CA No.

: CE(AF)SZ/PAN/18 OF 2013-14
Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

1 2-Jul-14 38.52 50.37 0.765 35.70 52.74 0.677


2 6-Jul-14 34.37 50.97 0.674 36.52 54.37 0.672
3 11-Jul-14 34.37 51.56 0.667 35.02 54.66 0.641
4 19-Jul-14 40.67 54.52 0.746 49.18 53.63 0.917
5 28-Jul-14 34.97 53.33 0.656 42.07 50.96 0.826
6 31-Jul-14 36.74 52.74 0.697 41.93 51.85 0.809
7 1-Aug-14 38.59 52.15 0.740 40.82 53.48 0.763
8 4-Aug-14 43.26 55.11 0.785 39.56 53.93 0.734
9 5-Aug-14 43.26 54.11 0.799 40.15 53.93 0.744
10 7-Aug-14 40.89 55.70 0.734 40.00 50.30 0.795
11 9-Aug-14 42.08 54.52 0.772 44.00 53.48 0.823
12 11-Aug-14 41.48 56.29 0.737 41.18 55.26 0.745
13 13-Aug-14 42.67 55.11 0.774 41.78 53.48 0.781
14 18-Aug-14 42.07 54.52 0.772 41.48 53.93 0.769
15 19-Aug-14 41.48 52.74 0.786 42.37 44.67 0.949
16 20-Aug-14 42.08 53.92 0.780 42.82 54.37 0.788
17 21-Aug-14 40.89 53.92 0.758 42.37 54.96 0.771
18 23-Aug-14 42.67 52.74 0.809 42.67 54.82 0.778
19 26-Aug-14 42.67 50.96 0.837 42.96 54.67 0.786
20 27-Aug-14 42.67 49.00 0.871 42.22 55.11 0.766
21 29-Aug-14 43.85 53.92 0.813 43.85 53.93 0.813
22 1-Sep-14 50.96 55.25 0.922 48.51 52.45 0.925
23 2-Sep-14 39.11 48.22 0.811 40.44 49.33 0.820
24 3-Sep-14 46.81 53.34 0.878 44.74 52.59 0.851
25 6-Sep-14 42.67 55.14 0.774 43.11 50.22 0.858
26 7-Sep-14 42.71 53.95 0.792 41.63 52.56 0.792
27 8-Sep-14 42.08 53.93 0.780 41.48 52.62 0.788
28 9-Sep-14 43.26 53.93 0.802 41.93 51.70 0.811
29 11-Sep-14 41.48 49.76 0.834 41.18 52.00 0.792
30 12-Sep-14 43.04 53.34 0.807 41.48 52.89 0.784
31 13-Sep-14 41.48 56.47 0.735 41.48 54.22 0.765
32 15-Sep-14 41.48 54.52 0.761 42.37 52.88 0.801
33 16-Sep-14 41.93 52.91 0.792 41.63 52.88 0.787
34 19-Sep-14 43.85 52.14 0.841 41.93 53.33 0.786
35 21-Sep-14 40.89 48.01 0.852 36.15 46.37 0.780
36 23-Sep-14 43.26 53.33 0.811 42.81 53.33 0.803
Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

37 25-Sep-14 42.08 56.29 0.748 44.15 53.63 0.823


38 26-Sep-14 43.26 58.09 0.745 43.71 53.92 0.811
39 27-Sep-14 43.86 53.92 0.813 41.93 55.56 0.755
40 1-Oct-14 44.45 51.55 0.862 42.37 53.77 0.788
41 2-Oct-14 46.22 48.64 0.950 44.92 51.41 0.874
42 7-Oct-14 46.23 50.38 0.918 41.34 52.15 0.793
43 8-Oct-14 44.45 53.57 0.830 44.00 53.78 0.818
44 9-Oct-14 45.98 52.74 0.872 43.70 54.66 0.799
45 13-Oct-14 45.04 53.62 0.840 44.00 54.67 0.805
46 16-Oct-14 41.48 51.56 0.804 40.00 52.00 0.769
47 18-Oct-14 48.59 54.51 0.891 42.66 53.04 0.804
48 19-Oct-14 40.29 49.18 0.819 42.22 54.96 0.768
49 20-Oct-14 43.26 53.33 0.811 43.11 53.63 0.804
50 21-Oct-14 40.54 51.79 0.783 44.29 54.67 0.810
51 27-Oct-14 40.74 52.14 0.781 42.22 52.89 0.798
52 23-Nov-14 42.96 55.11 0.780 43.85 53.93 0.813
53 1-Dec-14 37.93 53.33 0.711 41.33 44.89 0.921
54 1-Dec-14 39.11 52.15 0.750 41.18 45.33 0.908
55 2-Dec-14 37.33 53.33 0.700 41.93 49.33 0.850
56 2-Dec-14 38.52 52.15 0.739 42.07 49.78 0.845
57 3-Dec-14 37.33 52.14 0.716 42.52 50.37 0.844
58 3-Dec-14 39.11 51.55 0.759 41.78 49.63 0.842
59 4-Dec-14 37.33 53.30 0.700 41.78 50.96 0.820
60 4-Dec-14 39.11 52.15 0.750 41.48 51.11 0.812
61 4-Dec-14 38.52 53.93 0.714 41.78 51.11 0.817
62 5-Dec-14 38.52 52.15 0.739 42.82 48.59 0.881
63 5-Dec-14 39.11 52.75 0.741 42.52 49.18 0.865
64 6-Dec-14 40.3 52.15 0.773 41.78 50.22 0.832
65 15-Dec-14 39.7 52.15 0.761 42.22 51.85 0.814
66 15-Dec-14 39.7 51.56 0.770 42.52 51.85 0.820
67 16-Dec-14 39.7 52.15 0.761 37.04 52.15 0.710
68 16-Dec-14 37.93 60.52 0.627 37.34 51.41 0.726
69 17-Dec-14 39.11 52.15 0.750 42.81 51.56 0.830
70 17-Dec-14 39.11 51.56 0.759 42.08 51.11 0.823
71 18-Dec-14 35.56 50.97 0.698 39.71 50.96 0.779
72 18-Dec-14 36.74 50.37 0.729 41.33 51.76 0.798
73 19-Dec-14 39.7 52.15 0.761 42.22 51.41 0.821
74 19-Dec-14 40.3 53.33 0.756 42.37 51.85 0.817
75 20-Dec-14 38.52 52.74 0.730 42.37 51.71 0.819
76 20-Dec-14 39.7 53.33 0.744 42.22 50.96 0.828
77 29-Dec-14 41.48 52.60 0.789 42.80 50.22 0.852
78 29-Dec-14 40.89 51.56 0.793 42.52 50.82 0.837
79 30-Dec-14 41.48 50.96 0.814 42.67 50.96 0.837
80 30-Dec-14 41.48 52.60 0.789 42.82 51.26 0.835
81 30-Dec-14 42.08 51.56 0.816 42.22 51.26 0.824
Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

82 5-Jan-15 40.89 53.33 0.767 42.82 50.52 0.848


83 5-Jan-15 40.3 52.74 0.764 42.22 50.97 0.828
84 5-Jan-15 41.48 54.52 0.761 42.22 51.26 0.824
85 6-Jan-15 40.89 53.33 0.767 43.11 51.41 0.839
86 6-Jan-15 41.48 53.92 0.769 42.78 50.96 0.839
87 6-Jan-15 43.01 54.52 0.789 54.37 60.59 0.897
88 7-Jan-15 39.7 53.33 0.744 42.52 51.41 0.827
89 7-Jan-15 39.7 52.74 0.753 42.82 52.00 0.823
90 8-Jan-15 40.3 53.30 0.756 42.37 52.74 0.803
91 8-Jan-15 40.89 53.93 0.758 41.93 53.19 0.788
92 9-Jan-15 40.3 53.69 0.751 42.96 52.07 0.825
93 9-Jan-15 40.77 53.93 0.756 42.07 52.59 0.800
94 10-Jan-15 41.48 54.52 0.761 42.82 52.74 0.812
95 10-Jan-15 40.89 53.92 0.758 42.37 52.74 0.803
96 11-Jan-15 40.89 53.33 0.767 42.52 51.56 0.825
97 11-Jan-15 40.3 52.74 0.764 42.37 51.70 0.820
98 12-Jan-15 39.11 53.57 0.730 41.93 52.30 0.802
99 12-Jan-15 40.3 52.15 0.773 42.52 52.45 0.811
100 13-Jan-15 45.04 54.52 0.826 44.00 52.89 0.832
101 13-Jan-15 41.48 53.33 0.778 42.22 52.15 0.810
102 14-Jan-15 40.3 52.42 0.769 42.22 52.15 0.810
103 14-Jan-15 40.89 52.74 0.775 42.67 52.59 0.811
104 16-Jan-15 40.89 53.33 0.767 42.67 52.44 0.814
105 16-Jan-15 40.3 52.15 0.773 42.22 51.85 0.814
106 17-Jan-15 41.48 54.52 0.761 42.22 52.44 0.805
107 21-Jan-15 40.65 53.33 0.762 42.96 53.93 0.797
108 21-Jan-15 41.48 53.93 0.769 42.97 51.41 0.836
109 22-Jan-15 41.48 53.33 0.778 42.67 51.85 0.823
110 22-Jan-15 43.46 53.92 0.806 42.22 51.85 0.814
111 22-Jan-15 40.89 52.15 0.784 41.63 51.11 0.815
112 23-Jan-15 37.93 53.33 0.711 41.93 52.00 0.806
113 23-Jan-15 39.35 53.92 0.730 42.96 51.85 0.829
114 24-Jan-15 40.3 52.74 0.764 42.52 52.45 0.811
115 24-Jan-15 40.89 52.15 0.784 42.67 51.26 0.832
116 24-Jan-15 39.55 53.33 0.742 41.93 52.15 0.804
117 25-Jan-15 39.11 52.74 0.742 42.82 52.15 0.821
118 25-Jan-15 39.35 53.92 0.730 42.67 51.70 0.825
119 27-Jan-15 37.93 51.56 0.736 42.52 51.26 0.829
120 27-Jan-15 38.52 52.74 0.730 42.67 51.41 0.830
121 27-Jan-15 39.11 52.74 0.742 43.11 52.59 0.820
122 27-Jan-15 39.7 53.33 0.744 42.82 52.15 0.821
123 28-Jan-15 40.89 52.15 0.784 44.59 51.85 0.860
124 28-Jan-15 40.3 53.33 0.756 43.26 51.85 0.834
125 28-Jan-15 39.7 51.56 0.770 43.70 51.41 0.850
126 31-Jan-15 35.84 51.85 0.691 44.30 52.45 0.845
127 31-Jan-15 37.33 52.74 0.708 43.56 52.59 0.828
128 1-Feb-15 39.11 54.52 0.717 40.44 52.30 0.773
129 1-Feb-15 42.67 53.33 0.800 43.11 51.85 0.831
130 2-Feb-15 42.71 52.74 0.810 41.63 52.59 0.792
Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

