DETAIL SECT.

OF CORRIDOR

DETAIL SECT. OF RAMP AND CORRIDOR

DETAIL OF STIFFENER DETAIL OF FOOTING TIE BEAM

NOTE :

COLUMN ELEVATION

FOUNDATION PLAN DETAIL OF F-1 / C-1

VARIOUS DPWH FOUNDATION PLAN, DETAIL OF F-1 / C-1,


(SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET) PROPOSED PROJECTS COLUMN ELEVATION, BOD
NAPOLEON B. TORIBIO NELSON S. ANTONIO DOMICIANO B. LUSICA DETAIL OF STIFFENER, 11
STRUCTURAL DESIGN STRUCTURAL DESIGN PROJECT MANAGER
STANDARD ONE-STOREY DETAIL OF FOOTING TIE BEAM,
S-4
GILBERTO S. REYES RAUL C. ASIS ROGELIO L. SINGSON 16
POSITION: STRUCTURAL ENGINEER POSITION: STRUCTURAL ENGINEER SCHOOL BUILDING
OIC, BUILDING DIVISION DIRECTOR IV, BOD DETAIL SECTION OF RAMP & CORRIDOR,
PRC No.: 32516 TIN No.: 107-915-002 PRC No.: 14234 TIN No.: 178-384-258 UNDERSECRETARY SECRETARY
( 3-CLASSROOM ) DETAIL SECTION OF CORRIDOR