Summary Recommended Load

Hilti HIT-RE100 with Rebar [K 250]


Deform Rebar Installed Length Develop to Yield
Hole Diameter lb,inst [mm] Length
[mm] 113 130 160 190 220 250 290 320 360 380 400 450 500 600 700 800 lb [mm]
10 Fdes [kN] 19.0 22.7 28.0 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 31.4 180
D 12 Vol.[ml] 5 6 8 9 10 11 13 15 16 17 18 20 22 27 31 36
13 Fdes [kN] 36.0 42.8 49.5 53.0 53.0 53.0 53.0 53.0 53.0 53.0 53.0 53.0 53.0 53.0 236
D 16 Vol.[ml] 14 17 20 22 26 28 32 34 35 40 44 53 61 70
16 Fdes [kN] 45.2 52.5 59.5 69.0 76.2 80.4 80.4 80.4 80.4 80.4 80.4 80.4 80.4 338
D 20 Vol.[ml] 28 32 36 42 47 52 55 58 65 72 87 101 116
19 Fdes [kN] 54.4 61.7 71.6 79.0 89.0 94.0 98.8 111.3 113.4 113.4 113.4 113.4 459
D 24 Vol.[ml] 48 54 63 69 78 82 86 97 108 129 151 172
22 Fdes [kN] 64.1 74.3 82.0 92.3 97.4 102.5 115.3 128.0 152.0 152.0 152.0 594
D 28 Vol.[ml] 75 87 96 108 114 120 135 150 180 210 240
25 Fdes [kN] 77.8 87.0 96.5 101.8 107.3 120.5 134.0 160.8 187.7 196.3 733
D 32 Vol.[ml] NOT RECOMMENDED 116 128 144 152 160 180 200 240 280 320
29 Fdes [kN] 94.0 103.5 109.5 115.2 129.5 144.0 172.8 201.5 230.3 918
D 35 Vol.[ml] 123 139 146 154 173 192 231 269 308
32 Fdes [kN] 110.0 115.8 121.8 137.0 152.3 182.8 213.0 243.5 1057
D 40 Vol.[ml] 208 219 231 260 288 346 404 461

Condition : Reaction Time :


Rebar yield strength fyk 400 N/mm2
Temperature of the Working time in which rebar Curing time before rebar
Concrete grade (cube) fck 25 N/mm2 base material : can be inserted and adjusted : can be fully loaded
Spacing s 150 mm
Clear cover c 100 mm 40º 12 Min 4 hours
30º 20 Min 8 hours
Partial safety factor : 20º 30 Min 12 hours
Steel �s 1.15 15º 1.5 hours 24 hours
10º 2 hours 48 hours
5º 2.5 hours 72 hours

© Summary Recommended Load HIT-RE 100 - PT. Hilti Nusantara Hilti. Outperform. Outlast.