131 2-Feb-15 42.08 53.33 0.789 41.48 51.71 0.802


132 3-Feb-15 41.48 52.74 0.786 41.48 52.17 0.795
133 3-Feb-15 41.93 53.33 0.786 41.93 51.70 0.811
134 3-Feb-15 40.89 52.74 0.775 41.93 51.70 0.811
135 4-Feb-15 42.08 51.56 0.816 43.70 52.74 0.829
136 4-Feb-15 43.26 52.74 0.820 43.71 52.00 0.841
137 4-Feb-15 40.29 51.56 0.781 42.22 51.11 0.826
138 5-Feb-15 40.5 51.72 0.783 42.22 52.59 0.803
139 5-Feb-15 41.19 50.97 0.808 43.85 51.85 0.846
140 7-Feb-15 42.08 51.88 0.811 42.52 51.85 0.820
141 7-Feb-15 42.67 50.96 0.837 43.41 52.00 0.835
142 8-Feb-15 39.7 52.15 0.761 42.96 51.71 0.831
143 8-Feb-15 40.89 52.74 0.775 43.11 52.15 0.827
144 10-Feb-15 41.48 52.75 0.786 42.37 52.88 0.801
145 10-Feb-15 4.89 52.74 0.093 42.22 53.32 0.792
146 11-Feb-15 39.11 49.18 0.795 42.82 54.51 0.786
147 11-Feb-15 38.52 53.30 0.723 42.52 50.96 0.834
148 12-Feb-15 38.52 52.74 0.730 42.37 54.36 0.779
149 12-Feb-15 39.7 52.74 0.753 42.22 53.32 0.792
150 13-Feb-15 41.48 52.74 0.786 42.52 54.36 0.782
151 13-Feb-15 40.89 52.74 0.775 42.82 53.18 0.805
152 14-Feb-15 42.07 53.93 0.780 42.67 54.36 0.785
153 14-Feb-15 41.72 52.76 0.791 42.96 53.92 0.797
154 17-Feb-15 41.48 52.74 0.786 43.11 50.22 0.858
155 17-Feb-15 42.67 53.93 0.791 43.11 50.96 0.846
156 20-Feb-15 39.11 51.53 0.759 42.37 50.36 0.841
157 20-Feb-15 40.89 50.96 0.802 43.26 50.07 0.864
158 21-Feb-15 38.52 53.36 0.722 43.26 50.07 0.864
159 21-Feb-15 39.7 53.93 0.736 42.96 50.66 0.848
160 22-Feb-15 40.89 52.74 0.775 43.41 52.15 0.832
161 22-Feb-15 39.7 52.74 0.753 43.41 51.70 0.840
162 23-Feb-15 40.89 53.33 0.767 42.22 52.59 0.803
163 23-Feb-15 40.3 52.74 0.764 42.52 52.00 0.818
164 24-Feb-15 38.52 52.15 0.739 42.22 51.70 0.817
165 25-Feb-15 38.52 51.56 0.747 41.93 51.85 0.809
166 25-Feb-15 37.93 51.56 0.736 42.07 51.40 0.818
167 26-Feb-15 39.11 52.74 0.742 41.78 52.00 0.803
168 26-Feb-15 37.33 53.92 0.692 42.52 52.30 0.813
169 27-Feb-15 39.11 52.74 0.742 41.48 52.00 0.798
170 27-Feb-15 38.52 52.74 0.730 41.78 51.56 0.810
171 27-Feb-15 38.52 50.97 0.756 42.82 51.41 0.833
172 28-Feb-15 40.3 51.69 0.780 42.22 51.26 0.824
173 28-Feb-15 39.7 50.97 0.779 41.78 51.56 0.810
174 2-Mar-15 40.3 52.74 0.764 42.22 51.41 0.821
175 2-Mar-15 40.89 53.33 0.767 42.82 51.85 0.826
176 2-Mar-15 40.89 53.93 0.758 42.78 51.26 0.835
177 3-Mar-15 42.66 53.33 0.800 47.25 52.59 0.898
178 3-Mar-15 40.89 52.15 0.784 45.62 51.41 0.887
179 5-Mar-15 43.85 52.74 0.831 46.81 52.45 0.892
Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

180 7-Mar-15 41.48 52.15 0.795 45.47 52.59 0.865


181 7-Mar-15 42.66 52.74 0.809 46.96 52.00 0.903
182 8-Mar-15 42.69 53.33 0.800 43.41 52.89 0.821
183 10-Mar-15 43.26 55.12 0.785 44.73 51.41 0.870
184 10-Mar-15 42.07 52.75 0.798 43.70 51.41 0.850
185 10-Mar-15 42.67 55.12 0.774 43.25 51.70 0.837
186 10-Mar-15 43.26 53.34 0.811 43.84 51.26 0.855
187 19-Mar-15 40.89 52.74 0.775 42.07 54.66 0.770
188 19-Mar-15 40.3 51.56 0.782 42.96 52.00 0.826
189 19-Mar-15 40.3 53.33 0.756 42.22 53.63 0.787
190 20-Mar-15 40.89 51.79 0.790 42.22 52.89 0.798
191 20-Mar-15 39.7 53.92 0.736 42.52 49.33 0.862
192 20-Mar-15 40.3 52.14 0.773 42.07 50.37 0.835
193 21-Mar-15 40.89 55.11 0.742 42.07 52.15 0.807
194 21-Mar-15 39.7 54.52 0.728 42.67 53.04 0.804
195 22-Mar-15 40.3 54.52 0.739 42.52 52.30 0.813
196 22-Mar-15 40.89 51.56 0.793 42.96 52.00 0.826
197 22-Mar-15 40.89 51.38 0.796 42.96 52.59 0.817
198 23-Mar-15 40.3 53.95 0.747 42.37 52.56 0.806
199 23-Mar-15 40.89 53.93 0.758 42.82 52.60 0.814
200 25-Mar-15 39.11 53.93 0.725 41.93 51.70 0.811
201 25-Mar-15 40.3 49.76 0.810 42.37 52.00 0.815
202 25-Mar-15 39.11 53.34 0.733 41.48 52.89 0.784
203 26-Mar-15 40.3 51.55 0.782 42.07 53.77 0.782
204 26-Mar-15 40.3 50.37 0.800 43.11 51.41 0.839
205 26-Mar-15 40.3 50.38 0.800 42.07 52.15 0.807
206 27-Mar-15 39.7 53.57 0.741 42.82 53.78 0.796
207 27-Mar-15 40.3 52.74 0.764 41.63 54.66 0.762
208 27-Mar-15 39.7 53.62 0.740 42.82 54.67 0.783
209 28-Mar-15 40.3 53.34 0.756 42.52 51.55 0.825
210 28-Mar-15 40.89 55.12 0.742 42.07 52.15 0.807
211 3-Apr-15 40.3 55.71 0.723 43.56 48.44 0.899
212 3-Apr-15 39.12 55.71 0.702 43.41 48.45 0.896
213 3-Apr-15 43.3 53.93 0.803 42.81 49.30 0.868
214 4-Apr-15 40.89 51.56 0.793 43.40 49.33 0.880
215 6-Apr-15 40.89 55.12 0.742 42.22 51.56 0.819
216 6-Apr-15 42.67 52.75 0.809 42.67 50.82 0.840
217 7-Apr-15 40.3 55.42 0.727 42.52 52.74 0.806
218 7-Apr-15 39.11 53.92 0.725 42.81 52.74 0.812
219 8-Apr-15 41.48 53.33 0.778 43.11 51.56 0.836
220 8-Apr-15 40.89 52.74 0.775 43.41 51.70 0.840
221 9-Apr-15 40.3 55.11 0.731 42.22 52.74 0.801
222 14-Apr-15 41.48 52.74 0.786 41.48 52.59 0.789
223 14-Apr-15 43.26 53.33 0.811 41.93 51.85 0.809
224 15-Apr-15 46.81 53.17 0.880 44.74 51.85 0.863
225 15-Apr-15 42.67 51.56 0.828 43.11 51.41 0.839
226 16-Apr-15 39.11 53.93 0.725 42.81 51.70 0.828
227 16-Apr-15 39.11 52.78 0.741 42.08 52.30 0.805
228 17-Apr-15 35.56 53.33 0.667 39.71 52.30 0.759
Beams Cubes
Sl Date
No Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

229 20-Apr-15 41.48 52.74 0.786 42.37 51.70 0.820


230 20-Apr-15 42.67 53.33 0.800 41.63 51.85 0.803
231 20-Apr-15 43.85 54.52 0.804 41.93 51.70 0.811
232 20-Apr-15 40.89 53.33 0.767 36.15 51.26 0.705
233 21-Apr-15 43.26 52.87 0.818 43.71 51.85 0.843
234 21-Apr-15 43.86 53.93 0.813 41.93 50.82 0.825
235 22-Apr-15 44.45 52.74 0.843 42.37 52.15 0.812
236 22-Apr-15 46.22 54.52 0.848 44.92 51.41 0.874
237 23-Apr-15 43.85 52.15 0.841 41.34 51.85 0.797
238 23-Apr-15 44.45 52.15 0.852 44.00 51.26 0.858
239 24-Apr-15 40.89 51.56 0.793 42.37 51.85 0.817
240 24-Apr-15 38.52 52.15 0.739 43.26 51.11 0.846
241 28-Apr-15 39.11 53.33 0.733 41.93 52.74 0.795
242 29-Apr-15 40.3 52.74 0.764 42.52 51.11 0.832
243 30-Apr-15 39.71 52.74 0.753 44.15 52.59 0.840
244 30-Apr-15 37.93 51.56 0.736 44.44 51.41 0.864
245 2-May-15 40.89 53.93 0.758 43.11 51.26 0.841
246 2-May-15 42.07 55.11 0.763 43.41 50.96 0.852
247 2-May-15 40.3 52.74 0.764 43.11 51.70 0.834
248 3-May-15 40.89 52.90 0.773 42.52 51.11 0.832
249 3-May-15 41.48 53.92 0.769 42.52 51.26 0.829
250 4-May-15 42.07 52.74 0.798 42.82 50.82 0.843
251 4-May-15 41.48 53.33 0.778 43.26 51.11 0.846
252 5-May-15 40.3 53.17 0.758 42.52 50.96 0.834
253 5-May-15 39.11 52.74 0.742 41.78 51.26 0.815
254 6-May-15 41.11 52.15 0.788 43.11 51.70 0.834
255 6-May-15 40.3 52.15 0.773 43.41 50.82 0.854
256 6-May-15 40.89 52.74 0.775 42.52 51.11 0.832
257 7-May-15 41.48 52.74 0.786 42.82 51.41 0.833
258 7-May-15 40.3 53.33 0.756 43.11 51.85 0.831
259 11-May-15 41.48 54.52 0.761 42.52 50.96 0.834
260 12-May-15 41.48 52.74 0.786 42.52 51.41 0.827
261 12-May-15 42.07 52.74 0.798 43.11 51.85 0.831
262 13-May-15 40.3 52.74 0.764 42.22 51.41 0.821
263 13-May-15 40.89 52.15 0.784 42.52 51.41 0.827
264 14-May-15 39.7 52.15 0.761 42.67 51.26 0.832
265 14-May-15 39.11 53.33 0.733 42.81 51.70 0.828
266 15-May-15 40.29 42.82
267 15-May-15 39.11 43.11
268 16-May-15 40.3 42.67
269 19-May-15 41.48 42.96
270 20-May-15 41.48 42.67
271 20-May-15 39.11 42.37
272 21-May-15 41.48 41.18
273 21-May-15 41.93 41.93
274 22-May-15 39.7 42.67
275 1-Jun-15 40.3 43.71
276
277
Beams Cubes
Sl
No Date Flexural Strength Flexural Strength R Value (Ratio Flexural Strength Flexural Strength R Value (Ratio of
Value 7 Days Value 28 Days of 7/28 Day) Value 7 Days Value 28 Days 7/28 Day)

278
279
280
STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


1 2-Jul-14 50.37 2537.14
2 6-Jul-14 50.97 2597.94 (xm)2 2827.050
3 11-Jul-14 51.56 2658.43 N(xm)2 84811.500
4 19-Jul-14 54.52 2972.43 S (x)2 84924.24
5 28-Jul-14 53.33 2844.09 s2 = 3.888
S (x)2 - N(xm)2 ÷ (N-1)
6 31-Jul-14 52.74 2781.51
7 1-Aug-14 52.15 2719.62 s 1.972
8 4-Aug-14 55.11 3037.11
9 5-Aug-14 54.11 2927.89 LCL = xm- t . s 50.212
10 7-Aug-14 55.70 3102.49
11 9-Aug-14 54.52 2972.43
12 11-Aug-14 56.29 3168.56
13 13-Aug-14 55.11 3037.11
14 18-Aug-14 54.52 2972.43
15 19-Aug-14 52.74 2781.51
16 20-Aug-14 53.92 2907.37
17 21-Aug-14 53.92 2907.37
18 23-Aug-14 52.74 2781.51
19 26-Aug-14 50.96 2596.92
20 27-Aug-14 49.00 2401.00
21 29-Aug-14 53.92 2907.37
22 1-Sep-14 55.25 3052.56
23 2-Sep-14 48.22 2325.17
24 3-Sep-14 53.34 2845.16
25 6-Sep-14 55.14 3040.42
26 7-Sep-14 53.95 2910.60
27 8-Sep-14 53.93 2908.44
28 9-Sep-14 53.93 2908.44
29 11-Sep-14 49.76 2476.06
30 12-Sep-14 53.34 2845.16
SUM = 1595.06 84924.24
(xm) = 53.17

