FAIAD BERGIN FOR OIL SERVICE

MORNING DAILY REPORT


05:00 TO 05:00

REPORT NO #60

Company Foreman: TAREQ , ABD ALMOLA


Date: 2/14/2024 Rig: _B8 MMM 5 -6 FAIAD Foreman: Moayad
FAIAD Night Pusher Hani
Drlg Supt BELGASEM
Time from release: Days Time from spud: 60 Days depth: Hrs
0500 Operation: Midnight depth:
Footage past 24 hrs Repair Time
0 D: R C= for the Month:
DRILLING DATA
Bit Number Drilling OTHER 3 Ream&wash down
Run No. Circulate Trips 16 1/2 CUT AND SLIP
Owner Repair W.O.LIGHT R/D CMT HEAD
Serial Number PJ7734 Survey Serv.Drl.Line D.O.C
Size 6" P/T BOP Run CSG&CMT WORK OVER PULL 4 1/2
Type TCB N/UP&N/D BOP WIER LINE JOB PRSSURE TEST
Jets LOGGING R/up csgs tools MIXING
Depth Out WAIT ON PERFOR Milling
05:00 TO 09:00 Drills Total HOURS 24
Depth In Mud Pump Liner (Hrs) Piston (Hrs) Valve (Hrs)
Footage #1 _ _ _
Hour # 2_ _ _
Footage per hour OPERATIONS
RPM FROM TO
Bit weight C:\Users\hp\Deskto
Bit Condition 05:00 TO 09:00 Work on fish ( Engauge spare and start over pull 210 - 250 klb, after that fish released) fish moved up 32 ft.
POOH W/ BHA # 43 ( Fabricate spare, X-O, pumper sup , F/JAR, 4 3/4" DC & 3 1/2" DP) F/ 9911 ft. TO Suface. NO
P/Pressure 09:00 TO 17:00
Prgress.

Pumps Number 1 Number 2 Number 3 17:00 TO 20:00 Prepare modificated 3 3/8" Spare.
Stroke 9" 9" N/A 20:00 TO 04:30 RIH W/BHA # 44 ( 3 3/8" F/ Spare, Drain sub, Pumper sub, F/ Jar, 4 3/4" DC, And 3 1/2" DP) F/ Surface To TOF.
SPM 0 55 N/A 04:30 TO 05:00 TAG FISH @ 9905FT AND Work on fish.
BBPM 0 4.1085 N/A
Single/Par ** N/A
Hrs. run 143 N/A
Drill. Assy @ 06:00

ENGINEERING DATA: MUD DATA


String wt : LBS Mud type :
D.C. wt : Wt :
Annul.Vel. Vis :
Noz.Vel. WL
Ton miles FC :
PH :
Circ. Sand =
Cond. Oil = PRESENT OPERATION : WORK ON FISH & POOH

GENERAL INFORMATION Monthly footage Days AHEAD / BEHIND Program

DC on loc. 91/2"DC 0 JITs 8" DC 0 JITs 8"1/2 0 JTS 61/2" DC 0JITs 3 1/2" DP 372 JTS
DP on loc. 5'' DP 0 JITs 5'' HWDP 0 JITs 43/4" DC 10 JITs 31/2'' HWDP 16 JITs
Present Quantity of Diesel @ Rig 147 Bbls Camp 74 Bbls
Diesel Off Load Quantity (If received last 24 hrs) Bbls Camp Bbls
Diesel Daily Consumption @ Rig 12 Bbls Camp 5 Bbls
Diesel used for water trucks Bbls Water at Mini Camp 45 Bbls
Water at rig 1000 Bbls Total daily consumption Bbls Water at Camp Fresh 200 Bbls
Last casing size: Days since last LTA: 0 FAIAD:
Date BOP last tested: 17-Dec-23 Accident reported: Payroll Number
Accumulator pressure: 3000 PSI Accident Details ‫الحمد هلل رب العالمين‬
Manifold pressure 1500 PSI Engines Running Hrs:
Top Drive
Hydrill pressure 750 PSI Engine # Daily Hrs
Crown-O-Matic checked by:Both drillers Status #1 Module
BOP Drill 2400-1200hrs Sec. : #2 DRILLMEC HTD 250CR
BOP Drill 1200-0000hr Sec. : #3 Last Service Date
Geolograph ok Pens working 1/14/2024
Wt. Ind.:OK Alarms Auto. Driller
Running Hrs since last service
Vehicles FAIAD Rent Shale Shaker (Hrs) FAIAD 27 SOC 2
Trucks 1 Catering FAIAD: 9 POWE TONG
Crew Bus 1 Medical 1 VISITOR 0
Forklift 1 CONTRACTOR 2 OIL SERV Rotary Table
Crane Screen Stock(Size, Qu.) Mud Engneer 1 LJOWF FISHING MAN 1 Last Service Date
Cat.D8 NSR 0 Extra:
Pick up Total Personnel: 43 Hrs since Last Serv.

