COMMISSIONING PROCEDURE
For
0 2016-8-1 Li Bin Hu Zhangwei Pu Xiaoqin Guo Baodong
Construction
OWNER
VIETNAM ELECTRICITY
THERMAL POWER PROJECT MANAGEMENT BOARD 3
CONSULTANT
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3
CONTRACTOR
THE CONSORTIUM OF CHENGDA-DEC-SWEPDI-ZEPC
SUBCONTRACTOR
THE COMMISSIONING & TEST INSTITUTE OF SICHUAN ELECTRIC
SECTI POWER INDUSTRY
CONTRACT No.
PROJECT DUYEN HAI 3 THERMAL POWER PROJECT
DH3-05082011
Contents
1. Objective of commissioning...................................................................................................... 3
2. Content of Commissioning........................................................................................................ 3
3. Compilation Basis ..................................................................................................................... 3
4. Tools and Instruments ............................................................................................................... 3
5. Conditions to be met prior to Commissioning .......................................................................... 3
6. Commissioning Procedure ........................................................................................................ 4
7. Safety measures ......................................................................................................................... 5
CHENGDA-DEC-SWEPDI-ZEPC
1. Objective of commissioning
The commissioning is intended to check the adaptability of the unit and its coordination
control system on load change.
2. Content of Commissioning
3. Compilation Basis
N/A
6. Commissioning Procedure
7. Safety measures