Daily Report

Report No: OTC-SAR-DR-0047 Date: 29-Jul-2021


Project Name Remedial Measures Against Flooding In Al Jouf Province Annex 1
Owner Saudi Railway (SAR)
Consultant Khatib & Alami
Contractor Al-Omaier Trading & Contracting Company
Cumulative Planned Progress % (14.10%) As Per Schedule Cumulative Actual Progress % (12.50%)
Day
Sat Sun Mon Tue Wed Thu Fri

Weather Status:
Windy Rainy Cloudy Sunny/Clear
Humidity: Low Medium High
Temperature: 38°-22°
Contractor Manpower in Site : ‫ﺍﻷﻳﺪﻱ ﺍﻟﻌﺎﻣﻠﺔ ﻟﺪﻯ ﺍﻟﻤﻘﺎﻭﻝ ﻓﻲ ﺍﻟﻤﻮﻗﻊ‬

Construction Manager
Administration officer

Mechanical Engineer
Quantity Surveyor
Planning Engineer

Auto cad operator

Total Direct M.P


QA/QC inspector

Total direct M.P


QA/QC Engineer
QA/QC Manager

Design Engineer
Project Manager

Safety inspector
Chief Surveyor

Track Engineer

Security guard
-Skilled /Labor

&Accountant
HSE Engineer
HSE Manager

Site Engineer

Office Boy

-Operator
Surveyor

Lab tech
Forman

Driver

Total
Actual
1 1 1 1 3 1 1 1 1 1 1 13 2 10 1 5 5 4 27 40
Planned
0 0 0

Contractor Equipment in Site :‫ﺍﻟﻤﻌﺪﺍﺕ ﻟﺪﻯ ﺍﻟﻤﻘﺎﻭﻝ ﻓﻲ ﺍﻟﻤﻮﻗﻊ‬


Roller Compactor

Concrete mixer
Concrete pump

Low/High Bed
DISEL Truck
Mobile Crane

Dump Truck
Boom Truck

Water Truck

Machinery
Excavator

Generator

Borehole
Back hoe

Loader
Bobcat
Grader

Roller
Dozer

Total
bus

Actual
1 1 1 1 2 4 1 2 3 16
Planned
0

Work in Progress Today : Work in Progress Tomorrow & RFIs:


1 Service Road Preparation At Sta. (1215+000) . 1 Service Road Preparation from Sta. (1160+000) to (1175+000)

2 Surveying Work at sta. (1212+950) . 2 Surveying Work at sta. (1023+000) &(1024+000) (RFIs)
Finishing Structure Excavation for Culvert Foundation At sta.
3 Structure Excavation for Culvert Foundation At sta. (1212+950) . 3
(1212+950) .
4 4 Preparation for Riprap Work.

5 5

7/29/2021
Daily Report
Report No: OTC-SAR-DR-0047 Date: 29-Jul-2021
Service Road Preparation

Old pipe line crossing 1212+950

Structure Excavation for Culvert Foundation At sta (1212+950)

Submitted By Contractor: Reviewed By Consultant:

Name: Mustafa Amer (PM / Contractor Annex‐1) Name: Engr. Ehab Shoukry (PM ‐ Consultant)]

Signature:  Signature:

Date: 29/7/2021 Date: