You are on page 1of 5

⠿ OFFSHORE WIND TURBINES

Artificial intelligence and predictive


maintenance

Project preInO combines artificial intelligence with


automatic self-organization to optimize maintenance
and repair at sea by setting in motion the corresponding
personnel, material and spare parts logistics
by Marco Lewandowski and Stephan Oelker
Universität Bremen

Perfect O
ffshore wind turbines in
deep-sea locations, also referred
to as farshore wind farms, as a
general rule contain technical

timing
systems such as condition monitoring and
data acquisition platforms to assess the
condition of the system or its components.
Nevertheless, the planning, processing
and controlling of maintenance tasks that
are substantially based on information
from these tools rarely work in practice
under the uncertain conditions of maritime
facilities. Because many faults can hardly
be recognized in advance, the maintenance
process most often starts after the
occurrence of defects, including logistics or

36 ⠿ MARINE MAINTENANCE TECHNOLOGY INTERNATIONAL | SEPTEMBER 2014


OFFSHORE WIND TURBINES ⠿

MARINE MAINTENANCE TECHNOLOGY INTERNATIONAL | SEPTEMBER 2014 ⠿ 37


⠿ OFFSHORE WIND TURBINES

ABOVE: Condition information and processing of operative maintenance tasks is based on various data sources

even procurement or picking of spare parts. control maintenance measures dynamically costs. Approximately 25% of the total cost of
Thus, isolated condition-monitoring tools based on the topical requirements. In the ownership for a life of 20 years is linked to
and condition-based maintenance strategies future, it is believed that wind turbines the O&M phase. A main cost is the treatment
do not promise to achieve great success in themselves will gain an intelligence (due to of unexpected faults, which might include
this field. systems and algorithms) which gives them considerable costs for personnel, material
However, these are the first requirements the ability to make decisions, i.e.- I need and spare parts as well as logistics.
of a proactive maintenance strategy, which maintenance, I need a spare part. While the availability of logistical
uses data and information from several resources is crucial for several maintenance
sources and intelligently condenses it into Today’s situation actions, particularly the exchange of large
relevant events and recommendations The economic use of the sea is continuous. components, there are further uncertainties
for operators. The research conducted Besides its role for global trade, i.e. the in the offshore context. In particular, these
in German project preInO, funded by the shipping of goods between continents, include technical challenges for O&M
German Federal Ministry of Economic the number of maritime facilities has risen including health and security concepts,
Affairs and Energy, aims to use existing steadily over the years. A major reason certifications, access systems and weather
technical monitoring tools and for this development is energy production conditions. Critical limitations with respect
state-of-the-art methodologies to assess from offshore wind. While wind farms to maintenance operations already exist in
the condition of systems, taking into are generally operated remotely without case of waves higher than 2.5m and winds
account the circumstances of operation and constant on-the-spot supervision, essentially greater than 20m/sec. Because of these
maintenance. This includes, for instance, farshore wind farms have high requirements limitations, ships’ accessibility to a farshore
periodic inspection as well as condition- regarding maintenance operations and wind farm in the German North Sea is
based troubleshooting just before a failure accompanying logistics. The figures from assumed to be 20% of the days of the year.
occurs. Data-driven approaches will be able such wind farms indicate a high relevance Regarding its economic relevance, a wind
to provide priority estimations and give for the operations and maintenance phase farm such as Alpha Ventus in the North Sea,
instruction in order to plan, perform and (O&M phase) with respect to the related with a total of 60MW windpower capacity

38 ⠿ MARINE MAINTENANCE TECHNOLOGY INTERNATIONAL | SEPTEMBER 2014


OFFSHORE WIND TURBINES ⠿

installed, can have downtime costs of about


E600,000 a year. Approximately 25%
Traditional maintenance approaches of the total cost of
and maritime-specific challenges
The described conditions offshore illustrate
ownership for a life of
the difference between performing 20 years is linked to
maintenance tasks at onshore facilities
compared with maritime facilities such
the O&M phase
as wind turbines. Key aspects, such as
operating plants remotely and
encompassing the difficulties in accessing
them in the event of failures, illustrate
that traditional maintenance strategies
fail to have the desired effect of efficiency
and effectiveness.
In general, one can distinguish between
corrective and preventive maintenance.
Corrective maintenance – also known as
run-to-failure or reactive maintenance –
means that measures and tasks are taken
after a failure. The preferred maintenance
strategy is moving to a preventive predict-
and-prevent approach, but how does this
work in practice? Preventive maintenance downtime can last up to a week. The be foreseen, so some corrective measures
strategies try to avoid possible failures, maintenance strategy is principally still have to be taken. They lead to short-
either by time-based maintenance, which time-based. Basic condition monitoring, term troubleshooting, which might require
means that measures will be carried out using supervisory control and data expensive helicopter services for personnel
after a predefined operating interval or acquisition (SCADA) systems is conducted, and material transport.
after time-dependent intervals. Otherwise while further specialized condition- Although condition-based maintenance
maintenance can be condition-based, which monitoring systems observe crucial using enhanced condition-monitoring
often employs a condition-monitoring system components, such as the main gear and rotor technologies promises to be the most
to observe various indicators of the system. bearing by means of vibration analysis. cost-beneficial strategy, there are several
In theory, maintenance can be planned These systems are used to detect failures obstacles. The most crucial is that operators
whenever one or more indicators show that before they occur, to prevent subsequent normally have limited knowledge about
something is going to fail. damage, which leads to maintenance failure modes and, even more important,
In reality, maintenance at today’s planning based on conditions by having need to know the relationship between the
farshore wind farms is actually a mixture of a short- to medium-term perspective. One observed data and failures. The problem
several strategies. During yearly planned essential focus is to avoid the cost-intensive of reliable sensor-data should not be
maintenance, mainly inspections, services exchange of large components. But there will neglected. Finally, using isolated condition-
and smaller repairs are conducted. The still be some maintenance tasks that cannot based maintenance tools, as is done at wind

