Professional Documents
Culture Documents
Re-inspection was conducted on site at Baan Yamu today. All points raised in the initial inspection have been
addressed.
Note to mention:
Non of the panels have earth leakage protection. We tested the earth to neutral voltage and it showed clear.
The earth is clean at this property and the boards are protected from overload and short circuit only.
(1)
151.jpeg
(2)
152.jpeg
(3)
153.jpeg
(4)
154.jpeg