You are on page 1of 25

Gas – LNG Infrastructure,

Transport & Logistic Forum 2019

UTILIZATION OF PORTS FOR GAS - LNG


Working Area of PT Pelabuhan Indonesia III (Persero)
REGIONAL KALIMANTAN
 BANJARMASIN
 KOTABARU
 SAMPIT
REGIONAL JAWA TENGAH  KUMAI
 TANJUNG EMAS
 TPKS
 TANJUNG INTAN

Sampit
Kumai
Banjarmasin
Kotabaru

TanjungEmas
TPKS
Gresik
REGIONAL BBN
TanjungPerak
 BENOA
CelukanBawang
 TANJUNG WANGI
Port
43
TanjungIntan Tanjung
Tembaga Tanjung
Wangi Benoa Lembar Bima Maumere
 CELUKAN BAWANG
 LEMBAR

7Province Kupang
 BIMA
 MAUMERE
REGIONAL JAWA TIMUR  KUPANG
 TANJUNG PERAK
 GRESIK
 TANJUNG TEMBAGA
Our Service

Ship and MarineService StevedoringService ContainerService Dredging & Oil & Gas Service
Channel Service
TerminalService PassengerService Port Facility Property & Marina Logistic Service

OtherServices
6 Subsidiary
5 Afiliations
14 Subsidiary
BUSINESS UNIT PT PELINDO III (PERSERO) RELATED TO
LNG DEVELOPMENT AND ENERGY

PT Pelindo Marine Service PT Lamong Energi Indonesia


• Government Marine Services • Shore Connection Service
(Facilities and pilotage service in • Electrical Engineering & Contracting
accordance with government
• Ship Water Service
regulations)
• Bandwidth and Telematics Services
• Shipbroking
• Operators and Electricity
• International & NG Marine Services
Development Partner
(Facilities and / or pilotage services in
International waters)
PT Pelindo Energi Logistik
PT Terminal Teluk Lamong • Management Business Terminal
• Ship Service Tank
• Terminal Service • Unit Shorebase
• Stevedoring Service • LNG Business Unit
• Container & Dry Bulk Service
• Fuel Business Unit
• Terminal LNG Service
• Waste Management
Operation Scheme
LNG Seller
LNG Midstream PLTDG Pesanggaran Bali

LNG Sales Purchase Agreement (SPA)


LNG Buyer
Terminal LNG
Bontang
PT PELINDO ENERGI LOGISTIK

Carrier Storage Re-Gas Port A Pipe


FSRU Karunia FSU Lumbung LNG Terminal
ST Triputra
Dewata Dewata Benoa
22.500 cbm
26.000 cbm 2 x 25mmscfd

Pipeline ± 3,5 km
LNG / CNG Sales Purchase Agreement (SPA)
PLTDG Pesanggaran 200 MW
LNG Terminal Benoa Layout
FRU Gas Pipe to
LNGC
MRS
Triputra Lumbung Via Pig
22.500 cbm Dewata Launcher

FSRU
Karunia Dewata
26.000 cbm

Tower Pipe

2 Line
Cryogenic
Pipe

Operation
Office

Control Room
Development LNG Terminal and LNG Retail Filling Station
At Terminal Teluk Lamong

OR
U
FS

Terminal (Shared):
- LNGC
- FSU
- Port Services
- Port Charges
- Pipeline
ESTABLISMENT OF A JOINT VENTURE COMPANY FOR DEVELOPMENT LNG
TERMINAL AT TELUK LAMONG
Port Dues Regional Jatim Otoritas
Pelabuhan

Lease Agreement

51% LNG Carrier Provider


PT PGN LNG Indonesia

Joint-Venture Company
Head of Agreement PT Lamong Nusantara Gas Handling and Pipe
Midstream LNG
Terminal LNG Jawa Timur
 Regasification
 O&M

49%
PT Pelindo Energi Logistik FSU

Terminal Use Agreement

Cust.

12th September G
Phase 1: Gas 30 BBTUD
Gas Sales & Purchase Agreement

2019
a
s
Offtaker
LNG Retail

Phase 2: Gas 10 BBTUD


LNG Sales & Purchase Agreement (FOB)
PROGRESS CONSTRUCTION ORU AND LNG FILLING STATION
AT TERMINAL TELUK LAMONG

WORK FOUNDATION AND PIPPING INSTALLATION ORU


PROGRESS CONSTRUCTION ORU AND LNG FILLING STATION
AT TERMINAL TELUK LAMONG
WORKING PROGRESS CYROGENIC PIPELINE
WORKING PROGRESS OF ELECTRICAL FACILITIES ORU
LNG DEVELOPMENT OPPORTUNITIES
PORT OF CELUKAN BAWANG
01 PORT OF TANJUNG EMAS
NORTH BALI 02 SEMARANG – CENTRAL JAVA

PORT OF MEKARPUTIH
KOTABARU - KALIMANTAN 03
PORT OF TANJUNG INTAN
04 CILACAP – CENTRAL JAVA

JIIPE 05
LNG FOR CRUISE
06
LNG RETAIL FILLING STATION 07
Port Of Celukan Bawang - North Bali

Dmg. C.
DMG II Cair

Port Of Celukan
Bawang

PLTU Celukan
Bawang

Phase I Capacity 380 MW  Operated 2015


Phase II Capacity 330 MW  Start Development
2019
Port Of Mekar Putih – South Kalimantan

DMG II

Port Of Mekar Putih


Port OF Tanjung Emas Semarang – Central Java

TERMINAL LNG AT TANJUNG EMAS PORT TO SUPPORT


INDONESIA POWER TAMBAK LOROK CAPACITY 780 MW
Port OF Tanjung Intan Cilacap– Central Java

PLANNING
TERMINAL LNG

TERMINAL LNG TO SUPPORT REFINERY UNIT CILACAP


CAPACITY UP TO 200 MMSCFD
LNG FOR CRUISE
POWER PLANT - JIIPE
PT BERKAH MANYAR SEJAHTERA
PROJECT ON GOING

SMELTER FREPORT INDONESIA


• Soil & Civil Work In Progress

POWER PLANT 200 – 300 MW


• Progres Soil Investigation
PORT DEVELOPMENT PLAN

111 Ha
112 Ha
Dev stage 3
Dev stage 1
40 Ha (2022-2025)
(Finish)
Dev stage 2
(2021)
87 Ha
Dev stage 4
(2026-2035)
BUSINESS PARTNERS PT PELINDO III (PERSERO)
PT PERTAMINA AKR

PT PUPUK INDONESIA K3S HULU

PT SINAR MAS OTHERS


PT SEMEN INDONESIA
GROUP, PT PGN GROUP,
PT FKS GROUP, PT PLN,
SHIPPING COMPANY, Etc.
.
Integrated Services Shorebase Terminal
AFILIASI PELINDO III GROUP

Marine Servive

Terminal Gresik Logistic


Service
Fequipment Service

Spare part, Repair &


Maintenance

Health Service
PEL Integrated Services
Shorebase Terminal Labour Supply Servive

Catering

Warehouse
THANKS YOU