Sl No Description Remarx
Control and Instrumentation
1 HMI Upgradation in Stage-1 Units 1
2 ASLD Installation in St-1 Units
3 Total Battery Set replacement in Unit-1 UPS
4 Static Weighbridge commissioning for Rail loading facility of Ash
5 Security CCTV system Installation and commissioning
6 CHP CCTV system augmentation for St-1
7 Smart positioner installtion for critical drives in TG and SG area in St-1
Conversion of critical switches used in Unit Protections in SG and TG to
8 Transmitters in St-1 Units
Sea Water Pump House conversion of PLC to Emerson DCS and transmission
9 of Data to Main plant Control room
10 AGC Pilot project implentation
11 APC for St-1 & 2 Units proposal award link to digitalisation
Improvements in CLCS- Sliding pressure control, St-1 Burner Tilt auto
12 operation, Auto control for DSM management link to digitalisation
13 System fault diagnostics - automatic alert transmission
Electrical Maintenance
1 Replacement of All HT switchgear Numerical relays
2 Replacement of 33kV lines of Sweet Water Pump House
3 Unit 1 GRP Panel Replacement
4 Automatic Generation Control (AGC) for Stg. II
5 Line Diffl. Protection (LDP)Relay replacement for 5 lines
Mechanical Maintenance Department
1 Unit 4 Duct louvers replacement
2 HFO to LDO Conversion
3 Unit 4 ., all APH Baskets replacemnt
Coal Handling Department
1
2
3
Business Excellence Department
1 Improving Visual Management of Plant including Night Path Direction