Professional Documents
Culture Documents
Anritsu-S331A Maintenance Manual
Anritsu-S331A Maintenance Manual
a e
ri c
e fa
l
S er
e V
a
t
rn
In
xt 2
E 1
e g
tt in
ry
a rg
D ) B a
V A Ch
C
5 m
2 5C
1 4
-1
(
Site
t
Te or
st
P
Ma
ster
S33
R et
1A
D
F
1 AU
SCTO
AL
E
STA
CA RT
L
2 ES
C
CL AP
3 CA
L
EA E
R
SA
SEVE
TU
P
4
5 RE
SE CAL
TU L
P
LIM
IT 6
7 MA
RK
ER
SA
DISVE
PL
AY
8 EN
TE
9 RE
DISCA
PLLL
AY
R
ON
0 RU
OF HO N
F LD
This manual provides maintenance instructions for Paragraphs 4 through 7 contain tests that can be
the Site Master S110, S111, S112, S113, S330, used to verify the performance of the Site Master
S330A, S331, and S331A Personal SWR/ RL and and its components. These tests support the follow-
Fault Location Testers. It describes the product and ing models of the Site Master series having any ver-
provides performance verification procedures, parts sion of firmware; S110, S111, S112, S113, S330,
replacement procedures, and a replaceable parts list. S330A, S331, and S331A.
The Site Master (Figure 1) is a hand held SWR/RL 1. Press and hold the ESCAPE/CLEAR key,
(standing wave ratio/return loss) and Distance-To- then press the ON/OFF key to turn on
Fault measurement instrument. It combines a syn- the Site Master. (This sets the instru-
thesized source, VSWR Bridge, and receiver on a ment to the factory preset state.)
single printed circuit board (PCB). An optional
2. For models where there is no display
power monitor is also available. A block diagram is
contrast control on the top panel, release
shown in Figure 2.
the ESCAPE/CLEAR key and use the
Up/Down Arrow key to adjust the con-
trast to give a readable display.
A D C
S e r ia l
D is p la y C P U P o rt
4. CW MEASUREMENT NOTE
Before continuing, allow a five
4.1. Firmware Version 1.10 and Below minute warm up for the internal
circuitry to stabilize.
This following test can be used to verify the CW fre-
quency accuracy of the Site Master. The signal is not 2. Press the FREQ soft key.
a true CW frequency signal; rather, it consists of a
3. Press the F1 soft key, set to 1000.0 MHz,
narrow band of frequencies, centered on the selected
then press the ENTER key.
frequency. This “dithering” of the selected frequency
enhances the rejection of interference signals when 4. Press the F2 soft key, set to 1000.0 MHz,
used on a live site. Measurement calibration of the then press the ENTER key.
Site Master is not required for this test.
5. Connect a RF cable from the Site Master
Test Port to the RF Input on the
a. Equipment Required:
MS2602A.
· Spectrum Analyzer 6. Set up the Spectrum Analyzer as follows:
Anritsu Model MS2602A
(a) Press Preset.
b. Procedure: (b) Press Center and enter 1 GHz.
(c) Press Span and enter 500 kHz.
1. Press and hold the ESCAPE/CLEAR key,
then press the ON/OFF key to turn the (d) Press RB. Use the F5 key to toggle to
Site Master on. (This sets the instrument 30 kHz.
to the factory preset state).
(e) Press VBW. Use the F5 key to toggle
to OFF.
2 Site Master MM
(f) Press Ref Lvl. b. Procedure:
(g) Enter 10.00 dBm.
1. Press and hold the ESCAPE/CLEAR key,
(h) Press Shift and 8. then press the ON/OFF key to turn the
Site Master on. (This sets the instrument
(i) Press F3 to select LOG 2dB/.
to the factory preset state.)
(j) Press Attn.
NOTE
(k) Use the F6 key to toggle to 20dB.
Before continuing, allow a five
(l) Press SWP T. minute warm up for the internal
circuitry to stabilize.
(m) Use the F5 key to toggle to 20s.
(n) Press Shift and 4. 2. Press the FREQ soft key.
(o) Use the F3 key to toggle to A-Mode 3. Press the F1 soft key, set to 1000.0 MHz,
MAX. then press the ENTER key.