Prepared by……. Moayad Mini


‫شركة فياض برقن للخدمات النفطية‬ Drilling Operation Summary
FAIAD BERGIN FOR OIL SERVICES OCTOBER 2023

OPERATOR: SIRTE OIL RIG


CO. FB #: B_ WELL NO.:MMM12-6 / ALRASHAD Field
Operating Hours Total
Date
Day Standby
Repair Shutdown
Moving Operating OPERATIONS
SEP Work w/ crew Hours Hours

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30
TOTAL: 0 0 0 0 0 0

.
COMPANY MAN OPERATOR SIRTE OIL COREPRESENTATIVE FAIAD BERGIN REPRESENTATIVE
Block wt 20000 Block wt 20000 BLOCK WEIGHT
Depth 9910 Depth ____
M/wt 9.4 M/wt ____ TOTAL BUOYED WEIGHT OF CSG
Dp wt 13.3 Dp wt ____
Dc1 wt/ft 47 Dc1 wt/ft SHOE DEPTH
Dc1 length 263 Dc1 length
Dc2 wt/ft 0 Dc2 wt/ft mud weight =
Dc2 length 0 Dc2 length
Buoy.factor 0.856269 Buoy.factor #VALUE! csg weight
Ton mile 196 Ton mile #VALUE!
CSG. Length =
Drlg ton M #VALUE!
CSG ton mile =
Trip ton M #VALUE!

DP3 1/2 ___ Q:GPM ___ N#1 ___


DP 5'' G105, ___ Hole ___ N#2 ___
HWDP 5'' ___ Dp OD ___ N#3 ___
N#4
8'' DC ___ N#5
N#6
N#7
N#8

WIPER TRIP TON MILES

STRING WEIGHT ___

STANDS PULLED ___

BLOCK WEIGHT ___

TON MILES #VALUE! annularl velocity #VALUE! Jets velocity


20,000 lbs

0.86

8,795 ft

8.60 ppg

0 lbs / ft

0 ft

33.31

#VALUE!
FAIAD BERGIN FOR OIL SERV

DRILLING CO : FAIAD BERGIN OIL DROW WORKS MR-8000


RIG : Rig FB_ 8 DRUM DIAM. 7'
T . P: SULIMAN DERRICK HIGHT 126 ft MM/YYYY

WELL : MMM10-6 TRAVELING SHEAVE DIAM 7'


