DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-01 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 04 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DPTP_13 DHTJ_A07 581038 106841 130 0.00 0.00 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
Standing
PVC Waiting Car

Foam
Cement

Fuel - Solar (liter) 0L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-01 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 05 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DPTP_13 DHTJ_A07 581038 106841 130 0.00 0.00 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
Standing
PVC Waiting Car

Foam
Cement

Fuel - Solar (liter) 0L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE : 07 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A09 581359 106728 129 25.00 27.25 2.25 27.25
28.75
30.10
31.50
32.20
33.60 36.00 2.40

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Drilling OH
Foam Work Drilling coring
Cement Work Drilling OH
General Back to camp
Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 25.00 Remark :


Total Coring : 6.35
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
28.75 1.50 1.50 100%
30.10 1.35 1.35 100%
31.50 1.40 1.40 100%
32.20 0.70 0.70 100%
33.60 1.40 1.40 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 11:30 4.000
11:30 16:00 4.500
16:00 16:30 0.500
16:30 17:00 0.500
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 08 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A09C 581359 106728 129 36.00 39.00 3.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Flushing
Foam General Geophysical Logging
Cement General Flushing
Work Drilling OH
Fuel - Solar (liter) 20 L General Geophysical Logging
General Moving
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 3.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 11:30 4.000
11:30 12:00 0.500
12:00 13:00 1.000
13:00 13:45 0.750
13:45 14:30 0.750
14:30 16:30 2.000
16:30 17:30 1.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 09 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DPTP-06 DHTJ_A10 501955 106503 113 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Setting rig
Foam General Drilling OH
Cement General Back to camp

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 60.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 16:30 7.500
16:30 17:00 0.500
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 10 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DPTP-04 DHTJ_A12 582214 106409 105 0.00 53.00 53.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Flushing
Foam General Geophysical logging
Cement General Moving
Work Drilling OH
Fuel - Solar (liter) 20 L General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 53.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
10:00 11:00 1.000
11:00 13:00 2.000
13:00 17:00 4.000
17:00 17:30 0.500
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 11 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DPTP-04 DHTJ_A12 582214 106409 105 53.00 60.00 7.00

DPTP_02 DHTJ_A14 592455 106310 95 0.00 50.00 50.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
Cement General Flushing
General Geophisical logging
Fuel - Solar (liter) 20 L General Rig down
General Moving
General Set up rig
Hydraulic Oil (Liter) Work drlling OH
PERSONIL Hours General Back to camp
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 53.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 10:00 1.000
10:00 11:30 1.500
11:30 12:30 1.000
12:30 13:30 1.000
13:30 14:30 1.000
14:30 15:00 0.500
15:00 17:00 2.000
17:00 18:00 1.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 12 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_02 DHTJ_A14 592455 106310 95 50.00 60.00 10.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
Cement General Flushing
General Geophisical logging
Fuel - Solar (liter) 10 L General Rig down
General Moving
General Machine acces
Hydraulic Oil (Liter) General Back to camp
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 53.00 Remark :


Total Coring : 0.00 NO COAL
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 10:30 1.500
10:30 11:30 1.000
11:30 12:00 0.500
12:00 13:00 1.000
13:00 15:30 2.500
15:30 17:30 2.000
17:30 18:00 0.500
0.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 13 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_21 DHTJ_A16 582293 107894 121 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up rig
Cement General Preparation rig
Work Deilling OH
Fuel - Solar (liter) 15 L Standing Rest and meal
Work Continue drilling OH
General Flushing
Hydraulic Oil (Liter) General Geophisical logging
PERSONIL Hours General Back to camp
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 53.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:30 2.000
9:30 10:30 1.000
10:30 11:00 0.500
11:00 12:00 1.000
12:00 13:00 1.000
13:00 16:00 3.000
16:00 16:30 0.500
16:30 17:30 1.000
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE : 14 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_20 DHTJ_A18 582367 107877 128 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up rig
Cement General Preparation rig
Work Drilling OH
Fuel - Solar (liter) 20 L Standing Rest and meal
Work Continue drilling OH
General Flushing
Hydraulic Oil (Liter) General Geophisical logging
PERSONIL Hours General Back to camp
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : 53.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:30 2.000
9:30 10:30 1.000
10:30 11:00 0.500
11:00 12:00 1.000
12:00 13:00 1.000
13:00 15:30 2.500
16:30 16:00 23.500
16:00 17:00 1.000
17:00 17:30 0.500
33.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 15 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_22 DHTJ_A20 582202 108010 93 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up rig
Cement General Preparation rig
Work Drilling OH
Fuel - Solar (liter) 15 L Standing Rest and meal
Work Continue drilling OH
General Flushing
Hydraulic Oil (Liter) General Geophisical logging
PERSONIL Hours General Continue flushing
Driller Burhan General Back
Continue geophisical logging
to camp
Mechanic Kasman General
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 9:30 0.500
9:30 10:00 0.500
10:00 12:00 2.000
12:00 13:00 1.000
13:00 14:00 1.000
14:00 14:30 0.500
14:30 15:00 0.500
15:00 16:00 1.000
eophisical logging 16:00 17:00 1.000
17:00 17:30 0.500
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 16 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_23 DHTJ_A21 582088 108050 113 0.00 58.50 58.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up rig
Cement General Preparation rig
Work Drilling OH
Fuel - Solar (liter) 20 L Standing Rest and meal
Work Continue drilling OH
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 9:30 0.500
9:30 10:00 0.500
10:00 12:00 2.000
12:00 13:00 1.000
13:00 17:00 4.000
17:00 17:30 0.500
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 17 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DPTP_24 DHTJ_A23 581931 108098 111 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam General Flushing
Cement General Geophisical logging
General Rig down
Fuel - Solar (liter) 15 L Geeneral Moving
Standing Rest and meal
General Continue moving
Hydraulic Oil (Liter) General Set up
PERSONIL Hours Work Drilling OH
Driller Burhan General Back to camp
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 9:30 1.000
9:30 10:00 0.500
10:00 10:30 0.500
10:30 12:00 1.500
12:00 13:00 1.000
13:00 14:00 1.000
14:00 14:30 0.500
14:30 17:00 2.500
17:00 17:30 0.500
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 18 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A25 581925 107897 100 0.00 30.00 30.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam General Flushing
Cement General Geophisical logging DHTJ_A23
General Rig down
Fuel - Solar (liter) 15 L General Moving
Standing Rest and meal
General Continue moving
Hydraulic Oil (Liter) General Set up
PERSONIL Hours Work Drilling OH
Driller Burhan General Geophisical logging DHTJ_A25
Mechanic Kasman General Back to camp
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 9:30 1.000
l logging DHTJ_A23 9:30 10:00 0.500
10:00 10:30 0.500
10:30 12:00 1.500
12:00 13:00 1.000
13:00 14:00 1.000
14:00 15:00 1.000
15:00 16:00 1.000
l logging DHTJ_A25 16:30 17:00 0.500
17:00 17:30 0.500
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 20 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A26 581900 107688 102 13.50 60.00 46.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling progres
Cement Standing Rest and meal
Work Continue drilling progres
Fuel - Solar (liter) 20 L General Flushing
Genera Geophisical logging
General Rig down
Hydraulic Oil (Liter) General Moving
PERSONIL Hours General Back to camp
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 12:00 3.500
12:00 13:00 1.000
rilling progres 13:00 14:30 1.500
14:30 15:00 0.500
15:00 15:30 0.500
15:30 16:00 0.500
16:00 17:00 1.000
17:00 17:30 0.500
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE : 21 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Waiting rain

