N NOTATIONS

W E : CENTRE POINT

EL. : ELEVATIONS
: NORTH

AREA LIMIT
N.
S
W. : WEST
E. : EAST
S. : SOUTH

EQUIPMENT LOCATIONS

NO. EQUIPMENT CODE LOCATIONS FROM CENTRE POINT

1 T-82501 S. : 36'1'' W. : 6'6''


2 T-82502 S. : 16'4'' W. : 29'6''
3 P-82501 E. : 9'9'' W. : 24'7''
6.0

2.0
4 P-82502 N. : 16'4'' W. : 24'7''
5 E-82501 E. : 13'1'' W. : 37'8''
E-82501 P-82501
6 E-82502 N. : 22'11'' W. : 37'8''
AREA LIMIT

7 V-82501 N. : 3'3'' W. : 29'6''

8 V-82505 N. : 3'3'' W. : 9'10''

V-82501 V-82505
10.0

6.0

6.0

2.5
T-82502
6.0

6.5
P-82502

E-82502 Note : All Dimension in Millimetres


T-82501
7.0 PIPING ENGINEERING STUDY PROGRAM
13.0 DEPARTMENT OF MARINE ENGINEERING
PPNS Politeknik
Perkapalan
Negeri Surabaya SHIPBUILDING INSTITUTE OF POLYTECHNICS SURABAYA

PLOT PLAN
Prepared by : Date :

GEMAH ZENTRINDA ADAM


DESULPHURIZATION Checked by : Date :

AND SULPHUR
RECOVERY Approved by : Date :

Date Issued : Scale : Series : No Rev : Date :