You are on page 1of 1

DRLLING DEPARTEMNT DAILY DRILLING REPORT

Date Company
Day Location
Shift Rig No
PT. PELSART TAMBANG KENCANA

From To Metres
Hole number Size R/S S/U Core Rec. Bit* OR Hours
(Metres) (Metres) Drilled

RECOVERY % : TOTAL HOURS


VISCOSITY MUD SURVEYS ACTIVTY TIMES HOURS
Rig Down
Time Second Remarks No. Depth Dip Azimuth
Moving Rig

Rig up

Change Bit*

Change drilling method


CONSUMABLES MATERIAL LEFT IN HOLE Condition Hole
Item Size Qty Item Size Qty Freeing rods**

PVC Casing Safety meeting

Trol Prestart Check

Gel Mixing mud

Liqiud polymer Orientation

CRP Pulling casing

Oil engine PERSONAL Pulling rods**

Fuel Classification Name Hours Reaming

Hm start Driller Reaming casing

Hm finish Offsider Service and repairs

Pertamax Offsider Shifting


Offsider Standby
Offsider Surveying

Remarks : Waiting drill pad/location


Breakdown/Unplanned maintance
**State if due to ground condition
others
Travelling
TOTAL HOURS FOR SHIFT

You might also like