Foam
Cement

Fuel - Solar (liter)

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 22 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A28 581830 107323 112 0.00 55.00 55.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Set up
Foam General Preparation rig
Cement Work Drilling OH
Standing Rest and meal
Fuel - Solar (liter) 20 Work Continue drilling OH
General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 10:00 1.500
10:00 12:00 2.000
12:00 13:00 1.000
13:30 17:00 3.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 23 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A30 581561 107073 126 0.00 27.00 27.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam General Flushing
Cement General Geophisical logging
General Rig down
Fuel - Solar (liter) 15 General Moving
Standing Rest and meal
General Continue moving
Hydraulic Oil (Liter) General Set up
PERSONIL Hours Work Drilling OH
Driller Burhan General Back to camp
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 10:00 1.500
10:00 10:30 0.500
10:30 11:30 1.000
11:30 12:00 0.500
12:00 13:00 1.000
13:00 14:00 1.000
14:00 15:00 1.000
15:00 17:00 2.000
17:00 17:30 0.500
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 24 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A30 581561 107073 126

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
Breakdow
PVC n Trouble tyre car
General Go to site
Foam BreakdownTrouble yanmar&Preparation
Cement General Back to camp

Fuel - Solar (liter)

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 13:00 6.000
13:00 13:30 0.500
nmar&Preparation 13:30 17:00 3.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 25 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A30 581561 107073 126 27.00 40.00 13.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
BreakdownPrearation machine yanmar
Foam Work Drilling OH
Cement General Back to camp

Fuel - Solar (liter) 10

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
machine yanmar 7:30 15:30 8.000
15:30 17:00 1.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 26 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A30 581561 107073 126

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prearation rig
Foam General Flushing
Cement General Geophisical logging
General Rig down
Fuel - Solar (liter) General Moving
Standing Standby waiting car
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 10:00 1.000
10:00 10:30 0.500
10:30 11:00 0.500
11:00 12:00 1.000
12:00 16:30 4.500
16:30 17:00 0.500
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 27 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A32 581413 106274 124 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Continue moving
Foam General Set up rig
Cement Standing Rest and meal
Work Drilling OH
Fuel - Solar (liter) 20 General Flushing
General
General Geophisical logging
Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 8:00 0.500
8:00 11:00 3.000
11:00 12:00 1.000
12:00 13:00 1.000
13:00 16:00 3.000
16:00 17:00 1.000
17:00 17:30 0.500
17:30 18:00 0.500
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE : 28 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Standby

Foam
Cement

Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 17:00 9.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
9.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 29 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A33 581556 106230 144 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Rig down
Foam General Moving
Cement General Set up
Work Drilling OH
Fuel - Solar (liter) 20 General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 13:00 4.500
13:00 14:00 1.000
14:00 17:00 3.000
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :30 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A34 581500 106238 186 0.00 25.00 25.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam General Flushing
Cement General Geophisical logging DHTJ_A33
General Rig down
Fuel - Solar (liter) 20 General Moving
General Set up rig
Work Drilling OH
Hydraulic Oil (Liter) General Geophisical logging
PERSONIL Hours General Rig down
Driller Burhan General Moving
Mechanic Kasman General Back to camp
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 8:00 0.500
8:00 9:30 1.500
9:30 10:30 1.000
l logging DHTJ_A33 10:30 11:00 0.500
11:00 11:30 0.500
11:30 14:00 2.500
14:00 14:30 0.500
14:30 15:30 1.000
15:30 16:00 0.500
16:00 16:30 0.500
16:30 17:30 1.000
17:30 18:00 0.500
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE :31 Januari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A35 581245 106336 152 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Continue moving
Foam General Set up
Cement Work Drilling OH
General Flushing
Fuel - Solar (liter) 20 General Geophisical logging
General Rig down
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 8:00 0.500
8:00 11:30 3.500
11:30 12:30 1.000
12:30 15:00 2.500
15:00 15:30 0.500
15:30 16:00 0.500
16:00 16:30 0.500
16:30 17:00 0.500
0.000
0.000
0.000
0.000
9.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE :01 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Standby

