You are on page 1of 90

REPUBLIC OF THE PHILIPPINES

OFFICE OF THE CITY/ MUNICIPAL


ENGINEER/ BUILDING OFFICIAL

DISTRICT / CITY / MUNICIPALITY

LAND USE AND ZONING

LINE AND GRADE

P E R S P E C T I VE

TABLE OF CONTENTS
ARCHITECTURAL

ARCHITECTURAL STRUCTURAL PLUMBING ELECTRICAL ELECTRONICS MECHANICAL

A-1 PERSPECTIVE, TABLE OF CONTENTS A-13R TYPICAL DETAIL OF CORRIDOR RAILING S-1 GENERAL CONSTRUCTION NOTES, OPTION - 1 (WITH REGULAR CLASSROOM LAYOUT) E-1 GROUND FLOOR LIGHTING LAYOUT (OPTION - 1) EC-1a GROUND FLOOR (OPTION 1) AND SECOND OPTION - 1 (WITH REGULAR CLASSROOM LAYOUT) OPTION - 4 (WITH SCIENCE LABORATORY ROOM)
(FRONT RAILING). DESIGN CRITERIA SECOND FLOOR LIGHTING LAYOUT FLOOR FIREDETECTION AND ALARM SYSTEM
A-2 GROUND FLOOR PLAN (OPTION - 1) , SECOND P-1 GROUND FLOOR PLAN AND SECOND FLOOR
TYPICAL DETAIL OF CORRIDOR RAILING E-2 THIRD FLOOR LIGHTING LAYOUT M-1 SCHEDULE OF EQUIPMENTS, GROUND FLOOR M-7 SCHEDULE OF EQUIPMENTS
FLOOR PLAN, SCHEDULE OF FLOOR FINISHES, S-2 GENERAL CONSTRUCTION NOTES PLAN (SEWER AND DRAINAGE LINE LAYOUT) EC-1b GROUND FLOOR (OPTION 2) AND SECOND
( SIDE RAILING). FOURTH FLOOR LIGHTING LAYOUT FLOOR FIRE DETECTION AND ALARM SYSTEM VENTILATION AND CEILING FAN LAYOUT, GROUND FLOOR AIR CONDITIONING AND
SCHEDULE OF WALL FINISHES TYPICAL DETAIL SECTION OF STAIR. S-3 FOUNDATION PLAN P-2 THIRD FLOOR PLAN AND DECK ROOF FLOOR TYPICAL SECOND AND THIRD FLOOR VENTILATION LAYOUT
TYPICAL DETAIL SECTION OF STAIR STEPS. SECOND FLOOR FRAMING PLAN PLAN (SEWER AND DRAINAGE LINE LAYOUT) E-3 ROOF DECK POWER LAYOUT EC-1c GROUND FLOOR (OPTION 3) AND SECOND VENTILATION AND CEILING FAN LAYOUT TYPICAL SECOND AND THIRD FLOOR
A-2a GROUND FLOOR PLAN (OPTION - 2), GROUND FLOOR POWER LAYOUT (OPTION - 1)
DETAIL SECTION OF CONCRETE BENCH P-3 GROUND FLOOR PLAN (WATER AND FIRE LINE FLOOR FIRE DETECTION AND ALARM SYSTEM VENTILATION AND CEILING FANLAYOUT
GROUND FLOOR PLAN (OPTION - 3), S-4 THIRD FLOOR FRAMING PLAN M-2 GENERAL NOTES, LEGENDS, FOURTH FLOOR
SCHEDULE OF FLOOR FINISHES, SCHEDULE OF FOURTH FLOOR FRAMING PLAN LAYOUT), ROOF PLAN (DRAINAGE LAYOUT) E-4 SECOND FLOOR POWER LAYOUT EC-1c GROUND FLOOR (OPTION 4) AND SECOND VENTILATION AND CEILING FAN LAYOUT,
A-14 SCHEDULE OF DOORS AND WINDOWS M-8 GENERAL NOTES, LEGENDS,
WALL FINISHES THIRD FLOOR POWER LAYOUT FLOOR FIRE DETECTION AND ALARM SYSTEM MISCELLANEOUS DETAILS
S-5 DETAIL PLAN AND ELEVATION OF CF-1, F-1 P-4 SECOND FLOOR PLAN , THIRD FLOOR PLAN FOURTH FLOOR VENTILATION AND CEILING FAN
A-2b GROUND FLOOR PLAN (OPTION - 4),
A-15 DETAIL ELEVATION AND SECTION OF CORRIDOR
(EXPOSURE - B) AND ROOF DECK FLOOR PLAN (WATER AND E-5 FOURTH FLOOR POWER LAYOUT EC-2 THIRD FLOOR AND FOURTH FLOOR FIRE WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC LAYOUT, MISCELLANEOUS DETAILS STRUCTURAL
RAILING (TYP. @ SECOND AND THIRD FLOOR) FIRE LINE LAYOUT) ROOF DECK POWER LAYOUT
THIRD FLOOR PLAN, SCHEDULE OF FLOOR DETAIL PLAN AND ELEVATION OF CF-1, F-1 DETECTION AND ALARM SYSTEM DIAGRAM OF WATER PUMPING SYSTEM,
FP-7 FOURTH FLOOR FE AND FHC LAYOUT
FINISHES, SCHEDULE OF WALL FINISHES (EXPOSURE - D) P-5 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) MISCELLANEOUS DETAILS
A-16 DETAIL OF TOILETS E-6 GENERAL NOTES EC-3a FIRE DETECTION AND ALARM SYSTEM RISER SCHEDULE OF EQUIPMENT
SCHEDULE OF FOOTING TIE BEAM (EXPOSURE - B) PLUMBING NOTES
ELECTRICAL SYMBOLS DIAGRAM (OPTION 1, 3 & 4) FP-1 GENERAL NOTES, LEGEND, GROUND FLOOR MISCELLANEOUS DETAILS
A-3 FOURTH FLOOR PLAN, DECK ROOF FLOOR PLAN, A-17 DETAIL OF TOILETS SCHEDULE OF FOOTING TIE BEAM (EXPOSURE - D)
P-6 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT) SCHEDULE OF LOADS FE AND FHC LAYOUT, TYPICAL SECOND AND
SCHEDULE OF FLOOR FINISHES, SCHEDULE OF EC-3b FIRE DETECTION AND ALARM SYSTEM RISER FP-8 FOURTH FLOOR FE AND FHC LAYOUT
S-6 WALL TO TIE-BEAM CONNECTION DETAILS PLUMBING NOTES SCHEDULE OF LIGHTING FIXTURES AND LAMPS THIRD FLOOR FE AND FHC LAYOUT
WALL FINISHES A-18 DETAIL OF BLACKBOARD DIAGRAM (OPTION 2) SCHEDULE OF EQUIPMENT
DETAIL OF WALL FOOTING -1 ELECTRICAL RISER DIAGRAM
DETAIL OF CHALK DUST BOX P-7 ISOMETRIC DIAGRAM (WATER LINE LAYOUT), FP-2 FOURTH FLOOR FE AND FHC LAYOUT, SCHEDULE MISCELLANEOUS DETAILS
A-4 ROOF PLAN, FRONT ELEVATION, DETAIL SECTION (CHALK DUST BOX) DETAIL SECTION OF HAN WASHING COUNTER E-7 GROUND FLOOR POWER LAYOUT EC-04 VOICE AND DATA RISER DIAGRAM
PLUMBING LEGEND OF EQUIPMENT, MISCELLANEOUS DETAILS
SCHEDULE OF WALL FINISHES DETAIL LAVATORY (HAND WASH) (WITH HOME ECONOMICS ROOM - OPTION - 2)
DETAIL SECTION OF CONCRETE SEATING EC-05 CLOSED CIRCUIT TELEVISION RISER DIAGRAM
P-8 DETAIL OF CATCH BASIN GROUND FLOOR LIGHTING LAYOUT
A-5 REAR ELEVATION, LEFT SIDE ELEVATION, DETAIL SECTION OF CONCRETE CANOPY (WITH HOME ECONOMICS ROOM - OPTION - 2) OPTION - 2 (WITH HOME ECONOMICS ROOM)
DETAIL OF SEPTIC VAULT EC-06 MISCELLANOUES DETAILS 1
RIGHT SIDE ELEVATION, SCHEDULE OF WALL
S-7 REF. DETAIL ELEVATION OF COLUMNS SCHEDULE OF SLAB REINFORCEMENT E-8 GENERAL NOTES
FINISHES M-3 SCHEDULE OF EQUIPMENTS, GROUND FLOOR
SCHEDULE OF COLUMN (EXPOSURE -D & V=340) P-9 DETAIL OF CISTERN TANK ELECTRICAL SYMBOLS AIR-CONDITIONING AND VENTILATION LAYOUT,
A-6 CROSS SECTION, LONGITUDINAL SECTION, SCHEDULE OF COLUMN (EXPOSURE -B & V=270) SCHEDULE OF LOADS SANITARY/ PLUMBING
TYPICAL SECOND & THIRD FLOOR VENTILATION
SCHEDULE OF WALL FINISHES DETAIL SECTION OF STAIR ON FILL SCHEDULE OF LIGHTING FIXTURES AND LAMPS
OPTION - 2 (WITH HOME ECONOMICS ROOM) AND CEILING FAN LAYOUT
ELECTRICAL RISER DIAGRAM
A-7 GROUND FLOOR REFLECTED CEILING PLAN S-8 SCHEDULE OF BEAMS AND GIRDERS M-4 GENERAL NOTES, LEGENDS, FOURTH FLOOR
(OPTION 2, 3 & 4) SCHEDULE OF SLABS P-1a GROUND FLOOR PLAN (SEWER AND DRAINAGE E-9 GROUND FLOOR LIGHTING LAYOUT
VENTILATION AND CEILING FAN LAYOUT,
SCHEDULE OF CEILING FINISHES, NOTES, LEGEND TYPICAL GIRDER/ BEAM DETAILS LINE LAYOUT) (WITH COMPUTER LABORATORY ROOM - OPTION - 3)
MISCELLANEOUS DETAILS
GROUND FLOOR PLAN (WATER LINE LAYOUT) GROUND FLOOR POWER LAYOUT
S-9 SCHEDULE OF BEAMS AND GIRDERS (WITH COMPUTER LABORATORY ROOM - OPTION - 3) WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC
A-8 TYPICAN 2ND AND 3RD FLR. REFLECTED CEIL. PLAN, P-1b ISOMETRIC DIAGRAM (WATER LINE LAYOUT)
FOURTH FLOOR REFLECTED CEILING PLAN (EXPOSURE - B) E-10 GENERAL NOTES DIAGRAM OF WATER PUMPING SYSTEM,
DETAIL SECTION OF R.C. RAMP P-1c ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) MISCELLANEOUS DETAILS
SCHEDULE OF CEILING FINISHES, ELECTRICAL SYMBOLS
DETAIL OF CEILING AIR-VENT SCHEDULE OF LOADS FP-3 FOURTH FLOOR FE AND FHC LAYOUT
S-10 END WALL DETAIL OPTION - 3 (WITH COMPUTER LABORATORY ROOM) SCHEDULE OF LIGHTING FIXTURES AND LAMPS
ROOF FRAMING PLAN DETAIL ADAPTABLE TO OPTION - 1 SCHEDULE OF EQUIPMENT
A-9 DETAIL BAY SECTIONS ELECTRICAL RISER DIAGRAM MISCELLANEOUS DETAILS
DETAIL SECTION (R.C. GUTTER) DETAIL OF R.C. GUTTER
DETAIL SECTION OF CORRIDOR RAILING DETAIL OF PLANTED COLUMN (PC-1) OPTION - 4 (WITH SCIENCE LABORATORY ROOM) E-11 GROUND FLOOR LIGHTING LAYOUT FP-4 FOURTH FLOOR FE AND FHC LAYOUT, SCHEDULE
(WITH COMPUTER LABORATORY ROOM - OPTION - 4)
(TYP. @ SECOND TO FOURTH FLOOR) OF EQUIPMENT, MISCELLANEOUS DETAILS
S-11 DETAIL ELEVATION OF TRUSS 1 P-1d GROUND FLOOR PLAN (SEWER AND DRAINAGE SECOND FLOOR POWER LAYOUT ELECTRICAL
A-10 DETAIL OF MAIN ENTRANCE REFERENCE WELD DETAIL LINE LAYOUT) (WITH SCIENCE LABORATORY ROOM - OPTION - 4) OPTION - 3 (WITH COMPUTER LABORATORY ROOM)
TYPICAL DETAIL OF SERVICE ENTRANCE SCHEDULE OF TRUSS MEMBERS AND WELDS GROUND FLOOR PLAN (WATER LINE LAYOUT)
SPOT DETAIL SECTION OF CORRIDOR RAILING (EXPOSURE - B) E-12 GENERAL NOTES M-5 SCHEDULE OF EQUIPMENT
P-1e ISOMETRIC DIAGRAM (WATER LINE LAYOUT) ELECTRICAL SYMBOLS GROUND FLOOR AIR-CONDITIONING AND
(AT GROUND FLOOR) SCHEDULE OF TRUSS MEMBERS AND WELDS
SPOT DETAIL SECTION OF STAIR STEP (EXPOSURE - D) P-1f ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SCHEDULE OF LOADS VENTILATION LAYOUT
(MAIN/ SERVICE ENTRANCE) SCHEDULE OF LIGHTING FIXTURES AND LAMPS TYPICAL SECOND AND THIRD FLOOR
S-12 DETAIL SECTIONS, CONNECTIONS & ANCHORAGES ELECTRICAL RISER DIAGRAM VENTILATION AND CEILING FAN LAYOUT
A-11 DETAIL OF RAMP OF TRUSS MEMBERS M-6 GENERAL NOTES, LEGEND, FOURTH FLOOR
DETAIL SECTIONS OF RAMP VENTILATION AND CEILING FAN LAYOUT
DETAIL SECTION OF RAMP RAILING S-13 DETAIL ELEVATION OF TRUSS - 2
MISCELANEOUS DETAILS
TYPICAL DETAIL PLAN OF HAND WASHING COUNTER DETAIL CONNECTION AND SPACING OF J-BOLT
TYP. DETAIL SECTION OF HAND WASHING ISOMETRIC VIEW OF CONNECTION OF ROOFING TO WP-1 SCHEDULE OF EQUIPMENTS, ISOMETRIC
COUNTER PURLINS DIAGRAM OF WATER PUMPING SYSTEM,
MISCELLANEOUS DETAILS
A-12 TYPICAL DETAIL OF STAIR, S-14 DETAIL ELEVATION OF STAIR MECHANICAL
TYPICAL DETAIL OF STAIR FROM FOURTH FLOOR DETAIL SECTION OF STAIR FP-5 GROUND FLOOR FE AND FHC LAYOUT
TO DECK ROOF FLOOR LEVEL DETAIL PLAN OF LINTEL BEAM TYPICAL SECOND AND THIRD FLOOR FE AND ]
DETAIL PLAN OF STAIRWAY COLUMN FHC LAYOUT
A-13 TYPICAL DETAIL SECTION OF STAIR
FP-6 FOURTH FLOOR FE AND FHC LAYOUT
TYPICAL DETAIL SECTION OF STAIR (TO DECK ROOF) S-15 FRAMING PLAN OF SATIR @ FOURTH FLOOR LEVEL
DETAIL SECTION OF STAIR LANDING SCHEDULE OF EQUIPMENT
FRAMING PLAN OF STAIR @ ROOF DECK LEVEL
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF) MISCELLANEOUS DETAILS
STAIR DETAIL FROM 4TH FLOOR TO ROOF DECK
TYPICAL DETAIL SECTION OF STAIR STEPS DETAIL PLAN OF LINTEL BEAM (LB-1)
TYPICAL DETAIL SECTION OF STAIR STEPS DETAIL PLAN OF MEDIA AGUA
(TO DECK ROOF)
SPOT DETAIL (NON-SKID NOSING STRIP)
SPOT DETAIL (TYPICAL HANDRAIL)

ARCHITECTURAL CONCEPT:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TABLE OF CONTENTS
MODIFIED STANDARD DPWH - DEPED PERSPECTIVE CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
RICARDO S. CANDIDO
DRAFTSMAN 1
APPROVED WITH SIGNATURE BOD
A-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3450 1550

EWF-1 EWF-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 R W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
W-3 W-4 MEDIA AGUA W-4 W-3

C
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
STO. HE IWF-1
IWF-2

3150

3150
IWF-1 IWF-1
FL-3
BD-1 BD-1 D-3a BD-1 BD-1
IWF-2 SHE IWF-1 IWF-1 IWF-1 IWF-1 IWF-2
FL-3 D-2 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING EWF-1 FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING


EWF-1 EWF-1 EWF-1
EWF-1
EWF-1 EWF-1
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
R

D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
EWF-1a UP DN W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 DN UP EWF-1a
2500

2500
W-2
C O R R I D O R C O R R I D O R C O R R I D O R EWF-1
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
R FL-2 FL-2 FL-2
ELEV. 3450.00 mm

1200
CANOPY

1000
R
FL-2a
EWF-1a
LEGEND: EWF-1a
R
EWF-1a

EWF-1a EWF-1a SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :


R REVISION OF DRAWING DETAILS (1/23/2018) 275 9000 275 MARK WALL DESCRIPTION MARK WALL DESCRIPTION
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR
(FROM 150 mm THK. CHB RAILING TO REINFORCED
2 SECOND FLOOR PLAN 9550 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
SCALE 1: 100 M. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED A-2 FL - 1
(PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
EWF - 1 PAINTED FINISH
DESIGN. (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
FLOOR ADAPTING THE PROPOSED DEPED DESIGN. FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN NOTE: FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
BREAKER) ABOVE WINDOW (W-1) AT REAR.

- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
DESIGN FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH USED AS ALTERNATE ROOFING MATERIALS).
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.
FLOOR FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES - TYPICAL ON ALL TOILET WALLS
FLOOR FINISH

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
450 950

950 450
EWF-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
R
IWF-2 LINE OF MEDIA AGUA ABOVE W-4 W-3 IWF-2
W-3 W-4
C
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1

1 PWD PWD
IWF-2
3150

3150
A-6 IWF-1 IWF-1

HANDWASHING
BD-1 BD-1 D-3 D-3
HE BD-1
SHE IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

FL-3 D-2 D-2


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1

CONCRETE PLATFORM
EWF-1 EWF-1
EWF-1
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
1500
CONCRETE PLATFORM
3850

3850
IWF-1 IWF-1 ELEV. 319.00 mm IWF-1 IWF-1 IWF-1
HANDWASHING

EWF-1 R

STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
UP D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a UP
EWF-1 EWF-1
2500

2500
UP W-2 UP
C O R R I D O R C O R R I D O R C O R R I D O R
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
1500 R FL-2 FL-2 FL-2 1500 1675
ELEV. 300.00 mm

A
1200

300
1600

1600
1200

SLOPE 1:12 SLOPE 1:12


RAMP UP 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) UP UP REINFORCED CONCRETE BENCH WITH PLAIN RAMP UP EWF-1
FL-4 AT 600 MM HIGH WITH PLAIN CEMENT PLASTER PAINTED ELEV. 0.00 mm CEMENT PLASTER PAINTED FINISH
FL-4
LINE OF CANOPY ABOVE
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)

9000 (1 @ 900 mm, 1@ 700 mm


HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C 9550
- TYPICAL TO OTHER SIDE
1500 3600 3600 1500
SIDE ( SEE DETAIL)
3
2
A-6 1 GROUND FLOOR PLAN (OPTION - 1) A-6

SCALE 1: 100 M.
A-2

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN
CADD: SIGNED SIGNED
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR PLAN SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SCHEDULE OF FLOOR FINISHES FGSERRANO
ARCHITECT III
GDTUSCANO
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-2
BUILDINGS DIVISION SCHEDULE OF CEILING FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 400 450 950

EWF-1 W-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 R W-1 W-1 W-1 W-1 W-1 W-1 W-1
IWF-2 LINE OF MEDIA AGUA ABOVE W-4 W-3 IWF-2
W-3 W-4
C
1200

925
IWF-2 1200 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1

PWD PWD
IWF-2

3150

3150
HANDWASHING
BD-1 BD-1 D-3 D-3
IWF-1 HE BD-1
SHE IWF-1 IWF-1 IWF-1 FL-3
COMPUTER ROOM

HANDWASHING
FL-3 D-2 D-2
FL-1
CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1

CONCRETE PLATFORM
EWF-1 EWF-1
EWF-1
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM
3850

3850
HANDWASHING
EWF-1 IWF-1 IWF-1 ELEV. 319.00 mm IWF-1 IWF-1 IWF-1
R

STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
UP D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a UP
EWF-1
2500

2500
W-2 1675
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
1500 R FL-2 FL-2 FL-2 1500
ELEV. 300.00 mm

300
1200
1600

1600
1200
SLOPE 1:12 SLOPE 1:12
RAMP UP 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) UP UP RAMP UP EWF-1
REINFORCED CONCRETE BENCH WITH PLAIN
FL-4 AT 600 MM HIGH WITH PLAIN CEMENT PLASTER PAINTED CEMENT PLASTER PAINTED FINISH
LINE OF CANOPY ABOVE ELEV. 0.00 mm
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)

9000 (1 @ 900 mm, 1@ 700 mm


HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C 9550
- TYPICAL TO OTHER SIDE
1500 3600 3600 1500
SIDE ( SEE DETAIL)
1 GROUND FLOOR PLAN (WITH COMPUTER ROOM - OPTION - 3)
SCALE 1: 100 M. SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
A-2a
LEGEND:
MARK WALL DESCRIPTION MARK WALL DESCRIPTION

R REVISION OF DRAWING DETAILS (1/23/2018)


PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
FL - 1 EWF - 1 PAINTED FINISH
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
(FROM 150 mm THK. CHB RAILING TO REINFORCED (SUBMIT COLOR SCHEMES FOR APPROVAL)
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
DESIGN.
FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
NOTE: 100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2
BREAKER) ABOVE WINDOW (W-1) AT REAR. FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
- REVISION OF TOILET'S WALL & FLOOR FINISHES AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE FL - 4 IWF - 1 PLASTER PAINTED FINISH
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES USED AS ALTERNATE ROOFING MATERIALS). (SUBMIT COLOR SCHEMES FOR APPROVAL)
FLOOR FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES
FLOOR FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
950 450 450 950

EWF-1 W-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 R W-1 W-1 W-1 W-1 W-1 W-1 W-1
IWF-2 LINE OF MEDIA AGUA ABOVE W-4 W-3 IWF-2
W-3 W-4
C
IWF-2 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1

PWD PWD
IWF-2
3150

3150
KITCHEN

HANDWASHING
BD-1 BD-1 D-3 D-3
HE BD-1
SHE IWF-1 IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

FL-3 D-2 DRY WALL (low partition) - 1200 mm HIGH D-2


IWF-1
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1

CONCRETE PLATFORM
EWF-1 EWF-1
DINING AREA EWF-1
9500

9500
HANDWASHING
LIVING AREA
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM
3850

3850
HANDWASHING

HOME ECONOMICS ROOM


EWF-1 FL-1 IWF-1 IWF-1 ELEV. 319.00 mm IWF-1 IWF-1 IWF-1
R

STO. STO.
D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
UP D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a UP
EWF-1
2500

2500
W-2 1675
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
EWF-1a 1500 R FL-2 FL-2 FL-2 1500
ELEV. 300.00 mm

A
300
1200
1600

1600
1200

SLOPE 1:12 SLOPE 1:12


RAMP UP 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) UP UP RAMP UP EWF-1
REINFORCED CONCRETE BENCH WITH PLAIN
FL-4 AT 600 MM HIGH WITH PLAIN CEMENT PLASTER PAINTED CEMENT PLASTER PAINTED FINISH
FL-4
LINE OF CANOPY ABOVE ELEV. 0.00 mm
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)

9000 (1 @ 900 mm, 1@ 700 mm


HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C 9425
- TYPICAL TO OTHER SIDE
1500 3600 3600 1500
SIDE ( SEE DETAIL)
1 GROUND FLOOR PLAN (WITH HOME ECONOMICS ROOM - OPTION - 2)
SCALE 1: 100 M.
A-2a

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN WITH HOME ECONOMICS
CADD: SIGNED
MODIFIED STANDARD DPWH - DEPED ROOM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
GROUND FLOOR PLAN WITH COMPUTER ROOM FGSERRANO GDTUSCANO
ARCHITECT III ARCHITECT II
APPROVED WITH SIGNATURE BOD
A - 2a
BUILDINGS DIVISION SCHEDULE OF FLOOR FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHEDULE OF CEILING FINISHES CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3450 1550

EWF-1 EWF-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1


W-1 R W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
W-3 W-4 MEDIA AGUA W-4 W-3

C
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
STO. HE IWF-1
IWF-2

3150

3150
IWF-1 IWF-1
FL-3
BD-1 BD-1 D-3a BD-1 BD-1
IWF-2 SHE IWF-1 IWF-1 IWF-1 IWF-1 IWF-2
FL-3 D-2 D-2

7000 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
LANDING EWF-1 FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 LANDING
EWF-1 EWF-1 EWF-1
EWF-1
EWF-1 EWF-1
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
R

D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
EWF-1a UP DN W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 DN UP EWF-1a
2500

2500
W-2
C O R R I D O R C O R R I D O R C O R R I D O R EWF-1
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
R FL-2 FL-2 FL-2
ELEV. 6600.00 mm

EWF-1a
EWF-1a
EWF-1a

1 THIRD FLOOR PLAN SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :


SCALE 1: 100 M.
A-2b MARK WALL DESCRIPTION MARK WALL DESCRIPTION
LEGEND:
150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
FL - 1 EWF - 1 PAINTED FINISH
R (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
REVISION OF DRAWING DETAILS (1/23/2018) (SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
(FROM 150 mm THK. CHB RAILING TO REINFORCED FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
DESIGN.
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) NOTE: R
100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS. FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
BREAKER) ABOVE WINDOW (W-1) AT REAR. AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
- REVISION OF TOILET'S WALL & FLOOR FINISHES
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH USED AS ALTERNATE ROOFING MATERIALS).
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. IWF - 2 R
FLOOR FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
FLOOR FINISH - TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
950 450 1200 1100 2200 450 950

EWF-1 EWF-1 EWF-1 W-1 W-1 EWF-1 EWF-1 EWF-1 EWF-1


W-4 W-1a W-1 W-1 R W-1 W-1 W-1 W-1 W-1
IWF-2 LINE OF MEDIA AGUA ABOVE W-4 W-3 IWF-2
W-3 W-4
C
(low partition) - 1800 mm HIGH

1200
1200

IWF-1 IWF-1 IWF-1 IWF-1


SHO.
PWD PWD
DRY WALL

IWF-1
IWF-2
3150

3150
IWF-2

HANDWASHING
BD-1 BD-1 D-3
D-3 HE BD-1
SHE LOCKERS
&
IWF-1 IWF-1 IWF-1 FL-3
HANDWASHING

FL-3 D-2 DRESSING RM.


D-2
D-2a
CLASS ROOM CLASS ROOM CLASS ROOM
7000

EWF-1
LANDING SCIENCE LABORATORY ROOM FL-1 FL-1 FL-1 EWF-1 LANDING EWF-1
EWF-1

CONCRETE PLATFORM
EWF-1 FL-1 EWF-1
D-2
EWF-1
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM

IWF-1
3850

3850
3500
HANDWASHING

IWF-1
EWF-1 IWF-1 ELEV. 319.00 mm IWF-1 IWF-1 IWF-1
R

STO. IWF-1 STO.


D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
B
25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP
UP D-3a W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 D-3a UP
EWF-1
2500

2500
W-2 1675
UP EWF-1 C O R R I D O R C O R R I D O R C O R R I D O R EWF-1
UP
EWF-1 EWF-1 EWF-1 EWF-1
EWF-1a 1500 2250 R FL-2 FL-2 FL-2 1500
ELEV. 300.00 mm

125
300
1200
1600

1600
1200

SLOPE 1:12 SLOPE 1:12


RAMP UP 150 mm THK. CHB EXTERIOR WALL RAILING (BELOW R.C. BENCH) UP UP RAMP UP EWF-1
REINFORCED CONCRETE BENCH WITH PLAIN
FL-4 AT 600 MM HIGH WITH PLAIN CEMENT PLASTER PAINTED CEMENT PLASTER PAINTED FINISH
FL-4
LINE OF CANOPY ABOVE ELEV. 0.00 mm
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)

9000 (1 @ 900 mm, 1@ 700 mm


HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C 1500 3600 9450 3600 1500
- TYPICAL TO OTHER SIDE SIDE ( SEE DETAIL)

1 GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM - OPTION - 4)


SCALE 1: 100 M.
A-2b

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN WITH SCIENCE LABORATORY
CADD: SIGNED SIGNED
MODIFIED STANDARD DPWH - DEPED ROOM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
THIRD FLOOR PLAN FGSERRANO
ARCHITECT III
GDTUSCANO
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A - 2b
BUILDINGS DIVISION SCHEDULE OF FLOOR FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
SCHEDULE OF CEILING FINISHES CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
525 5000 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 5000 525
EWF-2 400 EWF-2
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL THICKNESS OF 0.43 - 0.45 mm THK.
EWF-2 REINFORCED CONCRETE GUTTER EWF-2 400 EWF-2
(PROVIDE INTEGRAL MEMBRANE WATERPROOFING)
(WITH PAINT) CORRUGATED G.I. SHEET ROOFINGS.

RD RD RD RD RD RD RD RD RD RD RD

1100

1000
ELEV. 12900.00 mm BUILDING LINE BELOW
C

4250
DECK ROOF DECK ROOF

3150
FL-2a EWF-1 FL-2a
EWF-1 100 mm HIGH DOOR
THRESHOLD
LINE OF ROOF EAVES ABOVE LINE OF ROOF EAVES ABOVE

800
SD-1 SD-1

400

400
7000
DN DN EWF-1a
100 mm HIGH DOOR
9500 EWF-1 THRESHOLD

9500
3850 IWF-1 IWF-1
IWF-1a

B
2500

IWF-1

BUILDING LINE BELOW


A
1100

1100
RD RD RD RD RD RD RD

EWF-2 REINFORCED CONCRETE GUTTER EWF-2 EWF-2


(PROVIDE INTEGRAL MEMBRANE WATERPROOFING)

2 ROOF DECK FLOOR PLAN (SHOWING PARTIAL PLAN OF ROOF) SCHEDULE OF FLOOR FINISHES : SCHEDULE OF WALL FINISHES :
SCALE 1: 100 M.
A-3
LEGEND: MARK WALL DESCRIPTION MARK WALL DESCRIPTION

150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER


PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
FL - 1 EWF - 1 PAINTED FINISH
R REVISION OF DRAWING DETAILS (1/23/2018) (PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
(SUBMIT COLOR SCHEMES FOR APPROVAL)
- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
FLOOR ADAPTING THE PROPOSED DEPED DESIGN. FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 1a PLASTER PAINTED FINISH
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) MEMBRANE WATER PROOFING (SUBMIT COLOR SCHEMES FOR APPROVAL)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
NOTE: 100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
- REVISION ON SCHEDULE OF WALL FINISHES FL - 3 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R EWF - 2
(EWF-2, FROM 150 mm THK. CHB TO REINFORCED FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
CONCRETE) - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
- REVISION OF TOILET'S WALL & FLOOR FINISHES AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 1 PLASTER PAINTED FINISH
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR USED AS ALTERNATE ROOFING MATERIALS).
FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR
300 X 300 mm VITRIFIED GLAZED TILE WALL FINISH
FINISH - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS. IWF - 2 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER) R
- TYPICAL ON ALL TOILET WALLS

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
3450 1550

EWF-1 EWF-1 EWF-1 EWF-1 LINE OF ROOF EAVE ABOVE EWF-1 EWF-1 EWF-1 EWF-1

W-3 W-4 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-4 W-3

C
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
STO. HE IWF-1
IWF-2
3150

3150
IWF-1 IWF-1
FL-3
BD-1 BD-1 BD-1 D-3a BD-1 BD-1
IWF-2 SHE IWF-1 IWF-1 IWF-1 IWF-1 IWF-2
FL-3 D-2 D-2
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
EWF-1 EWF-1 FL-1 FL-1 FL-1 FL-1 FL-1 EWF-1 EWF-1
EWF-1 EWF-1
EWF-1 EWF-1
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
IWF-1 IWF-1 IWF-1 IWF-1 IWF-1
R

D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1 D-1
UP UP
B
19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP 19 mm DROP
EWF-1a D-2 DN W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 DN EWF-1a
D-2
2500

2500
W-2
C O R R I D O R C O R R I D O R C O R R I D O R EWF-1
EWF-1 EWF-1 EWF-1 EWF-1 EWF-1
R FL-2 FL-2 FL-2 1000
ELEV. 9750.00 mm

A
R 900

LINE EAVE ABOVE

EWF-1a EWF-1a EWF-1a EWF-1a

1 FOURTH FLOOR PLAN


SCALE 1: 100 M.
A-3

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOURTH FLOOR PLAN
CADD: SIGNED SIGNED
MODIFIED STANDARD DPWH - DEPED ROOF DECK FLOOR PLAN SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SCHEDULE OF FLOOR FINISHES FGSERRANO
ARCHITECT III
GDTUSCANO
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-3
BUILDINGS DIVISION SCHEDULE OF CEILING FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2

W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2

W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2 W-2

W-2 W-2 W-2 W-2 W-2

SCHEDULE OF WALL FINISHES :


MARK WALL DESCRIPTION
SCHEDULE OF FLOOR FINISHES : 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
LEGEND: MARK WALL DESCRIPTION
EWF - 1 PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)

150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT


R REVISION ON THE DRAWING DETAILS (1/23/2018) FL - 1
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
EWF - 1a PLASTER PAINTED FINISH
(PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS)
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR - REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. (SUBMIT COLOR SCHEMES FOR APPROVAL)
(FROM 150 mm THK. CHB RAILING TO REINFORCED CHB TO 100 mm THK. REINFORCED CONCRETE.
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER 100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
DESIGN.
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN NOTE: FL - 2 FOR FL- 2a - PLAIN CEMENT FLOOR FINISH WITH INTEGRAL EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED MEMBRANE WATER PROOFING
- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH DESIGN
FLOOR ADAPTING THE PROPOSED DEPED DESIGN. - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
- REVISION OF TOILET'S WALL & FLOOR FINISHES
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3) - (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT FL - 3 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR FINISH R IWF - 1 PLASTER PAINTED FINISH
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE (SUBMIT COLOR SCHEMES FOR APPROVAL)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS. - (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR
FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR USED AS ALTERNATE ROOFING MATERIALS). 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
FINISH FL - 4 NON - SKID CEMENT FLOOR FINISH WITH 6mm GROOVE LINES IWF - 2 R
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.
- TYPICAL ON ALL TOILET WALLS

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRONT ELEVATION
CADD: SIGNED SIGNED
MODIFIED STANDARD DPWH - DEPED ROOF PLAN SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SCHEDULE OF FLOOR FINISHES FGSERRANO
ARCHITECT III
GDTUSCANO
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-4
BUILDINGS DIVISION SCHEDULE OF CEILING FINISHES JOSEPHINE P. ISTURIS DANTE B. POTANTE GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION DIRECTOR IV, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
C B A A B C SCHEDULE OF WALL FINISHES :
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL 0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL MARK WALL DESCRIPTION
THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT) THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
CORRUGATED G.I. SHEET ROOFING 1100 1100 1100 1100 CORRUGATED G.I. SHEET ROOFING
150 mm THK. CHB END WALL WITH PLAIN CEMENT 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER

3 00
300

300

300
3400 PLASTER PAINTED FINISH EWF - 1 PAINTED FINISH
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END 0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
3400
FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS (SUBMIT COLOR SCHEMES FOR APPROVAL)
OF 0.43 - 0.45 mm THK. APEX LINE OF TRUSS OF 0.43 - 0.45 mm THK.
150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH EWF - 1a PLASTER PAINTED FINISH
PAINTED FINISH (ALL-AROUND) (SUBMIT COLOR SCHEMES FOR APPROVAL)

3150
100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
EWF - 2

400
FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
EWF-2
TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL

1400

1400
100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT

431
IWF - 1 PLASTER PAINTED FINISH
CEILING LINE
EWF-2 (SUBMIT COLOR SCHEMES FOR APPROVAL)
EWF-2

3150
19 mm SQUARE BARS (PAINTED FINISH) FULLY 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH

500
IWF - 2 R

1000 500
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
(GRILLE SUPPORT FRAME)

600 300
- TYPICAL ON ALL TOILET WALLS

1000
FOURTH FLOOR LINE (CORRIDOR)

450
LEGEND:
EWF-1

3150
EWF-1 EWF-1
R REVISION ON THE DRAWING DETAILS (1/23/2018)
THIRD FLOOR LINE (CORRIDOR) - ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN

450
R BREAKER) ABOVE WINDOW (W-1) AT REAR.
- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH
REINFORCED CONCRETE CANOPY WITH PAINTED FLOOR ADAPTING THE PROPOSED DEPED DESIGN.
1000 EWF-1
3150

FINISH - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)


EWF-1 EWF-1
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
450 SECOND FLOOR LINE (CORRIDOR) CHB TO 100 mm THK. REINFORCED CONCRETE.

700

700
600
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
R DESIGN
EWF-1 1000
3150

- REVISION OF TOILET'S WALL & FLOOR FINISHES


- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR
1000

1000
GROUND FLOOR LINE (CORRIDOR)
700

700
FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR
300

300
FINISH
NATURAL GRADE LINE
600 6400 1950 450 450 1950 600 6400 600
7000 2500 1400 (1 @ 900 mm, 1@ 700 mm 1400 2500 7000
HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON
NOTE:
SIDE ( SEE DETAIL)
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
2 LEFT SIDE ELEVATION 3 RIGHT SIDE ELEVATION AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
SCALE 1: 100 M. SCALE 1: 100 M.
A-5 A-5 USED AS ALTERNATE ROOFING MATERIALS).
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.

13 12 11 10 9 8 7 6 5 4 3 2 1

55000
0.40 mm THK. (BASE METAL THICKNESS) WITH 5000 9000 9000 9000 9000 9000 5000
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
TOTAL THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS
CORRUGATED G.I. SHEET ROOFING
OF 0.43 - 0.45 mm THK.
APEX LINE OF TRUSS

150 mm THK. CHB END WALL WITH PLAIN CEMENT


PLASTER PAINTED FINISH (TYPICAL TO OTHER SIDE)
3150

R
D-5 D-5 EWF-2
TOP LINE OF ROOF BEAM/
DECK ROOF FLOOR LEVEL

1400
431

CEILING LINE
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH
PAINTED FINISH (ALL-AROUND)
3150

W-3 W-4 W-4 W-3

1475
925
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
FOURTH FLOOR LINE (CORRIDOR)

450
EWF-1
3150

EWF-1
W-4 W-3

1475
W-3 W-4

925
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
THIRD FLOOR LINE (CORRIDOR)

450
EWF-1
3150

EWF-1
W-4 W-3

1475
W-3 W-4

925
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
SECOND FLOOR LINE (CORRIDOR) R
R

450
3150

W-3 W-4 W-4 W-3

1475
925
W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1
GROUND FLOOR LINE (CORRIDOR)
300

NATURAL GRADE LINE


EWF-1 EWF-1 EWF-1 EWF-1

950 5000 45000 5000

1 REAR ELEVATION
SCALE 1: 100 M.
A-5

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LEFT ELEVATION
MODIFIED STANDARD DPWH - DEPED RIGHT ELEVATION CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) REAR ELEVATION FG SERRANO / GD TUSCANO
ARCHITECT III ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-5
BUILDINGS DIVISION SCHEDULE OF WALL FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SCHEDULE OF FLOOR FINISHES CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF WALL FINISHES :
C B A C B A MARK WALL DESCRIPTION
0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS 0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
OF 0.43 - 0.45 mm THK. 4200 1225 THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT) EWF - 1 PAINTED FINISH
1100 400 1100 CORRUGATED G.I. SHEET ROOFING 1100 1100 (SUBMIT COLOR SCHEMES FOR APPROVAL)

300

300
3 00
30 0
950 950
950 950 150 mm THK. CHB EXTERIOR WALL RAILING WITH PLAIN CEMENT
APEX LINE OF TRUSS APEX LINE OF TRUSS EWF - 1a PLASTER PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH
PAINTED FINISH (ALL-AROUND) 100 mm THK. R.C. PARAPET WITH PLAIN CEMENT PLASTER PAINTED
R EWF - 2 FINISH (SUBMIT COLOR SCHEMES FOR APPROVAL)
3150

EWF-2 EWF-2 EWF-2


S E E T R U S S 100 mm THK./ 150 mm THK. CHB INTERIOR WALL WITH PLAIN CEMENT
S E E T R U S S D E T A I L
TOP LINE OF ROOF BEAM/ D E T A I L IWF - 1 PLASTER PAINTED FINISH

550 800

600 800
DECK ROOF

500
DECK ROOF FLOOR LEVEL TOP LINE OF ROOF BEAM

1400

1400

1400
(SUBMIT COLOR SCHEMES FOR APPROVAL)

431
450
CEILING LINE (CORRIDOR) CEILING LINE (CLASSROOM) CEILING LINE (CORRIDOR) 200 X 200 mm VITRIFIED GLAZED TILE WALL FINISH
TOILET CEILING LINE IWF - 2 R
W-3
4.5 mm THK. FIBER CEMENT BOARD WITH PAINTED IWF-1 (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
IWF-2 LANDING EWF-1 4.5 mm THK. FIBER CEMENT BOARD WITH - TYPICAL ON ALL TOILET WALLS
3150

FINISH ON METAL FURRING CEILING NAILERS W-1

2700
2700
2600
PAINTED FINISH ON METAL FURRING CEILING

1000 500
D-2 D-4

900 600
19 mm SQUARE BARS (PAINTED FINISH) FULLY D-1 NAILERS

1800

1575
1500
(GRILLE SUPPORT FRAME)
SHE 400 CLASS ROOM

900
FOURTH FLOOR LINE (CORRIDOR) CORRIDOR FOURTH FLOOR LINE (CORRIDOR) CORRIDOR
LEGEND:
TOILET CEILING LINE
IWF-2 W-3 R
REINFORCED CONCRETE MEDIA AGUA WITH PAINTED
LANDING FINISH
3150

W-1 19 mm SQUARE BARS (PAINTED FINISH) FULLY R REVISION OF DRAWING DETAILS (1/23/2018)
2600

D-2
D-1
1575
1500

(GRILLE SUPPORT FRAME)


- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH
SHE CLASS ROOM

900
800

THIRD FLOOR LINE (CORRIDOR) THIRD FLOOR LINE (CORRIDOR) CORRIDOR FLOOR ADAPTING THE PROPOSED DEPED DESIGN.
CORRIDOR
- REVISION OF STAIR RAILING FROM GROUND TO THIRD FLOOR,
ADAPTING THE PROPOSED DEPED DESIGN
TOILET CEILING LINE
IWF-2 W-3 REINFORCED CONCRETE MEDIA AGUA WITH PAINTED PLAIN CEMENT PLASTER WITH PAINTED FINISH
LANDING
R
1000 - ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
FINISH
3150

W-1 1000 ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED


2600

D-2 REINFORCED CONCRETE CANOPY WITH PAINTED DESIGN


R
D-1
1575

FINISH
1500

PLAIN CEMENT FLOOR FINISH WITH INTEGRAL - ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN
SHE CLASS ROOM

900
800

SECOND FLOOR LINE (CORRIDOR) SECOND FLOOR LINE (CORRIDOR) MEMBRANE WATER PROOFING BREAKER) ABOVE WINDOW (W-1) AT REAR.
CORRIDOR CORRIDOR

700

700
- REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK.
IWF-1 CHB TO 100 mm THK. REINFORCED CONCRETE.
TOILET CEILING LINE
EWF-1 IWF-1 REINFORCED CONCRETE CANOPY WITH PAINTED
W-3 - REVISION OF TOILET'S WALL & FLOOR FINISHES
LANDING FINISH
3150

W-1 - (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH
2600

EWF-1 D-2 D-1 TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FLOOR
1575
1500

SHE CLASS ROOM FINISH TO 300 X 300 mm VITRIFIED UNGLAZED TILES FLOOR

900

600
GROUND FLOOR LINE (CORRIDOR) STORAGE RM. GROUND FLOOR LINE (CORRIDOR) FINISH
400

CORRIDOR RAMP CORRIDOR


300

300
NATURAL GRADE LINE NATURAL GRADE LINE
IWF-2

3150 3700 1200 (1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING 2625 NOTE:
7000 2500 1600 FLOOR LEVEL) 7000 2700 300
STEEL VERTICAL PIPE RAILING - ( SEE DETAIL) - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
2 CROSS SECTION 3 CROSS SECTION ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
USED AS ALTERNATE ROOFING MATERIALS).
SCALE 1: 100 M. SCALE 1: 100 M.
A-6 A-6
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
400 400

APEX LINE OF TRUSS


0.40mm THK. PRE-PAINTED AND PREFORMED G.I. END
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL FLASHING G.I. SHEET WITH TOTAL COATED THICKNESS
THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT) OF 0.43 - 0.45 mm THK.
CORRUGATED G.I. SHEET ROOFING
3150

EWF-2
TOP LINE OF ROOF BEAM/ S E E T R U S S D E T A I L
600 800

600 800
DECK ROOF FLOOR LEVEL DECK ROOF DECK ROOF

1400
TOILET CEILING LINE
W-3 W-3
3150

IWF-2
2600

2600
D-3a D-2

1800
BD-1 BD-1 BD-1
1500

1500
SHE D-2 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 HE
FOURTH FLOOR LINE (CORRIDOR)

550
TOILET CEILING LINE
W-3 W-3
3150

IWF-1
2600

2600
BD-1 D-3a D-2

1800
BD-1 BD-1

1500
EWF-1 D-2
SHE W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 HE
THIRD FLOOR LINE (CORRIDOR)

550
TOILET CEILING LINE
W-3 W-3
3150

IWF-1
2600

2600
BD-1 D-3a D-2

1800
BD-1 BD-1

1500
EWF-1 D-2
SHE W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1 HE
SECOND FLOOR LINE (CORRIDOR)

550
TOILET CEILING LINE
W-3 W-3
3150

IWF-2
2600

D-3 D-3

1800
BD-1 D-2 D-2 BD-1

1500
300

SHE CLASS ROOM CLASS ROOM HE


1000

1000
GROUND FLOOR LINE (CORRIDOR) W-1 CLASS ROOM W-1 W-1 W-1 W-1 W-1 W-1 CLASS ROOM W-1 W-1 CLASS ROOM W-1
700

700
300

NATURAL GRADE
LINE

300 X 300 mm VITRIFIED GLAZED TILE COUNTER TOP FINISH 300 X 300 mm VITRIFIED GLAZED TILE
1000 400 5000 9000 9000 9000 9000 9000 5000 400 1000 COUNTER TOP FINISH (HAND WASH COUNTER)
(HAND WASH COUNTER)
- SIZE & OR COLOR FOR APPROVAL BY THE END-USER - SIZE & OR COLOR FOR APPROVAL BY THE END-USER
EWF-1 IWF-1 IWF-1 IWF-1 EWF-1

1 LONGITUDINAL SECTION
SCALE 1: 100 M.
A-6

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS CROSS SECTION
MODIFIED STANDARD DPWH - DEPED LONGITUDINAL SECTION CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF WALL FINISHES FG SERRANO / GD TUSCANO
ARCHITECT III ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-6
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF CEILING FINISHES:
LEGEND: MARKS D E S C R I P T I O N S REMARKS

REVISION ON SCHEDULE OF CEILING FINISHES AND PROVIDE 12 mm X 38 mm X 5 m. X 0.8 mm THK.


LEGEND: R1 DESCRIPTIONS (6/25/2018) CL - 1
4.5 mm THK. FIBER CEMENT CEILING BOARD METAL CARRYING CHANNEL ( CEILING JOIST) AT
WITH PAINTED FINISH R1 1200 mm ON CENTER WITH
CL-1 - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH
R REVISION ON THE DRAWING DETAILS (1/23/2018) ON METAL FURRING CEILING FRAME. PROVIDE 8 mm THICK ROOF 19 mm X 50 mm X 5 m. X 0.5 mm THK. METAL
INSULATION WITH TWO(2) LAYERS POLYETHYLINE BUBBLED FILM DOUBLE FURRING CHANNEL (CEILING NAILER)
- ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN BONDED/LAMINATED BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS
AT 400 mm ON CENTER AND WITH
ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED (REFER TO MANUFACTURERS' SPECIFICATIONS) 4.5 mm THK. FIBER CEMENT CEILING BOARD
DESIGN 12 mm X 38 mm X 5 m. X 0.8 mm THK. METAL
ADDITIONAL SCHEDULE OF CEILING FINISHES CL - 1a WITH PAINTED FINISH (CEILING EAVES)
CHANNEL (CEILING HANGERS) AT 1200 mm ON
- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE, SUN BREAKER) (PROVIDE CEILING AIR-VENTILATION) - SEE DETAIL
WITH PAINTED FINISH, ABOVE WINDOW (W-1), AT REAR CL-1b - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH CENTER (TYPICAL ON ALL ROOMS)
ON METAL FURRING CEILING FRAME
(ADAPT REMARKS SPECIFICATION)
EXPOSED R. C. UNDER SLABS/ BEAMS WITH PLAIN
CL - 2
CEMENT PLASTER PAINTED FINISH

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
400 3425 1675 R
1575 3425 400

LINE OF MEDIA AGUA ABOVE

C
PWD PWD
SHE CL- 1b CL- 1b HE
3150

3150
R1 R1
CL- 1b CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 1b
R1 R1

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

STAIR WELL STAIR WELL


9500

9500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2
3850

3853
STO. CL- 2 STO.
CL- 2 CL- 2

B
C O R R I D O R
2500

2500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2

A
1200

1000
R

GROUND FLOOR REFLECTED CEILING PLAN 275 9000 275


9550
2 OPTION -4
SCALE 1: 100 M.
A-7

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
400 3425 1575 R
1575 3425 400
LINE OF MEDIA AGUA ABOVE

C
PWD PWD
SHE CL- 1b CL- 1b HE
3150

3150
R1 R1
CL- 1b CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 1b
R1 R1

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

STAIR WELL STAIR WELL


9500

9500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2
3850

3853
STO. STO.
CL- 2 CL- 2

B
C O R R I D O R
2500

2500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2

A
1200

1000

R
NOTE:
275 9000 275
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
GROUND FLOOR REFLECTED CEILING PLAN 9550 AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
1 OPTION -1 (ADAPTABLE TO OPTION -2 & 3) USED AS ALTERNATE ROOFING MATERIALS).
SCALE 1: 100 M.
A-7 - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR REFLECTED CEILING PLAN
CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
(OPTION - 2 , 3 & 4)
SCHEDULE OF CEILING FINISHES
IRMA B. BERNARDO
ARCHITECT III
APPROVED WITH SIGNATURE BOD
A-7
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
NOTE CHECKED: SIGNED B 21 90
LEGEND OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DepEd
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF CEILING FINISHES:
1200 FROM 25 X 50 mm WOOD FRAME MARKS D E S C R I P T I O N S REMARKS
13 50 25 STAINLESS STEEL WIRE MESH SCREEN
PROVIDE 12 mm X 38 mm X 5 m. X 0.8 mm THK.
CEILING HANGER/SUPPORT AT 1200 mm O.C.
4.5 mm THK. FIBER CEMENT CEILING BOARD METAL CARRYING CHANNEL (CEILING JOIST) AT
25 CL - 1 R1
WITH PAINTED FINISH

25
1200 mm ON CENTER WITH
FROM 25 X 50 mm WOOD FRAME

50

27
19 mm X 50 mm X 5 m. X 0.5 mm THK. METAL
375
325

25 DOUBLE FURRING CHANNEL (CEILING NAILER)


13 13
25 X 25 mm WOOD CEILING AIR-VENT @ 25
25 AT 400 mm ON CENTER AND WITH
50 mm O. C., TYPICAL 4.5 mm THK. FIBER CEMENT CEILING BOARD