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2

31 13-Sep-14 56.47 3188.86


32 15-Sep-14 54.52 2972.43 (xm)2 2787.840
2
33 16-Sep-14 52.91 2799.47 N(xm) 83635.200
34 19-Sep-14 52.14 2718.58 S(x)2 83760.87
35 21-Sep-14 48.01 2304.96 s2 = 4.333
S(x)2 - N(xm)2 ÷ (N-1)
36 23-Sep-14 53.33 2844.09
37 25-Sep-14 56.29 3168.56 s 2.082
38 26-Sep-14 58.09 3374.45
39 27-Sep-14 53.92 2907.37 LCL = xm- t . s 49.678
40 1-Oct-14 51.55 2657.40
41 2-Oct-14 48.64 2365.85
42 7-Oct-14 50.38 2538.14
43 8-Oct-14 53.57 2869.74
44 9-Oct-14 52.74 2781.51
45 13-Oct-14 53.62 2875.10
46 16-Oct-14 51.56 2658.43
47 18-Oct-14 54.51 2971.34
48 19-Oct-14 49.18 2418.67
49 20-Oct-14 53.33 2844.09
50 21-Oct-14 51.79 2682.20
51 27-Oct-14 52.14 2718.58
52 23-Nov-14 55.11 3037.11
53 1-Dec-14 53.33 2844.09
54 1-Dec-14 52.15 2719.62
55 2-Dec-14 53.33 2844.09
56 2-Dec-14 52.15 2719.62
57 3-Dec-14 52.14 2718.58
58 3-Dec-14 51.55 2657.40
59 4-Dec-14 53.30 2840.89
60 4-Dec-14 52.15 2719.62
SUM = 1583.90 83760.87
(xm) = 52.80
STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Lab Engr Contractor JE Civil Engr-In-Charge

Sl No Date Flexural Strength Value (Flexural Strength Value)2


61 4-Dec-14 53.93 2908.44
62 5-Dec-14 52.15 2719.62 (xm)2 2791.010
63 5-Dec-14 52.75 2782.56 N(xm)2 83730.300
64 6-Dec-14 52.15 2719.62 S(x)2 83828.75

65 15-Dec-14 52.15 2719.62 s2 = 3.395


66 15-Dec-14 51.56 2658.43 S(x)2 - N(xm)2 ÷ (N-1)
67 16-Dec-14 52.15 2719.62 s 1.843
68 16-Dec-14 60.52 3662.67
69 17-Dec-14 52.15 2719.62 LCL = xm- t . s 50.066
70 17-Dec-14 51.56 2658.43
71 18-Dec-14 50.97 2597.94
72 18-Dec-14 50.37 2537.14
73 19-Dec-14 52.15 2719.62
74 19-Dec-14 53.33 2844.09
75 20-Dec-14 52.74 2781.51
76 20-Dec-14 53.33 2844.09
77 29-Dec-14 52.60 2766.76
78 29-Dec-14 51.56 2658.43
79 30-Dec-14 50.96 2596.92
80 30-Dec-14 52.60 2766.76
81 30-Dec-14 51.56 2658.43
82 5-Jan-15 53.33 2844.09
83 5-Jan-15 52.74 2781.51
84 5-Jan-15 54.52 2972.43
85 6-Jan-15 53.33 2844.09
86 6-Jan-15 53.92 2907.37
87 6-Jan-15 54.52 2972.43
88 7-Jan-15 53.33 2844.09
89 7-Jan-15 52.74 2781.51
90 8-Jan-15 53.30 2840.89
SUM = 1584.97 83828.75
(xm) = 52.83

Lab Engr Contractor JE Civil Engr-In-Charge

Sl No Date Flexural Strength Value (Flexural Strength Value)2


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

91 8-Jan-15 53.93 2908.44


92 9-Jan-15 53.69 2882.62 (xm)2 2836.630
93 9-Jan-15 53.93 2908.44 N(xm)2 85098.900
94 10-Jan-15 54.52 2972.43 S(x)2 85125.39

95 10-Jan-15 53.92 2907.37 s2 = 0.914


96 11-Jan-15 53.33 2844.09 S(x)2 - N(xm)2 ÷ (N-1)
97 11-Jan-15 52.74 2781.51 s 0.956
98 12-Jan-15 53.57 2869.74
99 12-Jan-15 52.15 2719.62 LCL = xm- t . s 51.826
100 13-Jan-15 54.52 2972.43
101 13-Jan-15 53.33 2844.09
102 14-Jan-15 52.42 2747.86
103 14-Jan-15 52.74 2781.51
104 16-Jan-15 53.33 2844.09
105 16-Jan-15 52.15 2719.62
106 17-Jan-15 54.52 2972.43
107 21-Jan-15 53.33 2844.09
108 21-Jan-15 53.93 2908.44
109 22-Jan-15 53.33 2844.09
110 22-Jan-15 53.92 2907.37
111 22-Jan-15 52.15 2719.62
112 23-Jan-15 53.33 2844.09
113 23-Jan-15 53.92 2907.37
114 24-Jan-15 52.74 2781.51
115 24-Jan-15 52.15 2719.62
116 24-Jan-15 53.33 2844.09
117 25-Jan-15 52.74 2781.51
118 25-Jan-15 53.92 2907.37
119 27-Jan-15 51.56 2658.43
120 27-Jan-15 52.74 2781.51

SUM = 1597.88 85125.39


(xm) = 53.26

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


121 27-Jan-15 52.74 2781.51
122 27-Jan-15 53.33 2844.09 (xm)2 2753.100
2
123 27-Jan-15 53.93 2908.44 N(xm) 82593.000
124 28-Jan-15 52.15 2719.62 S(x)2 82622.84

125 28-Jan-15 53.33 2844.09 s2 = 1.029


126 28-Jan-15 51.56 2658.43 S(x)2 - N(xm)2 ÷ (N-1)
127 31-Jan-15 51.85 2688.42 s 1.014
128 31-Jan-15 52.74 2781.51
129 1-Feb-15 54.52 2972.43 LCL = xm- t . s 50.948
130 1-Feb-15 53.33 2844.09
131 2-Feb-15 52.74 2781.51
132 2-Feb-15 53.33 2844.09
133 3-Feb-15 52.74 2781.51
134 3-Feb-15 53.33 2844.09
135 3-Feb-15 52.74 2781.51
136 4-Feb-15 51.56 2658.43
137 4-Feb-15 52.74 2781.51
138 4-Feb-15 51.56 2658.43
139 5-Feb-15 51.72 2674.96
140 5-Feb-15 50.97 2597.94
141 7-Feb-15 51.88 2691.53
142 7-Feb-15 50.96 2596.92
143 8-Feb-15 52.15 2719.62
144 8-Feb-15 52.74 2781.51
145 10-Feb-15 52.75 2782.56
146 10-Feb-15 52.74 2781.51
147 11-Feb-15 49.18 2418.67
148 11-Feb-15 53.30 2840.89
149 12-Feb-15 52.74 2781.51
150 12-Feb-15 52.74 2781.51

SUM = 1574.09 82622.84


(xm) = 52.47

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


151 13-Feb-15 52.74 2781.51
152 13-Feb-15 52.74 2781.51 (xm)2 2772.020
153 14-Feb-15 53.93 2908.44 N(xm)2 83160.600
154 14-Feb-15 52.76 2783.62 S(x)2 83177.02

155 17-Feb-15 52.74 2781.51 s2 = 0.566


156 17-Feb-15 53.93 2908.44 S(x)2 - N(xm)2 ÷ (N-1)
157 20-Feb-15 51.53 2655.34 s 0.752
158 20-Feb-15 50.96 2596.92
159 21-Feb-15 53.36 2847.29 LCL = xm- t . s 51.522
160 21-Feb-15 53.93 2908.44
161 22-Feb-15 52.74 2781.51
162 22-Feb-15 52.74 2781.51
163 23-Feb-15 53.33 2844.09
164 23-Feb-15 52.74 2781.51
165 24-Feb-15 52.15 2719.62
166 25-Feb-15 51.56 2658.43
167 25-Feb-15 51.56 2658.43
168 26-Feb-15 52.74 2781.51
169 26-Feb-15 53.92 2907.37
170 27-Feb-15 52.74 2781.51
171 27-Feb-15 52.74 2781.51
172 27-Feb-15 50.97 2597.94
173 28-Feb-15 51.69 2671.86
174 28-Feb-15 50.97 2597.94
175 2-Mar-15 52.74 2781.51
176 2-Mar-15 53.33 2844.09
177 2-Mar-15 53.93 2908.44
178 3-Mar-15 53.33 2844.09
179 3-Mar-15 52.15 2719.62
180 5-Mar-15 52.74 2781.51

SUM = 1579.43 83177.02


(xm) = 52.65

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


181 7-Mar-15 52.15 2719.62
182 7-Mar-15 52.74 2781.51 (xm)2 2800.530
183 8-Mar-15 53.33 2844.09 N(xm)2 84015.900
184 10-Mar-15 55.12 3038.21 S(x)2 84074.76