Foam
Cement

Fuel - Solar (liter)

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Muamar
Irwan

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 17:00 9.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
9.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE :02 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A36 581439 105839 0.00 52.50 52.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up rig
Cement Work Drilling OH
General Back to camp
Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:30 3.000
10:30 11:30 1.000
11:30 17:30 6.000
17:30 18:00 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE :03 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)
DHTJ_A36 581439 105839 52.50 60.00 7.50

DHTJ_A37 581559 105789 0.00 30.00 30.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
General
Cement Flushing
General Geophisical logging
Fuel - Solar (liter) 20 General Rig down
General Moving
General Set up
Hydraulic Oil (Liter) General Preparation rig
PERSONIL Hours Work Drilling OH
General
Driller Burhan Back to camp
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 10:00 1.500
10:00 11:00 1.000
11:00 12:00 1.000
12:00 13:00 1.000
13:00 14:30 1.500
14:30 15:00 0.500
15:00 16:00 1.000
16:00 17:00 1.000
0.500
17:00 17:30
0.000

10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE :04 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A37 581559 105789 30.00 60.00 30.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
General
Cement Flushing
General Geophisical logging
Fuel - Solar (liter) 20 General Rig down
General Waiting car
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 12:30 4.000
12:30 13:30 1.000
13:30 14:30 1.000
14:30 15:00 0.500
15:00 17:00 2.000
17:00 17:30 0.500
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE :05 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A38 581326 105877 0.00 42.00 42.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving
Foam General Set up
Cement Work Drilling OH
General Back to camp
Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00 Water loss mulai kedalaman 12.00 M
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
10:00 11:00 1.000
11:00 16:30 5.500
16:30 17:00 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000

mulai kedalaman 12.00 M


DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :06 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A38 581326 105877 42.00 60.00 18.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
Cement General Flushing
General Geophisical logging
Fuel - Solar (liter) 20 General Rig down
General Waiting plan
General Moving
Hydraulic Oil (Liter) General Back to camp
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00 Water loss mulai kedalaman 12.00 M
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 11:30 3.000
11:30 12:00 0.500
12:00 12:30 0.500
12:30 13:30 1.000
13:30 14:30 1.000
14:30 17:00 2.500
17:00 17:30 0.500
0.000
0.000
0.000
10.500

mulai kedalaman 12.00 M


DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE :07 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A39 581430 106051 0.00 60.00 60.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Set up
Foam General Preparation rig
Cement Work Drilling OH
General Flushing
Fuel - Solar (liter) 20 General Geophisical logging
General Rain
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 9:30 1.000
9:30 13:00 3.500
13:00 14:00 1.000
14:00 14:30 0.500
14:30 16:30 2.000
16:30 17:00 0.500
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE :08 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A40 581525 106010 0.00 21.00 21.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Rig down
Foam General Moving
Cement General Set up
General Preparation rig
Fuel - Solar (liter) 10 Work Drilling OH
General Trouble machine suplay
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:30 8:00 0.500
8:00 8:30 0.500
8:30 12:00 3.500
12:00 12:30 0.500
12:30 13:00 0.500
13:00 15:00 2.000
achine suplay 15:00 16:30 1.500
16:30 17:00 0.500
0.000
0.000
0.000
0.000
9.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE :09 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A40 581525 106010 21.00 60.00 39.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
Cement General Flushing
General Geophisical logging
Fuel - Solar (liter) 10 General Rig down
General Moving
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 12:00 3.500
12:00 13:00 1.000
13:00 13:30 0.500
13:30 14:30 1.000
14:30 17:00 2.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE :10 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A42 581644 105959 0.00 61.50 61.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Set up
Foam Work Set polypep
Cement General Preparation rig
General Drilling OH
Fuel - Solar (liter) 20 Work Flushing
General Geophisical logging
General Rig down
Hydraulic Oil (Liter) General Moving
PERSONIL Hours General Back to camp
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 10:00 1.500
10:00 11:00 1.000
11:00 15:00 4.000
15:00 15:30 0.500
15:30 16:00 0.500
16:00 16:30 0.500
16:30 17:30 1.000
17:30 18:00 0.500
0.000
0.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE :11 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

0.00 11.00 11.00 11.00


DHTJ_A40C 12.50
. 13.85
15.35
16.85
18.35
19.85 23.50 3.65 23.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Set up
Foam General Preparation rig
Cement Standing Rest and meal
Work Drilling OH
Fuel - Solar (liter) 20 Work Drilling coring
General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 10.35
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

