeder calibration done
• All Ignitor/Scanner cleaning
• All DPU Upload/backup taken
• Historian Back up taken
• Fast Opening Device for HP Bypass taken in Service Unit#2
• CEMS calibration Done
• Interlock Protection Checking and protocol signing under progress
• LVS alarm Checking under progress
  1
C&I MAINTNENANCE FOR JULY MONTH

PM Compliance:

• BTG - 99%

2
C&I MAINTNENANCE FOR JULY MONTH

Maintenance activities low light


BTG AREA
• CEMS System Not Giving Correct Readings
• CW Discharge Valves Second position feedback not Commissioned
• CW pump house dewatering pump not commissioned
• Approaches & Platforms not yet made for Scanners.
• Hpbypass Servo required

3
C&I MAINTNENANCE
Way forward ( What is planned in forth coming days ) –
with tentative target

Sr.
No. Equipment Description Why Required Tentative Plan
Service Air Ignitor cooling air line To stop 1 SAC, Optimization of
1 Compressor modification Service air,APC 3 months
Centrifuge oil Commissioning from Remote
2 pump (CCR) Local to remote/Cost Control 2 months
To meet out emergency
3 ACDB/DCDB Loop checking and tagging requirment Shutdown-10Days
to meet out Emergency
4 Unit Control Panel equipment trial from UCP requirement Shutdown-10Days

5 CMC Tunning of all Auto Loops Smooth Operation Two Months

4
C&I MAINTNENANCE
Spares requirement – High light

BTG AREA

• Lube oil Temperature control valve Card assembly


• TDBFP Centrifuge Controller Module
• Unit-2 FG-3 lame Scanner Spare Cable
• Hydrogen Dew point Sensor and Filter
• Auma and Rotork spares to attend defects
• HT Oxygen Analyzer Controller – Seco
• Generator Conductivity Analyzer Controller - Yokogawa

5
C&I MAINTNENANCE
Area Of Concern

Heat Rate Improvement


Aux Power Consumption Monitoring
Approaches or Platforms

You might also like