You are on page 1of 4

DAILY REPORT HEAVY LIFTING

for
REPLACEMENT DRYER BM-302

Date 28-Mar-21
Working Time 07.00 - 18.00 Prepared by: Approved by:
Contractor PT.GTA
Contract No.
Work Title Replacement Dryer
Site Location Gerem - Banten Document Control BPPI

1. Weather Condition
12 Rainfall Record
11 13
10 14 Time Rain Condition
9 15 Start - End Hour Heavy Medium Drizzle
8 16 Clear (Cerah)
7 17 Cloudy (Berawan)
Rain (Hujan)
6 18
5 19
4 20
3 21
2 22
1 24 23

2. Manpower and Construction Equipment


A. Direct Worker Number of Worker by Area (Site) Total Man-Hour Total
No. Category ISBL OSBL Man-Day Normal Overtime Night Man-Hour
1 Alpaidin Scaffolder 1 1,00 1,00 9,00 - - 9,00
2 Aditiyo Suharjo Skill 2 1,00 1,00 9,00 - - 9,00
3 Dede Robiyana S. Rigger 1,00 1,00 9,00 - - 9,00
4 Haryanto Scaffolder 1 1,00 1,00 9,00 - - 9,00
5 Fandy Fahrudin Rotary 1,00 1,00 9,00 - - 9,00
6 Kamsan Scaffolder 2 1,00 1,00 9,00 - - 9,00
7 Kusnadi Scaffolder 2 1,00 1,00 9,00 - - 9,00
8 Leo Chandra S. Rigger 1,00 1,00 9,00 - - 9,00
9 Mahsus Fauzi Rotary 1,00 1,00 9,00 - - 9,00
10 Mustofa Helper 1,00 1,00 9,00 - - 9,00
11 Rohman Fitter 1,00 1,00 9,00 - - 9,00
12 Novan Riyadi Welder 1,00 1,00 9,00 - - 9,00
13 Suhendra S. Welder 1,00 1,00 9,00 - - 9,00
14 Tofik Hidayat Rotary 1,00 1,00 9,00 - - 9,00
15 Sopan Scaffolder 1,00 1,00 9,00 - - 9,00
16 Sofwan Rigger 1,00 1,00 9,00 - - 9,00
17 Alfian Rigger 1,00 1,00 9,00 - - 9,00
18 Caskuni Scaffolder 1,00 1,00 9,00 - - 9,00
19 Wiwik Wibowo Rotary 1,00 1,00 9,00 - - 9,00
20 Widi Nugroho Helper 1,00 1,00 9,00 - - 9,00
21 Syahrul Sahabi Rigger 1,00 1,00 9,00 - - 9,00
22 Faris Luthfan Rigger 1 1,00 1,00 9,00 - - 9,00
23 Asep Sapei Rigger 1 1,00 1,00 9,00 - - 9,00
24 Nasuri Helper 1,00 1,00 9,00 - - 9,00
25 Yusup Apendi Rigger 1 1,00 1,00 9,00 - - 9,00
26 Imron A T Rigger 1 1,00 1,00 9,00 - - 9,00
27 Maftuhi Helper 1,00 1,00 9,00 - - 9,00
