10 @150 C/C (PL2) LATERAL TIES

THROUGHTOUT THE LENGTH OF PILE


15 Nos 1m dia Piles NOTE :
1. CONC. GRADE
a. ABUTMENT AND PILES - M25
b. PILE CAPS - M25
2. CLEAR COVER
a. ABUTMENT and PILE CAP - 65 mm
b. BACK WALL - 40mm
c. ABUTMENT -65 mm
c. PILES - 80 mm
BAR BENDING SCHEDULE OF PILES AND PILE CAP(PER WALL)
S.N. SHAPE LABEL DIA. NOS. LENGTH WEIGHT
(mm) (m) (Kg/m)
400
10 @100 C/C (PL2) LATERAL TIES PL1 20 375 19.47 2.47 18034.09
AT TOP 1m LENGTH OF PILE NEAR HEAD 1 19070
M20 CONCRETE 2 250
PL2 10 1965 3.076 0.62 3747.62
3 1000 7400 1000 APC1 25 98 9.40 3.85 3546.62
4 1000 14500 1000 APC2 16 50 16.50 1.58 1303.50
5 1000 7400 1000 APC3 20 98 9.40 2.47 2275.36
10 @150 C/C (PL2) LATERAL TIES
THROUGHTOUT THE LENGTH OF PILE
6 1000 14500 1000 APC4 16 50 16.50 1.58 1303.50
7 APC5 8 3 44.80 0.40 53.76
8
1070 APC6 10 49 34.50 0.62 1048.31
TOTAL PER ABUTMENT FOUNDATION 31312.76 kg
Consultant: Department of Roads:
Government of Nepal
Ministry of Physical Planning Works &
DRG.No:-4
Transport Management Designed by: Checked by:
Pile Details IDRS-REC J/V SCALE:-
Checked by: Recom. by:
Sheet No:1
Approved by: Approved by: