You are on page 1of 2

ID.No./Seat No.

MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY,


JAMSHORO.

SECOND TERM SECOND YEAR (4TH TERM) B.E.(ENVIRONMENT)


SUPPLEMENTARY EXAMINATION 2011 OF 09-BATCH
PLUMBING DESIGN

Dated: 12-10-2011 Time Allowed: 03 Hours. Max.Marks 80


01. (a) Define plumbing , Explain why plumbing is essential for built forms [07]
(b) Write down general principles of plumbing [09]

02. (a) Briefly define the types of water closets [06]


What is water closet, with help of sectional sketch highlight the function of WC [10]
coupled with flushing system.

03. (a) What is cistern


(b) Evaluate the function of ball valve or float valve in water cistern [06]
(c) Analyze the function wall hung cistern [08]

04. (a) Define urinal and state it function and deployment


(b) What is faucet and analyze its function with help of sketch [10]

05. (a)What is direct and indirect supply of water? [06]

(b) State your detail comments and sketches to propose water supply mode for a [10]
house experiencing short of water supply.

06. (a) Define the terms drainage below and above the ground [04]
(b) Draw a sectional elevation of house showing soil and waste disposal system [12]
through employment of various appliances used in kitchen bath and toilets.
07. Define fire and with help of sketches analyze the function of sprinkler system to
fight fire rating “A”

08. Define yard hydrant, discus the function and application of yard hydrant in [16]
Pakistan.
NOTE: ATTEMPT ANY FIVE QUESTIONS.

Q.No. Marks

---------------THE END--------------

You might also like