25
1200
12 mm X 38 mm X 5 m. X 0.8 mm THK. METAL
4.5 nn THK. FIBER CEMENT CEILING BOARD WITH CL - 1a WITH PAINTED FINISH (CEILING EAVES)
25 25 25 X 25 mm WOOD CEILING AIRVENT at 50 mm O. C., TYPICAL CHANNEL (CEILING HANGERS) AT 1200 mm ON
PAINTED FINISH ON METAL FURRING CEILING (PROVIDE CEILING AIR-VENTILATION) - SEE DETAIL
CENTER (TYPICAL ON ALL ROOMS)
STAINLESS STEEL WIRE MESH SCREEN, TYPICAL SECTION FRAMES

PLAN EXPOSED R. C. UNDER SLABS/ BEAMS WITH PLAIN


CL - 2
3 DETAIL OF CEILING AIR-VENT CEMENT PLASTER PAINTED FINISH

A-8 SCALE 1: 20 m

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3775 1225 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
400 3425 1575 400 LEGEND:
R
1100

CL- 1a CL- 1a CL- 1a CL- 1a

C REVISION ON THE DRAWING DETAILS (1/23/2018)


- ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN
CL- 1 BREAKER) ABOVE WINDOW (W-1) AT REAR.
SHE HE
3150

3150
CL- 1 CL- 1

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
LEGEND:
7000

CL-2 STAIR WELL CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 CL- 1 STAIR WELL CL-2
REVISION ON SCHEDULE OF CEILING FINISHES AND
9500

9500
R1 DESCRIPTIONS (6/25/2018)
3850

3853
C O R R I D O R C O R R I D O R
CL- 1 CL- 1 CL-1 - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH
ON METAL FURRING CEILING FRAME. PROVIDE 8 mm THICK ROOF
INSULATION WITH TWO(2) LAYERS POLYETHYLINE BUBBLED FILM
BONDED/LAMINATED BETWEEN BY ALUMINUM FOIL RADIENT BARRIERS
B (REFER TO MANUFACTURERS' SPECIFICATIONS)

C O R R I D O R C O R R I D O R C O R R I D O R ADDITIONAL SCHEDULE OF CEILING FINISHES


2500

2500
CL- 1 CL- 1 CL- 1 CL-1b - 4.5 mm THICK FIBER CEMENT CEILING BOARD WITH PAINTED FINISH
ON METAL FURRING CEILING FRAME
(ADAPT REMARKS SPECIFICATION)
A
1100

CL- 1a CL- 1a CL- 1a CL- 1a

CL-2
2 FOURTH FLOOR REFLECTED CEILING PLAN NOTE:
SCALE 1: 100 M.
A-8
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
1 2 3 4 5 6 7 8 9 10 11 12 13 ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
55000 USED AS ALTERNATE ROOFING MATERIALS).
5000 9000 9000 9000 9000 9000 5000 - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.
3425 1575 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1575 3425
400 R
400

MEDIA AGUA MEDIA AGUA MEDIA AGUA MEDIA AGUA MEDIA AGUA
400

C
STO.
SHE CL- 1b HE
3150

3150
R1
CL- 1b CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 1b
R1 R1

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000
9500

9500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2
3850

3853
STAIR WELL STAIR WELL

B
C O R R I D O R
2500

2500
CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2 CL- 2

1 TYPICAL SECOND & THIRD FLOOR REFLECTED CEILING PLAN


SCALE 1: 100 M.
A-8

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL 2nd & 3rd FLOOR REFLECTED
MODIFIED STANDARD DPWH - DEPED CEILING PLAN CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR(4) STOREY, TWENTY (20) 4th FLOOR REFLECTED CEILING PLAN
IRMA B. BERNARDO
ARCHITECT III
APPROVED WITH SIGNATURE BOD
A-8
BUILDINGS DIVISION SCHEDULE OF CEILING FINISHES JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 21 90
DETAIL OF CEILING AIR-VENT OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DepEd
ARCHITECT IV TECHNICAL SERVICES, DPWH
REINFORCED CONCRETE GUTTER
A
0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL
THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT) C R.C. MEDIA AGUA WITH LEGEND:
(PROVIDE WATER -BASED WATERPROOFING)
CORRUGATED G.I. SHEET ROOFING PAINTED FINISH REVISION ON THE DRAWING DETAILS (1/23/2018) A 19 mm SQUARE BAR WITH PAINTED FINISH
1200 (RAILING GRILLE FRAME)
400 R - REVISION OF PARAPET WALL (R.C. GUTTER) FROM 100 mm THK. 150
100 mm X 50 mm THK. PRE-CAST MOULDINGS 950 CLASSROOM FLOOR - (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)
WITH PAINTED FINISH
- TOP & BOTTOM OF PARAPET (ALL-AROUND)
100 STEEL C - PURLINS SPACED @ 600 mm O.C.
(REFER TO STRUCTURAL) LEVEL SPOT DETAIL CHB TO 100 mm THK. REINFORCED CONCRETE.
- REVISION OF CORRIDOR RAILING AT SECOND TO FOURTH
50 50
50
SEE DETAIL
100
6 (MEDIA AGUA) FLOOR ADAPTING THE PROPOSED DEPED DESIGN.

19
- REVISION OF CORRIDOR RAILING AT GROUND FLOOR FULLY WELDED ON 19 mm SQUARE BAR BRACKET
(FROM 150 mm THK. CHB RAILING TO REINFORCED
100 mm THK. R.C. PARAPET WITH PLAIN CORRIDOR FLOOR A-9 SCALE 1: 25 M. EMBEDDED ON CHB WALL

150
CONCRETE BENCH) ADAPTING THE PROPOSED DEPED - (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)
CEMENT PLASTER PAINTED FINISH - EWF-2 LEVEL

400

425
DESIGN. SEE DETAIL
ANGULAR STEEL TRUSSES

500

77 300

600
(PROVIDE 25 mm SQUARE WATER DRIP MOULD)

75
- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)

800

150
(REFER TO STRUCTURAL)

123
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.

200

175
TOP LINE OF ROOF BEAM/ EXPOSED REINFORCED CONCRETE BEAM/ REINFORCED CONCRETE BEAM - ADDITIONAL MEDIA AGUA (REINFORCED CONCRETE SUN 100
PROVIDE 20 mm SQUARE GROOVE

300
1400
DECK ROOF FLOOR LEVEL WITH PAINTED FINISH WITH PLAIN CEMENT PLASTER BREAKER) ABOVE WINDOW (W-1) AT REAR. 150 mm THK. CHB EXTERIOR WALL RAILING

100

196

300
PAINTED FINISH LINE (DRIP MOULD) WITH PLAIN CEMENT PLASTER PAINTED FINISH

900
1500
1100
4.5 mm THK. FIBER CEMENT CEILING BOARD - (EWF-1a)
(REFER TO STRUCTURAL FOR BEAM'S SIZES)
PAINTED FINISH ON METAL FURRING CEILING

900
DETAIL SECTION OF CORRIDOR RAILING

600
600
NAILERS 100
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
- (FL-2)
1000 mm O.C. (OVER FLOW PIPE)
5 (TYPICAL AT SECOND TO FOURTH FLOOR )
4 DETAIL SECTION (R.C. GUTTER) SECOND FLOOR LINE (CORRIDOR)
A-9 SCALE 1: 30 M.

600
METAL SPANDREL CEILING EAVE EXPOSED REINFORCED CONCRETE
(PROVIDE PERFORATED CEILING VENT) A-9 SCALE 1: 30 M.
(PROVIDE WATER DRIP MOULD) UNDER SLAB WITH PAINTED FINISH

0.60 mm THK. (BASE METAL THICKNESS) 9 10 2 11 0.40 mm THK. (BASE METAL THICKNESS) WITH TOTAL REINFORCED CONCRETE BEAM WITH PLAIN CEMENT
A-9 THICKNESS OF 0.43 - 0.45 mm THK. (WITH PAINT)
PREFORMED AND PRE-PAINTED RIDGE ROLL PLASTER PAINTED FINISH
9000 CORRUGATED G.I. SHEET ROOFING 150 (REFER TO STRUCTURAL FOR BEAM'S SIZES)
A B
APEX LINE OF TRUSS 1100 2500 150 mm THK. CHB PARAPET WITH PLAIN CEMENT
950 PLASTER PAINTED FINISH - EWF-2 C
100 mm X 50 mm THK. PRE-CAST MOULDINGS WITH (SUBMIT COLOR SCHEMES FOR APPROVAL) 1100
0.40 mm THK. (BASE METAL PAINTED FINISH (ALL-AROUND) REINFORCED CONCRETE GUTTER 950
THICKNESS) WITH TOTAL (PROVIDE WATER BASE WATERPROOFING)
4
THICKNESS OF A-9
100 mm THK. R.C. PARAPET WITH PLAIN 0.40mm THK. PRE-PAINTED AND PREFORMED
0.43 - 0.45 mm THK.
CEMENT PLASTER PAINTED FINISH - EWF-2 G.I. END FLASHING SHEET WITH TOTAL
(WITH PAINT) CORRUGATED R R
3200

(PROVIDE 25 mm SQUARE WATER DRIP MOULD) COATED THICKNESS OF 0.43 - 0.45 mm THK.
G.I. SHEET ROOFING
0.40 mm THK. (BASE METAL THICKNESS)
WITH TOTAL THICKNESS OF 0.43 - 0.45 mm
THK. (WITH PAINT) CORRUGATED G.I. SHEET
- 2 % SLOPING ROOFING
4.5 mm THK. FIBER CEMENT CEILING BOARD
800

800

800
TOP LINE OF ROOF BEAM/ PAINTED FINISH ON METAL FURRING CEILING
DECK ROOF FLOOR LEVEL

300
1400

1400

1400

1400
300
NAILERS

431

431
600

600
CEILING LINE CEILING LINE

150 mm THK. CHB INTERIOR WALL WITH


R 4.5 mm THK. FIBER CEMENT CEILING BOARD R PLAIN CEMENT PLASTER PAINTED FINISH
PAINTED FINISH ON METAL FURRING CEILING - IWF-1 W-1
3150

150 mm THK. CHB EXTERIOR WALL


NAILERS

2700
W-2 WITH PLAIN CEMENT PLASTER
600

600
150 mm THK. CHB EXTERIOR WALL RAILING PLAIN CEMENT FLOOR FINISH WITH FLOOR PAINTED FINISH - EWF-1
WITH PLAIN CEMENT PLASTER PAINTED FINISH PARTIAL PART HARDENER (PROVIDE 6mm GROOVES PARTIAL PART
1500

- EWF-1a

300
@ 1000 mm O.C. BOTH WAYS) - FL-1
OF OF

900
900

900
CLASSROOM FLOOR

600
FOURTH FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM 400

1200

1200

19
600

75
150
EXPOSED REINFORCED CONCRETE
1650

EXPOSED REINFORCED CONCRETE BEAM/S & UNDER SLAB WITH PAINTED


R FINISH - (EWF-1)
BEAM/S & UNDER SLAB WITH PAINTED
FINISH - (EWF-1) 150 mm THK. CHB INTERIOR WALL WITH
W-2 W-2 R.C. MEDIA AGUA WITH
3150

W-2 PLAIN CEMENT PLASTER PAINTED FINISH W-1


PAINTED FINISH
19 mm SQUARE BAR WITH PAINTE FINISH - IWF-1
600

600
(RAILING GRILLE FRAME) PLAIN CEMENT FLOOR FINISH WITH FLOOR

850
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR) PARTIAL PART HARDENER (PROVIDE 6mm GROOVES PARTIAL PART
1500

300

300
SEE DETAIL @ 1000 mm O.C. BOTH WAYS) - FL-1
OF OF 400

900
900

900
CLASSROOM FLOOR

600

600
THIRD FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM 400

1200

1200

19
R

600

75
150
EXPOSED REINFORCED CONCRETE
1650

BEAM/S & UNDER SLAB WITH PAINTED


FINISH
EXPOSED REINFORCED CONCRETE UNDER
SLAB WITH PAINTED FINISH 150 mm THK. CHB INTERIOR WALL WITH
W-2 W-2 R.C. MEDIA AGUA WITH
3150

W-2 PLAIN CEMENT PLASTER PAINTED FINISH W-1


PAINTED FINISH
19 mm SQUARE BARS (EPOXY PAINTED FINISH) - IWF-1
600

600
(RAILING GRILLE SUPPORT FRAME) PLAIN CEMENT FLOOR FINISH WITH FLOOR
850

- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR) PARTIAL PART HARDENER (PROVIDE 6mm GROOVES PARTIAL PART
1500

300

300
SEE DETAIL @ 1000 mm O.C. BOTH WAYS) - FL-1
OF OF 400

900
900

900
CLASSROOM FLOOR
600

600
SECOND FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM
1200

1200

19
600

75
150
EXPOSED REINFORCED CONCRETE BEAM
WITH PAINTED FINISH
150 mm THK. CHB EXTERIOR WALL WITH PLAIN
CEMENT PLASTER PAINTED FINISH - EWF-1 W-1
W-2 150 mm THK. CHB INTERIOR WALL WITH 150 mm THK. CHB EXTERIOR WALL
3150

1950

(SUBMIT COLOR SCHEMES FOR APPROVAL)


2550

PLAIN CEMENT PLASTER PAINTED FINISH WITH PLAIN CEMENT PLASTER


REINFORCED CONCRETE BENCH WITH PLAIN - IWF-1 PAINTED FINISH - EWF-1
CEMENT PLASTER AND PAINTED FINISH
R
PARTIAL PART PARTIAL PART
OF OF

500 100

900
CLASSROOM FLOOR
600

600

600
GROUND FLOOR LINE (CORRIDOR) CORRIDOR CLASSROOM LEVEL CLASSROOM

19
300

NATURAL GRADE LINE 300 PLAIN CEMENT FLOOR FINISH WITH FLOOR
150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER HARDENER (PROVIDE 6mm GROOVES
4500 4500
PAINTED FINISH - EWF-1a (SUBMIT COLOR SCHEMES FOR APPROVAL) @ 1000 mm O.C. BOTH WAYS) - FL-1
2500

DETAIL BAY ELEVATION NOTE: DETAIL BAY SECTION DETAIL BAY SECTION
1 @ FRONT, ALONG GRID-A, BETWEEN GRIDS 9 - 11 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL AREAS PRONE TO
2 @ FRONT, BETWEEN GRIDS 10-11, ALONG GRIDS A & B) 3 @ REAR, BETWEEN GRIDS 10 -11, ALONG GRID C)
CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT ROOFING SHEETS
SCALE 1: 50 M. (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE USED AS ALTERNATE ROOFING MATERIALS). SCALE 1: 50 M. SCALE 1: 50 M.
A-9 A-9 A-9
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL BAY SECTIONS
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION (R.C. GUTTER) CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) DETAIL SECTION OF RAILING @ CORRIDOR (TYP. @ FG SERRANO / GD TUSCANO
ARCHITECT III ARCHITECT II
APPROVED WITH SIGNATURE BOD
A-9
BUILDINGS DIVISION SECOND TO FOURTH FLOOR) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
PLAIN CEMENT FLOOR FINISH WITH
FLOOR HARDENER - FL -2
300
GROUND FLOOR LINE (CORRIDOR) 125 150
A B
19 mm SQUARE BAR WITH PAINTED FINISH 6 mm THK. NON-SKID METAL
(RAILING GRILLE FRAME) NOSING STRIP (SUBMIT SAMPLE) REINFORCED CONCRETE STAIR

150
1200 2500
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)

300
1000 SEE DETAIL REINFORCED CONCRETE BENCH WITH PLAIN
R CRASH GRAVELED STONE CEMENT PLASTER PAINTED FINISH

150
R
NATURAL GRADE LINE
WELDED ON 19 mm SQUARE BAR BRACKET EMBEBBED

100
150 mm THK. CHB EXTERIOR WALL ON CHB WALL
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) REINFORCED CONCRETE COLUMN WITH PLAIN
RAILING WITH PLAIN CEMENT
PLASTER PAINTED FINISH - EWF-1a PARTIAL PART SEE DETAIL CEMENT PLASTER PAINTED FINISH
OF 150 mm THK. CHB EXTERIOR WALL RAILING AT
CLASSROOM FLOOR TYP. SPOT DETAIL SECTION OF STAIR STEP 600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN CEMENT

800
GROUND FLOOR CLASSROOM

600
LEVEL
600

PLASTER PAINTED FINISH


LINE (CORRIDOR) CORRIDOR 5 (WITH NON - SKID NOSING STRIP)

500
(SUBMIT COLOR SCHEMES FOR APPROVAL)
100

A-10 SCALE 1 : 10 M. PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER


600

EXPOSED REINFORCED CONCRETE BEAM 1 13 - FL -2


WITH PAINTED FINISH
25 X 25 mm GROOVE WATER DRIP MOULD
GROUND FLOOR LINE (CORRIDOR)

150 mm THK. CHB EXTERIOR WALL


150 mm THK. CHB EXTERIOR WALL W-2 150 mm THK. CHB INTERIOR WALL WITH
3150

WITH PLAIN CEMENT PLASTER PAINTED


WITH PLAIN CEMENT PLASTER PAINTED PLAIN CEMENT PLASTER PAINTED FINISH REINFORCED CONCRETE COLUMN WITH
FINISH - EWF-1

300
FINISH - EWF-1 - IWF-1 PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)
(SUBMIT COLOR SCHEMES FOR APPROVAL) PARTIAL PART (REFER TO STRUCTURAL FOR COLUMN SIZES) PARTIAL PART
5
A-10
OF 5
A-10
OF NATURAL GRADE LINE
CLASSROOM FLOOR
CLASSROOM CORRIDOR

800
GROUND FLOOR LINE GROUND FLOOR LINE
150 mm = 300 mm

150 mm = 300 mm
LEVEL
CORRIDOR
2 - RISERS @

2 - RISERS @
(CORRIDOR) (CORRIDOR)

19
300

CRASH GRAVELED STONE


NATURAL GRADE LINE NATURAL GRADE LINE

PLAIN CEMENT FLOOR FINISH WITH FLOOR PLAIN CEMENT FLOOR FINISH WITH FLOOR
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER (PROVIDE 6mm GROOVES
300 2700 300 HARDENER - FL -2
HARDENER - FL -2 @ 1000 mm O.C. BOTH WAYS) - FL -1
3000

2 DETAIL SECTION OF MAIN ENTRANCE 4 TYP. DETAIL SECTION OF SERVICE ENTRANCE DETAIL SECTION OF CORRIDOR RAILING
A-10 SCALE 1: 50 M.
A-10 SCALE 1: 50 M.
6 (AT GROUND FLOOR)
2
4 A-10 SCALE 1 : 10 M.
A-10
6 7 A-10 8
R
B A
275 9000 275

REINFORCED CONCRETE CANOPY WITH PLAIN REINFORCED CONCRETE COLUMN WITH PAINTED FINISH
700

CEMENT PLASTER PAINTED FINISH (REFER TO STRUCTURAL FOR COLUMN SIZES)


150 mm THK. CHB EXTERIOR WALL RAILING
WITH PLAIN CEMENT PLASTER PAINTED FINISH (1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)

2550
- (EWF-1a)
150 mm THK. CHB EXTERIOR WALL WITH PLAIN - TYPICAL ON BOTH SIDE ( SEE DETAIL)
CEMENT PLASTER PAINTED FINISH - EWF-1
2550

(SUBMIT COLOR SCHEMES FOR APPROVAL)


6 GROUND FLOOR CORRIDOR

900
100 mm THK. CHB EXTERIOR WALL WITH PLAIN

300 mm = 300 mm
A-10
LINE (CORRIDOR)

2 - RISERS @
REINFORCED CONCRETE BENCH WITH PLAIN

100 700
CEMENT PLASTER PAINTED FINISH - EWF-1
CEMENT PLASTER PAINTED FINISH

300
CLASSROOM FLOOR W-2 W-2
DETAILED ELEVATION THRU - A
800
300 mm = 300 mm

LEVEL

600
C O R R I D O R
2 - RISERS @

ELEV. 300.00 mm GROUND FLOOR LINE (CORRIDOR) NATURAL GRADE


19

LINE 2500 1400


300

300
NOTE:
NATURAL GRADE LINE
1 13 2 12 - FOR SCHOOL BUILDING SITE LOCATED NEAR
150 mm THK. CHB EXTERIOR WALL RAILING AT
4500 4500 SEA BOARDS OR COASTAL AREAS PRONE TO
PLAIN CEMENT FLOOR FINISH WITH FLOOR 600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN CEMENT
HARDENER - FL -2 9000 PLASTER PAINTED FINISH CORROSION ON G.I. ROOFING, CORRUGATED
1000 400 5000
(SUBMIT COLOR SCHEMES FOR APPROVAL) ASPHALT ROOFING SHEETS
300 (3.0 mm THK. - BITUMINOUS - CELLULOSE
DETAILED ELEVATION
PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER FIBRES CAN BE USED AS ALTERNATE ROOFING
(PROVIDE 6mm GROOVES @ 1000 mm O.C. BOTH WAYS) PLAIN CEMENT FLOOR FINISH WITH MATERIALS).
- (F -1) FLOOR HARDENER
D-3a - FL -2 - FOR COLUMNS AND BEAMS SIZES REFER TO
B STRUCTURAL SHOP DRAWINGS.

SEE DETAILED ELEVATION


R 150 mm THK. CHB EXTERIOR WALL WITH PLAIN
PARTIAL PART OF CLASSROOM ELEV. 319.00 mm
CEMENT PLASTER PAINTED FINISH - EWF-1 EMBEDDED ON CHB RAILING SPACED @ 1050 mm O.C
FL-1 (SUBMIT COLOR SCHEMES FOR APPROVAL) - TYPICAL TO OTHER SIDE

REINFORCED CONCRETE BENCH WITH PLAIN

2500

2025
B UP PARTIAL PART OF CORRIDOR CEMENT PLASTER AND PAINTED FINISH
19 mm DROP 19 mm DROP
LINE OF 150 mm THK. CHB EXTERIOR WALL RAILING AT LINE OF 150 mm THK. CHB EXTERIOR WALL RAILING AT
600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN CEMENT 1350 600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN CEMENT
PLASTER PAINTED FINISH PLASTER PAINTED FINISH
ELEV. 300.00 mm
(SUBMIT COLOR SCHEMES FOR APPROVAL) (SUBMIT COLOR SCHEMES FOR APPROVAL)
50 50 50 50 A
A
2500

125
950 900 350 1500 150 150 1500 350 900 950

(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)


PARTIAL PART OF CORRIDOR

1600
SLOPE 1:12 1
LEGEND:

1200

1200
ELEV. 300.00 mm RAMP UP A-10
200

- TYPICAL ON BOTH SIDE ( SEE DETAIL)

A R REVISION OF DRAWING DETAILS (1/23/2018)


300
300

REINFORCED CONCRETE BENCH WITH PLAIN ELEV. 0.00 mm - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)
1200

ELEV. 0.00 mm CEMENT PLASTER PAINTED FINISH 100 PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.
UP UP GROOVE LINES
- FL -4 1500 3600 300 DETAILED PLAN - ADDITIONAL CANOPY (REINFORCED CONCRETE) ALONG MAIN
DETAILED PLAN PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER ENTRANCE, AS RECOMMENDED ON THE PROPOSED DEPED
LINE OF CANOPY ABOVE - FL -2 DESIGN
275 9000 275 TYP. DETAIL OF SERVICE ENTRANCE - REVISION OF CORRIDOR RAILING AT GROUND FLOOR
(FROM 150 mm THK. CHB RAILING TO REINFORCED
9550 3 (@ BOTH SIDE ALONG GRIDS 1 & 13, SHOWING RAMP) CONCRETE BENCH) ADAPTING THE PROPOSED DEPED
DESIGN.
SCALE 1: 50 M.
A-10
1 DETAIL OF MAIN ENTRANCE (@ FRONT, ALONG GRID - A)
SCALE 1: 50 M.
A-10

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF MAIN ENTRANCE
MODIFIED STANDARD DPWH - DEPED TYPICAL DETAIL OF SERVICE ENTRANCE CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SPOT DETAIL SECTION OF CHB RAILING @ CORRIDOR IRMA B. BERNARDO
ARCHITECT III
APPROVED WITH SIGNATURE BOD
A - 10
BUILDINGS DIVISION SPOT DETAIL SECTION OF STAIR STEP (MAIN/ SERVICE JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ENTRANCE) CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/ LANDING FLOOR LEVEL)

19mm/VARIABLE
19mm/VARIABLE 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
1 13
NON - SKID CEMENT FLOOR FINISH PAINTED FINISH - EWF-1
WITH 6 mm HORIZONTAL GROOVE (SUBMIT COLOR SCHEMES FOR APPROVAL)

200
LINES 6 6 mm THK.
6 400
GROOVE LINE - PROVIDE WATER FAUCET AS SHOWN
RAMP THRESHOLD WITH PLAIN CEMENT PLASTER PAINTED FINISH 200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH
100 300
6 (100 mm HIGH FROM RAMP FLOOR FINISH) (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)

900
- TYPICAL TO OTHER SIDE
FULLY WELDED 25 200 X 200 mm VITRIFIED GLAZED TILE HAND
WASHING BACK SPLASH FINISH

900
700
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
RAILING SPACED AT 600 mm O. C. - TYPICAL TO OTHER SIDE
REINFORCED CONCRETE SLAB FULLY WELDED - TYPICAL ON BOTH SIDE (SEE DETAIL)
PARTIAL PART

300
PORCH FINISH FLOOR LEVEL
OF TOILET

100 100

100
200
1000
150 mm THK. CHB WITH VITRIFIED GLAZED TILE WALL

700
SPOT DETAIL SECTION OF RAMP FLOORING

600
FINISH - HAND WASHING LAVATORY SUPPORT (TYPICAL)

300

500
4 HAND WASHING PLATFORM
FLOOR LEVEL
A-11 SCALE 1:10 M.

100
NATURAL GRADE LINE NATURAL GRADE LINE

NON - SKID CEMENT FLOOR FINISH WITH 6 mm HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB)
(1 @ 900 mm, 1@ 700 mm HORIZONTAL GROOVE LINES WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER 1000 475
HIGH FROM RAMP/ LANDING FLOOR LEVEL) FULLY WELDED ON - FL - 2

SUPPORT EMBEDDED ON CHB RAILING SPACED


- TYPICAL ON BOTH SIDE ( SEE DETAIL) 5 @ 1050 mm O.C - TYPICAL TO OTHER SIDE
A-11

7 TYPICAL DETAIL SECTION OF HAND WASHING COUNTER

150
100

A-11 SCALE 1: 30 M.

900
750
GROUND FLOOR LINE (CORRIDOR)
5 TYP. DETAIL OF RAMP RAILINGS
100

300
NATURAL GRADE LINE
A-11 SCALE 1:15 M.

NON - SKID CEMENT FLOOR FINISH 125 150 150 mm THK. CHB EXTERIOR WALL RAILING
100 1200 100 WITH PLAIN CEMENT PLASTER PAINTED FINISH 150 mm THK. CHB EXTERIOR WALL WITH PLAIN CEMENT PLASTER
- EWF-1a PAINTED FINISH - EWF-1

(SUBMIT COLOR SCHEMES FOR APPROVAL)


(SUBMIT COLOR SCHEMES FOR APPROVAL)
C - PROVIDE WATER FAUCET AS SHOWN B
3 DETAIL SECTION OF RAMP 200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING BACK
7000
SCALE 1: 50 M.
A-11 SPLASH FINISH
(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
7
- TYPICAL TO OTHER SIDE
A-11

1 13 2 12
R

300

200 200
5000 HAND WASHING SINK LEVEL

1000

700

700
600

500
HAND WASHING PLATFORM FLOOR
LEVEL
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/

100
LANDING FLOOR LEVEL) FULLY WELDED ON SUPPORT EMBEDDED ON CHB RAILING SPACED
@ 1050 mm O.C - TYPICAL TO OTHER SIDE NATURAL GRADE LINE
HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB)
RAILING - TYPICAL ON BOTH SIDE ( SEE DETAIL) D-3 WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER
REINFORCED CONCRETE BENCH WITH PLAIN 150 mm THK. CHB WITH VITRIFIED GLAZED TILE WALL FINISH
- FL - 2
D-3a - HAND WASHING LAVATORY SUPPORT (TYPICAL)
CEMENT PLASTER PAINTED FINISH
1200 1613 1612 1612 1613
7000

200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH
100 600 200

DETAILED ELEVATION
900

(SIZE & OR COLOR FOR APPROVAL BY THE END-USER)


700

600

- TYPICAL TO OTHER SIDE


GROUND FLOOR LINE (CORRIDOR)
100

LEGEND:
300

200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING


C BACK SPLASH FINISH (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
- TYPICAL TO OTHER SIDE
B
NATURAL GRADE LINE
100

7000
4 100 R REVISION OF DRAWING DETAILS (1/23/2018)
A-11
100 1500 3600 300 3150 3850
- REVISION OF HAND WASHING COUNTER TOP FINISHES
NON - SKID CEMENT FLOOR FINISH WITH 6 mm - COUNTER TOP & BACK SPLASH FINISH 150 mm THK. CHB (BROKEN LINE BELOW)
O.C. WITH EPOXY PAINTED FINISH 1075
HORIZONTAL GROOVE LINES
2 DETAIL SECTION OF RAMP - ( SEE DETAIL)
FROM 200 X 200 mm VIT. GLAZED TILES TO 300 X 300 mm VIT.
GLAZED TILES
- HAND WASHING SINK SUPPORT (TYPICAL)

SCALE 1: 50 M.
A-11

12 NOTE:
1 13 2 PIPE CHASE PARTIAL PART OF STAIR
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA
PARTIAL PART OF FEMALE TOILET
BOARDS OR COASTAL AREAS PRONE TO CORROSION
ON G.I. ROOFING, CORRUGATED ASPHALT ROOFING

275
5000 SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE
FIBRES CAN BE USED AS ALTERNATE ROOFING
MATERIALS). 1

100 300
(1 @ 900 mm, 1@ 700 mm HIGH FROM RAMP/

400

400
LANDING FLOOR LEVEL) FULLY WELDED ON
- FOR COLUMNS AND BEAMS SIZES REFER TO FD HANDWASHING COUNTER FD
150 mm THK. CHB EXTERIOR WALL WITH STRUCTURAL SHOP DRAWINGS.

75
D-3a
PLAIN CEMENT PLASTER PAINTED FINISH
RAILING - TYPICAL ON BOTH SIDE ( SEE DETAIL) D-3 - EWF-1a 200 X 200 mm VITRIFIED GLAZED TILE HAND WASHING COUNTER TOP FINISH

1400
(SUBMIT COLOR SCHEMES FOR APPROVAL) (SIZE & OR COLOR FOR APPROVAL BY THE END-USER)
- TYPICAL TO OTHER SIDE
200

- PROVIDE WATER FAUCET AS SHOWN

1000
REINFORCED CONCRETE
H A N D W A S H I N G A R E A
600 200
900

PLATFORM
GROUND FLOOR LINE (CORRIDOR) R
900
100
300

HAND WASHING PLATFORM (REINFORCED CONCRETE SLAB)


NATURAL GRADE LINE
100

WITH PLAIN CEMENT FLOOR FINISH PROVIDE FLOOR HARDENER


1200 1500 3600 300 DETAILED PLAN - FL - 2

NON - SKID CEMENT FLOOR FINISH WITH 6mm 6450


GROOVE LINES

1 DETAIL ELEVATION OF RAMP O.C. WITH EPOXY PAINTED FINISH


- ( SEE DETAIL)
6 TYPICAL DETAIL OF HAND WASHING COUNTER
SCALE 1: 50 M.
A-11
A-11 SCALE 1: 30 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF RAMP
CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED DETAIL SECTIONS OF RAMP
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
DETAIL SECTION OF RAMP RAILING IRMA B. BERNARDO
ARCHITECT III
APPROVED WITH SIGNATURE BOD
A - 11
BUILDINGS DIVISION TYPICAL DETAIL OF HAND WASHING COUNTER JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
TYP. DETAIL SECTION OF HAND WASHING COUNTER CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEPED
ARCHITECT IV TECHNICAL SERVICES, DPWH
1 13 1 13 2 12

3250 5000

550 1000 2250 8- TREADS @ 250 mm


ROOF BEAM (TOP VIEW) 1450 = 2000 mm

100 mm HIGH DOOR


LEGEND:
PARTIAL PART OF DECK ROOF
THRESHOLD

LINE OF END WALL ABOVE LANDING 64 65 66 LANDING 64 65 66 67 68 69 70 71 72 SD-1


R REVISION ON THE DRAWING DETAILS (1/23/2018)
FL-2

1000

1000
950
FL-2
DN - REVISION OF STAIR RAILING FROM GROUND FLOOR TO

1350
THIRD FLOOR, ADAPTING THE PROPOSED DEPED DESIGN.
63 63
62 62

8- TREADS @ 250 mm

8- TREADS @ 250 mm
61 61
60 60

= 2000 mm

= 2000 mm
3800

3800
59 59
58 58
NOTE:

2700
57 (FULLY WELDED ON 19 mm 57 (FULLY WELDED ON 19 mm

2450
56 BAR VERTICAL RAILING TYPICAL) 56 BAR VERTICAL RAILING TYPICAL)
55 55 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR
COASTAL AREAS PRONE TO CORROSION ON G.I. ROOFING,
850

CORRUGATED ASPHALT ROOFING SHEETS (3.0 mm THK. - BITU-

800

975
UP MINOUS - CELLULOSE FIBRES CAN BE USED AS ALTERNATE
B B ROOFING MATERIALS).
D-2 - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP
150 mm THK. CHB EXTERIOR WALL 400 1000 3650
WITH PLAIN CEMENT PLASTER
DRAWINGS.
PAINTED FINISH (EWF-1)

DETAIL PLAN OF STAIR DETAIL PLAN OF STAIR


@ FOURTH FLOOR LEVEL @ ROOF DECK FLOOR LEVEL

2 TYPICAL DETAIL OF STAIR (FROM FOURTH FLOOR TO DECK ROOF FLOOR LEVEL)
SCALE 1 : 50 M
A-12

1 13 1 13 1 13 1 13

1
A-13

3250 3250 3250 3250


1575 1575 1575 1575 1575 1575 1575 1575
100 100 100 100
FINISH (FULLY WELDED ON 12 mm FINISH (FULLY WELDED ON 12 mm FINISH (FULLY WELDED ON 12 mm FINISH (FULLY WELDED ON 12 mm
BAR VERTICAL RAILING) BAR VERTICAL RAILING) BAR VERTICAL RAILING) BAR VERTICAL RAILING)

LINE OF END WALL ABOVE LINE OF END WALL ABOVE

950
LANDING LANDING LANDING 200 LANDING 200
1250

1250

1250
1350

1350

1350
FL-2 FL-2 FL-2 FL-2
PARTIAL PART OF HANDWASHING AREA

9 27 45 45
100

100

100

100
8- TREADS @ 250 mm
10 28 46 46
8 -TREADS @ 300 mm = 2400 mm

8 -TREADS @ 300 mm = 2400 mm

8 -TREADS @ 300 mm = 2400 mm


8 26 44 44

= 2000 mm
7 11 25 29 43 47 43 47
3800

3800

3800

3800
6 12 24 30 42 48 42 48

5 13 23 31 41 49 41 49
2300

2300

2300
4 14 22 40 40 50

3 STO. 21 39 39 51

2 R 20 R 16 38 R 34 38 R 52

850
1 19 17 37 35 37 53

B B 18 B 36 B 54

D-3a 75 75 675 75
UP UP DN UP DN D-2 DN
150 mm THK. CHB EXTERIOR WALL 150 mm THK. CHB EXTERIOR WALL 150 mm THK. CHB EXTERIOR WALL
PARTIAL PART OF WITH PLAIN CEMENT PLASTER PARTIAL PART OF WITH PLAIN CEMENT PLASTER PARTIAL PART OF WITH PLAIN CEMENT PLASTER PARTIAL PART OF
CORRIDOR PAINTED FINISH (EWF-1) CORRIDOR PAINTED FINISH (EWF-1) CORRIDOR PAINTED FINISH (EWF-1) CORRIDOR
FL-1 FL-1 FL-1 FL-1

DETAIL PLAN OF STAIR DETAIL PLAN OF STAIR DETAIL PLAN OF STAIR DETAIL PLAN OF STAIR
@ GROUND FLOOR LEVEL @ SECOND FLOOR LEVEL @ THIRD FLOOR LEVEL @ FOURTH FLOOR LEVEL

1 TYPICAL DETAIL OF STAIR


SCALE 1 : 50 M
A-12

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL DETAIL PLAN OF STAIR
CADD: SIGNED
MODIFIED STANDARD DPWH - DEPED TYPICAL DETAIL OF STAIR FROM THIRD FLOOR TO SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
DECK ROOF FLOOR LEVEL GILDA P. CARMONA
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
A - 12
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC,-UNDERSECRETARY FOR
SECRETARY, DEP ED
ARCHITECT IV TECH'L.SERVICES, DPWH
1 13

FINISH (900 mm HIGH FROM FINISH FLOOR FINISH (FULLY WELDED ON STEEL BAR
LINE-LANDING) RAILING)

FULLY WELDED

LINE OF ROOF BEAM


12 mm BAR VERTICAL RAILING

900
PLAIN CEMENT FLOOR FINISH
WITH FLOOR HARDENER

LANDING 12 mm G.I. BAR VERTICAL


9 SPOT DETAIL (TYP. HANDRAIL) B
RAILING (FULLY WELDED TYPICAL)

175
A-13 SCALE 1:5 M.
8-TREADS @ 300 mm = 2400 mm
(FULLY WELDED ON STEEL BAR RAILING)

175
2 8-TREADS @ 250 mm

1575
REINFORCED CONCRETE
A-13 = 2000 mm LANDING SLAB (EXPOSED
1000 UNDER SLAB WITH PAINTED 1250
19 mm BAR VERTICAL RAILING
(FULLY WELDED ON HANDRAIL) FINISH)
300

300
300
7
A-13

900
PLAIN CEMENT FLOOR FINISH
APEX LINE OF TRUSS WITH FLOOR HARDENER (FL-2) 4 TYP. DETAIL SECTION OF STAIR LANDING
REINFORCED CONCRETE LANDING SLAB
A-13 SCALE 1 : 15 M.

(EXPOSED UNDER SLAB WITH PAINTED FINISH)


LANDING
3200

LEGEND:
R REVISION ON THE DRAWING DETAILS (1/23/2018)
TOP LINE OF ROOF BEAM/ PARTIAL PART - REVISION OF STAIR RAILING FROM GROUND FLOOR TO 9 3
DECK ROOF FLOOR LINE OF DECK ROOF THIRD FLOOR, ADAPTING THE PROPOSED DEPED DESIGN. A-1
72
71 150 1250
425

70

175 mm = 1575 mm
2100

69
WITH PAINTED FINISH

9-RISERS @
CEILING LINE 68
TYP. DETAIL SECTION OF STAIR LANDING NOTE:
1575

67 (FULLY WELDED ON STEEL

18-RISERS @ 175 mm
66 BAR RAILING)
900

65 5 (GOING TO DECK ROOF) - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR

= 3150 mm
64
COASTAL AREAS PRONE TO CORROSION ON G.I. ROOFING, 6 mm THK. NON-SKID METAL
LANDING 63
3150

62 A-13 SCALE 1 : 15 M.
CORRUGATED ASPHALT ROOFING SHEETS (3.0 mm THK. - BITU- NOSING STRIP (SEE DETAIL)
61
D-2 MINOUS - CELLULOSE FIBRES CAN BE USED AS ALTERNATE

175 mm = 1575 mm
60
D-2

9-RISERS @
1250
59 ROOFING MATERIALS).
REINFORCED CONCRETE STAIR

175
58
57 - FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP (SEE STRUCTURAL DETAIL)

900
900

PARTIAL 56 PARTIAL
PART OF 55 PART OF
DRAWINGS.

175
FOURTH FLOOR LINE (CORRIDOR) FEMALE T&B 54 CORRIDOR
53
19 mm BAR VERTICAL RAILING
9-RISERS @ 175 mm

52 WITH PAINTED FINISH


CL
19

1 13 2 12

175
51 ( FULLY WELDED ON HANDRAIL )
= 1575 mm

50 6 mm THK. NON-SKID
49 METAL NOSING STRIP 8

175
18-RISERS @ 175 mm

48
(SUBMIT SAMPLE) A-13
900

47 350
= 3150 mm

46
5000 12 mm G.I. BAR VERTICAL RAILING

(TYPICAL DEPTH)
LANDING 45

175
3150

44 (FULLY WELDED ON HANDRAIL)

100 mm
D-2 43
175 mm = 1575 mm

42 400 1125 2250


9-RISERS @

41
17-RISERS @ 175 mm = 2975 mm

1250 40
39 250 250 250 250 250
PARTIAL 12 mm G.I. BAR VERTICAL
900

PARTIAL 38
PART OF 37 PART OF RAILING EMBEDDED ON REINFORCED
THIRD FLOOR LINE (CORRIDOR) FEMALE T&B 36 CORRIDOR CONCRETE STAIR
35 TYP. DETAIL SECTION OF STAIR STEPS

50
9-RISERS @ 175 mm 9-RISERS @ 175 mm 9-RISERS @ 175 mm 9-RISERS @ 175 mm

34
19

33
6 (STAIR GOING TO DECK ROOF)
18 - RISERS @ 175 mm = 3150 mm
= 1575 mm

32 REINFORCED
CEILING LINE 31 CONCRETE STAIR
30
3 (FULLY WELDED ON 19 mm
A-13 SCALE 1 : 15 M.
900

29
A-13 BAR VERTICAL RAILING TYPICAL) 6
28
A-13 9

100
2100
LANDING 27 SD-1 A-1
3150

(FULLY WELDED ON 19 mm 19 mm BAR VERTICAL RAILING 3 PLAIN CEMENT FLOOR FINISH


26
SPOT DETAIL

75
BAR VERTICAL RAILING TYPICAL) 25 (FULLY WELDED TYPICAL) WITH FLOOR HARDENER (FL-2)
D-2 100 mm HIGH
24
(NON - SKID NOSING STRIP)
= 1575 mm

DOOR THRESHOLD 7
18-RISERS @ 175 mm = 3150 mm

100
23

350
1250 22 TOP LINE OF ROOF BEAM WITH PAINTED FINISH
21
PARTIAL 53
54 LANDING A-13 SCALE 1:5 M. (FULLY WELDED ON STEEL
900

PARTIAL 20

9-RISERS @ 175 mm
PART OF 52 BAR RAILING)
PART OF 19

75
SECOND FLOOR LINE (CORRIDOR) 51
2100

FEMALE T&B 18 CORRIDOR

= 1575 mm
50 6 mm THK. NON-SKID METAL
17
NOSING STRIP (SEE DETAIL)
425

16 49
19

15 48
18 - RISERS @ 175 mm = 3150 mm

900
= 1575 mm

14 47 250 REINFORCED CONCRETE STAIR


CEILING LINE 46
13 (SEE STRUCTURAL DETAIL)

900
12 LANDING 100 2-19 mm G.I. BAR VERTICAL RAILING
900

300

11 R (FULLY WELDED ON HANDRAIL)


12 mm G.I. BAR VERTICAL
12 mm BAR VERTICAL RAILING
10
WITH EPOXY PAINTED FINISH

175
RAILING (FULLY WELDED TYPICAL) LANDING 9
3150

8 RAINFORCED CONCRETE ( FULLY WELDED ON HANDRAIL )


D-2 7 COLUMN CL 19 mm G.I. BAR VERTICALRAILING

175
6 7
= 1575 mm

5 EMBEDDED ON REINFORCED A-13


1575

4 CONCRETE STAIR
4 3 5

(TYPICAL DEPTH)
175
PARTIAL A-13
900

PARTIAL A-13 2
PART OF 1 PART OF REINFORCED

100 mm
GROUND FLOOR LINE (CORRIDOR) CORRIDOR CONCRETE STAIR

100
FEMALE T&B STORAGE ROOM 8-TREADS @ 250 mm

175
300

1250 = 2000 mm
19

6 mm THK. NON-SKID
NATURAL GRADE LINE METAL NOSING STRIP

8-TREADS @ 300 mm = 2400 mm


2 TYPICAL DETAIL SECTION OF STAIR (TO DECK ROOF) (SUBMIT SAMPLE) 50 50 50
1250
A-13 SCALE 1 : 50 M
3650 SPOT DETAIL 300 300 300

8 (NON - SKID NOSING STRIP) 3 TYP. DETAIL SECTION OF STAIR STEPS


1 TYPICAL DETAIL SECTION OF STAIR A-13 SCALE 1:5 M.

SCALE 1 : 50 M
A-13 SCALE 1 : 15 M.
A-13

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TYPICAL DETAIL SECTION OF STAIR
TYPICAL DETAIL SECTION OF STAIR (TO DECK ROOF) CADD:
MODIFIED STANDARD DPWH - DEPED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
DETAIL SECTION OF STAIR LANDING
DETAIL SECTION OF STAIR LANDING (TO DECK ROOF) GILDA P. CARMONA
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
A - 13
BUILDINGS DIVISION
TYPICAL DETAIL SECTION OF STAIR STEPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
TYP. DETAIL SECTION OF STAIR STEPS (TO DECK ROOF) CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING SPOT DETAIL (NON-SKID NOSING STRIP)
SPOT DETAIL (TYPICAL HANDRAIL) MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
OIC,-UNDERSECRETARY FOR
SECRETARY, DEP ED
ARCHITECT IV TECH'L.SERVICES, DPWH
R
LEGEND:
SECOND REVISION ON THE DRAWING DETAILS (4/30/2018)
125 150 REINFORCED CONCRETE BENCH WITH PLAIN
CEMENT PLASTER PAINTED FINISH

REINFORCED CONCRETE COLUMN WITH PLAIN


CEMENT PLASTER PAINTED FINISH

150 mm THK. CHB EXTERIOR WALL RAILING AT

AP

100
600 mm HIGH (BELOW R.C. BENCH) WITH PLAIN
1. CORRIDOR RAILINGS CEMENT PLASTER PAINTED FINISH
-FROM RECTANGULAR ZOCALO TO TRAPEZOIDAL ZOCALO (SUBMIT COLOR SCHEMES FOR APPROVAL)

400
-FROM 600 mm TO 300 mm HEIGHT OF LOWER ZOCALO FROM THE CORRIDOR FINISH FLOOR LINE PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER

300
- FL -2
2. STAIR RAILINGS GROUND FLOOR LINE (CORRIDOR)
-FROM DECORATIVE RAILINGS TO PLAIN VERTICAL RAILINGS

3.CONCRETE BENCH AT GROUND FLOOR

300
-FROM 600 mm BENCH TOP HEIGHT TO 400 mm BENCH TOP HEIGHT
NATURAL GRADE LINE

CRASH GRAVELED STONE

2500

DETAIL SECTION OF CONCRETE BENCH


5 RAILING (GROUND FLOOR CORRIDOR)
A-13 R SCALE 1 : 10 M.

PLAIN CEMENT FLOOR FINISH


WELDED ON 19 mm SQUARE BAR BRACKET WITH FLOOR HARDENER (FL-2)
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)

WITH PAINTED FINISH


(FULLY WELDED ON STEEL
BAR RAILING)
6 mm THK. NON-SKID METAL
1500

1500
NOSING STRIP (SEE DETAIL)

600
150 mm THK. CHB EXTERIOR WALL RAILING REINFORCED CONCRETE STAIR
(SEE STRUCTURAL DETAIL)

900
175
WITH PLAIN CEMENT PLASTER PAINTED FINISH
900

- EWF-1a
12 mm BAR VERTICAL RAILING
WITH EPOXY PAINTED FINISH

175
2ND & 3RD FINISH FLOOR ( FULLY WELDED ON HANDRAIL )

300
LINE (CORRIDOR)

175

(TYPICAL DEPTH)
175
300 300

100 mm
175
ELEVATION
50 50 50 50 50

300 300 300 300 300


2025

TYP. DETAIL OF CORRIDOR RAILING 4 TYP. DETAIL SECTION OF STAIR STEPS


A-13 R SCALE 1 : 15 M.
(SIDE RAILING)
2 ALONG GRID 1 & 13 (TYPICAL @ 2nd & 3rd FLOOR)
A-13 R SCALE 1: 20 M.

19 mm SQUARE BAR WITH PAINTED FINISH


(RAILING GRILLE FRAME)
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR)
600
200

17

9-RISERS @ 175 mm
16
15

= 1575 mm

18 - RISERS @ 175 mm = 3150 mm


14
600

600
CEILING LINE 13
12

900
11 R
12 mm G.I. BAR VERTICAL 10
RAILING (FULLY WELDED TYPICAL) LANDING 9
SECOND & THIRD FLOOR LINE 150 mm THK. CHB EXTERIOR WALL RAILING 8

9-RISERS @ 175 mm
(CORRIDOR LEVEL) WITH PLAIN CEMENT PLASTER PAINTED FINISH
300

300

D-2 7
- EWF-1a 6

= 1575 mm
5

1575
4
3
PARTIAL

900
200 300 300 200 PARTIAL 2
PART OF 1 PART OF
ELEVATION 400 3700 REINFORCED CONCRETE BEAM WITH PLAIN CEMENT GROUND FLOOR LINE (CORRIDOR)
FEMALE T&B STORAGE ROOM CORRIDOR
PLASTER PAINTED FINISH

300

19
NATURAL GRADE LINE

1250 8-TREADS @ 300 mm = 2400 mm


3650
(PROVIDE WATER DRIP MOULD)

TYP. DETAIL OF CORRIDOR RAILING (FRONT RAILING) 3 TYPICAL DETAIL SECTION OF STAIR
1 ALONG GRID A (TYPICAL @ 2nd & 3rd FLOOR)
A-13 R SCALE 1 : 50 M
A-13 R SCALE 1: 20 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (SUPPLEMENTAL DETAILS) TYPICAL DETAIL OF CORRIDOR RAILING ( FRONT RAILING). CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN MODIFIED STANDARD DPWH - DEPED TYPICAL DETAIL OF CORRIDOR RAILING ( SIDE RAILING).
TYPICAL DETAIL SECTION OF STAIR. GILDA P. CARMONA
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
A - 13 R
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) TYPICAL DETAIL SECTION OF STAIR STEPS.
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
DETAIL SECTION OF CONCRETE BENCH CHECKED: SIGNED OIC,-UNDERSECRETARY FOR B 21 90
BONIFACIO DRIVE PORT AREA, MANILA CLASSROOM SCHOOL BUILDING MARYLENE C. SISON
ARCHITECT IV
CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD
TECH'L.SERVICES, DPWH
SECRETARY, DEP ED
900 TAG NO. TAG NO. 3 EQUAL PARTS TAG NO.
200 200 200 D-1 D-3a = 2700 W-1a
800

300

300
DESCRIPTION DESCRIPTION DESCRIPTION

KD & TERMITE TREATED HOLLOW CORE FLUSH

150
PANEL DOOR (SWING DOOR SWING TYPE WITH
CASEMENT WINDOW w/
TYPE) W/ FIXED GLASS LOUVERS ON 50 x 150mm
825 6mm THK. CLEAR GLASS
TRANSOM ABOVE ON WOODEN/ STEEL DOOR

1200
PANE ON STEEL FRAME &
50 x 150mm WOODEN/ JAMBS/ FRAMES COM-
w/ FIXED GLASS TRANSOM
2400

STEEL JAMBS/ FRAMES PLETE w/ HARDWARE


ABOVE
2100

2100
150

w/ LEVER TYPE DOOR ACCESSORIES, CYLIN-


(PROVIDE WINDOW GRILLE
KNOB DRICAL DOOR KNOB EQ EQ EQ EQ EQ EQ
600 INSIDE, REFER TO
MANUFACTURER'S SPECS.)
825

1035

1035
40 SETS 5 SETS

300

900
1 SET
CLASSROOM GROUND/CORRIDOR CLASSROOM

300
FLOOR LINE LOCATION: FLOOR LINE LOCATION: FLOOR LINE LOCATION:
150

SCIENCE LABORATORY
325 275 CLASSROOMS STORAGE ROOM ROOM (OPTION - 4)
TAG NO. TAG NO. TAG NO.
2 EQUAL PARTS
D-2 SD-1
= 1500
W-2
800
800

300
DESCRIPTION 500 DESCRIPTION F F DESCRIPTION

HOLLOW CORE FLUSH STEEL DOOR FRAME


TYPE SWING DOOR ON SWING DOOR W/ FIXED "
JALOUSIE WINDOW w/
50 x 150mm WOODEN/ Z -TYPE" LOUVERS
6mm THK. CLEAR GLASS

1600
STEEL JAMB W/ MARINE (AS SHOWN)
BLADES ON WOODEN/
PLYWOOD FACING BOTH (SEE MANUFACTURERS
STEEL JAMBS/ FRAMES
SIDES COMPLETE w/ SPECS.)
w/ STEEL FRAMING GRILL
2100

1900
HARDWARE AND

2000
ON THE OUTER- SIDE
ACCESSORIES W/ LEVER 2 SETS
TYPE DOOR KNOB
40 SETS

935
1035

800
10 SETS R
CLASSROOM DECK ROOF TRESHHOLD CLASSROOM
FLOOR LINE LOCATION: FLOOR LINE LOCATION: FLOOR LINE LOCATION:

100
HE/SHE TOILETS; STAIR-
DOOR TO ROOF DECK DECK ROOF CLASSROOMS
TAG NO. TAG NO. 3 EQUAL PARTS TAG NO.
D-2a BD-1 = 1800 W-3
800

300
DESCRIPTION DESCRIPTION F F F DESCRIPTION

HOLLOW CORE FLUSH 600 BAR DOOR (SWING TYPE)

900
TYPE SWING DOOR ON ON 50 x 150mm WOODEN/
AWNING WINDOW W/

600
50 x 150mm WOODEN/ STEEL DOOR JAMBS/ 6mm THK. CLEAR GLASS
STEEL JAMB W/ MARINE FRAMES w/ MARINE
PANE ON STEEL FRAME
PLYWOOD FACING BOTH PLYWOOD (TWO FACE)
& w/ FIXED GLASS
SIDES COMPLETE w/ COMPLETE w/ HARDWARE
TRANSOM ABOVE
2100

HARDWARE AND & ACCESSORIES w/


1300

ACCESSORIES W/ LEVER DOOR BOLT 8 SETS


1500

1500
TYPE DOOR KNOB
1035

18 SETS
1 SET
CORRIDOR TOILET TOILET
LOCATION: LOCATION: LOCATION:
200

FLOOR LINE FLOOR LINE FLOOR LINE


MALE/ FEMALE LOCKER
OPTION - 4 (SCIENCE LAB.) HE/SHE TOILETS HE,SHE TOILETS
TAG NO. 4 EQUAL PARTS TAG NO. TAG NO.
D-3 = 3600 W-1 600
W-4 LEGEND:
1000

300
F
300

DESCRIPTION DESCRIPTION DESCRIPTION R REVISION ON THE DRAWING DETAILS (1/23/2018)


- REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)

900
HOLLOW CORE FLUSH PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS

600
TYPE SWING DOOR ON AWNING WINDOW W/
CASEMENT WINDOW w/
50 x 150mm WOODEN/ 6mm THK. CLEAR GLASS
6mm THK. CLEAR GLASS
STEEL JAMB w/ MARINE
1200

PANE ON STEEL FRAME & PANE ON STEEL FRAME


PLYWOOD (TWO FACE) & w/ FIXED GLASS
w/ FIXED GLASS TRANSOM
COMPLETE w/ HARDWARE TRANSOM ABOVE
ABOVE
2100

AND ACCESSORIES NOTE:


(PROVIDE WINDOW GRILLE
PROVIDE KICK PLATE w/ EQ EQ EQ EQ EQ EQ EQ EQ 8 SETS
1600

INSIDE, REFER TO SCIENCE LABORATORY ROOM = 9 SETS


800
LEVER TYPE DOOR KNOB
MANUFACTURER'S SPECS.) OPTION - 4 1 DOORS AND WINDOWS SCHEDULE
1035

NOTE:
900

30 SETS LOCATION: A-14 SCALE 1 : 25 M


2 SETS SCIENCE LABORATORY ROOM = 39 SETS HE,SHE & PWD
100 300

GROUND/CORRIDOR CLASSROOM TOILET


FLOOR LINE LOCATION: FLOOR LINE OPTION - 4 LOCATION: FLOOR LINE TOILETS; SCIENCE
LABORATORY TOILET
PWD TOILETS CLASSROOMS (OPTION-4)

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
DOORS AND WINDOWS SCHEDULE CADD:
MODIFIED STANDARD DPWH - DEPED SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
LARK MAVERICK E. DE VERA
ARCHITECT II
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
A - 14
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
2
900
PARTIAL PART OF CORRIDOR @ 2nd to 4th FLOOR
900
LEGEND:
150 100 50 150 TYP. DETAIL OF CORRIDOR RAILING (FRONT RAILING)
50 2 ALONG GRID A (TYPICAL @ 2nd to 4th FLOOR) R REVISION ON THE DRAWING DETAILS (1/23/2018)
A-15 SCALE 1: 20 M.
- REVISION OF CORRIDOR RAILING AT SECOND AND
THIRD FLOOR ADAPTING THE PROPOSED DEPED DESIGN.

400
A A - REVISION OF JAULOUSIE WINDOW (W-2) - FROM THREE (3)
PANEL WINDOWS REDUCED INTO TWO (2) PANEL WINDOWS.

19 mm SQUARE BAR BRACKET (HANDRAIL SUPPORT)


19 mm SQUARE BAR WITH PAINTED FINISH 150
WITH PAINTED FINISH FULLY WELDED ON G.I. PIPE
(RAILING GRILLE FRAME) 50 50
NOTE:
HANDRAIL SPACE AT 600 mm O.C.
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR)
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR) 2 250 600 600 600 600 600 600 250
50 - FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS OR COASTAL
100
PLAN AREAS PRONE TO CORROSION ON G.I. ROOFING, CORRUGATED ASPHALT
ROOFING SHEETS (3.0 mm THK. - BITUMINOUS - CELLULOSE FIBRES CAN BE
USED AS ALTERNATE ROOFING MATERIALS).
- FOR COLUMNS AND BEAMS SIZES REFER TO STRUCTURAL SHOP DRAWINGS.

150
19 mm SQUARE BAR WITH PAINTED FINISH

400
(RAILING GRILLE FRAME)

425
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR)
600

600
300
19 mm SQUARE BAR BRACKET WITH PAINTED FINISH

123
200

200

175
(HANDRAIL SUPPORT) FULLY WELDED ON G.I. PIPE
HANDRAIL SPACE AT 600 mm O.C. AND EMBEDDED ON
CHB WALL

1500
300
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR)

900
1100

100
50 PLAIN CEMENT FLOOR FINISH WITH FLOOR HARDENER
900

900
50

600
150 mm THK. CHB EXTERIOR WALL RAILING
SECOND & THIRD FLOOR LINE WITH PLAIN CEMENT PLASTER PAINTED FINISH

1500
(CORRIDOR LEVEL) - EWF-1a
TYPICAL DETAIL SECTION THRU - X

700 700 EXPOSED REINFORCED CONCRETE BEAM/S &

600
UNDER SLAB WITH PAINTED FINISH
ELEVATION
600

900 2700 REINFORCED CONCRETE BEAM WITH PLAIN CEMENT


PLASTER PAINTED FINISH

150

(PROVIDE WATER DRIP MOULD)


19 mm SQUARE BAR WITH PAINTED FINISH
(RAILING GRILLE FRAME)
B A
- (TYPICAL ON SECOND & THIRD FLOOR CORRIDOR) 2500 1700
SEE DETAIL
100 1500 100 75 75
150 mm THK. CHB EXTERIOR WALL RAILING
WITH PLAIN CEMENT PLASTER PAINTED FINISH PARTIAL PART OF CORRIDOR 428 422 422 428
- EWF-1a 800 (TYPICAL @ 2nd to 4th) 800
50 150 217 211 211 211 211 211 211 217
13 150 150 100 150
50

50
1

100

100

100
125
50

TYP. DETAIL OF CORRIDOR RAILING

50
31

12 mm SQUARE BAR WINDOW GRILLE

100

119

119
FRAME WITH PAINTED FINISH
(SIDE RAILING)

300
1 ALONG GRID 1 & 13 (TYPICAL @ 2nd to 4th FLOOR)

602
119

119
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR)
A-15 SCALE 1: 20 M.
600 600

119
19 mm SQUARE BAR BRACKET SUPPORT FULLY WELDED
ON G.I. PIPE HANDRAIL SPACE AT 600 mm O.C. PLAN

119
- (TYPICAL ON SECOND TO FORTH FLOOR CORRIDOR)
B A
2500

119
100 12 mm SQUARE BAR DOWEL
(WINDOW GRILLE SUPPORT)

119
EMBEDDED ON CHB WALL SPACED
AS SHOWN

1600

1800

1800
596
119
119

1300
WELDED ON 19 mm SQUARE BAR BRACKET
- (TYPICAL ON SECOND TO FOURTH FLOOR CORRIDOR)

119
600

119
190 100

119
1500
300

150 mm THK. CHB EXTERIOR WALL RAILING


119

602
WITH PLAIN CEMENT PLASTER PAINTED FINISH
900

- EWF-1a
119
600

600

50 50
2ND TO 4TH FINISH FLOOR
100 100 100 100
LINE (CORRIDOR)
125

100 100 100 100


100

100

100
50
525 600
600

428 422 422 428


800 900 800
LINE OF WINDOW GRILE (W-2)
850 850
ELEVATION DETAILED SECTION THRU - A
DETAILED ELEVATION 3 TYP. DETAIL OF WINDOW GRILLE FOR W-2
SCALE 1: 10 M.
2025
A-15

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARCHITECTURAL SECTION
MODIFIED STANDARD DPWH - DEPED DETAIL OF CORRIDOR RAILINGS LOCATED CADD: SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ALONG GRID-1 & 13, GRID- A OF 2ND ROMEO R. RONDA
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
A - 15
BUILDINGS DIVISION AND 4TH FLOOR JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING DETAIL OF WINDOW GRILLE FOR W-2 CHECKED: SIGNED B 21 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF FINISHES
FLOOR FINISH DESCRIPTION: COUNTERTOP DESCRIPTION: FACIAL MIRROR DESCRIPTION: 1 2 C C
200mm X 200mm VITRIFIED UNGLAZED TILES (SIZE CT-1 100mm THK. CHB. COUNTERTOP FM - 1 2000mm x 550mm x 3mm THK. FACIAL MIRROR 5000 3275
IN 300mm X 300mm VITRIFIED 3275
FL - 3 & OR COLOR FOR APPROVAL BY THE END-USER) R GLAZED TILES
IN ALUMINUM FRAMING
375 2575 100 1700 2975 100
FM - 2 500mm X 600mm X 3mm THK. TILTED FIXED 1175 100 1800 150
WALL FINISH DESCRIPTION: GRAB BAR DESCRIPTION: FACIAL MIRROR IN ALUMINUM FRAMING SUBMIT 275 475 900 900 850 850 1350 1025 600
100 mm THK./ 150 mm THK. CHB INTERIOR WALL GB - 1 SAMPLE FOR ARCHITECTS APPROVAL
IWF - 1 13
WITH PLAIN CEMENT CAPPING EQ. EQ. EQ. EQ. 750 390 460 13 1225 400 600
A-16
PLASTER PAINTED FINISH GB - 2 A-16 100
GRAB BAR
100 100 100
(SUBMIT COLOR SCHEMES FOR APPROVAL) FINISH CEILING HT.
FINISH CEILING HT. FINISH CEILING HT.
200mm X 200mm VITRIFIED GLAZED TILE WALL CEILING DESCRIPTION:
IWF - 2 CF - 1
FINISH CF - 1 4.5mm THK. FIBER CEM. BOARD CEILING CF - 1
R CF - 1

1100
800

800
(SIZE & OR COLOR FOR APPROVAL BY THE (PAINTED) IN 12mm x 38mm x 5mm x 0.80mm F F F F IWF - 1
END-USER) THK. METAL FURRING CHANNEL FRAMING W-3 IWF - 1
- TYPICAL ON ALL TOILET WALLS SPACED @ EVERY 400mm O.C. W-3 W-4 IWF - 1 IWF - 2

300

300
2600

700
IWF - 2

300
2600

2600
D-2

200 550
FM - 2 IWF - 2
1 2

150
1500
GB - 1

1800

1800
PWD TOILET

1350
BD-1

1600
BD-1
LEGEND: 5000

1500

1500
200

1050
14 GB - 2 HE TOILET
SHE TOILET

750
550 CT-1
75 375 2575 1700 GB - 2 A-16 CORRIDOR

850
CORRIDOR FINISH FLOOR LINE CORRIDOR

400
R REVISION OF DRAWING DETAILS (1/23/2018) PWD TOILET
SLOPE

200

200
FINISH FLOOR LINE FINISH FLOOR LINE

150
281
275 475 900 900 850 850 TOI. FIN. FLOOR LINE OPEN

281
- REVISION OF TOILET'S WALL & FLOOR FINISHES TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH
FINISH GRADE LINE
EQ. EQ. EQ. EQ. 750 390 460 FINISH GRADE LINE FINISH GRADE LINE
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FINISH
TO 300 X 300 mm VITRIFIED TILES FLOOR FINISH 100 100 100 EQ. EQ.
SECTION - 1 (PWD & FEMALE TOILET) SECTION - 5 (PWD TOILET) SECTION - 9 (MALE TOILET)
GB - 1

5 6 7
A-16 A-16 A-16 2 1 12 13 C
GB - 2 5000 5000
W-3 W-4
100
C 150 1500 100 3250 150 1700 100 2575 375 75 3275

290
500

3200 795 850 1625 100 800 275 150 1800 100 1175
600

PIPESLOP SINK
700
100

CHASE 1200 2000 390 460


1375

750
CEMENT MORTAR PLASTERING WITH
1500

2100
1800
VITRIFIED CERAMIC TILES FINISH
PART OF HANDWASHING

675
775

PWD TOILET
2375

BD-1 ELEV. 281.00 mm FINISH CEILING HT. FINISH CEILING HT.


3
200

760
3275

3275
2975

100

A-16 FL - 3 100 1800 CF - 1


BD-1 CF - 1 F F F F
CF - 1

1000
300 300

1100

1100

1100
600 600

100
FL - 3 IWF - 1
850

4 19mm RAMP W-4 W-3

100
SHE TOILET D-3 IWF - 1 IWF - 1

300
A-16 DN.
ELEV. 281.00 mm DROP EQ. EQ.

1175

2600

2600

2600
200 550
D-3 FM - 1 CT-1
FM - 2

600

600
600

650
CT-1 D-2
D-2 CORRIDOR GB - 1 IWF - 2

1800
100

BD-1

150

150
ELEV. 300.00 mm

1500

1500

1500

1500

1500
300
PWD TOILET SHE TOILET PWD TOILET HE TOILET PWD TOILET
PART OF STAIR IWF - 2 IWF - 2 GB - 1

850
NOTE:

750

750
300 600 600 300 OPEN CORRIDOR CORRIDOR

400
FINISH FLOOR LINE FINISH FLOOR LINE

150
SLOPE
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS 100 100 250

281
281

281
1800 950 TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
OR COASTAL AREAS PRONE TO CORROSION ON G.I. ROOFING,
2000 1200 FINISH GRADE LINE FINISH GRADE LINE
CORRUGATED ASPHALT ROOFING SHEETS (3.0 mm THK. -
BITUMINOUS - CELLULOSE FIBRES CAN BE USED AS ALTERNATE 3200 SECTION - 2 (PWD & FEMALE TOILET) SECTION - 6 (PWD & MALE TOILET) SECTION -10 (PWD TOILET)
ROOFING MATERIALS).
150 3250 100 1500 150
- FOR COLUMNS AND BEAMS SIZES REFER TO
STRUCTURAL SHOP DRAWINGS. 3500 1650
C 13 12 C
DET. PLAN OF FEMALE & PWD TOILET @ GROUND FLOOR 3275 5000 100 150
2975 100 150 3250 1600 150
2375 600 3200
12 13 1500 850 2000 1200
CF - 1
950
5000 FINISH CEILING HT. FINISH CEILING HT.

100 100 1375 100 1800 100


375 IWF - 1

800
1700 2575 75

1000

1000
600 775 300 300
GB - 2 1100 600 600
275 500 CF - 1
850 850 1625 800 300
IWF - 1
2200

100 100
2600

2600
550

550
460 390 750 FM - 1 D-3

750
D-2 IWF - 2 IWF - 2
1100

GB - 1

200

200
1600

1500
PWD TOILET

300
SHE TOILET CT-1 HE TOILET CT-1
12 11 10

850

850
675

550
A-16 A-16 A-16 SLOP CORRIDOR OPEN CORRIDOR
400

200
SINK OPEN FINISH FLOOR LINE FINISH FLOOR LINE
W-4 W-3
281

281
TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
C
150

FINISH GRADE LINE FINISH GRADE LINE


290

PIPE SECTION - 3 (FEMALE TOILET) SECTION - 7 (MALE & TOILET)


1225

1350

CHASE
750
2100

1800

550

8
PWD TOILET
A-16 FL - 3
C C
200

100

ELEV. 281.00 mm
760
3275

3275
2975

FL - 3
400

SLOP SINK 100 2975


HANDWASHING

9 600 2375
1025

HE TOILET
100

A-16 ELEV. 281.00 mm 850 1500 600 1025 1350


RAMP
600

DN. 19mm 600 400 1225


100 1375
DROP
1175

D-3
600

D-2 CT-1 FINISH CEILING HT.


FINISH CEILING HT.
200

200

800
CORRIDOR
100

CF - 1
800

ELEV. 300.00 mm CF - 1
300 600 600 300
900

IWF - 1

300
IWF - 1
300

W-3
250 950 100 1800 100

2600
2600

450
D-2
650

1200 2000 IWF - 2 IWF - 2

200
1800
1800

BD-1 BD-1

1500
1500

1500

1500 100 3250


3200 150
CT-1 HE TOILET CT-1

850
850

1650 3500 SHE TOILET CORRIDOR


CORRIDOR

200
FINISH FLOOR LINE
200

OPEN FINISH FLOOR LINE OPEN


281

TOI. FIN. FLOOR LINE


281

TOI. FIN. FLOOR LINE


DET. PLAN OF MALE & PWD TOILET @ GROUND FLOOR FINISH GRADE LINE FINISH GRADE LINE

SECTION - 4 (FEMALE TOILET) SECTION - 8 (MALE TOILET)

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DET. PLAN OF FEMALE & PWD TOILET @ GROUND
CADD: SIGNED
MODIFIED STANDARD DPWH - DEPED FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
GROUND FLOOR, SCHEDULE OF FINISHES, GINO PAOLO L. VILLANUEVA
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A -16
BUILDINGS DIVISION DET. SECTIONS OF FEMALE & PWD TOILET, JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
DET. SECTIONS OF MALE & PWD TOILET CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
SCHEDULE OF FINISHES
FLOOR FINISH DESCRIPTION: COUNTERTOP DESCRIPTION: FACIAL MIRROR DESCRIPTION: 1 2 12 13 C
200mm X 200mm VITRIFIED UNGLAZED TILES (SIZE CT-1 100mm THK. CHB. COUNTERTOP FM - 1 2000mm x 550mm x 3mm THK. FACIAL MIRROR 5000 5000 3275
FL - 3 & OR COLOR FOR APPROVAL BY THE END-USER) R IN 300mm X 300mm VITRIFIED IN ALUMINUM FRAMING 150
GLAZED TILES
500mm X 600mm X 3mm THK. TILTED FIXED
450 3125 100 1200 4425 450 3125
FM - 2
WALL FINISH DESCRIPTION: GRAB BAR DESCRIPTION: FACIAL MIRROR IN ALUMINUM FRAMING SUBMIT
SAMPLE FOR ARCHITECTS APPROVAL
275 942 100 942 100 942 190 4235 100 275 1825 100 1150
IWF - 1 100 mm THK./ 150 mm THK. CHB INTERIOR WALL GB - 1
WITH PLAIN CEMENT CAPPING 100 EQ. EQ. EQ. EQ. EQ. EQ. 1935 100 2150 1350 475
PLASTER PAINTED FINISH
(SUBMIT COLOR SCHEMES FOR APPROVAL)
GB - 2
GRAB BAR
1000 100 1000 600
FINISH CEILING HT. FINISH CEILING HT. FINISH CEILING HT.
200mm X 200mm VITRIFIED GLAZED TILE WALL CEILING DESCRIPTION:
IWF - 2
FINISH CF - 1 CF - 1
R
CF - 1 4.5mm THK. FIBER CEM. BOARD CEILING
300

800

800
800
(SIZE & OR COLOR FOR APPROVAL BY THE (PAINTED) IN 12mm x 38mm x 5mm x 0.80mm F F F F F F F F CF - 1

1100
END-USER) THK. METAL FURRING CHANNEL FRAMING
- TYPICAL ON ALL TOILET WALLS SPACED @ EVERY 400mm O.C. W-3 W-4 W-4 W-3
IWF - 1 300

300

300
300
IWF - 1

225 75
IWF - 1

300

1050 300
2600

2600
2600
1 2
LEGEND: IWF - 2 D-2

1100
1800
1100

1800
5000

1800

1350
1500
BD-1 BD-1 BD-1 BD-1 BD-1 IWF - 2

1500
550

1500

1050
450 3125 100 1200 STORAGE IWF - 2
R REVISION OF DRAWING DETAILS (1/23/2018) SHE TOILET
IWF - 1
HE TOILET HE TOILET

400
275 942 100 942 100 942 CORRIDOR

400
CORRIDOR CORRIDOR

200
- REVISION OF TOILET'S WALL & FLOOR FINISHES

200
150

200
150
- (IWF-2) FROM 200 X 200 mm VIT. GLAZED WALL TILES FINISH FINISH FLOOR LINE FINISH FLOOR LINE OPEN FINISH FLOOR LINE
TO 300 X 300 mm VIT. GLAZED TILES WALL FINISH
100 EQ. EQ. EQ. EQ. EQ. EQ. TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
TOI. FIN. FLOOR LINE
- (FL-3) FROM 200 X 200 mm VITRIFIED UNGLAZED TILES FINISH
TO 300 X 300 mm VITRIFIED TILES FLOOR FINISH TYP. SECOND - THIRD FLOOR TYP. SECOND - THIRD FLOOR
SECTION - 1 (STORAGE & FEMALE TOILET) SECTION - 5 (MALE TOILET) SECTION - 9 (MALE TOILET)
TYPICAL @ SECOND AND THIRD FLOOR

5 600 100
A-17
6
A-17
IWF - 1
1 2 13 12
W-3 W-4 5000 5150 100 400 100

150
C 150 1200 475 3150 150 3420 1730 16 369 16
100 175 1150 2000 3225 100 1480 150
PIPE
1175
1050

600 600 2000 1225


1225

CHASE 200 100 100


100 1800 100

1875
STORAGE 300 300

1975
ELEV. (SEE ELEV.)
175

FINISH CEILING HT. FINISH CEILING HT.


FL - 2
100

3 300 600 600 300


3275

3025
2975

BD-1 BD-1 BD-1


275
400

A-17 FL - 3 F CF - 1

1000

1000
100

1100
1000

CF - 1

100

140
600

4 SHE TOILET IWF - 1


1600

19mm IWF - 1

100
ELEV. (SEE ELEV.)
A-17 D-3a
DROP

2600
2600

550
450
1010
D-2 FM - 1 FM - 1
600

CT-1
D-3a IWF - 2

400 450200
CORRIDOR

200
1600

1600
IWF - 2

1500

1500
ELEV. (SEE ELEV.)
CT-1 CT-1
PART OF STAIR SHE TOILET HE TOILET

850

850
300 600 600 300
OPEN CORRIDOR OPEN CORRIDOR
NOTE: 100 1800 100 FINISH FLOOR LINE FINISH FLOOR LINE
TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
2000 1175 200 100
- FOR SCHOOL BUILDING SITE LOCATED NEAR SEA BOARDS TYP. SECOND - THIRD FLOOR TYP. SECOND - THIRD FLOOR
OR COASTAL AREAS PRONE TO CORROSION ON G.I. ROOFING, 3150 300 1200
CORRUGATED ASPHALT ROOFING SHEETS (3.0 mm THK. -
BITUMINOUS - CELLULOSE FIBRES CAN BE USED AS ALTERNATE
150 3250 100 1500
150 SECTION - 2 (STORAGE & FEMALE TOILET) SECTION - 6 (MALE TOILET)
ROOFING MATERIALS). 3400 1750
- FOR COLUMNS AND BEAMS SIZES REFER TO
STRUCTURAL SHOP DRAWINGS.
5150 C C
3275 3275
DET. PLAN OF FEMALE @ SECOND - THIRD FLOOR 150 2975 100 2975 150
1225 100 1000 600 1145 1825
880 265 450 1375

12 13 FINISH CEILING HT. FINISH CEILING HT.

1000 100
100 1225

650 350
CF - 1
800

1000

1000
5000
CF - 1
W-3
300

4425 450 IWF - 1


IWF - 1
2600

2600
850 200 550

550
190 4235 100 275
1175 BD-1 D-2
BD-1 150 600
1175 IWF - 2 300 300

200
1800

1200

1935 100 2150

1600

1600
IWF - 2 225 75
1500

1500
CT-1
1000 100 1000 SHE TOILET HE TOILET

850
CT-1
EQ. EQ. EQ. EQ.
300

CORRIDOR CORRIDOR

200
OPEN FINISH FLOOR LINE OPEN FINISH FLOOR LINE
11 10 9 TOI. FIN. FLOOR LINE TOI. FIN. FLOOR LINE
A-17 A-17 A-17
TYP. SECOND - THIRD FLOOR TYP. SECOND - THIRD FLOOR
W-4 W-3
SECTION - 3 (FEMALE TOILET) SECTION - 7 (MALE TOILET)
150

C
300
600

PIPE
300

C
1050

1175
1225

C
1400

CHASE
1825

HE TOILET 150 2970 100


7
450 100

ELEV. (SEE ELEV.)


2975
A-17 BD-1 BD-1
100

1175 600 600 600


3275

3275
2970

2975
600

1600 1375
265 450

14 600
8 600 1000 100 1225 A-16
100

A-17 FL - 3 600 400


600

19mm FINISH CEILING HT.