12.50 1.50 1.50 100%


13.85 1.35 1.35 100%
15.35 1.50 1.50 100%
16.85 1.50 1.50 100%
18.35 1.50 1.50 100%
19.85 1.50 1.50 100%
25.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 12:00 3.500
12:00 13:00 1.000
13:00 13:30 0.500
13:30 17:00 3.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :13 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A45 581486 105924 0.00 39.00 39.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam General Set up
Cement Work Drilling OH
General Rest and meal
Fuel - Solar (liter) 20 General Continue drilling OH
General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:30 1.000
8:30 9:30 1.000
9:30 12:00 2.500
12:00 13:00 1.000
13:00 17:00 4.000
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE :14 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A45 581486 105924 0.00 39.00 39.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling progres
Cement General Flushing
General Geophisical logging
Fuel - Solar (liter) 20 General Rig down
General Moving
General Set up
Hydraulic Oil (Liter) General Back to camp
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
10:00 12:00 2.000
12:00 12:30 0.500
12:30 13:00 0.500
13:00 14:00 1.000
14:00 16:00 2.000
16:00 17:00 1.000
17:00 17:30 0.500
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE :15 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A47C 581875 107001 0.00 7.00 7.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
BreakdownTrouble machine yanmar
Foam Work Drilling progres
Breakdow
Cement n Trouble machine yanmar
General Back to camp
Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
7:00 7:30 0.500
achine yanmar 7:30 12:00 4.500
12:00 13:00 1.000
achine yanmar 13:00 16:30 3.500
16:30 17:00 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE :16 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A47C 581875 107001

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Trouble machine yanmar/standby

Foam
Cement

Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
achine yanmar/standby 7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE :17 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A47C 581875 107001

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Trouble machine yanmar/standby

Foam
Cement

Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00 Mobil breakdown
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
achine yanmar/standby 7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE :18 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A47C 581875 107001

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Trouble machine yanmar/standby

Foam
Cement

Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 0.00 Mobil breakdown
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

HOURS
Remark From To AGG
achine yanmar/standby 7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE :19 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

7.00 12.00 5.00 12.00


DHTJ_A47C 581875 107001
12.50
13.90
15.40
16.30 20.00 3.70 20.00
21.50
23.00
24.50
25.50
27.00 32.00 5.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Preparation rig
Foam Work Drilling OH
Cement Work Drilling coring
General Flushing
Fuel - Solar (liter) 20 General Geophisical logging
General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : Remark :


Total Coring : 11.30
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

12.50 0.50 0.50 100%

13.90 1.40 1.40 100%


15.40 1.50 1.50 100%
16.30 0.90 0.90 100%
21.50 1.50 1.40 93%
23.00 1.50 1.50 100%
24.50 1.50 1.50 100%
25.50 1.00 1.00 100%
27.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
10:00 10:30 0.500
10:30 16:00 5.500
16:00 16:30 0.500
16:30 17:00 0.500
17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :21 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

0.00 43.00 43.00


DHTJ_A50 581506 107163 137

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Flushing
Foam General Geophysical Logging
Cement General Moving
Work Drilling OH
Fuel - Solar (liter) 20 General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 43.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
10:00 11:00 1.000
11:00 14:00 3.000
14:00 17:30 3.500
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :22 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) Total (m) From (m)

DHTJ_A50 581506 107163 137 43.00 60.00 17.00


DHTJ_A53 581539 107124 144 0.00 20.00 20.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Work Drilling OH
Foam General Geophysical Logging
Cement General Moving
Work Drilling OH
Fuel - Solar (liter) 20 General Back to camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 37.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
11:30 12:30 1.000
12:30 15:00 2.500
15:00 17:30 2.500
17:30 18:00 0.500
9.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Ravu
DATE :23 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A53C 581539 107124 144 20.00 25.50 5.50 25.50


27.00
28.35
29.10
30.60 50.00 19.40

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Work Drilling OH
Foam Work Drilling Coring
Cement Work Drilling OH
General Back to camp
Fuel - Solar (liter) 20

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 24.90 Remark :


Total Coring : 5.10
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

27.00 1.50 1.50 100%


28.35 1.35 1.35 100%
29.10 0.75 0.75 100%
30.60 1.50 0.75 50%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 10:00 2.500
11:30 15:30 4.000
15:30 17:00 1.500
17:00 17:30 0.500
9.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE :25 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A55C 581520 107145 142 0.00 10.10 10.10 10.10


10.95 13.00 2.05

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Breakdown Repair mesin yanmar 65
Foam Work Drilling OH
Cement Work Driling Coring
Work Drilling OH
Fuel - Solar (liter) 20 General Back to Camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 12.15 Remark :


Total Coring : 0.85
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

10.95 0.85 0.05 6%

HOURS
Remark From To AGG
7:00 7:30 0.500
sin yanmar 65 7:30 12:40 5.167
12:40 17:00 4.333
17:00 17:20 0.333
17:20 17:40 0.333
17:40 18:15 0.583
11.250
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE :26 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A55C 581520 107145 142 13.00 14.40 1.40 14.40


15.60 30.00 14.40

DHTJ_A58C 581521 107139 138 0.00 14.95 14.95 14.95

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Breakdown Drilling OH at DHTJ-55C
Foam Work Drilling Coring at DHTJ-55C
Cement Work Driling OH at DHTJ-55C
General Geophysical Logging
Fuel - Solar (liter) 20 General Moving
Work Drilling OH at DHTTJ-58C
Work Drilling Coring at DHTJ-58C
Hydraulic Oil (Liter) General Back to Camp
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 30.75 Remark :


Total Coring : 2.70
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

15.60 1.20 1.20 100%

16.45 1.50 0.90 60%

HOURS
Remark From To AGG
7:00 7:30 0.500
at DHTJ-55C 7:30 10:00 2.500
ring at DHTJ-55C 10:00 10:25 0.417
at DHTJ-55C 10:25 10:40 0.250
10:40 11:15 0.583
11:15 13:00 1.750
at DHTTJ-58C 13:00 17:00 4.000
ring at DHTJ-58C 17:00 17:30 0.500
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE :27 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A58C 581521 107139 138 16.45 21.00 4.55


DHTJ_A58CR 581524 107139 138 0.00 10.00 10.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Work Drilling OH at DHTTJ-58C
Foam General Geophysical Logging
Cement General Moving
Work Drilling OH at DHTJ-A58CR
Fuel - Solar (liter) 20 Standing Perbaikan spy motor rotary
General Back to Camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 14.55 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
at DHTTJ-58C 7:30 12:00 4.500
12:00 12:30 0.500
12:30 13:00 0.500
at DHTJ-A58CR 13:00 16:00 3.000
spy motor rotary 16:00 17:00 1.000
17:30 18:00 0.500
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE :28 Febuari 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A58CR 581524 107139 138 10.00 13.00 3.00 13.00


14.50
15.80
16.95 21.00 4.05

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Work Drilling OH at DHTTJ-58CR
Foam Work Drilling Coring at DHTTJ-58CR
Cement General Geophysical Logging
General Moving & Setup rig DHTJ-A60C
Fuel - Solar (liter) 20 General Back to Camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 7.05 Remark :


Total Coring : 3.95
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

14.50 1.50 0.90 60%


15.80 1.30 0.65 50%
16.95 1.15 1.15 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
at DHTTJ-58CR 7:30 12:00 4.500
ring at DHTTJ-58CR 12:00 14:30 2.500
14:30 15:00 0.500
Setup rig DHTJ-A60C 15:00 17:30 2.500
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE :1Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A60C 581808 107550 0.00 0.08 0.08 0.08
2.30
3.80 10.00 6.20
DHTJ_A62C 581822 107539 0.00 5.00 5.00 5.00
6.50
8.00 13.00 5.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare
Foam Work Drilling Coring at DHTJ_A60C
Cement General Rest & Meal
General Geophysical Logging
Fuel - Solar (liter) 20 General Moving To DHTJ_A62C
Work Drilling CR
General Back To Camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 16.28 Remark :


Total Coring : 6.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
2.30 1.50 0.65 43%
3.80 1.50 1.50 100%

6.50 1.50 1.30 87%


8.00 1.50 0.85 57%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
ring at DHTJ_A60C 9:00 12:00 3.000
12:00 13:00 1.000
13:00 13:30 0.500
DHTJ_A62C 13:30 14:30 1.000
14:30 17:00 2.500
17:00 17:30 0.500
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 2 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A62C 581822 107539

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare
Foam General Geophysical Logging
Cement Breakdown Repair Menara ( Las)

Fuel - Solar (liter)

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
9:00 9:30 0.500
9:30 17:00 7.500
10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 3 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A63C 582132 107340 0.00 2.40 2.40 2.40
3.90
5.40 8.00 2.60 8.00
9.50
11.00 24.30 13.30 24.30
25.40
26.90 28.50 1.60 28.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare Moving
Foam General Travelling Moving ( Demob)
Cement General Setting Unit
General Rest & Meal
Fuel - Solar (liter) 20 L Work Drilling OH
General Back To Camp

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 19.90 Remark :


Total Coring : 10.10
Total Depth Drilled :
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
3.90 1.50 1.50 100%
5.40 1.50 1.50 100%
9.50 1.50 1.50 100%
11.00 1.50 1.50 100%
25.40 1.10 1.10 100%
26.90 1.50 1.50 100%
30.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.500
Moving ( Demob) 9:00 11:30 2.500
11:30 12:00 0.500
12:00 13:00 1.000
13:00 17:30 4.500
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jumad
DATE : 4 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A63C 582132 107340 30.00 30.50 0.50 30.50
32.00 34.00 2.00 34.00
35.50
37.00 39.00 2.00 39.00
40.50
42.00 45.00 3.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
Work Drilling OH/CR, EOH
Foam General Geophisical Logging
Cement General Down Rig & Prepare to moving
General Back to Camp
Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 7.50 Remark :


Total Coring : 7.50
Total Depth Drilled : 15.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
32.00 1.50 1.50 100%
35.50 1.50 1.50 100%
37.00 1.50 1.50 100%
40.50 1.50 1.50 100%
42.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 15:00 7.500
15:00 16:00 1.000
& Prepare to moving 16:00 17:00 1.000
17:00 18:00 1.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 5 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A65C 581798 106560 117 m 0.00 3.00 3.00 3.00
4.50
6.00 9.00 3.00 9.00
10.20
11.70
13.20
14.70 27.75 13.05 27.75

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving Rig to DHTJ_A65C
Foam Work Drilling OH/CR, Continue
Cement General Back to Camp

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 19.05 Remark :


Total Coring : 8.70
Total Depth Drilled : 27.75
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
4.50 1.50 1.50 100%
6.00 1.50 1.50 100%
10.20 1.20 1.20 100%
11.70 1.50 1.50 100%
13.20 1.50 1.50 100%
14.70 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
g to DHTJ_A65C 7:30 11:00 3.500
/CR, Continue 11:00 17:30 6.500
17:30 18:00 0.500
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 6 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A65C 581798 106560 117 m

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Stanby Sarana LV Breakdown

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 18:00 11.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 7 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A65C 581798 106560 117 m 27.75
29.25
30.75 37.50 6.75 37.50
39.00 45.50 6.50 45.50
47.00 52.00 5.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Waiting Rain
General Go to site
Foam Work Drilling OH/CR, EOH
Cement General Geophisical Logging
General Back to camp
Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 18.25 Remark :


Total Coring : 6.00
Total Depth Drilled : 24.25
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
29.25 1.50 1.50 100%
30.75 1.50 1.50 100%
39.00 1.50 1.50 100%
47.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 12:00 5.000
12:00 13:00 1.000
13:00 17:00 4.000
17:00 18:00 1.000
18:00 19:00 1.000
12.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 8 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A68C 582362 107777 134 m