28 Ibrahim Millwright 1,00 1,00 9,00 - - 9,00
29 Ahmad Sofiyan Fitter 1,00 1,00 9,00 - - 9,00
30 Irfan Ihfana Rotary 1,00 1,00 9,00 - - 9,00
31 Firdaus Noer F Helper 1,00 1,00 9,00 - - 9,00
32 M Doni Fatetey Fitter 1,00 1,00 9,00 - - 9,00
33 Fatulloh Fitter 1,00 1,00 9,00 - - 9,00
34 Sohari Rigger 1,00 1,00 9,00 - - 9,00
35 Rosihin Rigger 1,00 1,00 9,00 - - 9,00
36 Ali Imron Helper 1,00 1,00 9,00 - - 9,00
37 Feri Irawan Helper 1,00 1,00 9,00 - - 9,00
38 Kamsin Helper 1,00 1,00 9,00 - - 9,00
39 Rohmayadi Helper 1,00 1,00 9,00 - - 9,00
40 Dedi Supriyadi Helper 1,00 1,00 9,00 - - 9,00
41 Soma Reza S Helper 1,00 1,00 9,00 - - 9,00
42 Suhendri Welder 1,00 1,00 9,00 - - 9,00
43 Safrani Welder 1,00 1,00 9,00 - - 9,00
44 Hambali Fitter 1,00 1,00 9,00 - - 9,00
45 Ahmad Hujaini Fitter 1,00 1,00 9,00 - - 9,00
46 Fatulloh Rigger 1,00 1,00 9,00 - - 9,00
47 Jaliludin Helper 1,00 1,00 9,00 - - 9,00
48 Yudi Hardiyanto Helper 1,00 1,00 9,00 - - 9,00
49 Asmuni Helper 1,00 1,00 9,00 - - 9,00
50 Muh Yusuf Helper 1,00 1,00 9,00 - - 9,00
51 Dedi Supriyadi Fitter 1,00 1,00 9,00 - - 9,00
52 Yusroni Scaffolder 1,00 1,00 9,00 - - 9,00
53 Jahroni Welder 1,00 1,00 9,00 - - 9,00
54 Sahbadi Welder 1,00 1,00 9,00 - - 9,00
55 Ade Rohman Welder 1,00 1,00 9,00 - - 9,00
56 Aryo Wibisono Helper 1,00 1,00 9,00 - - 9,00
57 Anisah Office Girl 1,00 1,00 9,00 - - 9,00
58 Sodikin Helper 1,00 1,00 9,00 - - 9,00
59 Nur Rohman Scaffolder 1,00 1,00 9,00 - - 9,00
60 Mas'ud Helper 1,00 1,00 9,00 - - 9,00
61 Wahyu Krist Helper 1,00 1,00 9,00 - - 9,00
62 Nuryana SPV 1,00 1,00 9,00 - - 9,00
63 Wiji Riyadi Fitter 1,00 1,00 9,00 - - 9,00
64 Robi Ibam Helper 1,00 1,00 9,00 - - 9,00
65 Gilang N Fitter 1,00 1,00 9,00 - - 9,00
66 Wawan DH SPV 1,00 1,00 9,00 - - 9,00
67 Dendi Romadhan Fitter 1,00 1,00 9,00 - - 9,00
68 Hilman Lukia Pipe Fitter 1,00 1,00 9,00 - - 9,00
69 A Wawan Welder 1,00 1,00 9,00 - - 9,00

