Professional Documents
Culture Documents
OTC Daily Report 29-07-2021
OTC Daily Report 29-07-2021
Weather Status:
Windy Rainy Cloudy Sunny/Clear
Humidity: Low Medium High
Temperature: 38°-22°
Contractor Manpower in Site : ﺍﻷﻳﺪﻱ ﺍﻟﻌﺎﻣﻠﺔ ﻟﺪﻯ ﺍﻟﻤﻘﺎﻭﻝ ﻓﻲ ﺍﻟﻤﻮﻗﻊ
Construction Manager
Administration officer
Mechanical Engineer
Quantity Surveyor
Planning Engineer
Design Engineer
Project Manager
Safety inspector
Chief Surveyor
Track Engineer
Security guard
-Skilled /Labor
&Accountant
HSE Engineer
HSE Manager
Site Engineer
Office Boy
-Operator
Surveyor
Lab tech
Forman
Driver
Total
Actual
1 1 1 1 3 1 1 1 1 1 1 13 2 10 1 5 5 4 27 40
Planned
0 0 0
Concrete mixer
Concrete pump
Low/High Bed
DISEL Truck
Mobile Crane
Dump Truck
Boom Truck
Water Truck
Machinery
Excavator
Generator
Borehole
Back hoe
Loader
Bobcat
Grader
Roller
Dozer
Total
bus
Actual
1 1 1 1 2 4 1 2 3 16
Planned
0
2 Surveying Work at sta. (1212+950) . 2 Surveying Work at sta. (1023+000) &(1024+000) (RFIs)
Finishing Structure Excavation for Culvert Foundation At sta.
3 Structure Excavation for Culvert Foundation At sta. (1212+950) . 3
(1212+950) .
4 4 Preparation for Riprap Work.
5 5
7/29/2021
Daily Report
Report No: OTC-SAR-DR-0047 Date: 29-Jul-2021
Service Road Preparation
Name: Mustafa Amer (PM / Contractor Annex‐1) Name: Engr. Ehab Shoukry (PM ‐ Consultant)]
Signature: Signature:
Date: 29/7/2021 Date:
7/29/2021