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Moving Rig to DHTJ_A68C
Foam General Setup Rig
Cement General Back to camp

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 8:00 1.000
g to DHTJ_A68C 8:00 16:00 8.000
16:00 17:00 1.000
17:00 18:00 1.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 9 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole Corin
Easting RL
Plan Actual From (m) To (m) (m) Total (m) To (m)
DHTJ_A68C 582362 134 m 0.00 12.00 12.00 12.00 13.30
13.30 18.00 4.70 18.00 19.50
19.50 20.50 1.00 20.50 22.00
22.00 34.50 12.50 34.50 35.90
35.90 37.15
37.15 38.25

CONSUMABLES ACTIVITY
Qty
Item Hole Description Remark
PVC General Go to site
Work Drilling OH/CR, Continue
Foam Standing Waiting rain
Cement Standing Service Machine Sancen
General Back to camp
Fuel - Solar (liter)

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole 30.20 Remark :


Total Coring 8.05 Hole Waterloss mulai di kedalaman 37.15 m ( Co
Total Depth Drilled 38.25
Total Depth Logging
Moving Distance

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
Cored (m) Recovered (m) Rec (%)
1.30 1.30 100%
1.50 1.50 100%
1.50 1.50 100%
1.40 1.40 100%
1.25 1.25 100%
1.10 1.10 100%

HOURS
From To AGG
7:00 8:00 1.000
8:00 15:00 7.000
15:00 16:00 1.000
16:00 17:00 1.000
17:00 18:00 1.000
11.000

di kedalaman 37.15 m ( Coring Run 6 )


DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 10 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A68C 582362 107777 134 m 38.25
39.25 41.00 1.75 41.00
42.50 51.00 8.50 51.00
52.50
54.00
55.15

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare to Drilling
Foam Work Drilling OH/CR, Continue
Cement Standing Service Machine Sancen
General Back to mess
Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 10.25 Remark :


Total Coring : 7.75 Trouble Machine Sancen
Total Depth Drilled : 18.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
39.25 1.00 1.00 100%
42.50 1.50 1.50 100%
52.50 1.50 1.50 100%
54.00 1.50 1.50 100%
55.15 1.15 1.15 100%
56.25 1.10 1.10 100%

HOURS
Remark From To AGG
7:00 8:00 1.000
8:00 9:00 1.000
/CR, Continue 9:00 16:00 7.000
chine Sancen 16:00 17:00 1.000
17:00 18:00 1.000
11.000

achine Sancen
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jumad
DATE : 11 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A68C 582362 107777 134 m 56.25
57.75 58.10 0.35 58.10
59.60 67.00 7.40

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare to Drilling
Foam Work Drilling OH/CR, EOH ( Waterloss )
Cement General Geophisical Logging
General Moving Rig to DHTJ_A71C
Fuel - Solar (liter) 20 L General Back to mess

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 7.75 Remark :


Total Coring : 3.00 Trouble Machine Sancen & Hole Waterl
Total Depth Drilled : 10.75
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
57.75 1.50 1.50 100%
59.60 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 8:00 1.000
8:00 9:00 1.000
/CR, EOH ( Waterloss ) 9:00 14:00 5.000
14:00 15:00 1.000
g to DHTJ_A71C 15:00 18:00 3.000
18:00 19:00 1.000
12.000

achine Sancen & Hole Waterloss


DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 12 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A71C 582606 108192 152 m 0.00 36.30 36.30 36.30
37.80 43.00 5.20 43.00
44.50
45.50

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare to Drilling
Foam Work Drilling OH/CR, Continue
Cement General Back to mess

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 41.50 Remark :


Total Coring : 4.00
Total Depth Drilled : 45.50
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
37.80 1.50 1.50 100%
44.50 1.50 1.50 100%
45.50 1.00 1.00 100%

HOURS
Remark From To AGG
7:00 8:00 1.000
8:00 9:00 1.000
/CR, Continue 9:00 17:00 8.000
17:00 18:00 1.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 13 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A71C 582606 108192 152 m 45.50 55.10 9.60 55.10
56.40
57.60
59.10
60.40
61.75
63.15 63.80 0.65 63.80

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare to Drilling
Foam Work Drilling OH/CR, Continue
Cement General Back to mess

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 10.25 Remark :


Total Coring : 9.25
Total Depth Drilled : 19.50
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
56.40 1.30 1.30 100%
57.60 1.20 1.20 100%
59.10 1.50 1.00 100%
60.40 1.30 1.30 100%
61.75 1.35 1.35 100%
63.15 1.40 1.40 100%
65.00 1.20 1.20 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.000
/CR, Continue 9:00 18:00 8.000
18:00 20:30 1.000
10.500
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 14 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A71C 582606 108192 152 m 65.00

66.50 71.30 4.80 71.30


72.10
73.60

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Prepare to Drilling
Foam Work Drilling OH/CR, Continue
Cement Standing Rest and meal
Work Continue drilling progres
Fuel - Solar (liter) 20 L General Flushing
General Geophisical logging
General Back to camp
Hydraulic Oil (Liter)
PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 4.80 Remark :


Total Coring : 5.20
Total Depth Drilled : 10.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)
66.50 1.50 1.50 100%