T-M GOAL PER FOOT CUT 2100 TRAVELING SHEAVE DIAM 7'
WEIGHT OF T.BLOCK __ 20000 LBS
DATE DEPTH WT.IND DRILL PIPE DRILL COLLARS WT.FT TRIP DRLG
READ SIZE WT/FT DRILL COLLARS WT/FT NO.FT D.C T.M T.M
12/1/2023
12/2/2023
12/3/2023
12/4/2023
12/5/2023
12/6/2023
12/7/2023
12/8/2023
12/9/2023
12/10/2023
12/11/2023
12/12/2023
12/13/2023
12/14/2023
12/15/2023
12/16/2023
12/17/2023 8795 90 3 1/2 9.30 68
12/18/2023 8795 150 3 1/2 13.30 152
12/19/2023 8938 150 3 1/2 13.30 156
12/20/2023 8938 150 3 1/2 13.30 156
12/21/2023 8938 150 3 1/2 13.30 156
12/22/2023 8938 150 3 1/2 13.30 156
12/23/2023 277
12/24/2023
12/25/2023 8938 139 3 1/2 13.30 155
12/26/2023
12/27/2023 9565 145 3 1/2 13.30 171
12/28/2023 36
12/29/2023
12/30/2023 8977 90 3 1/2 9.30 31
12/31/2023 8977 90 3 1/2 9.30 31
1/1/2024 9374 145 3 1/2 13.30 167
1/2/2024
1/3/2024 9490 155 3 1/2" 13.30 170
1/4/2024 9490 155 3 1/2" 13.30 170
1/5/2024 9490 155 3 1/2" 13.30 170
1/6/2024 518 35 3 1/2" 13.30 5
1/7/2024 9374 155 3 1/2" 13.30 180
1/8/2024 190
1/9/2024 9743 160 3 1/2" 13.30 191
1/10/2024 9743 160 3 1/2" 13.30 191
1/11/2024
1/12/2024 9910 165 3 1/2" 13.30 196
1/13/2024 9910 165 3 1/2" 13.30 196
1/14/2024 9910 165 3 1/2" 13.30 196
1/15/2024 9910 165 3 1/2" 13.30 196
1/16/2024 9910 165 3 1/2" 13.30 196
1/17/2024 9910 165 3 1/2" 13.30 196
1/18/2024
1/19/2024 9910 165 3 1/2" 13.30 196
1/20/2024 9910 165 3 1/2" 13.30 196
1/21/2024 9910 165 3 1/2" 13.30 196
1/22/2024 9910 165 3 1/2" 13.30 196
1/23/2024
1/24/2024 9907 165 3 1/2" 13.30 196
1/25/2024 9907 165 3 1/2" 13.30 196
1/26/2024 9907 165 3 1/2" 13.30 196
1/27/2024 9908 165 3 1/2" 13.30 196
1/28/2024
1/29/2024 9908 165 3 1/2" 13.30 196
1/30/2024 9908 165 3 1/2" 13.30 196
1/31/2024
2/1/2024 9908 165 3 1/2" 13.30 196
2/2/2024 9908 165 3 1/2" 13.30 196
2/3/2024 9908 165 3 1/2" 13.30 196
2/4/2024 9910 165 3 1/2" 13.30 196
2/5/2024
2/6/2024 9910 165 3 1/2" 13.30 196
2/7/2024 9910 165 31/2" 13.30 196
2/8/2024 9910 165 31/2" 13.30 196
2/9/2024 9910 165 31/2" 13.30 93
2/10/2024 9910 165 31/2" 13.30 102
2/11/2024
2/12/2024 9911 165 31/2" 13.30 196
2/13/2024
2/14/2024
2/15/2024
2/16/2024
2/17/2024
2/18/2024
2/19/2024
2/20/2024
2/21/2024
2/22/2024
2/23/2024
2/24/2024
2/25/2024
2/26/2024
2/27/2024
2/28/2024
2/29/2024 196
FOR OIL SERVICES

