PROJEC (CONSULTANT. MAIN CONTRACTOR ‘CLIENT
RH0324 Remedial =. g S/ \ R
Flooding in Al Jouf
Province SAUDI ARABIA RAILWAYS
Measures Against sob
cman Axagauuldysysil bgbsst
Site Daily Report Fr-CM-101-00
To Consultant: Date: ssn Ret. Nou 2
Maopomer one NCSC] Maapoweronse WCE sC | bguipmentonsie Me_1Se
age Disco Tabor Babes
seanage Tabor Boba |
Sue57QA Mi Ta ele Boon tack 7 |
Say pet Ns F Sear F
Atnginer Neca (aT Mantesnne
Nae aie [Racor i
Conmanal ange Pant Ops (Leeder i
Seer os Pier r Towereane 1
ny SE Tk |
Conant aes Waerboe 7
Section Mange Seay Taker
Works Supriendon Sect nae |_| comprar
Rosen F Sy od
Casta Welle Wathen
Daman Conese par ie |
Panning aaa Conse pan ie
Fanning Eger Cate
MPa Cube acing |
oa ibrar
Diner Bartending racine
Set Blokes |
Seager Genter F |
Tineleepr Tack
Gena aaa i
Carsten [eis
Carpeting Telia
Ciading er
Tiss Oper
Tab Tesi
Towa Toa?PROJEC ‘CONSULTANT MAIN CONTRACTOR. ccuIENT
\R
RH0324 Remedial B a>
Measures Against << ysis | i Ml
Flooding in Al Jouf toate @ysgaull dso! bobs
Province SAUDI ARABIA RAILWAYS
Site Daily Report FreCM-101-00
Date: 18/5/2021 Ref. No. 12
Weather: sunny Temp | Max] 36 | Mim] 18 01:56 Pm
Co.
Location: | Level] Description of work Unit | Quantity | Remarks
THES DEMOLITION OF CULVERT T 1
SITE OFFICE PARKING SHED FOR GENERATOR T 7
ICOMPACTING SERVICE ROAD OF SITE OFFICE] 1 1
SITE OFFICE ELECTRIC WORK IN SITE OFFICE 7 H
TRO SURVEYING WORKING 2 10
12131200
Description of major deliveries Unit | Quantity | Remarks
HSE report:
‘Quality report WVisual inspection
Other issues (visitors:
Contractors Re MUSTAFA AMER si ; C 7 _[ Pate: sIST202T
Consulta
at
Comment