AUTHOR Q&A:
A typical wind farm What windfarms are actively involved in And the most critical?
in the North Sea can the project?
Our main focus is on the wind farm Alpha
Offshore, every failure that leads to
downtime is critical due to opportunity
have downtime costs Ventus in the German North Sea. The
project is part of the research initiative
costs and logistical costs. Therefore,
main components such as gears, rotor
of about e600,000 Research at Alpha Ventus (RAVE). bearings, etc, are essentially critical due
to unexpected expenses, because they
a year What partners are involved? need special ships for the repair.
The project involves a consortium
funded by Germany’s Federal Ministry for According to your research so far, are
Economic Affairs and Energy. It is ran in you able to predict any potential savings
cooperation with the turbine manufacturer for operators?
Senvion from Hamburg and the software On the one hand, we try to replace
developing enterprise SWMS from the components just before they
Oldenburg. break, which is driven from the idea
of condition-based or predictive
What is one of the most common faults maintenance. On the other, we want to
for a farshore wind farm? optimize other traditional maintenance
It’s difficult to postulate, but even a measures by combining work or
relatively low-cost supporting device such rearranging the scope based on
as the azimuth could lead to high losses fundamental decision support. Therefore,
in the event of failure. cost savings of 10-15% seem realistic.

MARINE MAINTENANCE TECHNOLOGY INTERNATIONAL | SEPTEMBER 2014 ⠿ 39


⠿ OFFSHORE WIND TURBINES

frameworks for data management have


already been developed within the first period
of the project. In addition, uniform access to
data has been established so that processing
of data with a number of algorithms and
methodologies can take place. The concept
involves open access to this so-called
processing engine in terms of using different
programming languages, mathematical tools
and spreadsheets. The project uses numerous
real-data samples from offshore wind farms.
It is the outcome of a number of
methodologies that should enable the
condensed assessment of the condition of
components. This is particularized within
the project at the moment and goes along
with the further use of this information for
the scheduling of resources and logistics.
From a medium-term perspective, the project
will demonstrate and validate the developed
technology in the context of offshore wind
farms. As a matter of course, further research
will include the transfer of the investigation
into other application domains. \\
ABOVE: Scheduling of maintenance tasks based on conditon information is a core project focus

turbines today, is not equivalent to a holistic expected lead times for repair or predicted Marco Lewandowski graduated in industrial
condition-based maintenance strategy. residual lifetimes. Basically, there is no need engineering and management. He worked as a
Although 20-25% of maintenance costs to change the way measures take place at research scientist at the BIBA – Bremer Institut für
might be saved by conserving resources the moment, but making each individual Produktion und Logistik GmbH, focusing on enabling
simultaneously, business cases for holistic measure more efficient should lead to an technologies and smart devices for production
condition-based maintenance strategies are overall efficiency gain. and logistics environments. A main application
hard to calculate and justify. To give the best possible forecast of the domain encompasses maintenance in maritime
state of a component, data, such as sensor environments. Currently he is leading a demonstration
Opportunities for proactive values, statistical data, past maintenance and application center for key technologies in
maintenance concepts data, employee know-how, weather data, as logistics at the University of Bremen. Stephan Oelker
As there are many maintenance challenges well as inventory and personnel planning, graduated in industrial engineering and management
for offshore wind farms, there can are analyzed and automatically linked and works as a research scientist in the BIBA ‘logistics
reasonably be several approaches to to a relevant event. The prioritization of factory’ division. The focus of his research work is
maintenance. Because of the availability of detected errors, the dynamic planning of the development of solutions and concepts for the
technical systems for condition monitoring the scope of the service and the scheduling operation phase of offshore wind turbines.
and data acquisition, condition-based of the workflow with associated logistics
maintenance seems to be the strategy to operations using decentralized control
follow. But will sensor technology and systems are investigated within the project Conference speakers
data analysis ever remove the need for to make possible a proactive maintenance
visual inspections or campaign-based strategy for offshore wind turbines.
measurements? It is unlikely for the near It should be mentioned that the
future; however, following the basic idea assessment of condition is based on the
of proactive maintenance, measures could state of research, including methodical
contribute to improving the case-specific data collection, data mining and complex
best option for a maintenance strategy. event processing, as well as prognostic
This is clear for condition-based and diagnostic technologies based on Marco Lewandowski and
measures in particular, as better time artificial intelligence. Stephan Oelker, Universität Bremen
prediction or better data mining would Paper: Artificial intelligence and
lead to a longer planning horizon. Anyway, Progress achieved and future predictive maintenance
the proactive paradigm is also valid for prospects
planned time-based maintenance or Proactive maintenance is data-driven, which More information:
www.marinemaintenanceworldexpo.com
inspection where one could rearrange means that data from different sources is
fixed time intervals or adjust the scope of combined and condensed into information
an inspection if the data indicates that the and action-oriented knowledge. Isolated
considered object is in good condition. Even condition-monitoring systems become
corrective measures can become more much more useful by combining data in
predictable, with statistical data providing this way. Accordingly, infrastructure and