300
1150

FINISH CEILING HT.


DROP D-2
880

300 13 75 175 50
600

800
CT-1 A-16

1000
CF - 1
300
1000

1000
100

W-3 CF - 1

300
300 300 IWF - 1
CORRIDOR 600 600

300
2600

200 550
2600

550

ELEV. (SEE ELEV.) IWF - 2


2500

100 1800 100 IWF - 1


1175 1800

1350

1600
200

1225 2000 CT-1 1500 IWF - 2

1050
1600

550
1500

150 100 BD-1 HE TOILET


450

1480 3225 CT-1

850
SHE TOILET
850

CORRIDOR
1730 3420

200
150

FINISH FLOOR LINE


400

CORRIDOR OPEN
OPEN FINISH FLOOR LINE
TOI. FIN. FLOOR LINE
TOI. FIN. FLOOR LINE

DET. PLAN OF MALE & PWD TOILET @ SECOND - THIRD FLOOR TYP. SECOND - THIRD FLOOR
SECTION - 8 (MALE TOILET)
SECTION - 4 (FEMALE TOILET) TYPICAL @ SECOND AND THIRD FLOOR

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DET. PLAN OF FEMALE & PWD TOILET @ GROUND
CADD: SIGNED
MODIFIED STANDARD DPWH - DEPED FRONT, DET. PLAN OF MALE TOILET & PWD TOILET @ SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
GROUND FLOOR, SCHEDULE OF FINISHES, GINO PAOLO L. VILLANUEVA
ARCHITECT II
APPROVED WITH SIGNATURE BOD
A - 17
BUILDINGS DIVISION DET. SECTIONS OF FEMALE & PWD TOILET, JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
DET. SECTIONS OF MALE & PWD TOILET CHECKED: SIGNED B 21 90
BONIFACIO DRIVE PORT AREA, MANILA
CLASSROOM SCHOOL BUILDING MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
ARCHITECT IV TECHNICAL SERVICES, DPWH
100
4800
50 X 50 mm HORIZONTAL SECONDARY WOODEN 50 6
FRAME, SPACED AS SHOWN 13
2400 2400
50 50
6 X 1200 X 2400 mm LAWANIT BLACKBOARD
(PAINTED-DEPED SPECS.)
50

19 X 50 mm WOOD BLACKBOARD EDGE FRAMING

19 X 50 mm WOOD
1200

1200

BLACKBOARD EDGE FRAMING

25
50 X 75 mm VERTICAL MAIN WOODEN FRAME

125
112

88
6 mm THK. MARINE

50
125

25
PLYWOOD TOP COVER
88
63

63
ELEMENTARY = 650 H
SECONDARY = 750

6
VERIFY HEIGHT

6 X 1200 X 2400 mm LAWANIT 50 19 X 50 mm WOOD


138 BLACKBOARD EDGE FRAMING
BLACKBOARD (PAINTED-DEPED SPECS.)
12 mm THK. PULL-OUT CHALK DUST BOX 12 mm THK. PULL-OUT CHALK DUST BOX HOUSING 12 mm THK. PULL-OUT CHALK DUST BOX
150
12 mm THK. SOLID WOOD CHALK DUST 6 X 1200 X 2400 mm LAWANIT
150 19 BLACKBOARD (PAINTED-DEPED SPECS.)
CATCHER (PAINTED-DEPED SPECS.)

FIN. WORKSHOP FLOOR LINE


50 X 50 mm VERTICAL AND HORIZONTAL SECONDARY
150 mm THK. CHB WALL WOODEN FRAMES, SPACED AS SHOWN

ELEVATION (FRONT VIEW)

19 X 50 mm WOOD
DETAIL SECTION (CHALK DUST BOX)

1200
1294

1294
BLACKBOARD EDGE FRAMING
SCALE 1: 8 M. 12 mm THK. SOLID WOOD CHALK DUST

247
CATCHER (PAINTED-DEPED SPECS.)
50 X 50 mm VERTICAL AND HORIZONTAL SECONDARY
WOODEN FRAMES, SPACED AS SHOWN

50
75
4900

25
125

ELEMENTARY = 650 H
SECONDARY = 750
2450 2450

VERIFY HEIGHT
12
50 X 75 mm VERTICAL MAIN 50 X 75 mm VERTICAL MAIN
WOODEN FRAME 81 50 WOODEN FRAME 100 12 mm THK. PULL-OUT CHALK DUST BOX
2400 600 600 600 600 150 mm THK. CHB WALL
50 6 mm THK. MARINE PLYWOOD
150 mm THK. CHB WALL

FIN. WORKSHOP FLOOR LINE


1

250
69

100
150

19

19
31
82

150
81

IN
12 mm THK. PULL-OUT CHALK DUST BOX 12 mm THK. SOLID WOOD CHALK DUST 6 X 1200 X 2400 mm LAWANIT 19 X 50 mm WOOD
150 CATCHER (PAINTED-DEPED SPECS.) BLACKBOARD (PAINTED-DEPED SPECS.) BLACKBOARD EDGE FRAMING

SECTION (SIDE VIEW)

PLAN (SECTIONAL VIEW)

50 X 50 mm VERTICAL AND HORIZONTAL SECONDARY WOODEN FRAMES,


SPACED AS SHOWN

4900 50 X 75 mm VERTICAL MAIN WOODEN FRAME


6 mm THK. MARINE PLYWOOD
TOP COVER
2450 2450

75 50
2400 600 600 600 600
150 mm THK. CHB WALL 50

6 mm THK. MARINE PLYWOOD BACKING


1 12 mm THK. X 100 mm SOLID WOOD CHALK DUST CATCHER
68

100
150

(PAINTED-DEPED SPECS.)
31
38

12 mm THK. X 25 mm SOLID WOOD CHALK DUST CATCHER SIDING


CHALK DUST BOX WITH 10 X 10 mm 19 X 50 mm WOOD BLACKBOARD EDGE FRAMING (PAINTED-DEPED SPECS.)
12 mm THK. SOLID WOOD CHALK DUST
150 S/S MESH SCREEN CATCHER (PAINTED-DEPED SPECS.)
6 X 1200 X 2400 mm LAWANIT BLACKBOARD (PAINTED-DEPED SPECS.)

PLAN (TOP VIEW)


12 mm THK. PULL-OUT CHALK DUST BOX

3 DETAIL OF BLACKBOARD 12 mm THK. WOOD CHALK DUST BOX HOUSING

A-18 SCALE 1: 20 M.
CHALK DUST BOX DETAIL (ISOMETRIC VIEW)
SCALE 1:10 M.

REPUBLIC OF THE PHILIPPINES ARCHITECTURAL CONCEPT:


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL OF BLACKBOARD
MODIFIED STANDARD DPWH - DEPED DETAIL OF CHALK DUST BOX CADD: SIGNED SIGNED SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) DETAIL SECTION (CHALK DUST BOX) MARYLENE C. SISON
ARCHITECT IV
APPROVED WITH SIGNATURE BOD
A - 18
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED OIC,-UNDERSECRETARY FOR B 21 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEPED
ARCHITECT IV TECH'L.SERVICES, DPWH
GENERAL CONSTRUCTION NOTES
GENERAL NOTES NOTES ON CONCRETE MIXES & PLACING
1. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY EIGHT 3. IF SLABS AR E REINFORCED BOTHWAYS BARS ALONG THE SHORTER SPAN SHALL BE PLACED
1.0 STANDARDS AND REFERENCES
(28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMP AS FOLLOWS. BELOW THOSE ALONE THE LONG SPAN AT THE CENTER AND OVER THE LONGER SPAN FOR
THE FOLLOWING SHALL GOVERN THE DESIGN FABRICATION AND CONSTRUCTION OF THE PROJECT.
MAX. SIZE OF REINFORCING BARS NEAR THE SUPPORTS. THE SPACING OF THE BARS AT THE COLUMN STRIPS
1.1 NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (N.S.C.P 2015) VOL. 1, SEVENTH EDITION. LOCATION 28 DAYS STRENGTH MAX SLUMP SHALL NOT BE MORE THAN ONE AND A HALF ( 1 21 ) SLAB THICKNESS.
AGGREGATE
2.0 DESIGN CRITERIA ALL OTHERS, INCLUDING 20 mm 100mm 4. TEMPERATURE BARS FOR SLAB SHALL BE GENERALLY PLACED NEAR THE FACE IN TENSION AND
4000 PSI (27.6 MPa)
2.1 LOADINGS SHALL NOT BE LESS THAN 0.0025 X GROSS-SECTIONAL AREA (Ag) OF THE SLAB.

CONF. REINF.
SUSPENDED SLABS JOINT HOOP SPACE @ "2Sh" WHEN
COLUMNS 4000 PSI (27.6 MPa) 20 mm 100mm ( SEE SCHEDULE BELOW)
A. DEAD LOAD THERE ARE BEAMS HAVING WIDTH OF
4000 PSI (27.6 MPa) 20 mm 100mm

D JOINT REINF. D
CONCRETE 23.56 kN/m3 BEAMS AT LEAST ONE-HALF THE COLUMN
SLAB ON FILL 2500 PSI (17.5 MPa) 20 mm 100mm SCHEDULE OF MINIMUM SLAB REINFORCEMENT WIDTH & DEPTHS NOT LESS THAN
STEEL 76.93 kN/m3
THREE QUARTERS OF THE DEEPEST
150 mm THK. CHB WALL 2.73 kPa 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. MINIMUM TEMPERATURE BARS BEAM THAT FRAME INTO FOUR

REINF.
100 mm THK. CHB WALL 2.11 kPa SUSPENDED SLABS 20mm 100 mm 10mm Ø @ 250mm EACH WAY SIDES OF THE COLUMN. ALL OTHER
B. LIVE LOAD SLAB ON GRADE 40mm 125 mm 10mm Ø @ 250mm EACH WAY CONDITIONS USE HOOPS @ "Sh" CENTERS.

CONF.

Sh
WALLS ABOVE THE GRADE 25mm
ROOF 1.00 kPa 150 mm 10mm Ø @ 250mm EACH WAY
BEAM STIRRUPS AND COLUMN TIES 40mm

COLUMN TIES AS
CLASSROOMS 1.90 kPa

PER SCHEDULE
WHERE CONCRETE IS EXPOSED TO 175 mm 10mm Ø @ 250mm EACH WAY
TOILETS 1.90 kPa FOR COL. BAR SPLICES SEE TABLE
EARTH BUT POURED AGAINST FORMS 200 mm 10mm Ø @ 250mm EACH WAY OF MIN. LAP SPLICE LENGTH OF
CORRIDORS ABOVE, STAIRS 3.80 kPa 50mm
WHERE CONCRETE IS DEPOSITED COLUMN REINFORCEMENT
CORRIDORS ON GROUND 4.80 kPa 75mm 5. UNLESS OTHERWISE NOTED IN THE PLANS ALL BEDDED SLABS SHALL BE REINFORCED WITH 10mm Ø
DIRECTLY AGAINST EARTH

CONF. REINF.
C. WIND LOAD AT 250mm O.C. EACH WAY TO CENTER OF SLAB AND CONSTRUCTION JOINTS FOR SAME SHALL
NOT BE LESS THAN 3.65 METER APART.

Sh
BUILDING CATEGORY = 1 (ESSENTIAL FACILITIES) 3. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSISITON WITHOUT SEGREGATION. RE-HANDLING

D JOINT REINF. D
OPTION 1 OPTION 2 OR PLACING SHALL BE DONE PREFERABLY WITH BUGGIES , BUCKETS OR WHEELBARROWS, 6. PROVIDE EXTRA REINFORCEMENTS FOR CORNER SLAB ( TWO ADJACENT DISCONTINUOES EDGES) NOTE:
EXPOSURE CAT. (FLAT UNOBSTRUCTED AREAS AND/OR (URBAN OR SUBURBAN AREAS WITH NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE FROM HOPPERS TO BUIGGIES, AS SHOWN BELOW. ALL CONCRETE REINF. DETAIL SHOULD
D NEAR BODIES OF WATER) B NUMEROUS CLOSELY SPACED OBSTRUCTIONS) BE DONE IN ACCORDANCE WITH ACI
WIND VELOCITY WHEELBARROWS OR BUCKETS IN WHICH CASE THEY SHALL NOT EXCEED SIX (6) METERS 7. CONCRETE SLAB REINFORCEMENT BE PROPERLY SUPPORTED WITH 10mm STEEL CHAIR
V=340 KPH V=270 KPH DETAILING MANUAL (LATEST EDITION)

CONF. REINF.
IN AGGREGATE LENGTH. OR APPROVED EQUIVALENT SPACED AT 1.0 METER ON CENTER BOTHWAYS.
P = qh [(GCpf)-(GCpi)] (DESIGN WIND PRESSURE)
4. NO DEPOSITING OF CONCRETE SHALL BE ALLOWED WITHOUT THE USE OF VIBRATORS UNLESS
WHERE: qh = VELOCITY PRESSURE (kPa) AUTHORIZED IN WRITING DESIGNER AND ONLY FOR UNUSUAL CONDITIONS WHERE VIBRATIONS
GCpf = EXTERNAL PRESSURE COFFECIENT Ø12x1000 LONG AT
ARE EXTREMELY DIFFICULT TO ACCOMPLISH. MID-DEPTH OF SLAB
GCpf = INTERNAL PRESSURE COFFECIENT
5. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & SECURED TYPICAL COLUMN ELEV. SHOWING
D. SEISMIC LOAD IN PLACE PRIOR TO PLACING OF CONCRETE. DOWN INTO EDGE BEAM. EXTENDED AT EACH CORNER DOWELS AND TIES SPACING
4-Ø 12@ 1800 LONG TOP BARS BEND 1-Ø12 TOP &
Cvl W (DESIGN BASE SHEAR) 6. ALL CONCRETE SHALL BE KEPT MOST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS IMMEDIATELY BARS MIN. OF 1,200 (4'-0") INTO BARS. BOTT. BARS
V=
RT AFTER POURING BY THE USE O WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER
APPROVED METHODS. 4-Ø12 BOTT. BARS
Vmax = 2.50CaI W

400
Vmin = 0.11 CalW
RT 7. STRIPPING OF FORMS AND SHORES: LAP SPLICE LENGTH:
Vmin = 0.80 ZNvI W (ZONE 4) FOUNDATION 24 HOURS AT ANY LEVEL NO MORE THAN
R 0
SUSPENDED SLAB EXCEPT WHEN 8 DAYS 60 SLAB 38mm ALTERNATE BARS SHOULD BE
0
WHERE: W = TOTAL DEAD LOAD ADDITIONAL LOADS ARE IMPOSED 60 OPENING CLEAR SPLICED. MIN. DISTANCE BET.
T = NATURAL PERIOD = Ct (h) 21 DAYS TWO ADJACENT BARS SPLICES
WALLS SHALL BE 600mm.
WHERE: C = NUMERICAL COEFFICIENT

CONF. REINF. TIES LAT. TIES H (CLEAR HEIGHT OF COL.)


400
BEAMS 14 DAYS
h = BUILDING HEIGHT 21 DAYS L
COLUMNS
I = IMPORTANCE FACTOR = 1.50

WITHIN CENTER
IN TWO WAY SLAB EXTEND
8. THE CONTRACTOR SHALL SUBMIT THE SCHEDULE OF POURING AND THE LOCATION OF THE

HALF OF "H"
R = NUMERICAL FACTOR = 8.50 60
0 BARS UP TO BEAM SUPPORT
SEISMIC COEFFICIENT Cv = 0.44 Nv CONSTRUCTION JOINTS TO THE STRUCTURAL ENGINEER AT LEAST (4) DAYS PRIOR TO THE 0.25L
POURING FOR APPROVAL. OMIT TRIMMER BARS WHERE
Ca = 0.64 Nv OPENING IS FRAMED BY BEAM TOP BARS @ SUPPORT (CONT.)
NEAR SOURCE FACTOR (5 km) Nv = 1.6 9. THE CONTRACTOR SHALL FURNISH AND MAITAIN ADEQUATE FORMS AND SHORINGS UNTIL THE TYPICAL CORNER SLAB DETAIL REQ'D. BOTT. BARS @ SUPPORT
Na = 1.2 CONCRETE MEMBERS HAVE ATTAINED THEIR WORKING CONDITION AND STRENGTH. TYPICAL SLAB

JT. REINF.
Z = SEISMIC ZONE = 0.40 (ZONE 4) OPENING DET.
S = SOIL TYPE = D
NOTES ON FOOTINGS
2.2 DESIGN STRESSES 1. FOOTINGS ARE DESIGNED FOR AN ALLOWANCE SOIL BEARING PRESSURE OF 96 KPa (2000psf).
CONTRACTOR SHALL REPORT TO THE ENGINEER, IN WRITING ,THE ACTUAL SOIL CONDITIONS
NOTES ON COLUMNS 0.165L SPLICE
BOTTOM BARS
A. CONCRETE COMPRESSIVE STRENGTH @ 28 DAYS: AT MID SPAN
a. FOOTINGS, COLUMNS, BEAMS AND SLABS f'c = 27.6 MPa (4,000 psi) UNCOVERED AND CONFIRM ACTUAL BEARING CAPACITY OF SOIL BEFORE DEPOSITING CONCRETE. 1. PROVIDE EXTRA SETS OF TIES AT 100 O.C. FOR TIED COLUMN REINFORCEMENT ABOVE 0.22L EXTRA TOP BARS
b. SLAB ON FILL f'c = 17.5 MPa (2,500 psi) 2. FOOTING SHALL REST AT LEAST 1500mm BELOW NATURAL GRADE LINE UNLESS OTHERWISE AND BELOW BEAM-COLUMN CONNECTIONS FOR A DISTANCE FROM FACE OF CONNECTION @ SUPPORT
C. SLAB f'c = 27.6 MPa (4,000 psi) INDICATED IN PLANS. NO FOOTING SHALL REST ON FILL EQUAL TO GREATER OF THE OVERALL THICKNESS OF COLUMN, 1/6 THE CLEAR HEIGHT OF
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE 75mm CLEAR FOR CONCRETE COLUMN OR 450mm.
B. REINFORCING STEEL BARS
DEPOSITED THE GROUND AND 50mm FOR CONCRETE DEPOSITED AGAINST A FORMWORK.
a. FOR BARS 16mm AND GREATER (INTERMEDIATE GRADE DEFORMED BAR) fy = 414 MPa (60,000 psi) 2. COLUMN TIES SHALL BE PROTECTED EVERYWHERE BY A COVERING OF CONCRETE CAST TYP. DETAIL OF COL. LAP SPLICE
4. IN CASES WHERE THE SOIL CONDITION IS SUCH THAT THE MINIMUM ALLOWABLE SOIL PRESSURE
b. FOR BARS LESS THAN 16mm (STRUCTURAL GRADE DEFORMED BAR) fy = 275 MPa (40,000 psi) MONOLITHICALLY WIT HTHE CORE WITH A MINIMUM THICKNESS OF 40mm AND NOT LESS
OF 96KPa (2000 psf) CAN NOT BE ATTAINED AT A PRACTICAL DEPTHS THE USE OF MICROPILES , & EXT. GIRDER TO COL. CONNECT.
C. STRUCTURAL STEEL ASTM-A36 THAN 40 TIMES THE MAXIMUM SIZE OF COARSE AGGREGATE IN MILLIMETERS.
BORED PILES, OR DRIVEN PILES MAY BE ADOPTED IN LIEU OF STANDARD ISOLATED FOOTINGS.
FOR TRUSSES, BRACINGS , & STRUTS fy = 248 MPa (36,000 psi) 3. WHERE COLUMNS CHANGE IN SIZE ,VERTICAL REINFORCEMENT SHALL BE OFFSET AT A
D. PURLINS SLOPE MONOLITHICALLY WITH THE CORE WITH MINIMUM THICKNESS OF 40mm AND
COLD FORMED LIGHT fy = 248 MPa (36,000 psi) NOTES ON REINFORCEMENT NOT LESS THAN 40 TIMES THE MAXIMUM SIZE COARSE AGGREGATE IN MILLIMETERS
E. MASONRY UNIT (CHB)
NON - LOADING BEARING CHB WALLS fm' = 3.45 MPa (500 psi)
1. UNLESS OTHERWISE NOTED IN PLANS, THE YIELD STRENGTH OF REINFORCING BARS SHALL BE: 4. UNLESS OTHERWISE INDICATED IN THE PLANS, LAP SPLICES FOR VERTICAL COLUMN NOTES ON BEAMS AND GIRDERS
A. FOOTINGS , FOOTING BEAMS AND GIRDERS fy = 414 MPa ( 60,000 psi ) REINFORCEMENT SHALL BE MADE WITHIN THE CENTER HALF OF COLUMN HEIGHT, AND
F. WELDS E - 60XX ELECTRODE fy = 414 MPa ( 60,000 psi )
B. COLUMNS AND SHEAR WALLS THE SPLICE LENGTH SHALL BE LESS THAN 40 BAR DIAMETERS. WELDING OR APPROVED 1. UNLESS, OTHERWISE NOTED IN PLANS , CAMBER ALL BEAMS AND GIRDER AT
G. STRUCTURAL BOLTS ASTM- A307 a. Ft = 96.60 mPa (14, 000 psi) fy = 414 MPa ( 60,000 psi )
C. BEAMS AND GIRDER MECHANICAL DEVICES MAY BE USED PROVIDED THAT NOT MORE THAN ALTERNATE BARS LEAST 6mmØ FOR EVERY 4.5O M OF SPAN , EXCEPT CANTILEVERS FOR WHICH
b. Fv= 69.00 mPa (10, 000 psi)
3.0 IN THE INTERPRETATION OF THE DRAWING, INDICATED DIMENSIONS SHALL GOVERN. D. NON-LOAD BEARING WALL PARTITIONS ,BEDDED SLABS , FLOOR & ROOF SLABS, THE CAMBER SHALL BE AS NOTED IN PLANS OR AS ORDERED BY THE ENGINEER
PARAPETS ,CATCH BASIN,SIDE WALK fy = 275 MPa ( 40,000 psi ) ARE WELDED OR MECHANICALLY SPLICED AT ANY LEVEL AND THE VERTICAL DISTANCES
DISTANCES AND SIZES SHALL NOT BE SCALED FOR CONSTRUCTIONS PURPOSES BETWEEN THESE WELDS OR SPLICES OF ADJACENT BARS IS NOT LESS THAN 600mm. BUT IN NO CASE LESS THAN 20 mm FOR EVERY 3.0 M OF FREE SPAN.
2. ALL REINFORCING BARS SIZE 10mm OR LARGER SHALL BE DEFORMED IN ACCORDANCE WITH THE ASTM A-706
4.0 IN REFERENCES TO OTHER DRAWINGS, SEE ARCHITECTURAL DRAWINGS FOR DEPRESSIONS IN FLOOR 2. TYPICAL BARS BENDING AND CUTTING DETAILS FOR BEAMS SHALL BE AS
BARS SMALLER THAN 10mm MAY BE PLAIN.
SLABS , OPENINGS IN THE WALLS AND SLABS , INTERIOR PARTITIONS , LOCATIONS OF DRAINS ETC. 3. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE w/ TABLE B SHOWN IN FIG. B-1
5.0 IN CASE OF DISCREPANCIES AS TO THE LAYOUT, DIMENSIONS AND ELEVATIONS BETWEEN THE (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWNON DRAWINGS , SPLICES SHALL BE H
STRUCTURAL PLANS AND ARCHITECTURAL DRAWINGS, THE CONTRACTORS SHALL NOTIFY BOTH THE STAGGERED WHENEVER POSSIBLE.
6.0 ALL CONCRETE WORKS AND CONCRETE REINFORCEMENTS SHALL BE DONE IN ACCORDANCE WITH THE CROSS-TIE
NOTES ON CONCRETE SLABS

350mm. MAX.
ACI.318-14M BUILDING CODE REQUIREMENT AND ALL STRUCTURAL STEEL WORKS ACCORDING WITH THE L1 L2
WITH THE AISC-05 IN SOFAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING CODE REQUIREMENT. 1. ALL SLAB REINFORCEMENTS SHALL BE 20mm CLEAR MINIMUM FROM BOTTOM AND FROM THE TOP OF SLAB. L1 3
1 1
L1 3 L2 3
1 1
L2 3
7.0 ACI REFERS TO AMERICAN CONCRETE INSTITUTE, AISC REFERS TO AMERICAN INSTITUTE OF STEEL 2. UNLESS OTHERWISE SHOWN, REINFORCEMENT IN CONTINUOUS ELEVETED SLAB SHALL BE CUT AS FOLLOWS:

10

H
dm
CONSTRUCTION AND ASTM REFERS TO AMERICAN SOCIETY FOR TESTING MATERIALS.

in.
8.0 CONSTURCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE SHOWN OR
BENT BAR
NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
L1 L2 1 1 1 1
9.0 SHOP DRAWING WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, MISCELLANEOUS L1 5 L1 5 L2 5
TOP BARS
L2 5
L1/4 L1/4 L2/4
IRON, PRE-CAST CONCRETE, ETC. SHALL BE SUBMITTED FOR ENGINEERS APPROVAL BEFORE FABRICATION. TOP BAR 2 Ø 12mm SIDE BARS WEB BARS
10. CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEUOS CURBS, SILLS , STOOLS EQUIPMENT AND BOTTOM BARS
MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL , ELECTRICAL AND MECHANICAL DRAWINGS. FIGURE B-1
11. ALL RESULTS OF THE MATERIAL TESTING FOR CONCRETE, REINFORCING BARS & STRUCTURAL STEEL MUST
BE NOTED & APPROVED BY THE MATERIALS ENGINEER/STRUCTURAL DESIGNER. BOTTOM BAR

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DESIGN CRITERIA ENGINEER II
MODIFIED STANDARD DPWH - DEPED GENERAL CONSTRUCTION NOTES CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-1
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL CONSTRUCTION NOTES
TABLE 'A' TABLE 'B'
REINFORCING CONCRETE LINTEL BEAMS IN NOTES ON STIRUPS
4-Ø16 VERT. BARS
TENSION BARS COMPRESSION BARS CONCRETE BLOCK WALLS SEE CONSTRUCTION NOTES
FOR MASONRY WALL REIN- 4-Ø16 VERT. BARS
1. ALL REINFORCEMENT SHALL BE BENT COLD UNLESS

550
TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) TABLE OF LAP SPLICE & ANCHORAGE LENGTH (mm) FORCEMENTS (TYPICAL) OTHERWISE PERMITTED BY THE STRUCTURAL ENGINEER.

