March 12 PORT HANDLING AT June 22 OFFLOADING BLADES September 15 OFFLOADING BASE TOWER SECTION FROM December 15 COMPLETE WIND TURBINE 2021 SOUTH VAN PHONG PORT 2021 FROM WIND TURBINE BLADE TRAILERS 2021 SELF-OFFLOADING TRUCK 2021 TRANSPORTATION
RAPID REACTIONS SERVE WIND ENERGY VICTORY.
The wind turbines at the Dak N’Drung It has been estimated that the construc- The region experienced exceptionally heavy (1,2,3) Wind Projects in Dak Song, Dak tion of a 300MW wind farm like this proj- rain. This transformed the compacted soil, Nong County, Vietnam, are 137 meters ect could require 1.300 truckloads, 280 which the turbines were to be stored on, in height from base to top, with 73.7 railcars, and eight ships. In this project, into a quagmire. With trailers were used meter-long blades. Transporting 10 there was no option but to transport wind to transport large and heavy parts of wind of these giant turbines, Power Load cargo by road. Driving trucks that were turbines, maintaining solid and stable access RESOURCES Optimised Mode down to 3.7 MW, was large enough to carry the wind turbine to the site was crucial for the project to be certainly a challenge. In addition to parts was an incredibly skilled job – At completed safely and successfully. contending with pouring rain and deep PPL, drivers must accomplish a four-year TRAILERS mud – completing the project on time training to be qualified for this work. PPL immediately set about re-deploying 17 axles hydraulic module trailer seemed to be an impossible task. It personnel and resources to assist with the 6 lowbed trailer was a remarkable performance from To maximize efficiency and optimize changing conditions. Loose topsoil was ≥46m extendable trailer PPL to bring 300 megawatts of wind resilience, the scope of work was split removed, drainage was improved, all trailer between transportation technicians, truck paths and work areas were covered with 7 axles extendable trailer power to the Dak Nong on schedule. drivers, and crane operators. Each with heavy-duty matting to maintain a viable The logistical effort in transporting a dedicated support service comprising work area. This ensured sufficient resources SPECIAL EQUIPMENT items with the size and complexity of tooling technicians, mechanics, safety ad- and personnel were mobilized to meet the 2 MAN’s special prime mover these wind turbines was vast, involving visors, quality control, and management. requirements of the project while guaran- 4 Hyundai Trago prime mover specialized vehicles, equipment, and To maximize cost-effectiveness, a fluid teeing safety at all times. approach was taken to manpower, per- 5 SITRAK prime mover technicians. Onshore turbines had to travel a significant distance through sonnel was only acquired when needed. Thanks to PPL’s equipment, manpower, varied and challenging terrain and On top of the predictable challenges, PPL and rapid response, the project proceeded had to overcome another major unfore- without delay. The Wind Farm came into CREW across county lines. seen issue: the weather. commercial operation on schedule at the 40 PPL professionals end of 2021.