72.10 0.80 0.80 100%


73.60 1.50 1.50 100%
75.00 1.40 1.40 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 9:00 1.000
/CR, Continue 9:00 12:00 3.000
12:00 13:00 1.000
rilling progres 13:00 15:30 2.500
15:30 16:30 1.000
16:30 17:30 1.000
17:30 18:00 1.000
11.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 15 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A73 582501 108423 0.00 12.00 12.00

DHTJ_A74C 582539 108400 0.00 3.00 3.00 3.00


4.50
6.00 17.90 11.90 17.90
18.50
20.00 25.00 5.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC General Go to site
General Rig down
Foam General Moving
Cement General Set up rig
General Preparation rig
Fuel - Solar (liter) 20 L Work Drilling progres
General Flushing
General Geophisical logging
Hydraulic Oil (Liter) General Rig down
PERSONIL Hours General Moving
Driller Burhan General Set up rig
Mechanic Kasman Work Drilling progres
Crew Arul General Back to camp
Azis

Total Manpower Hour

Total Open Hole : 31.90 Remark :


Total Coring : 5.10
Total Depth Drilled : 37.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

4.50 1.50 1.50 100%


6.00 1.50 1.50 100%
18.50 0.60 0.60 100%
20.00 1.50 1.50 100%

HOURS
Remark From To AGG
7:00 7:30 0.500
7:30 8:00 1.000
8:00 11:00 3.000
11:00 12:00 1.000
12:00 13:00 1.000
13:00 13:30 1.000
13:30 14:00 0.500
14:00 14:30 0.500
14:30 15:00 0.500
15:00 15:30 1.000
15:30 16:00 0.500
16:00 18:00 2.000
18:00 18:30 0.500

13.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Rabu
DATE : 16 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A73 582501 108423

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Kamis
DATE : 17 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A73 582501 108423

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Jum'at
DATE : 18 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)
DHTJ_A73 582501 108423

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Ricardus
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Sabtu
DATE : 19 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Minggu
DATE : 20 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Senin
DATE : 21 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU RIG NO. : RG-02 AIR


PROJECT : Pre-Production Drilling RIG TYPE : Jacro-175
LOCATION : Kaubun SIZE : AW
DAY : Selasa
DATE : 22 Maret 2022
SHIFT Day Night

HOLE DRILLING
ID Open Hole
Easting Northing RL
Plan Actual From (m) To (m) (m) Total (m)

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole Description Remark
PVC Standing Servis car/Standby

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00 Remark :


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Sample ID :
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)

Setup/Down Rig
Pull Up/Down Rod
Hole Condition
Reaming/Flushing
Geophisical Logging
STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Coring
To (m) Cored (m) Recovered (m) Rec (%)

HOURS
Remark From To AGG
7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Rabu
DATE : 23 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)

DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)

ACTIVITY HOURS
Description Remark From To AGG
Standing Servis car/Standby 7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Kamis
DATE : 24 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A74C 582539 108400 25.00
28.75

32.95
49.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 29.30


Total Coring : 5.70
Total Depth Drilled : 35.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
27.25 2.25 27.25 28.75 1.50 1.50 100%
30.25 1.50 30.25 31.45 1.20 1.20 100%
31.45 32.95 1.50 1.50 100%
47.50 14.55 47.50 49.00 1.50 1.50 100%
60.00 11.00

ACTIVITY HOURS
Description Remark From To AGG
Standing Go to site 7:00 7:30 0.500
Standing Preparation rig 7:30 10:00 2.500
Work Drilling progres 10:00 11:00 1.000
Breakdown Trouble ymachine yanmar 11:00 13:00 2.000
Work Continue drilling progres 13:00 17:00 4.000
General Back to camp 17:00 17:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.500

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Jum'at
DATE : 25 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A74C 582539 108400

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
Standing Go to site 7:00 7:30 0.500
Standing Preparation rig 7:30 9:00 1.500
General Flushing 9:00 10:00 1.000
General Geophisical logging 10:00 11:00 1.000
General Back to camp/Trouble car 11:00 11:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

4.500

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Sabtu
DATE : 26 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DPTJ_C13 DHTJ_A76 582414 108181 0.00

DPTJ_C02 DHTJ_A78 582463 108153 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 30.00


Total Coring : 0.00
Total Depth Drilled : 30.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
15.00 15.00 #DIV/0!
#DIV/0!
15.00 15.00 #DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
General Go to site 7:00 7:30 0.500
General Rig down 7:30 9:00 1.500
General Moving 9:00 11:00 2.000
General Set up rig 11:00 12:00 1.000
Work Drilling progres 12:00 13:00 1.000
General Flushing 13:00 14:00 1.000
General Geophisical logging 14:00 14:30 0.500
General Rig down 14:30 15:00 0.500
General Moving 15:00 15:30 0.500
General Set up rig 15:30 16:00 0.500
Work Drilling progres 16:00 17:00 1.000
General Back to camp 17:00 17:30 0.500
0.000

10.500

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Minggu
DATE : 27 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DPTJ_C02 DHTJ_A78 582463 108153 15.00

DPTJ_C14 DHTJ_A79 582274 107961 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 13.50


Total Coring : 0.00
Total Depth Drilled : 13.50
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
16.50 1.50 #DIV/0!
#DIV/0!
12.00 12.00 #DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
General Go to site 7:00 7:30 0.500
General Preparation rig 7:30 9:00 1.500
General Driliing progres&Flushing 9:00 10:00 1.000
General Geohisical logging 10:00 10:30 0.500
Breakdwon Trouble logging 10:30 12:00 1.500
General Continue logging 12:00 12:30 0.500
General Rig down 12:30 13:30 1.000
General Moving 13:30 15:30 2.000
General Set up 15:30 16:30 1.000
Work Drilling progres 16:30 17:30 1.000
General Back to camp 17:30 18:00 0.500
0.000
0.000