7. If the Site Master has gone into the hold 4. Press the F2 soft key, set to 1000.0 MHz,
mode, press the RUN/HOLD key to make then press the ENTER key.
the measurement.
5. Press the MAIN soft key to return to the
8. Allow a few sweeps to pass to create the Main Menu.
shape of a bandpass filter. The band-
width of the response should be greater 6. Press the OPT soft key to go to the Op-
than 175 kHz. tion Menu.
9. Use the Spectrum Analyzer marker to 7. Press the MORE soft key to go to the
measure the center of the response. The Option Sub-Menu.
frequency should be 1000 Mhz ±75 kHz. 8. Press the B6 soft key to turn Fixed CW
on.
4.2. Firmware Version 2.0 and Above
9. Connect the RF cable from the Site Mas-
Site Master Firmware Version 2.0 and above pro- ter Test Port to the RF Input on the
vides a Fixed CW function. This function lets you MS2602A.
measure the accuracy of the selected CW frequency 10. Set up the Spectrum Analyzer as follows:
without the “dithering.” Measurement calibration of
the Site Master is not required for this test. (a) Press Preset.
(b) Press Center and enter 1 GHz.
a. Equipment Required:
11. If the Site Master has gone into the hold
· Spectrum Analyzer mode, press the RUN/HOLD key to make
Anritsu Model MS2602A the measurement.
12. Use the Spectrum Analyzer marker to
measure the center of the response. The
frequency should be 1000 Mhz ±75 kHz.
Site Master MM 3
5. RETURN LOSS VERIFICATION 7. Connect the 6 dB offset to the Test Port
and verify that the reading is:
The following test can be used to verify the accuracy
q S110 and S111: 6 dB ±1.2 dB
of return loss measurements. Measurement calibra-
tion of the Site Master is required for this test.
q S112 and S113: 6 dB ±1.2 dB
a. Equipment Required:
q S330 and S331: 6 dB ±1.2 dB
· 20 dB offset, Anritsu SC5270
q S330A and S331A: 6 dB ±1.2 dB
· 6 dB offset, Anritsu SC5237
6. POWER MONITOR MEASUREMENTS
· Open/Short, Anritsu 22N50
· 50 Ohm Termination, If the Power Monitor (Option 5) is installed in the
Anritsu 26N50 or SM/PL Site Master, the following test can be used to verify
the accuracy of the power measurements. Measure-
b. Procedure: ment calibration of the Site Master is not required
for this test.
1. Press and hold the ESCAPE/CLEAR key,
then press the ON/OFF key to turn the a. Equipment Required:
Site Master on. (This sets the instrument
to the factory preset state.) · RF Detector, 10 MHz to 20 GHz,
Anritsu 560-7N50B
NOTE
· 10 dB Attenuator, Weinshel 1R-10
Before continuing, allow a five
minute warm up for the internal · 30 dB Attenuator, Weinshel 1R-30
circuitry to stabilize.
· RF Reference Source, 0.050 GHz,
Anritsu MA2418A
2. Press the FREQ soft key.
· DC Power Supply, Anritsu 2000-933
3. Press the F1 key, set the Site Master to
its lowest start frequency, then press the
b. Procedure
ENTER key.
4. Press the F2 key, set the Site Master to 1. Connect the DC Power Supply to the
its highest stop frequency, then press the MA2418A Reference Source. (Refer to
ENTER key. Figure 3 on the following page.)
5. Press the START CAL key and follow the 2. Connect the RF Detector output to the
instructions to perform a calibration us- RF Detector input on the Site Master.
ing a 22N50 Open/Short and 26N50 or
3. Connect the DC Power Supply to the ap-
SM/PL Termination.
propriate line voltage to supply power to
6. Connect the 20 dB offset to the Test Port the MA2418A Reference Source.
and verify that the reading is:
4. Press and hold the ESCAPE/CLEAR key,
q S110 and S111: 20 dB ±1.7 dB then press the ON/OFF key to turn the
Site Master on. (This sets the instrument
q S112 and S113: 20 dB ±1.7 dB to the factory preset state.)