185 10-Mar-15 52.75 2782.56 s2 = 2.030


186 10-Mar-15 55.12 3038.21 S(x)2 - N(xm)2 ÷ (N-1)
187 10-Mar-15 53.34 2845.16 s 1.425
188 19-Mar-15 52.74 2781.51
189 19-Mar-15 51.56 2658.43 LCL = xm- t . s 50.783
190 19-Mar-15 53.33 2844.09
191 20-Mar-15 51.79 2682.20
192 20-Mar-15 53.92 2907.37
193 20-Mar-15 52.14 2718.58
194 21-Mar-15 55.11 3037.11
195 21-Mar-15 54.52 2972.43
196 22-Mar-15 54.52 2972.43
197 22-Mar-15 51.56 2658.43
198 22-Mar-15 51.38 2639.90
199 23-Mar-15 53.95 2910.60
200 23-Mar-15 53.93 2908.44
201 25-Mar-15 53.93 2908.44
202 25-Mar-15 49.76 2476.06
203 25-Mar-15 53.34 2845.16
204 26-Mar-15 51.55 2657.40
205 26-Mar-15 50.37 2537.14
206 26-Mar-15 50.38 2538.14
207 27-Mar-15 53.57 2869.74
208 27-Mar-15 52.74 2781.51
209 27-Mar-15 53.62 2875.10
210 28-Mar-15 53.34 2845.16

SUM = 1587.60 84074.76


(xm) = 52.92

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


211 28-Mar-15 55.12 3038.21
212 3-Apr-15 55.71 3103.60 (xm)2 2862.250
213 3-Apr-15 55.71 3103.60 N(xm)2 85867.500
214 3-Apr-15 53.93 2908.44 S(x)2 85921.28

215 4-Apr-15 51.56 2658.43 s2 = 1.855


216 6-Apr-15 55.12 3038.21 S(x)2 - N(xm)2 ÷ (N-1)
217 6-Apr-15 52.75 2782.56 s 1.362
218 7-Apr-15 55.42 3071.38
219 7-Apr-15 53.92 2907.37 LCL = xm- t . s 51.457
220 8-Apr-15 53.33 2844.09
221 8-Apr-15 52.74 2781.51
222 9-Apr-15 55.11 3037.11
223 14-Apr-15 52.74 2781.51
224 14-Apr-15 53.33 2844.09
225 15-Apr-15 53.17 2827.05
226 15-Apr-15 51.56 2658.43
227 16-Apr-15 53.93 2908.44
228 16-Apr-15 52.78 2785.73
229 17-Apr-15 53.33 2844.09
230 20-Apr-15 52.74 2781.51
231 20-Apr-15 53.33 2844.09
232 20-Apr-15 54.52 2972.43
233 20-Apr-15 53.33 2844.09
234 21-Apr-15 52.87 2795.24
235 21-Apr-15 53.93 2908.44
236 22-Apr-15 52.74 2781.51
237 22-Apr-15 54.52 2972.43
238 23-Apr-15 52.15 2719.62
239 23-Apr-15 52.15 2719.62
240 24-Apr-15 51.56 2658.43

SUM = 1605.10 85921.28


(xm) = 53.50

Lab Engr Contractor JE Civil Engr-In-Charge


STANDARD DEVIATION : FLEXURAL STRENGTH

CA No. : CE(AF)SZ/PAN/18 OF 2013-14


Name of Work : Resurfacing of Runway and allied works at AF Station Panagarh
Contractor : M/s PNC Infratech Ltd

Sl No Date Flexural Strength Value (Flexural Strength Value)2


241 24-Apr-15 52.15 2719.62
242 28-Apr-15 53.33 2844.09 (xm)2 2803.700
2
243 29-Apr-15 52.74 2781.51 N(xm) 72896.200
244 30-Apr-15 52.74 2781.51 S(x)2 72898.79

245 30-Apr-15 51.56 2658.43 s2 = 0.104


246 2-May-15 53.93 2908.44 S(x)2 - N(xm)2 ÷ (N-1)
247 2-May-15 55.11 3037.11 s 0.322
248 2-May-15 52.74 2781.51
249 3-May-15 52.90 2798.41 LCL = xm- t . s 52.466
250 3-May-15 53.92 2907.37
251 4-May-15 52.74 2781.51
252 4-May-15 53.33 2844.09
253 5-May-15 53.17 2827.05
254 5-May-15 52.74 2781.51
255 6-May-15 52.15 2719.62
256 6-May-15 52.15 2719.62
257 6-May-15 52.74 2781.51
258 7-May-15 52.74 2781.51
259 7-May-15 53.33 2844.09
260 11-May-15 54.52 2972.43
261 12-May-15 52.74 2781.51
262 12-May-15 52.74 2781.51
263 13-May-15 52.74 2781.51
264 13-May-15 52.15 2719.62
265 14-May-15 52.15 2719.62
266 14-May-15 53.33 2844.09
267 15-May-15 0.00
268 0.00
269 0.00
270 0.00

SUM = 1376.58 72898.79


(xm) = 52.95

Lab Engr Contractor JE Civil Engr-In-Charge