PROJECT DETAILS
1. PROJECT GCA : 18,866 Hectares
2. Water required : 62.88 MCM
3. Captive Rivers : AGNI RIVER – 3
AGNI RIVER – 5
AGNI RIVER - 6

4. WATER RESOURCE AVAILABILITY :


a. RIVER SOURCE :

CATCMENT Area Yield Factor


TITLE Capacity in MCM
Sq km
Agni river -3 61 0.27 16.47
Agni River – 5 104 0.27 28.08
Agni River - 6 81 0.27 21.87
Total 66.42
Usable 66.42

b. LAKE SOURCE :
Area
TITLE Capacity in MCM
Sq km
K3-ST1* 1,77,131 0.88
Total 0.88
Usable 80% of Total 0.88
K3-ST1 - Stands for Khalwa Three-Storage Tank One.

5. KHALWA – THREE RESERVOIRS :

TITLE Area (Sq m) Capacity in MCM


K3-R1 276656 1.07
K3-R2 801650 4.00
K3-R3 907703 4.53
K3-R4 1061675 5.30
TOTAL 14.90
6. PROPOSED RESERVOIR LOCATIONS :
a. RESERVOIR NO 1 :
Location Co-ordinates Area (Ha) Submergence Area (Ha)
210 47’59.10” N 27.7 27.7
760 34’24.67” E

b. RESERVOIR No 2 :
Location Co-ordinates Area (Ha) Submergence Area (Ha)
210 50’49.71” N 80.2 80.2
760 33’51.99” E
c. RESERVOIR No 3 :
Location Co-ordinates Area (Ha) Submergence Area (Ha)
210 47’32.22” N 90.8 90.8
760 35’52.00” E

d. RESERVOIR NO 4 :
Location Co-ordinates Area (Ha) Submergence Area (Ha)
210 45’28.06” N 106 106
760 35’59.84” E
10. ADDITIONAL REQUIREMENTS :
a. Water Source :
I. Required : 62.88 MCM
II. Available : 66.42 MCM
III. Additional Planned : NIL

b. Water Storage :
I. Required : 18.86 MCM
II. Available – Storage Tank : 00.88 MCM
III. Reservoirs Planned : 14.90 MCM
Please Note : The storage shortfall 3.00 MCM ,shall be augmented by implementing open storages
within the existing river & rivulet networks closer to the reservoirs.