INNOVATIVE ADD-ON

PRIME MOVER
USED FOR
WIND POWER
TRANSPORTATION.

HUONG HOA
QUANG TRI, VIETNAM.

FASTER, SAFER, BIGGER


June 15 PORT HANDLING AT
HON LA PORT.
July 7 WIND TURBINES NACELLE
TRANSPORTATION.
July 20 OFFLOADING BASE
TOWER SECTION FROM July 30 COMPLETE
2021 2021 2021 SELF-OFFLOADING TRUCK. 2021 TRANSPORTATION

CHALLENGING ROUTE COMPLETED WITH INNOVATIVE ADD-ON PRIME MOVER AND STRONG MAN TRUCKS.
PPL negotiated steep gradients, long bridges There were numerous structures on the route, This route between the public highway and the
and other challenges to complete the transpor- including two long bridges, Giang (746,4 meter substation spanned almost 12 km and its con-
tation of 12 biggest wind turbines in Vietnam, length) and Quan Hau (549 meter length) stant bends and varying gradients made it the
with generator alone weighing 103t each. From both 12 meter-width, and PPL selected 16 axles most complex part of the transportation.
Hon La port of Quang Binh, the wind turbines, hydraulic module trailer to reduce the axle load-
with 76.293-meter-long blades, were trans- ings, enabling safe transportation over them On the MAN prime mover, steering, braking, RESOURCES
ported along a complex route 227 km length to all. All the bridges were assessed during the electrics, engine, and transmissions are syn-
Amaccao Wind farm in Quang Tri, where they planning stages to ensure they could support chronized by a computer, enabling each to be TRAILERS
are going to be successfully installed. the transport loads. matched across the vehicles and numerous 16 axles hydraulic module trailer
elements to be controlled identically. This made 6 lowbed trailer
Amaccao 1 wind farm generates 49.2 MW Another challenge on the route was the range of them the most efficient vehicles to assist with
≥46m extendable trailer 4 axles
sustainable power for more than 136.743 homes steep gradients, both up and downhill, that the traction during this section of the transporta-
10 axles extendable trailer
in Quang Tri County, Vietnam. Working with convoy needed to negotiate. PPL transported the tion. Driving trucks that were large enough to
the owner, Amaccao, PPL was responsible for wind turbines over gradients of up to 13% and carry the wind turbine parts was an incredibly 2 Wind turbine blade trailer
the port handling, off-loading and transporta- this was further complicated by road surfaces skilled job, and in this project three synchro- 13 axles hydraulic module trailer
tion of the 12 Goldwind turbines, Power Load made up of loose materials. It was an opportu- nized trucks make the work three times harder. 15 axles hydraulic module trailer
Optimized Mode up to 4.1 MW. These are the nity for the MAN prime movers to demonstrate At PPL, drivers must accomplish a four-year
biggest on-shore wind turbines in Vietnam until the strength of their capacities as they operated training to be qualified for this work. SPECIAL EQUIPMENT
2021, 141.176 meters in height from base to top, at their maximum gradient. 2 MAN’s special prime mover
with 76.293-meter-long blades, 5.534-meter PPL transported the wind turbines over 227 km 4 Hyundai Trago prime mover
tower bottom diameter. The logistical effort in As there is no limit to the number of prime mov- before off-loading them at the substation near
4 SITRAK prime mover
transporting items with the size and complexity ers that can be added to a convoy, PPL was able the construction site. PPL’s innovative solu-
of these wind turbines was vast, involving spe- to further utilize the capabilities of the innova- tions and the unique abilities of the MAN truck CREW
cialized vehicles, equipment, and technicians. tive trucks by adding a third prime mover for the ensured that this challenging operation could be 45 PPL professionals
transportation through Amaccao Windfarm. completed as efficiently as possible.

Discover more on ppl.com.vn


FASTER, SAFER, BIGGER