550
FIN. FLR. LVL.
LINTELS IN BLOCK WALLS

VARIES
2. AS SHOWN IN THE DESIGN DRAWINGS OR
BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi) BAR SIZES fc`= 20.7MPa(300psi) fc`= 27.6 MPa (4000psi)
CLEAR TOTAL MIN. HEIGHT OF REINFORCEMENT
PERMITTED BY THE STRUCTURAL ENGINEER.
(DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED (DEFORMED MM)
EMBEDMENT LAPPED EMBEDMENT LAPPED NAT. GRD. LVL.
SPAN LENGTH fc' LINTEL DOWEL BARS TO MATCH 3. TIES & CLOSE STIRRUPS MUST BE AT 135.
CHB VERTICAL BARS

600 (MIN.)
Ø10 300 300 300 300 Ø10 225 300 200 300 (L) (L+0.40M) (MPa) (mm) BOTTOM TOP STIRRUPS 550 550
Ø12 300 300 300 300 Ø12 275 300 250 300
Ø10 BOTT. BARS
@ 300 O.C. 180 DEG. HOOKS

250
1.20 M 1.60 M 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm
Dbar
Ø16 300 400 300 400 Ø16 350 400 325 400 1.50 M 1.90 M 14.0 200 1-Ø10 1-Ø10 Ø6 mm @ 200mm 3-Ø10 BOTT. BARS TYPICAL CONNECTION DETAIL

D+12db
Ø20 400 550 350 500 Ø20 450 500 475 500 1.80 M 2.20 M 200 1-Ø12 1-Ø10 Ø6 mm @ 200mm

550 550
OF R.C. WALL AT CORNERS
Ø25 600 800 750 Ø25 550 625 625 400
2.10 M 2.50 M 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm
Ø28 750 1000 650 850 Ø28 625 675 625 675 2.40 M 2.90 M 17.0 250 1-Ø12 1-Ø10 Ø6 mm @ 200mm 4db OR 65mm
Ø32 950 1300 850 1100 Ø32 700 775 700 775 2.70 M 3.10 M 250 1-Ø16 1-Ø12 Ø10mm @ 200mm
DOWEL TO MATCH
NOTES ON WELDS
3.00 M 3.40 M 300 1-Ø16 1-Ø12 Ø10mm @ 200mm 90 DEG. HOOKS
NOTES: NOTES: CHB VERT. BARS 1. USE E60xx ELECTRODES FOR ALL MEMBERS WELDED. Dbar
1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 1. TOP PLAIN BARS, MULTIPLY VALUE BY 2 3.30 M 3.70 M 20.0 300 1-Ø16 1-Ø12 Ø10mm @ 200mm
2. NOT MORE THAN 33% OF THE BARS SHALL BE 2. NOT MORE THAN 33% OF THE BARS SHALL BE 3.60 M 4.00 M 300 1-Ø20 1-Ø12 Ø10mm @ 200mm 300 2. WELDS SHALL DEVELOP THE FULL STRENGTH OF MEMBERS JOINED UNLESS

L
SPLICED WITHIN THE REQUIRED LAP LENGTH SPLICED WITHIN THE REQUIRED LAP LENGTH OTHERWISE SHOWN OR DETAILED IN THE DRAWINGS.

12db
(TYP.)

DOWEL
3. VALUES GIVEN ABOVE CAN ALSO BE USED FOR COLUMNS

400
12 THK. EXPANSION JOINT
FIN. FLR. LVL. D
WITH MASTIC FILLER
NOTES ON STRUCTURAL STEEL

250
1. STRUCTURAL STEEL TO BE USED FOR FABRICATION AND ERECTION OF THIS
3. IF THE BEAM REINFORCING BARS END IN A WALL, THE CLEAR DISTANCE FROM THE BAR TO THE FARTHER FACE OF THE 1-Ø16 VERT. BARS 6-Ø10 BARS (AS SHOWN) STRUCTURE SHALL COMPLY WITH ALL THE PERTINENT PROVISION OF AISC

(DOWEL)
Ø10 BOTT. BARS @ 300 O.C. MAIN BAR END HOOKS
WALL IS NOT LESS THAN 25mm. EMBEDMENT LENGTH SHALL BE SHOWN IN A TABLE 'A' FOR TENSION BARS AND TABLE 'B'

400
CHB WALL 400 SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL (ALL GRADES)
1-Ø16 VERT. BARS
FOR COMPRESSION BARS UNLESS UNLESS SPECIFIED IN PLAN. TOP BARS AND SHALL NOT BE SPLICED WITHIN THE FOR SIZE AND SPACING STEEL FOR BUILDING LATEST EDITION. BAR SIZE DIAMETER 180° HOOK 90° HOOK
COLUMN OR TWO STIRRUPS SHALL BE PROVED AT ALL SPLICES. OF HOR. & VERT. BARS (DEFORMED) (mm)
FOR SIZE AND SPACING SEE CONSTRUCTION NOTES. 2. ALL STRUCTURAL STEEL SHAPES SHALL CONFORM TO ASTM A36 STRUCTURAL D+2db L L
4. IF THERE ARE TWO OR MORE LAYERS OF REINFORCING BARS, USED 25mm BAR SEPARATORS SPACED AT 1.0M ON OF HOR. & VERT. BARS DOWEL TO MATCH STEEL UNLESS OTHERWISE INDICATED. 10 mm Ø 60 75 125 150
SEE CONSTRUCTION NOTES. CHB VERT. BARS
ON CENTER ON NO CASE SHALL THERE BE THAN TWO (2) SEPARATORS BETWEEN LAYERS OF BARS 3. ALL WELDED CONNECTIONS SHALL DEVELOP THE FULL STRENGTH OF THE 12 mm Ø 75 100 150 200
CHB WALL WHERE DEPRESSED
5. MINIMUM CONCRETE PROTECTION FOR REINFORCING BARS OR STEEL SHAPES SHALL BE AS SHOWN IN FIGURE B-2 300 SLAB OCCURS MEMBERS CONNECTED.
16 mm Ø 95 125 175 250
UNLESS ELSEWHERE. (TYP.) 4. UNLESS OTHERWISE SPECIFIED ALL WELDING RODS SHALL CONFORM WITH

DOWEL
CORNER WALL OPENING OR END WALL

400
20 mm Ø 115 150 200 300
E60 ELECTRODES.
FIN. FLR. LVL. 5. ALL BOLTS USED UNLESS OTHERWISE SPECIFIED SHALL BE ASTM A 307 BOLTS. 25 mm Ø 150 200 230 450

250
28 mm Ø 240 300 350 550
MAIN REINFORCEMENT MAIN REINFORCEMENT
CHB WALL R.C. COLUMN OR WALL
6-Ø10 BARS (AS SHOWN) NOTES ON EMBBED PIPES 32 mm Ø 300 335 450 600
t OR 1/4 D

t OR 1/4 D

Ø10 BOTT. BARS @ 300 O.C.


SLEEVES FOR UTILITY 400
SLEEVES FOR UTILITY
t

1-Ø16 VERT. BARS DOWEL BARS TO MATCH 1. ALL EMBEDED PIPES FOR UTILITIES ETC. THAT PASS THRU BEAMS SHALL NOT
PIPES MAX. 1/5 D PIPES MAX. 1/5 D CHB HOR. BARS
D

12 THK. EXPANSION JOINT EXCEED 100mm IN DIAMETER OR 1/3 BEAM DETPH WHICHEVER IS LESS, UNLESS
WITH MASTIC FILLER 12 THK. EXPANSION JOINT TYPICAL CHB FOOTING DETAILS OTHERWISE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER.
PROVIDE 3-Ø10 EXTRA STIRR. PROVIDE 3-Ø10 EXTRA STIRR. WITH MASTIC FILLER
EACH SIDE OF SLEEVES EACH SIDE OF SLEEVES ( WHERE APPLICABLE ) 2. NO PIPES SHALL BE ALLOWED TO PASS THRU BEAMS VERTICALLY. 135 DEG. HOOKS

L
3. NO PIPES SHALL BE EMBEDDED IN COLUMNS.

(DOWEL)
LE
400
TYP. DET. FOR SLEEVES TYP. DET. FOR SLEEVES FOR SIZE AND SPACING
THRU CONCRETE BEAM THRU CONCRETE BEAM OF HOR. & VERT. BARS NOTES ON CONSTRUCTION JOINTS IN CONCRETE 6d D
SEE CONSTRUCTION NOTES. 400 b
(DOWEL) 1. WHERE A CONSTRUCTION JOINT IS TO BE MADE, THE SURFACE OF CONCRETE
FIG. B-2 FIG. B-3

VERIFY DEPRESSION
30 BAR DIA. 30 BAR DIA. SHALL BE CLEANED AND ALL LAITANCE AND STANDING WATER REMOVED SHEAR
INTERSECTION WALL INTERSECTING R.C. COLUMN OR WALL (min.) (min.) KEY SHALL BE PROVIDE AT THE JOINT. L1

D=FOR BEAM
t=FOR SLAB
L
MAIN REINFORCEMENTS TO BE
6. WHEN A BEAM CROSSES A GIRDER , REST BEAM ON TOP OF GIRDER BARS, BEAM REINFORCING BARS SHALL BE TYPICAL CONNECTION DETAIL OF MASONRY WALL CONTINUOUS (TOP & BOTT. BARS)
SYMMETRICAL ABOUT THE CENTER LINE WHENEVER POSSIBLE. MAIN REINFORCEMENTS WHERE JOINTS IS AT POINT OF
TO BE CONTINUOUS STRESS, PROVIDE SHEAR RODS
7. GENERALLY, NO SPLICES SHALL BE PERMITTED AT POINTS WHERE CRITICAL BENDING STRESSES OCCUR, SPLICES WITH ENGINEERS APPROVAL STIRRUP AND THE TIE HOOKS
(ALL GRADES)
WHERE SO PERMITTED SHALL BE INDICATED IN TABLE 'A' AND 'B'. WELDED SPLICES SHALL DEVELOP IN TENSION AT D=FOR BEAM Ø10x1000 LONG
200 (MIN) 200 (MIN) 180° HOOK 90° HOOK
LEAST 125% OF THE SPLICED YIELD STRENGTH OF THE BAR NOT MORE THAN 50% OF THE BARS AT ANY ONE SECTION @ 300 O.C. 30Ø BAR 30Ø BAR BAR SIZE DIAMETER
2t=FOR SLAB
50 (DEFORMED) (mm) D+2db L L
IS ALLOWED TO BE SPLICED THEREIN. (MIN.) (MIN.)
30 BAR DIA. (min.) 40

D/3
Ø10 STIRRUPS 10 mm Ø 40 125 85 100
@ 150 O.C. TYPICAL DETAIL FOR BEAM

D/3
t/3 t/3

D
t/3
12 mm Ø 50 165 115 115

D/3
OR SLAB CHANGE SOFFIT SLAB 16 mm Ø 65 200 140 150
NOTES ON CONCRETE HOLLOW BLOCKS WALLS CHB WALL FOR SIZE AND SPACING
OF HOR. & VERT. BARS
BEAM
20 mm Ø 115 300 165 300
1. UNLESS OTHERWISE SHOWN IN PLANS ALL CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCKS SHALL BE REINFORCED SEE CONSTRUCTION NOTES
OPENING TYPICAL SLAB & BEAM 32 mm Ø 150 335 230 405
(DOWEL)
1-Ø16 VERT.
AS SHOWN IN THE SCHEDULE OF CONCRETE HOLLOW BLOCKS AND CERAMIC BLOCK REINFORCEMENT. BARS TYPICAL
400
DOWEL BARS TO MATCH
CHB VERT. BARS
CONSTRUCTION JOINT DET.
2. PROVIDE 150mm x 300mm STIFFENER COLUMN REINFORCED WITH 4-12mm WITH 10mm Ø TIES AT 150mm ON CENTER
WHERE CONCRETE HOLLOW BLOCK TERMINATES AND AT EVERY 3.0M LENGTH OF CONCRETE HOLLOW BLOCK 2-Ø12 TOP BARS NOTES ON CONCRETE WALLS
200

WALLS UNLESS NOTED IN STRUCTURAL PLANS. FIN. FLR. LVL.


2-Ø12 BOTT. BARS 1. ALL WALLS SHALL BE REINFORCED ACCORDING TO THE FOLLOWING SCHEDULE OF WALL
REINFORCEMENT UNLESS OTHERWISE INDICATED IN THE PLANS.
NOTE:
ELEVATION SECTION PROVIDE THESE ADDITIONAL BARS FOR
ALL OPENINGS PLUS BARS (NOT
NOTES ON CONCRETE HOLLOW BLOCKS WALLS REINFORCEMENTS TYP. DET. OF LINTEL BEAM AT CHB WALL OPENING REINFORCEMENT SHOWN) PARALLEL TO SIDE OF OPENING
WALL VERTICAL
THICKNESS EQUAL TO THE NUMBER OF TERMINATED
BLOCK THICKNESS REINFORCEMENT NOTES HORIZONTAL VERTICAL REMARKS SECTION BARS AT OPENING
HORIZONTAL LAPPED 100mm Ø10mm @ 250mm O.C. Ø10mm @ 300mm O.C. HORIZONTAL BARS
A. MINIMUM LAPS AT SPLICE= 0.25 M VER. BARS SEE ARCHITECTURAL & MECHANICAL
125mm Ø10mm @ 200mm O.C. Ø10mm @ 250mm O.C. AT CENTERS VERTICAL PLANS FOR SLAB OPENING LOCATION.
75 mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. B. PROVIDE RIGHT ANGLED REINFORCEMENT DOWEL BARS TO
AT CORNERS 0.92 m LONG FLR. SLAB OR BEAM MATCH VERT. BARS 150mm Ø12mm @ 250mm O.C. Ø12mm @ 300mm O.C. BARS STAGGED OUT HOR. BARS
125 mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C.
C.WHERE CHB OR CER. BLK. WALL DOWELS
(DOWEL)

WITH THE SAME SIZE AS VER. OR HOR. DOOR


150mm 10mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. 1. ALL JOINTS AND CELLS REINFORCING BARS SHALL HAVE 25mm CLEAR CONCRETE COVER FROM FACE OF WALL EXCEPT FOR
400

REINFORCEMENT SHALL BE PROVIDED OPENING


VERIFY ARCHITECTURAL

200 mm 12mm Ø EVERY 3RD LEVEL 10mm Ø @ 600mm O.C. CONTAINING REINFORCING WALLS IN CONTACT WITH THE GROUND WHERE A MINIMUM OF 60mm SHALL BE PROVIDED AND FOR
BARS SHALL BE FILLED EXPOSED FACES OF FORMED WALLS WHERE THE MINIMUM SHALL BE 50mm CLEAR.
WITH CONCRETE GROUT. 38mm CLEAR WINDOW
2. FOR REINFORCEMENTS SEE 2. CARRY VERTICAL BARS AT LEAST 60mm ABOVE FLOOR LEVEL TO PROVIDE FOR SPLICES WHEN NECESSARY OPENING
CONSTRUCTION NOTES. STOP AT 50mm BELOW TOP SLAB OR SOLID BAND WHERE THE WALL ENDS VERTICAL AND HORIZONTAL BARS
SHALL BE SPLICED BY LAPPING A DISTANCE EQUAL TO 30 DIAMETERS AND WIRED SECURELY WITH 16 G.I. WIRE
(DOWEL)

1-Ø16 CONT. HOR. BARS PROVIDED THAT SPLICES IN ADJACENT BARS ARE STAGGERED AT LEAST 1.50M O.C.
400

FOR FLOOR SLAB ONLY


3. UNLESS OTHERWISE NOTED IN THE PLANS, ALL OPENINGS IN WALLS 250mm OR THICKER SHALL BE REINFORCED
AROUND WITH 2-20mmØ BARS. FOR 225mm, 200mm, 175mm, 150mm THICK WALLS, USE 2-16mmØ. FOR 125mm AND
100mm THICK WALLS, USE 2-12mmØ BARS. ALL WALLS SPANNING SHALL HAVE VERTICAL REINFORCEMENT BENT
TYP. EXTERIOR WDW. & DOOR OPENING
TYP. SECTION OF MASONRY A U-FORM LIKE STIRRUPS AND SPACED ACCORDING TO THE SCHEDULE UNLESS OTHERWISE NOTED.
PARTITION REINFORCEMENTS

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL CONSTRUCTION NOTES ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-2
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175

MEDIA AGUA

C G-2

OPEN

OPEN
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2

3150
3200
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1 S-1

G-1C
B-1 B-1

G-1C
STC-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1
STC-1 STC-1

G-1C
STC-1
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1

G-1C
7000

(LB-1 BELOW) (LB-1 BELOW)


9500

9500
3850
3800

B-1

B-1
STAIRWELL STAIRWELL
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-3
S-1
S-3 S-1
G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3
B G-3 G-3

G-1B
2500

2500
G-1B
G-1B

G-1A

G-1A

G-1A
S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2
G-1B

G-1A

G-1A

G-1A
S-2 S-2

G-1A

G-1A
G-1A
S-2 S-2
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
A

CB-1

CB-1

CB-1
S-2 S-2
R 2B-2 2B-2

2 SECOND FLOOR FRAMING PLAN


S-3 SCALE 1:100 M

LEGEND:

R REVISION ON THE DRAWING DETAILS (1/23/2018)


- REVISION OF FOOTING TIE BEAMS DESIGNATIONS
- ADDITIONAL CANOPY (REINFORCED CONCRETE)
ALONG MAIN ENTRANCE, AS RECOMMENDED ON
THE PROPOSE DEPED DESIGN

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1 C-1, F-1

FTB-1A
C FTB-1A FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
WF-1

WF-1
3150

3150
STC-1, SF-1 STC-1, SF-1
FTB-2A

FTB-2A

FTB-2A

FTB-2A
FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2
STF-1

STF-1

STF-1

STF-1

STF-1

STF-1
7000

STC-1, STC-1,
SF-1 SLAB ON FILL SF-1
t = 100mm + FINISH W/
WF-1
9500

9500
10mmØ @300mm O.C.
WF-1

WF-1
3850

3850
WF-1
CF-1 CF-1 CF-1 CF-1 CF-1 EACHWAY TEMP. BARS CF-1 CF-1 CF-1 CF-1 CF-1 CF-1 CF-1 CF-1

C-2 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 FTB-1 C-2 C-2
B FTB-1A FTB-1A
FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2
2500

2500
C-3 FTB-1 C-3 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3 FTB-1 C-3
A
1600

1600
4 4
S-5 S-5

1 FOUNDATION PLAN R
S-3 SCALE 1:100M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOUNDATION PLAN ENGINEER II
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR FRAMING PLAN CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-3
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

MEDIA AGUA

OPEN

OPEN
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2

3150
3200
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1
S-1

G-1C
S-1

G-1C
G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1
RC-WALL B-1 B-1 RC-WALL
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1

G-1C
7000

G-1C
(LB-1 BELOW) (LB-1 BELOW)
9500

9500
3850
3800

B-1

B-1
STAIRWELL STAIRWELL
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-3
S-1
S-3 S-1
G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3
B G-3 G-3
2500

2500
G-1B

G-1B
G-1B

G-1A

G-1A

G-1A
S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2
G-1B

G-1A

G-1A

G-1A

G-1A
S-2 S-2

G-1A
G-1A
S-2 S-2
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
A

2 FOURTH FLOOR FRAMING PLAN


S-4 SCALE 1:100 M

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500

MEDIA AGUA

C
OPEN

OPEN
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2

3150
3200

S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1

S-1
G-1C

S-1

G-1C
B-1 B-1
G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1

G-1
STC-1 STC-1 STC-1 STC-1
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
G-1C
7000

G-1C
(LB-1 BELOW) (LB-1 BELOW)
9500

9500
3850
3800

B-1

B-1
STAIRWELL STAIRWELL
S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-1 S-3
S-1
S-3 S-1
G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3 G-3
B G-3 G-3

G-1B
2500

2500
G-1B
G-1B

G-1A

G-1A

G-1A
S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2
G-1B

G-1A

G-1A

G-1A

G-1A
S-2 S-2

G-1A
G-1A

S-2 S-2
G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2 G-2
A

1 THIRD FLOOR FRAMING PLAN


S-4 SCALE 1:100 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOURTH FLOOR FRAMING PLAN ENGINEER II
MODIFIED STANDARD DPWH - DEPED THIRD FLOOR FRAMING PLAN CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-4
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
A B A
LEGEND:
S SUPPLEMENTAL DRAWING DETAILS (1/23/2018)
- ADDITIONAL SCHEDULE/DETAILS OF STRUCTURAL MEMBERS FOR:
FGL FGL
EXPOSURE CATEGORY D - FLAT, UNOBSTRUCTED AREAS AND/OR

VARIES
STRUCTURES NEAR THE COASTLINE OR OTHER BODIES OF WATER
1000
HAVING WIND VELOCITY OF 340 kph
NGL NGL EXPOSURE CATEGORY B - URBAN AND SUBURBAN AREAS, WOODED
AREAS, OR OTHER TERRAIN WITH NUMEROUS CLOSELY SPACED
FTB FTB FTB FTB FTB FTB FTB OBSTRUCTIONS HAVING THE SIZE OF SINGLE-FAMILY DWELLINGS
OR LARGER HAVING WIND VELOCITY OF 270 kph
1500

1500
400 400 400
500

500
25 mm Ø TEMP. BOT. BARS @ 300mm O.C. 11-25 mm Ø BOT. BARS
100MM THK. WELL- 100MM THK. WELL-
COMPACTED GRAVEL BASE 5500 COMPACTED GRAVEL BASE 3800

25 mm Ø TOP BARS @ 300mm O.C.


SCHEDULE OF FOOTING TIE BEAMS (FTB) (EXPOSURE D AND V=340KPH) S
FTB

FTB
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT
FLOOR STIRRUPS SIZE
MARK BREADTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. REMARKS
LEVEL AND SPACING
4000

3800
C-3 FTB C-2 FTB FTB C-1 FTB
25 mm Ø TEMP. BOT. BARS @ 300mm O.C. B D TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.

FTB
FTB

25 mm Ø BOT. BARS @ 125mm O.C. 10mm Ø,1@ 50, 10 PROVIDE


11-25 mm Ø BOT. BARS @ 200mm O.C. EACHWAY GROUND
FTB

FTB-1 450 700 8-25mmØ 3-25mmØ 3-25mmØ 3-25mmØ @100, REST @ 2 -16 mmØ
FLOOR
200mm O.C. WEB BARS
LEVEL
10mm Ø,1@ 50, 10 PROVIDE
3800
FTB-1A 450 700 8-25mmØ 3-25mmØ 3-25mmØ 8-25mmØ @100, REST @ 2 -16 mmØ
1300 2500 1700 200mm O.C. WEB BARS
5500
(EXPOSURE D & V=340 KPH) 12mm Ø,1@ 50, 10 PROVIDE
FTB-2 600 700 12-25mmØ 6-25mmØ 6-25mmØ 12-25mmØ @100, REST @ 2 -16 mmØ
200mm O.C. WEB BARS
3 DETAIL PLAN & ELEV. OF CF-1 4 DETAIL PLAN & ELEV. OF F-1
12mm Ø,1@ 50, 10 PROVIDE
S-5 SCALE 1:60M S-5 SCALE 1:60M
FTB-2A 600 700 12-25mmØ 6-25mmØ 6-25mmØ 12-25mmØ @100, REST @ 2 -16 mmØ
200mm O.C. WEB BARS

A B A

GROUND FL GROUND FL
VAR.

VAR.

NGL NGL

FTB FTB FTB FTB FTB FTB FTB

SCHEDULE OF FOOTING TIE BEAMS (FTB) (EXPOSURE B AND V =270KPH ) S


1500

1500

300
300 300
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT
450

500

FLOOR STIRRUPS SIZE


25 mm Ø TEMP. BOT. BARS @ 300mm O.C. 12-25 mm Ø BOT. BARS EACHWAY MARK BREADTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. REMARKS
100MM THK. WELL- 100MM THK. WELL- LEVEL AND SPACING
COMPACTED GRAVEL BASE 5100 COMPACTED GRAVEL BASE 3800
B D TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.

10mm Ø,1@ 50, 10 PROVIDE


GROUND
25 mm Ø TOP BARS @ 300mm O.C. FTB-1 400 600 7-25mmØ 3-25mmØ 3-25mmØ 3-25mmØ @100, REST @ 2 -16 mmØ
FLOOR
200mm O.C. WEB BARS
FTB
FTB

LEVEL
10mm Ø,1@ 50, 10 PROVIDE
FTB-1A 400 600 7-25mmØ 3-28mmØ 3-25mmØ 3-25mmØ @100, REST @ 2 -16 mmØ
200mm O.C. WEB BARS
4000

3800

C-3 FTB C-2 FTB FTB C-1 FTB


25 mm Ø TEMP. BOT BARS @300mm O.C.
12mm Ø,1@ 50, 10 PROVIDE
FTB-2
FTB

400 600 6-25mmØ 3-25mmØ 4-25mmØ 5-25mmØ @100, REST @ 2 -16 mmØ
25 mm Ø BOT. BARS @ 150mm O.C.
FTB

12-25 mm Ø BOT. BARS EACHWAY


FTB

200mm O.C. WEB BARS

12mm Ø,1@ 50, 10 PROVIDE


FTB-2A 400 600 7-25mmØ 4-25mmØ 5-25mmØ 6-25mmØ @100, REST @ 2 -16 mmØ
3800
200mm O.C. WEB BARS
1100 2500 1500

5100
(EXPOSURE B & V=270 KPH)

1 DETAIL PLAN & ELEV. OF CF-1 S 2 DETAIL PLAN & ELEV. OF F-1 S
S-5 SCALE 1:60M S-5 SCALE 1:60M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL PLAN AND ELEVATION OF CF-1,F-1(EXPOSURE B) ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL PLAN AND ELEVATION OF CF-1,F-1(EXPOSURE D) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF FOOTING TIE BEAMS(EXPOSURE B) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-5
SCHEDULE OF FOOTING TIE BEAMS(EXPOSURE D) ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
LEGEND:

R REVISION ON THE DRAWING DETAILS (1/23/2018)

- UPDATED CANOPY DETAIL ON FRAMING PLAN


-DETAIL OF CONCRETE SEATING
-DETAIL SECTION OF CANOPY

10mm Ø @ EVERY 3rd LAYER,


HORZ. BARS
A
150mm THK. CHB FOR EXT. WALL 10mm Ø @ EVERY 3rd LAYER,
1200 100mm THK. CHB FOR INT. WALL HORZ. BARS
400
150 3-10mm Ø LONGITUDINAL
BARS SPACE AS SHOWN 10mm Ø @ 600mm O.C., VERT. BARS 100mm THK. CHB FOR INT. WALL
4-12mmØ LONGITUDINAL BARS SPACE

100 100
AS SHOWN W/ 12mmØ TRANSVERSE
100mm THK. BARS @ 250mm O.C.
10mm Ø @ 600mm O.C., VERT. BARS

200
10mm Ø @ 200mm HOR. TIE BARS

600
100 NGL

400
5 - 10mm Ø BARS

200
CORRIDOR
FFL
400

2-10mmØ LONGITUDINAL FINISH FLOOR LN.

