Time/ energy/ recycle/ salvage implication

Our system has been developed within a 7 days’ time. This time is inclusive of
starting designing on paper to fabricating the unit ready to be tested. The time required for
fabrication of the equipment is 5 days.

The designing of such a system has been achieved without using any new component.
All the components used in making of the system functional are unused electrical equipment.
Hence the system could be produced without any additional cost to the company’s exchequer.