TANGGUH EXPANTION PROJECT Job Form Number
Title ITR-IKM-SA-007
QC No ITP No
Material Receipt Inspection test Report
PT. Indotech KaryaMandiri RPT. No Sheet No
PRE CONCRETE INSPECTION REPORT
Concrete Structure Location :
Reference Drawing :
Concrete Rebar & Embed Dwg No :
Forms Rebar
Survey Checked Grade
Orientation Size
Size Splices
Elevation Spacing
Clean Oiled Clearance
Chamfer Cleanliness
Straight Lvl Plumb Adequate Support
Adequate Brasing
Sub Foundation Embedment
Piles Anchor Bold Type
Compaction Anchor Bold Location
Cleanliness AnchorBolt Sleeves
Moisture Anchor Bold Grounding
Blinding Layer Thread Projection
Elevation Well Pads
Angle Iron
Miscellaneous Insert
Key Ways Conduits
Blockouts Ground Wire
Surface Roughhened Water Stop
Bonding Agent
Sets/Test Speciment
Hoy/Cold Water Protection
Joints
Special PlacingEquipment Required
Order Concrete To The Following Specification
Mix Design Slump
Quantity Admixtures
Max Aggregate Delivery Per Hour
IKM Supervisor IKM QA/QC CSTS QA/QC
Date Date Date
Signature Signature Signature
Name Name Name