Professional Documents
Culture Documents
3.QTY Presentation 3
3.QTY Presentation 3
Technology College
Department: Construction Technology
and Management
Construction Specification
and
Quantity Surveying
Quantity Surveying 2
Quantity Surveying
Quantity Surveying 3
1. Quantifying Works
2. Quantifying Resources
3. Cost Estimating
Quantity Surveying 4
2. Quantifying Resources
Quantity Surveying 5
2. Quantifying Resources
Quantifying Materials
Quantifying Labour
Quantifying Equipments
Quantity Surveying 6
2. Quantifying Resources
Quantifying Materials
Quantity Surveying 7
2. Quantifying Resources
Quantifying Materials
Unit of Measurement for Construction Materials
No Material Type Unit
1 Cement Quintal/Kg
2 Sand, Aggregate m3
3 Reinforcement Bar Kg/ Berge
4 HCB Pcs
5 Brick Pcs
6 Stone m3
7 Timber Pcs/m2
Quantity Surveying 8
Quantifying Materials
Unit of Measurement for Construction Materials
No Material Type Unit
8 Nails Packet/ Kg
9 String Role/m
10 Binding Wire kg
11 Electric wire Role
12 Conduit pcs
13 Pipes Pcs/m
14 Fixtures pcs
Quantity Surveying 9
Material Purchase Request
10
.
11
.
12
Quantifying Materials Exercise…
Quantify the required material to construct 7
footings and foundation columns using C5 lean
concrete, C25 RCC and G75 rebars and request
using purchasing slip.
1. Cement
2. Sand
3. Aggregate
4. Reinforcement Bar
Quantity Surveying 13
Prepare takeoff sheet , BOQ and Materials Required
No ID Assignment/submit 30/07/2016 morning
5 1303289 Masonry
. 19
20
1306680 HCB
1306682 Internal Plastering
21 1306739 External Plastering
22 1306790 Roofing
23 1306870 External Painting
24 1307122 Internal Wall Painting
25 1307193 Soffit Painting
26 1307260 Septic Tank Pit excavation
27 1308375 Septic Tank masonry
15