TERMINATION, JOINTING AND TESTING OF POWER CABLE

REFERENCE

CLIENT Malakoff Utilities Sdn. Bhd.

INSTALLATION From MDS 3 to MDS 2

PARTICULARS Size: 3 X 1C 630 mm² Rating: 36 KV Type: XLPE/SWA /SCT/PE


BEFORE JOINT/ TERMINATION OF CABLE

ITEM JOB DESCRIPTION / CHECKLIST COMMENTS REMARKS

1. Isolate the Incoming Supply to the cable N/A √ X Satisfactory / Fail

2. Check the cable condition and its termination N/A √ X Satisfactory / Fail

3. Disconnect cables from termination at Outgoing from


N/A √ X Satisfactory / Fail
MDS1 H10 to MDS2.

4. Trace all cables before cable spiking works and cutting


N/A √ X Satisfactory / Fail
carried out.

5. Conduct Insulation Resistance test on both new and


existing cables for Phase-to-Phase and Phase-to-Earth N/A √ X Satisfactory / Fail
connections.

6. Conduct Pressure test on NEW cables for Phase-to-Phase


and Phase-to-Earth at 100% rated test Voltage and on
N/A √ X Satisfactory / Fail
EXISTING cables for Phase-to-Phase and Phase-to-Earth
at 75% rated test Voltage

7. Cable is ready for jointing works. N/A √ X Satisfactory / Fail

AFTER JOINT/ TERMINATION OF CABLE

ITEM JOB DESCRIPTION / CHECKLIST COMMENTS REMARKS

1. Check the cable condition and its termination/joints. N/A √ X Satisfactory / Fail

2. Inspect the condition of the cable lugs/ glands N/A √ X Satisfactory / Fail

3. Conduct Insulation Resistance test on cables for Phase-to-


N/A √ X Satisfactory / Fail
Phase and Phase-to-Earth connections

4. Conduct VLF Hi-pot test on cables for Phase-to-Phase and


N/A √ X Satisfactory / Fail
Phase-to-Earth connections

5. Carry out general cleaning of the cables N/A √ X Satisfactory / Fail

6. Terminate back the cables for both ends; Outgoing and


N/A √ X Satisfactory / Fail
Incoming side

REMARKS / RECOMMENDATIONS:

TESTED BY: WITNESSED BY:


DATE TESTED: DATE: