Cumulative Planned Progress % (11.40 %) under review Cumulative Actual Progress % (10.25 %) under review
Day
Sat Sun Mon Tue Wed Thu Fri
Weather Status:
Windy Rainy Cloudy Sunny/Clear
Humidity: Low Medium High
Temperature: 39°-23°
Administration officer
Construction Manager
Planning Engineer
Quantity Surveyor
Design Engineer
Project Manager
Track Engineer
Track Engineer
Safety inspector
-Skilled /Labor
Chief Surveyor
Security guard
&Accountant
HSE Engineer
HSE Manager
Site Engineer
Office Boy
-Operator
Surveyor
Lab tech
Forman
Driver
Total
Actual
1 1 1 1 1 3 1 1 1 1 1 3 1 1 18 2 17 1 3 7 4 34 52
Planned
0 0 0
Concrete mixer
Concrete pump
Low/High Bed
DISEL Truck
Mobile Crane
Dump Truck
Boom Truck
Water Truck
Machinary
Excavator
Generator
Borehole
Back hoe
Loader
Bobcat
Grader
Roller
Dozer
Total
bus
Actual
1 1 1 2 4 1 1 1 1 13
Planned
0
5 Structure Excavation for Bridge Foundation sta. 1243+850 Zone 5 5 Structure Excavation for Bridge Foundation sta. 1243+850 (RFIs)
6 Preperation for Dismantling Railway at Sta. (1119+261) 6 Preperation for Dismantling Railway at Sta. (1120+110)
7/1/2021
Daily Report
Report No: OTC-SAR-DR-0027 Date: 1-Jul-2021
Borehole Activity Type - SPT
7/1/2021
Daily Report
Report No: OTC-SAR-DR-0027 Date: 1-Jul-2021
Areas where Work Not Available as Planned (Issue if any needed to be cleared)
Name: Mustafa Amer (PM / Contractor Annex-1) Name: Engr. Abdulrahman Abdullah (PM - Consultant)]
Signature: Signature:
7/1/2021