ROPE MANUFACTURER _____


SIZE. LEN 1 1/8"
GRADE _____ 1st slip __200__tm

REEL. ___ ___ 2ed slip __400__tm


DATE ON dd/mm/yyyy slip &cut __600__tm
DATE OFF
T0TAL LA ST ACCUM LENGTH REMARKS Total cut PRESENT
T.M CUT T.M CUT LENGHT LENGHT
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
2,640
POOH TBG 2,640
RIH 6" bit 2,640
RIH imprssion 2,640
Scraper 2,640
R3-PKR 2,640
Spare & Fishing Jar 2,640
1121 Jaring Effect 2,640
Slip D, Sling 15 ft 15 2,625
RIH Over Mill 2,625
2,625
RIH 2 3/8" TBG & DP 2,625
wash down & reaming 2,625
F/ 8938 TO 9570 2,625
P/U & RIH 3 1/2" TBG 2,625
POOH 3 1/2" TBG 2,625
Spare & Fishing Jar 2,625
2,625
2 3/8" Cable Fishing Spare#1 2,625
2 3/8" Cable Fishing Spare#2 2,625
2 3/8"notch 2,625
RIH Spaer & Change prgram. 2,625
RIH Over shot. 2,625
Jaring Effect 2,625
RIH wash over Run # 1 2,625
1858 RIH wash over Run # 2 15 2,610
2,610
RIH F/Spear #1 2,610
RIH F/Spear #2 2,610
RIH F/4 3/4" Taper Tap 2,610
RIH F/Spear #3 2,610
RIH 6 1/8" Die Collar 2,610
1176 RIH 3.5" Taper tap 15 2,595
2,595
RIH Notch 2 7/8" tubing 2,595
RIH Impression block 2,595
RIH 2 1/4" to 3.5" Taper Tap 2,595
784 RIH2 3/4" to 4 3/4" Taper Tap 30 2,565
2,565
RIH 5 7/8" FLAT MILL 2,565
RIH Impression block 2,565
RIH Releasing Spare 2,565
RIH Over shoe mill 2,565
2,565
RIH 5.3 F/spare 2,565
RIH TAPER TAP 2,565
2,565
1,372 RIH Die Coller 15 2,550
RIH Fabricated F/Barel 2,550
RIH Fabricated F/Spare 2,550
RIH 6" flat mill 2,550
2,550
RIH 3 1/8" junk mill 2,550
RIH 5 7/8"Impression block 2,550
1,176 RIH 3 .078" F/Spare 30 2,520
RIH Modificate Taper tap 500 2,020
POOH Modificate Taper tap 2,020
Cut 100 ft. due to jump one row 100 1,920
RIH TAPER TAP 2 3/4" - 3 1/2" 1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
1,920
FAIAD BERGIN FOR OIL SERVICES

Monthly Diesel Received Report


Rig #B----

Date Ticket # Quantity Company Truck # Driver Name Received By


Remarks
WELL ____ DRILL COLLAR ROTATING HRS PER DAY

SIZE 4 3/ 4 x 2 1/4 MONTH Of MM YYYY

NO S.NO. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Rig-B--

23 24 25 26 27 28 29 30 31 TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Well: ____ H.W.D.P ROTATING HRS PER DAY

3 1/2 x 2 1/8 HWDP MONTH MM YYYY Rig B---


NO S. NO. 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Rig B---
24 25 26 27 28 29 30 31 TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Drill collar ROTATING HRS PER DAY
Location
17 1/2'' S-STB MONTH MM YYYY

SIZE NO S.NO. 0 1 2 3 4 5 6 7 8 9 10 11 12 13
1 BFH4817
2 ST-57A
3
4
5
6

IN OUT INSPECTED ON dd/mm/yyyy


HRS PER DAY

MONTH MM YYYY Rig -B--


14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Total
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Approved By: `
Tool Pusher
Total
Work done by drill line : Stuck-pipe & Jarring

Note : Jarring and working on string to unstick drill pipe causes extreme strain and wear on drill-line. It is imposs
to calculate exactly the work-done and amount of service-wear during this operation. It must be remember
that in all cases, visual inspection of drill-line by rig crew must take precedence over any sort of calculation
and accordingly slip & cut should be done.

IN-PUT DATA
Maximum weight (on Weight Indicator) while working-on-string = 140 ton
Number of times the string is pulled to above maximum weight = 170 from Record-o-graph.
Number of times Jarred up and Jarred down = 170 from Record-o-graph.

OUT-PUT DATA

Work done by above , ton-mile = 277 TM Est. Service Factor = 0.32


Date: 4/7/17

n drill-line. It is impossible
. It must be remembered
any sort of calculations

ecord-o-graph.
ecord-o-graph.