You are on page 1of 1

Drawing No: TP-0-BE-EG-73-006 Rev-B Name: EDG Sizing

Comments: 1. Worst case of Unit 3 &4 Due to BUS Fault or 400KV Block out and Unit 1& 2 is running. a) Fire alarm activated at GSU or Boiler side in unit 3 or 4. b) Failure to start diesel fire pump , We Cannot extinguish the flame. c) Unit 1 or 2 (CB-12 ) Switch gears to be shut down for fire water pump. d) But in the Unit-1 UAT sizing calculation Fire pump is not considered. Therefore Fire Pump has to be taken to account and may be considered in Power flow studies. 2. As per ETAP Report Page no-35 in Branch loading summary report -3 transformers Inputs are Overloaded .UAT-(1-EA-ET-001 (105.1%), 1-ESK-ET-003 (100.7) and T1-(103%) This is for Information Only 3. Motor capacity wise LRC (Locked rotor current) details may be updated on the details. 4. HV and MV Circuit Breaker rating interrupt report shall be affirmed. 5)7.5% Impedance tolerance taken for this calculation form IEEE-141-1993 Chapter-10 Page 516 Even though we may consider IEC -60076-1-9 (3) -10% for GSU&All service Transformers . The generator shall be considered - 15%. (However the tolerance of 7.5% will recover the healthy systems) 6. Fire pump motor acceleration study shall be added. Common Note: In 400KV Block Out Condition: The normally fire deluge valve is operating of water and air pressure. In case low pressure (long time 400KV Block out condition) of Service air and failure of the deluge air check valve (Non Return valve) at UAT/GSU/ECB/STG/Boiler ( any one ) place, deluge valve will open and Fire signal will trip to HV breaker and it will block to breaker closing until you normalize the systems. (Note: Failure of Deluge check value may happen as frequently)

You might also like