Total of Direct Worker 69,00 69,00 621,00 621,00

Page 1 of 4
B. Indirect Worker Number of Worker by Location Total Man-Hour Total
No. Category Office Man-Day Normal Overtime Night Man-Hour
1 Adi Suwandi Construction Manager 1,00 1,00 9,00 - - 9,00
2 Tina Lestari PTW 1,00 1,00 9,00 - - 9,00
3 Zalfa Zahiya F Document Control 1,00 1,00 9,00 - - 9,00
4 Muh.Fachrureza HSE 1,00 1,00 9,00 - - 9,00
5 Ropa Adianata R HSE 1,00 1,00 9,00 - - 9,00
6 Sunarto Matecon 1,00 1,00 9,00 - - 9,00
7 Robi Fahmi Matecon 1,00 1,00 9,00 - - 9,00
8 Rommy W Draftman 1,00 1,00 9,00 - - 9,00
9 Eko Meidianto Admin 1,00 1,00 9,00 - 9,00
10 Taufik K Eks. Kel.Rawa Arum 1,00 1,00 9,00 - - 9,00
11 Santubi Eks. Kel.Gerem 1,00 1,00 9,00 - - 9,00
12 Afrijal Operator Forklift 1,00 1,00 9,00 - - 9,00
13 Ervan Supriyatna Driver 1,00 1,00 9,00 - - 9,00
14 Fence Patty Operational 1,00 1,00 9,00 - - 9,00
15 Jan Ivan F H M Enginnering 1,00 1,00 9,00 - - 9,00
16 Slamet Widi Operator Skylift 1,00 1,00 9,00 - - 9,00
17 Amjar Hutabarat Quality Control 1,00 1,00 9,00 - - 9,00
18 Jonaem Manalu Millwright 1,00 1,00 9,00 - - 9,00
19 Maimun Joko Millwright 1,00 1,00 9,00 - - 9,00
20 Suyatno Gatot Millwright 1,00 1,00 9,00 - - 9,00
21 Yadi Supriyadi Operatior Crane 1,00 1,00 9,00 - - 9,00
22 Alfian Spv Rigger 1,00 1,00 9,00 - - 9,00
23 Caskuni Spv Scaffolder 1,00 1,00 9,00 - - 9,00
24 Sofwan Lead Riger 1,00 1,00 9,00 - - 9,00
25 Maliki Operator Crane 1,00 1,00 9,00 - - 9,00
26 Tugiran Transporter 1,00 1,00 9,00 - - 9,00
27 Andreas H Transporter 1,00 1,00 9,00 - - 9,00
28 Rio Alfero Transporter 1,00 1,00 9,00 - - 9,00
29 Murani Millwright 1,00 1,00 9,00 - - 9,00
30 Ambar Suci A Operator Crane 1,00 1,00 9,00 - - 9,00
31 Dzikrillah Mekanik 1,00 1,00 9,00 - - 9,00
32 Lawan Foreman Rigger 1,00 1,00 9,00 - - 9,00
33 Dodo Suryaman Spv 1,00 1,00 9,00 - - 9,00
34 Agung Sungko Operator Crane 1,00 1,00 9,00 - - 9,00
35 Karso Operator Crane 1,00 1,00 9,00 - - 9,00
36 Ade Irawan Rigger 1,00 1,00 9,00 - - 9,00
37 Sutarno Operator TMC 1,00 1,00 9,00 - - 9,00
38 Syifa Maulana Admin 1,00 1,00 9,00 - - 9,00
39 Epin Jubaedi Driver 1,00 1,00 9,00 - - 9,00
40 Aan Nurdiansyah Safetyman 1,00 1,00 9,00 - - 9,00

Total of Indirect Worker 40,00 40,00 360,00 360,00


C. Construction Equipment Number of Worker by Area
No. Function, Type, Model ISBL OSBL Unit-Day
1 Skylift 1,00 1,00
2 Forklift 1,00 1,00
3 Crane SL-6000 1,00 1,00
4
5
6
7
8
9
10
11
12

Total of Construction Equipment 3,00 3,00

Page 2 of 4
DAILY REPORT HEAVY LIFTING
for
REPLACEMENT DRYER BM-302

Date 28-Mar-21

3. Effort Within Today 4. Effort for Next Working Day


No. Work-Done Activity Area Status No. Activity Plan Area Status
1 Fabrication Plate Blue Cover Existing Area B7 - 2 ISBL C 1 Install Plate Blue Cover Existing Area B4 - 2 ISBL S
2 Bor Plate for Blue Cover Existing Area B7 - 2 ISBL C 2 Finishing Alignment Dryer Existing Area B4 - 2 ISBL S
3 Install Cover Coupling Existing Area B4 - 2 ISBL F 3 Install Motor Gear Box Existing Area B4 - 2 ISBL S
4 Alignment Frame Rotary Joint Existing Area B4 - 2 ISBL F 4 Install Remaining Insulation Dryer Existing Area B4 - 2 ISBL S
5 Install Flexible Hose Existing Area B4 - 2 ISBL F 5 Existing Area B4 - 2 ISBL S
6 Install Remaining Insulation Dryer Existing Area B4 - 2 ISBL C 6
7 Install Pipe 1" near Screw Feeder Existing Area B4 - 2 ISBL F 7
8 Install Scaffolding for Access Existing Area B4 - 2 ISBL F 8
9 9
10 10
11
12
13
14
15
16
17
18
19
20

Legend : S : Start C : Continue F : Finish P : Postpone

6. Area of Concern
No. Description Area
1
2

Page 3 of 4
DAILY REPORT HEAVY LIFTING
for
REPLACEMENT DRYER BM-302

Date 28-Mar-21

7. Daily Photograph

Connect and Tightening Bolt Flexible Joint


Install Blue Cover Top Section Install Remaining Insulation Dryer Fabrication Plate Blue Cover Install Flexible Hose Screw Feeder
Screw Feeder

Page 4 of 4