11.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Senin
DATE : 28 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A81 582289 107949 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 10.00


Total Coring : 0.00
Total Depth Drilled : 10.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
10.00 10.00 #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
Breakdown Preparation machine logging 7:00 11:30 4.500
General Go to site 11:30 12:00 0.500
General Geophisical logging 12:00 12:30 0.500
General Rig down 12:30 13:00 0.500
General Moving 13:00 14:00 1.000
General Set up 14:00 14:30 0.500
Work Drilling progres 14:30 15:30 1.000
General Rain 15:30 16:00 0.500
General Geophisical logging 16:00 16:30 0.500
General Rig down 16:30 17:30 1.000
General Back to camp 17:30 18:00 0.500
0.000
0.000

11.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Selasa
DATE : 29 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
General Go to site 7:00 7:30 0.500
General Rig down 7:30 8:30 1.000
General Moving 8:30 10:00 1.500
Breakdown Trouble car 10:00 15:00 5.000
General Back to camp 15:00 15:30 0.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

8.500

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Rabu
DATE : 30 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 0.00


Total Coring : 0.00
Total Depth Drilled : 0.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
Breakdown Standby/trouble car 7:00 17:00 10.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

10.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Kamis
DATE : 31 Maret 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A83 582186 107733 0.00
DHTJ_A87 582231 107719 0.00

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 28.00


Total Coring : 0.00
Total Depth Drilled : 28.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
10.00 10.00 #DIV/0!
18.00 18.00 #DIV/0!
#DIV/0!
#DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
General Go to site 7:00 7:30 0.500
General Continue moving 7:30 10:30 3.000
General Set up 10:30 11:30 1.000
General Preparation rig 11:30 12:00 0.500
Work Drilling progres 12:00 12:30 0.500
General Flushing 12:30 13:00 0.500
Standing Waiting logging 13:00 14:30 1.500
General Gephisical loggig 14:30 15:00 0.500
General Rig down 15:00 15:30 0.500
General Moving 15:30 16:00 0.500
General Set up rig 16:00 16:30 0.500
Work Drilling progres 16:30 17:30 1.000
General Back to camp 17:30 18:00 0.500

11.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Jum'at
DATE : 01 APRIL 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A88C 0.00

9.40

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 15.60


Total Coring : 4.40
Total Depth Drilled : 20.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
5.00 5.00 5.00 6.40 1.40 1.30 93%
6.40 7.90 1.50 1.50 100%
7.90 9.40 1.50 1.50 100%
20.00 10.60 #DIV/0!

ACTIVITY HOURS
Description Remark From To AGG
Breakdown Prepare car 7:00 9:00 2.000
General Go to site 9:00 9:30 0.500
General Flushing 9:30 10:00 0.500
General Logging DHTJ_A87 10:00 10:30 0.500
General Rig down 10:30 11:00 0.500
General Moving 11:00 12:00 1.000
Standing Rest and meal 12:00 13:00 1.000
General Continue moving 13:00 14:00 1.000
General Set up 14:00 15:00 1.000
Work Drilling progres 15:00 17:30 2.500
General Back to camp 17:30 18:00 0.500
0.000
0.000

11.000

Remark :

Sample ID :
DAILY DRILLING REPORT

CLIENT : PT. TJPU


PROJECT : Pre-Production Drilling
LOCATION : Kaubun
DAY : Sabtu
DATE : 02 APRIL 2022
SHIFT Day Night

HOLE
ID Open Hole
Easting Northing RL
Plan Actual From (m)
DHTJ_A90C 582087 107448 0.00

3.95

9.65

CONSUMABLES ACTIVITY
Qty
Item Time Hole
PVC

Foam
Cement

Fuel - Solar (liter) 20 L

Hydraulic Oil (Liter)


PERSONIL Hours
Driller Burhan
Mechanic Kasman
Crew Arul
Azis

Total Manpower Hour

Total Open Hole : 15.50


Total Coring : 4.50
Total Depth Drilled : 20.00
Total Depth Logging :
Moving Distance :

Signatures
Driller : Burhan

Wellsite : Eko
WORK Drilling (OH/Coring)
GENERAL Traveling (Moving/Demob)
RT Setup/Down Rig
Pull Up/Down Rod
Hole Condition
RIG NO. : RG-02 AIR Reaming/Flushing
RIG TYPE : Jacro-175 Geophisical Logging
SIZE : AW STANDING Rest & Meal / Shifting
Water Problem
Waiting (Rain/Order/Geos)
BREAKDOW Repair / Service
Trouble Machine/Spere part

DRILLING
Open Hole Coring
To (m) (m) Total (m) To (m) Cored (m) Recovered (m) Rec (%)
1.85 1.85 1.85 2.45 0.60 0.60 100%
2.45 3.95 1.50 1.50 100%
7.25 3.30 7.25 8.15 0.90 0.90 100%
8.15 9.65 1.50 1.50 100%
20.00 10.35

ACTIVITY HOURS
Description Remark From To AGG
Standing Waiting car 7:00 13:00 6.000
General Go to site 13:00 13:30 0.500
General Flushing 13:30 14:00 0.500
General Logging DHTJ_A88C 14:00 14:30 0.500
General Rig down 14:30 15:00 0.500
General Moving 15:00 15:30 0.500
Standing Set up rig 15:30 16:00 0.500
Work Drilling progres 16:00 17:30 1.500
General Back to camp 17:30 18:00 0.500
0.000
0.000
0.000
0.000
11.000

Remark :

Sample ID :