4 Site Master MM
Figure 3. Power Monitor Verification Test Setup
Site Master MM 5
Figure 4. 541XXA Precision Return Loss Test Setup
6 Site Master MM
20. When the calibration is complete, remove
1 : P R E C S N R L (A ) 1 0 .0 d B /D IV O F F S E T + 0 .0 d B
2 : O F F
5 4 1 4 7 A the 50 Ohm Termination.
P R E C IS IO N 21. Connect the SM/STL termination to the
R E T U R N L O S S
C A L IB R A T IO N beadless end of the air line and press the
Select key to begin the measurement.
C O N N E C T O P E N
T O A IR L IN E 22. Observe that the waveform displayed re-
sembles that shown in Figure 6.
23. Press the Cursor On/Off key to On.
24. Observe the CURSOR menu readout.
The minimum return loss reading for the
P R E S S S E L E C T
SM/STL temination should be 35 dB.
W H E N R E A D Y
25. Press the Cursor ON/Off key to Off.
S T A R T : 0 .0 1 0 0 G H z S T O P : 4 .0 0 0 0 G H z 26. Remove the SM/STL termination from
0 .4 G H z /D IV
4 0 1 p ts L E V E L + 7 .0 d B m the airline.
27. Repeat steps 21 thru 24 for the SM/PL
Figure 5. Example of a Good Connection termination. The minimum return loss
reading for the SM/PL termination
16. At the PRECISION RETURN LOSS should be 42 dB.
CALIBRATION menu prompt, connect
the Open to the beadless end of the air-
1 : P R E C S N R L (A ) 1 0 .0 d B /D IV O F F S E T + 0 .0 d B 5 4 1 4 7 A
line. Press the Select key to start the cal- 2 : O F F
ibration. C U R S O R
CAUTION 2 .4 0 5 0 G H z
During both calibration and
measurement, be sure to properly
align the beadless connector of the
airline. When the connectors are
mis-aligned, a spike will usually
P R E S S S E L E C T
be visible on the display. F O R
C U R S O R M E N U
S T A R T : 0 .0 1 0 0 G H z S T O P : 4 .0 0 0 0 G H z
18. At the next menu prompt, remove the 0 .4 G H z /D IV
4 0 1 p ts L E V E L + 7 .0 d B m
Open and connect the Short to the
beadless end of the airline. Press the Se-
lect key to start the calibration process. Figure 6. Direct Readout of the Precision Return Loss
Site Master MM 7
5
9
Detail A
7 (4 Places)
8 10
6
3
Raised
Wedge
er
ce Pownal
rfa er
Inteerial Ext
S
Chg ry
te
Bat GE
AR C
CH TATI
DISID S MAX
mA) C O X
(8505V
D AV VDC MA
.5-1 40 dBmON
12 0
+2 AUTI
C
rts
Po st
Te
t
De
2 (4 Places) RF
1 (4 Places)
8 Site Master MM
2. Replace the battery bracket (8) and insert 11. KEY PAD MEMBRANE REPLACEMENT
the four screws (7) to hold the battery
bracket in place. This procedure provides instructions for replacing
the key pad membrane. Refer to Figure 7 (page 8)
3. Reattach the battery connector to J6 (6) on during the procedure.
the main RF PCB assembly (3).
1. Place the Site Master face up on a work sur-
4. Set the bottom half in place. face.
5. While holding the two halves together, turn 2. Remove the four corner rubber bumpers (1).
the Site Master over and lay it face up on the
work surface. 3. Remove the four screws (PN 900-811) (2).
6. Reinstall the four screws (2). 4. While holding the two halves of the Site
Master together, turn it over and set it face
7. Install the rubber bumpers (1) on all four down on the work surface.
corners of the instrument.
CAUTION
10. BATTERY DISPOSAL In the next step, the PCB Assy (3)
and test port panel (4) must stay
The battery used in the Site Master is a recharge- with the front panel.
able nickel-cadmium (NiCd) battery and is covered
by the Battery Directive (91/157/EEC). As such, the 5. Remove the bottom half (5) and fold it over to
battery is marked as follows to indicate controlled lay upside down on the work surface.
disposal.
6. Disconnect the battery connector from J6 (6).
This marking indicates that
the battery is a recyclable 7. Remove the screw (10) located on the bottom
product. side of the main PCB Assy next to the RF
Bridge Assy.
This marking indicates that
the battery requires separate 8. Pull the PCB Assemblies clear from the top
collection and shows the half of the case.
chemical system (Nickel/
Cadmium). 9. Lift the damaged keypad membrane clear
from the keypad assembly.
% of Cell This marking indicates the
Component
Weight heavy-metal component 10. Install a new membrane.
Nickel 19 to 26% concentration as a percentage
Cadmium 17 to 22% of battery cell weight. NOTE
Carefully use pliers to pull the rub-
Spent nickel-cadmium batteries are valuable re- ber tabs tight to ensure that the
sources. Because they are reusable, do not throw membrane is flush with the PCB.
them away. Arrange for proper return for recycling
in your locality. If you do not have access to proper
disposal methods, return the battery pack to your
Anritsu service center. Service centers will dispose of
the unit at no charge. Anritsu service centers are
listed in Table 2 on page 11.
Site Master MM 9
12. LCD REPLACEMENT 13. MAIN RF PCB ASSEMBLY
REPLACEMENT
This procedure provides instructions for replacing
the Liquid Crystal Display (LCD). Refer to Figure 7 This procedure provides instructions for replacing
(page 8) during the procedure. the main RF PCB. Refer to Figure 7 (page 8) during
this procedure.
1. Place the Site Master face up on a work sur-
face. 1. Place the Site Master face up on a work sur-
face.
2. Remove the four corner rubber bumpers (1).
2. Remove the four corner rubber bumpers (1).
3. Remove the four screws (PN 900-811) (2).
3. Remove the four screws (PN 900-811) (2).
4. While holding the two halves of the Site
Master together, turn it over and set it face 4. While holding the two halves of the Site
down on the work surface. Master together, turn it over and set it face
down on the work surface.
CAUTION
In the next step, the PCB Assy (3) CAUTION
and test port panel (4) must stay In the next step, the PCB Assy (3)
with the front panel. and test port panel (4) must stay
with the front panel.
5. Remove the bottom half (5) and fold it over to
lay upside down on the work surface. 5. Remove the bottom half (5) and fold it over to
lay upside down on the work surface.
6. Disconnect the battery connector from J6 (6).
6. Disconnect the battery connector from J6 (6).
7. Remove the screw (10) located on the bottom
side of the main PCB Assy next to the RF 7. Remove the screw (10) located on the bottom
Bridge Assy. side of the main PCB Assy next to the RF
Bridge Assy.
8. Pull the PCB Assemblies clear from the top
half of the case. 8. Pull the PCB Assemblies clear from the top
half of the case.
9. Remove the grey/brown cable from the con-
nector J8. 9. Remove the four screws holding the LCD as-
sembly, but do NOT disconnect the 20-way
10. Remove the four screws from the LCD PCB connector from the keypad PCB assembly.
assembly.
10. While using pliers to gently squeeze the nine
11. Carefully remove the 20-way ribbon cable plastic spacer heads to release them from the
from the connector on the keypad PCB as- Keypad PCB assembly, carefully pull the
sembly. keypad PCB with the LCD from the main RF
PCB assembly.
12. Install the new LCD PCB Assembly.
11. Remove the four standoffs.
NOTE
For “CE” versions of the S110/S111
remove the EMI Shield cloth and
place on the new RF PCB assembly
during installation.
10 Site Master MM
12. Remove the three screws holding the main 14. REPLACEABLE PARTS
RF PCB assembly to the test port panel.
Replaceable parts for the Site Master are listed in
NOTE Table 1 on page 12.
Take care to not lose the mylar pad
under Q5.
14. Using a 5
16 - inch wrench, loosen the SMA
connector for the Test Port and remove the
test port panel.
NOTE
If the Power Monitor (Option 5) is in-
stalled, remove the two screws hold-
ing the Option 5 PCB assembly to the
test port panel and unsolder the
wires from pins 1 through 4 of the RF
Detector connector on the test port
panel.
Site Master MM 11
Table 1. Parts List
12 Site Master MM
Table 2. Anritsu Service Centers
Site Master MM 13
NOTES
14 Site Master MM