100 100 100


BARS WITH 10mmØ TIE 10mmØ BARS @ 300mm O.C.,

300
BARS @ 250mm O.C.
G-2 B-2 100mm THK. WELL-COMPACTED GRAVEL FILL
200

FINISH GRADE LN.


FTB
150mm THK. CHB WALL W/ 10mmØ 100mm THK. WELL-COMPACTED
VERT. BARS @ 600mm O.C. & 10mmØ GRAVEL FILL 100 300 100
HORZ. @ EVERY 3rd LAYER

DETAIL SECTION OF CANOPY 3 WALL TO TIE BEAMS CONN. DETAIL 4 DETAIL OF WF-1
1 OF MAIN ENTRANCE R FTB
S-6 SCALE 1:20 M S-6 SCALE 1:20 M
S-6 SCALE 1:20M
2 DETAIL OF CONC. SEATING
S-6 SCALE 1:20M

1 13

C B 400

7000
100 300
±1613 (VERIFY COLUMN SIZE) 1613 1613 ±1613 (VERIFY COLUMN SIZE)
150mm THK. CHB. WALL
25
A
150
4-10 mm Ø LONGITUDINAL BARS
10mmØ TRANSVERSE BARS SPACED AS SHOWN

200
@ 250mm O.C.

25 75
10mm Ø TRANSVERSE BARS @ 250mm O.C.

500
4-10mmØ LONGITUDINAL 150mm THICK R.C. WALL
BARS (SEE SECTION A-A) 150mm THICK CONC. WALL CONC. PLATFORM
150mm THICK CONCRETE WALL 10mmØ HOR. TIE BARS @ 200mm O.C. FINISH FLOOR LINE

10mmØ BARS@ 300mm O.C.

VARIES
CONC. PLATFORM 100mm THK. WELL
FINISH FLOOR LINE
COMPACTED GRAVEL FILL
FINISH GRADE LINE FINISH GRADE LINE

300
WF-1 WF-1 WF-1
WF-1 10mmØ HOR. TIE BARS @ 200mm O.C. 100mm THK. WELL COMPACTED WF-1
10mmØ VERTICAL BARS 200mm GRAVEL FILL
EACH FACE
A
DETAIL SECTION A-A FTB

5 DETAILS OF HAND WASH 6 DETAILS OF LAVATORY (HANDWASH)


S-6 SCALE 1:20 M S-6 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS WALL TO TIE BEAM CONNECTIONS DETAILS ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL OF WALL FOOTING -1 (WF-1) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) DETAIL SECTIONS OF HANDWASHING COUNTER MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-6
DETAIL LAVATORY (HANDWASH) ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING DETAIL SECTION OF CONCRETE SEATING CHECKED: SIGNED B 15 90
DETAIL SECTION OF CANOPY MAIN ENTRANCE OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
C

ROOF DECK FL SCHEDULE OF COLUMNS (EXPOSURE B AND V=340 KPH) S

PROVIDE 10mmØ SEISMIC TIE BARS


MARK FOOTING TO GROUND FLR LEVEL GROUND TO SECOND FLR LEVEL SECOND TO THIRD FLR LEVEL THIRD TO FOURTH FLR LEVEL FOURTH TO ROOF/DECK LEVEL
SPACED 100mm O.C.
670 600 600 600 550
75 75 40 40 40 40 40 40 40 40

3150

40

40

40

40
75
16 - 32mmØ VERTICAL 16- 32mmØ VERTICAL 8- 32mmØ VERTICAL 8- 32mmØ VERTICAL 8- 32mmØ VERTICAL
C-1 BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES

670

600

600

600

550
1@ 50, REST @ 100mm 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 11@ 100,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.

40

40

40

40
75
(3 TIES/SET) (2 TIES/SET) (2 TIES/SET) (2 TIES/SET) (2 TIES/SET)
4TH FL
770 700 700 700 550
75 75 40 40 40 40 40 40 40 40
PROVIDE 10mmØ SEISMIC TIE BARS
SPACED 100mm O.C.

40
75

40

40

40
24 - 32mmØ VERTICAL 24 - 32mmØ VERTICAL 16 - 32mmØ VERTICAL 16 - 32mmØ VERTICAL 12 - 32mmØ VERTICAL
C-2 BARS W/ 12mmØ TIES BARS W/ 12mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES
3150

770

700

700

700

550
1@ 50, REST @ 100mm 1@ 50, 14@ 100, 1@ 50, 14@ 100, 1@ 50, 14@ 100, 1@ 50, 11@ 100,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.

40

40

40
40
75
(3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (3TIES/SET)

620 550 550 550 550


75 75 40 40 40 40 40 40 40 40
3RD FL

40

40

40
75

40
16 - 32mmØ VERTICAL 16 - 32mmØ VERTICAL 12 - 32mmØ VERTICAL 8 - 32mmØ VERTICAL 8-32mmØ VERTICAL
PROVIDE 10mmØ SEISMIC TIE BARS BARS W/ 10mmØ TIES
SPACED 100mm O.C. C-3 BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES

620

550

550

550

550
1@ 50, REST @ 100mm 1@ 50, 11@ 100, 1@ 50, 11@ 100, 1@ 50, 11@ 100, 1@ 50, 11@ 100,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.
(2 TIES/SET)

40
40

40

40
75
3150

(3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (2 TIES/SET)

2ND FL

PROVIDE 10mmØ SEISMIC TIE BARS


SPACED 100mm O.C.
3150

FGL
SCHEDULE OF COLUMNS (EXPOSURE B & V= 270 KPH) S

MARK FOOTING TO GROUND FLR LEVEL GROUND TO SECOND FLR LEVEL SECOND TO THIRD FLR LEVEL THIRD TO FOURTH FLR LEVEL FOURTH TO ROOF/DECK LEVEL
VAR.

NGL 670 600 600 600 600


75 75 40 40 40 40 40 40 40 40
FTB FTB FTB

40

40

40

40
75
16 - 25mmØ VERTICAL 16 - 25mmØ VERTICAL 8-25mmØ VERTICAL 8 - 25mmØ VERTICAL 8-25mmØ VERTICAL
1500

BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES


C-1 BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES

670

600

600

600

600
1@ 50, REST @ 100mm 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.
(2 TIES/SET) (2 TIES/SET)

40

40

40

40
75
(3 TIES/SET) (3 TIES/SET) (2 TIES/SET)

670 600 600 600 600


75 75 40 40 40 40 40 40 40 40
100mm THK. WELL-COMPACTED
L
GRAVEL FILL

40
75

40

40

40
20 - 25mmØ VERTICAL 20 - 25mØ VERTICAL 16 - 25mmØ VERTICAL 16 - 25mmØ VERTICAL 12 - 25mmØ VERTICAL
REFERENCE DETAILED ELEV. OF COLUMNS C-2 BARS W/ 12mmØ TIES BARS W/ 12mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES

670

600

600

600

600
1 1@ 50, REST @ 100mm 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.
S-7

40

40

40
40
75
SCALE 1:60M (3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (3 TIES/SET)

670 600 600 600 600


75 75 75 40 40 40 40 40 40 40 40

40

40

40

40
16 - 25mmØ VERTICAL 16 - 25mmØ VERTICAL 12 - 25mmØ VERTICAL 8 - 25mmØ VERTICAL 8-25mmØ VERTICAL
BARS W/ 10mmØ TIES
300
C-3 BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES BARS W/ 10mmØ TIES
670

600

600

600

600
1@ 50, REST @ 100mm 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100, 1@ 50, 12@ 100,
10mm Ø @ 300mm O.C.,
O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C. REST @ 150mm O.C.
CHAIR BARS
(2 TIES/SET)

40

40

40

40
75

(3 TIES/SET) (3 TIES/SET) (3 TIES/SET) (2 TIES/SET)


10mm Ø @ SPACED AS
100

SHOWN, NOSING BARS


150
300

N.G.L
10mm Ø @ 300mm O.C.,
MAIN BARS
10mm Ø @ SPACED AS
SHOWN,TEMP BARS LEGEND:
100mm THK. WELL-COMPACTED
GRAVEL FILL
100 S SUPPLEMENTAL DRAWING DETAILS (1/23/2018)
- ADDITIONAL SCHEDULE/DETAILS OF STRUCTURAL MEMBERS FOR:
EXPOSURE CATEGORY D - FLAT, UNOBSTRUCTED AREAS AND/OR
2 DET. SECTION OF STAIR ON FILL STRUCTURES NEAR THE COASTLINE OR OTHER BODIES OF WATER
HAVING WIND VELOCITY OF 340 kph
S-7 SCALE 1:20 M
EXPOSURE CATEGORY B - URBAN AND SUBURBAN AREAS, WOODED
AREAS, OR OTHER TERRAIN WITH NUMEROUS CLOSELY SPACED
OBSTRUCTIONS HAVING THE SIZE OF SINGLE-FAMILY DWELLINGS
OR LARGER HAVING WIND VELOCITY OF 270 kph

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REFERENCE DETAILED ELEVATION OF COLUMNS ENGINEER II
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF COLUMN(EXPOSURE D & V=340) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF COLUMN(EXPOSURE B & V=270) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-7
DET. SECTION OF STAIR ON FILL ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
S SCHEDULE OF BEAMS AND GIRDERS( EXPOSURE D AND V=340KPH)
ROOF 10mm Ø,1@ 50, 10
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT PROVIDE 2 -16 mmØ
DECK RG-1 300 500 5-25mmØ 3-25mmØ 3-25mmØ 5-25mmØ @100, REST @
FLOOR LEVEL WEB BARS
MARK BREADTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. 200mm O.C.
LEVEL STIRRUPS SIZE REMARKS
AND SPACING
B D TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP. 10mm Ø,1@ 50, 10
PROVIDE 2 -16 mmØ
RG-2 400 500 4-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
WEB BARS
10mm Ø,1@ 50, 14 200mm O.C.
SECOND PROVIDE 2 -16 mmØ
G-1 450 700 8-25mmØ 5-25mmØ 5-25mmØ 5-25mmØ @100, REST @
FLOOR WEB BARS 10mm Ø,1@ 50, 10
200mm O.C. PROVIDE 2 -16 mmØ
LEVEL RB-1 300 500 6-25mmØ 3-25mmØ 4-25mmØ 5-25mmØ @100, REST @
WEB BARS
4L-12mmØ,1@ 50, 200mm O.C.
PROVIDE 2 -16 mmØ
G-1A 450 700 10-25mmØ 5-25mmØ 5-25mmØ 10-25mmØ REST @ 75mm O.C.
WEB BARS 10mm Ø,1@ 50, 10
PROVIDE 2 -16 mmØ
RB-1A 400 500 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
WEB BARS
4L-12mmØ,1@ 50, 200mm O.C.
PROVIDE 2 -16 mmØ
G-1B 450 700 11-25mmØ 6-25mmØ 6-25mmØ 11-25mmØ REST @ 75mm O.C.
WEB BARS 10mm Ø,1@ 50, 10
PROVIDE 2 -16 mmØ
RB-2 350 500 4-25mmØ 2-25mmØ 2-25mmØ 4-25mmØ @100, REST @
WEB BARS
10mm Ø,1@ 50, 14 200mm O.C.
PROVIDE 2 -16 mmØ
G-1C 450 700 9-25mmØ 6-25mmØ 6-25mmØ 6-25mmØ @100, REST @
WEB BARS 10mm Ø,1@ 50, 10
200mm O.C.
RB-3 250 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
10mm Ø,1@ 50, 10 200mm O.C.
G-2 300 400 4-25mmØ 2-25mmØ 2-25mmØ 4-25mmØ @100, REST @
200mm O.C. 10mm Ø,1@ 50, 10
RB-3A 250 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
10mm Ø,1@ 50, 10 200mm O.C.
PROVIDE 2 -16 mmØ
G-3 400 500 6-25mmØ 3-25mmØ 4-25mmØ 5-25mmØ @100, REST @
WEB BARS 10mm Ø,1@ 50, 8
200mm O.C.
RB-4 200 300 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
10mm Ø,1@ 50, 10 200mm O.C.
B-1 300 400 4-20mmØ 2-20mmØ 2-20mmØ 4-20mmØ @100, REST @
200mm O.C. 10mm Ø,1@ 50, 10
RB-5 200 400 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
10mm Ø,1@ 50, 10 200mm O.C.
B-2 250 400 4-16mmØ 2-16mmØ 2-16mmØ 4-16mmØ @100, REST @
200mm O.C. 10mm Ø,1@ 50, 10
RB-6 250 350 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
10mm Ø,1@ 50, 8 200mm O.C.
CB-1 250 400 4-16mmØ 2-16mmØ 4-16mmØ 2-16mmØ @100, REST @ 200mm
O.C TO FREE END 10mm Ø,1@ 50, 10
250 300 3-25mmØ 2-25mmØ 3-25mmØ 2-25mmØ @100, REST @ 200mm
RCB-1
10mm Ø,1@ 50, 14 O.C TO FREE END
THIRD PROVIDE 2 -16 mmØ
G-1 450 700 8-25mmØ 5-25mmØ 5-25mmØ 5-25mmØ @100, REST @
FLOOR WEB BARS 10mm Ø,1@ 50, 10
200mm O.C.
LEVEL RCB-2 250 300 3-25mmØ 2-25mmØ 3-25mmØ 2-25mmØ @100, REST @ 200mm
4L-12mmØ,1@ 50, O.C TO FREE END
PROVIDE 2 -16 mmØ
G-1A 450 700 8-25mmØ 5-25mmØ 5-25mmØ 8-25mmØ REST @ 75mm O.C.
WEB BARS 10mm Ø,1@ 50, 8
LRB-1 200 300 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
4L-12mmØ,1@ 50, 200mm O.C.
PROVIDE 2 -16 mmØ
G-1B 450 700 9-25mmØ 5-25mmØ 5-25mmØ 9-25mmØ REST @ 75mm O.C.
WEB BARS
SCHEDULE OF SLABS
10mm Ø,1@ 50, 14
PROVIDE 2 -16 mmØ REINFORCING BARS
G-1C 450 700 9-25mmØ 5-25mmØ 5-25mmØ 5-25mmØ @100, REST @
WEB BARS
200mm O.C. MARK THICKNESS REMARKS
PARALLEL TO PARALLEL TO
10mm Ø,1@ 50, 10 LONG SPAN SHORT SPAN
G-2 300 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
200mm O.C. 12mmØ @ 250 mm O.C. BENT- 12mmØ @190mm O.C. BENT- LEGEND:
S-1 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT
10mm Ø,1@ 50, 12 S SUPPLEMENTAL DRAWING DETAILS (1/23/2018)
G-3 300 550 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @ PROVIDE 2 -16 mmØ 12mmØ @200mm O.C. BENT- 12mmØ @150mm O.C. BENT-
- ADDITIONAL SCHEDULE/DETAILS OF STRUCTURAL MEMBERS FOR:
200mm O.C. WEB BARS S-2 100mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO - WAY
FACE OF SUPPORT FACE OF SUPPORT EXPOSURE CATEGORY D - FLAT, UNOBSTRUCTED AREAS AND/OR
STRUCTURES NEAR THE COASTLINE OR OTHER BODIES OF WATER
10mm Ø,1@ 50, 10 12mmØ @250mm O.C. BENT- HAVING WIND VELOCITY OF 340 kph
10mm Ø TEMPERATURE BARS
B-1 300 400 3-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ @100, REST @ S-3 100mm+FIN. @ 250mm O.C.
UP 2 OUT OF 3 @ L/4 FROM ONE - WAY
FACE OF SUPPORT EXPOSURE CATEGORY B - URBAN AND SUBURBAN AREAS, WOODED
200mm O.C. AREAS, OR OTHER TERRAIN WITH NUMEROUS CLOSELY SPACED
12mmØ @250mm O.C. BENT- 12mmØ @140mm O.C. BENT- OBSTRUCTIONS HAVING THE SIZE OF SINGLE-FAMILY DWELLINGS
S-4 120mm+FIN. UP 2 OUT OF 3 @ L/4 FROM UP 2 OUT OF 3 @ L/4 FROM TWO- WAY OR LARGER HAVING WIND VELOCITY OF 270 kph
10mm Ø,1@ 50, 14
FOURTH PROVIDE 2 -16 mmØ FACE OF SUPPORT FACE OF SUPPORT
G-1 450 700 7-25mmØ 4-25mmØ 3-25mmØ 4-25mmØ @100, REST @
FLOOR WEB BARS
200mm O.C.
LEVEL
4L-12mmØ,1@ 50, 100 GRID GRID GRID
G-1A 450 700 6-25mmØ 4-25mmØ 4-25mmØ 6-25mmØ REST @ 75mm O.C. PROVIDE 2 -16 mmØ
WEB BARS
L/4 + 12Ø L/4 + 12Ø
4L-12mmØ,1@ 50, 100
PROVIDE 2 -16 mmØ
G-1
G-1B 450 700 6-25mmØ 4-25mmØ 4-25mmØ 6-25mmØ REST @ 75mm O.C.
WEB BARS

10mm Ø,1@ 50, 14


PROVIDE 2 -16 mmØ
G-1C 450 700 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @
WEB BARS
200mm O.C.

10mm Ø,1@ 50, 10


G-2 250 400 3-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ @100, REST @
L/5 - 12Ø L/5 - 12Ø
200mm O.C.
L
10mm Ø,1@ 50, 10
PROVIDE 2 -16 mmØ
G-3 300 500 6-25mmØ 4-25mmØ 4-25mmØ 6-25mmØ @100, REST @
WEB BARS 1 TYPICAL GIRDER/BEAM DETAILS
200mm O.C.

10mm Ø,1@ 50, 10


S-8 SCALE 1:40 M

B-1 250 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @


200mm O.C.

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE D) ENGINEER II
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF SLABS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) TYPICAL GIRDER/BEAM DETAILS MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-8
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
S SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE B AND V=270KPH)
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT
ROOF 10mm Ø,1@ 50, 10
FLOOR DECK RG-1 300 400 4-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
MARK BREADTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. STIRRUPS SIZE
LEVEL REMARKS LEVEL 200mm O.C.
AND SPACING
B D TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.
10mm Ø,1@ 50, 12
PROVIDE 2 -16 mmØ
10mm Ø,1@ 50, 12 RG-2 400 600 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
SECOND PROVIDE 2 -16 mmØ WEB BARS
G-1 400 600 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @ 200mm O.C.
FLOOR WEB BARS
200mm O.C.
LEVEL 10mm Ø,1@ 50, 10
10mm Ø,1@ 50, 12 RB-1 300 400 4-25mmØ 2-25mmØ 2-25mmØ 4-25mmØ @100, REST @
PROVIDE 2 -16 mmØ 200mm O.C.
G-1A 400 600 7-25mmØ 4-25mmØ 3-25mmØ 6-25mmØ @100, REST @
WEB BARS
200mm O.C.
10mm Ø,1@ 50, 10
10mm Ø,1@ 50, 12 RB-1A 300 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
PROVIDE 2 -16 mmØ 200mm O.C.
G-1B 400 600 6-25mmØ 4-25mmØ 4-25mmØ 6-25mmØ @100, REST @
WEB BARS
200mm O.C.
10mm Ø,1@ 50, 10
10mm Ø,1@ 50, 12 RB-2 300 400 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
PROVIDE 2 -16 mmØ 200mm O.C.
G-1C 400 600 7-25mmØ 3-25mmØ 3-25mmØ 3-25mmØ @100, REST @
WEB BARS
200mm O.C.
10mm Ø,1@ 50,
10mm Ø,1@ 50, 10 RB-3 250 300 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ 8@100, REST @
G-2 250 400 4-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @ 200mm O.C.
200mm O.C.
10mm Ø,1@ 50, 10
10mm Ø,1@ 50, 12 RB-3A 250 400 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
PROVIDE 2 -16 mmØ 200mm O.C.
G-3 400 500 6-25mmØ 2-25mmØ 2-25mmØ 4-25mmØ @100, REST @
WEB BARS
200mm O.C.
10mm Ø,1@ 50,
10mm Ø,1@ 50, 10 RB-4 200 300 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ 8@100, REST @
B-1 250 400 4-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @ 200mm O.C.
200mm O.C.
10mm Ø,1@ 50, 12
10mm Ø,1@ 50, 10 RB-5 250 300 3-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @
B-2 250 400 4-25mmØ 2-25mmØ 2-25mmØ 4-25mmØ @100, REST @ 200mm O.C.
200mm O.C.
10mm Ø,1@ 50, 8
10mm Ø,1@ 50, 8 RB-6 250 350 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
CB-1 250 400 4-25mmØ 2-25mmØ 4-25mmØ 2-25mmØ @100, REST @ 200mm 200mm O.C.
O.C TO FREE END
10mm Ø,1@ 50, 8
10mm Ø,1@ 50, 12 RCB-1 250 350 3-25mmØ 2-25mmØ 3-25mmØ 2-25mmØ @100, REST @ 200mm
THIRD PROVIDE 2 -16 mmØ O.C TO FREE END
G-1 400 600 6-25mmØ 3-25mmØ 2-25mmØ 3-25mmØ @100, REST @
FLOOR WEB BARS
200mm O.C.
LEVEL 10mm Ø,1@ 50, 8
10mm Ø,1@ 50, 12 RCB-2 250 350 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @ 200mm
PROVIDE 2 -16 mmØ O.C TO FREE END
G-1A 400 600 5-25mmØ 3-25mmØ 3-25mmØ 5-25mmØ @100, REST @
WEB BARS
200mm O.C.
10mm Ø,1@ 50, 8
10mm Ø,1@ 50, 12 LRB-1 200 300 2-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
PROVIDE 2 -16 mmØ 200mm O.C.
G-1B 400 600 7-25mmØ 4-25mmØ 3-25mmØ 6-25mmØ @100, REST @
WEB BARS
200mm O.C.

10mm Ø,1@ 50, 12


PROVIDE 2 -16 mmØ
G-1C 400 600 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @
200mm O.C.
WEB BARS LEGEND:
10mm Ø,1@ 50, 10 S SUPPLEMENTAL DRAWING DETAILS (1/23/2018)
G-2 250 400 4-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @ - ADDITIONAL SCHEDULE/DETAILS OF STRUCTURAL MEMBERS FOR:
200mm O.C. EXPOSURE CATEGORY D - FLAT, UNOBSTRUCTED AREAS AND/OR
STRUCTURES NEAR THE COASTLINE OR OTHER BODIES OF WATER
10mm Ø,1@ 50, 10 HAVING WIND VELOCITY OF 340 kph
PROVIDE 2 -16 mmØ
G-3 400 500 4-25mmØ 2-25mmØ 2-25mmØ 3-25mmØ @100, REST @ EXPOSURE CATEGORY B - URBAN AND SUBURBAN AREAS, WOODED
WEB BARS AREAS, OR OTHER TERRAIN WITH NUMEROUS CLOSELY SPACED
200mm O.C.
OBSTRUCTIONS HAVING THE SIZE OF SINGLE-FAMILY DWELLINGS
OR LARGER HAVING WIND VELOCITY OF 270 kph
10mm Ø,1@ 50, 10
B-1 250 400 4-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ @100, REST @
200mm O.C.
1
10mm Ø,1@ 50, 12
FOURTH PROVIDE 2 -16 mmØ
G-1 400 600 7-25mmØ 3-25mmØ 3-25mmØ 3-25mmØ @100, REST @
FLOOR WEB BARS
200mm O.C.
LEVEL
10mm Ø,1@ 50, 12
PROVIDE 2 -16 mmØ
G-1A 400 600 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @
WEB BARS
200mm O.C. 1500 3600

10mm Ø,1@ 50, 12


PROVIDE 2 -16 mmØ
G-1
G-1B 400 600 5-25mmØ 3-25mmØ 3-25mmØ 5-25mmØ @100, REST @

t=100mm
WEB BARS CORRIDOR
200mm O.C.
GROUND F. L.
200

10mm Ø,1@ 50, 12

300
PROVIDE 2 -16 mmØ
G-1C 400 600 6-25mmØ 4-25mmØ 4-25mmØ 4-25mmØ @100, REST @
WEB BARS NGL
200mm O.C.
200

300
100mm THK. WELL-COMPACTED GRAVEL FILL
10mm Ø,1@ 50, 10 100
G-2 250 400 4-20mmØ 2-20mmØ 2-20mmØ 3-20mmØ @100, REST @ 10mm Ø @ 300mm O.C., EACH WAY; TEMP. BARS
200mm O.C.
100
10mm Ø,1@ 50, 10
PROVIDE 2 -16 mmØ
G-3 400 500 7-25mmØ 3-25mmØ 3-25mmØ 5-25mmØ @100, REST @
WEB BARS
200mm O.C.
1 DETAIL SECTION OF R.C. RAMP
10mm Ø,1@ 50, 10 S-9 SCALE 1:20 M
B-1 250 400 3-25mmØ 2-25mmØ 2-25mmØ 2-25mmØ @100, REST @
200mm O.C.

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SCHEDULE OF BEAMS AND GIRDERS (EXPOSURE B) ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION OF RC RAMP CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S-9
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS END WALL DETAIL ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN
ROOF FRAMING PLAN SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
FOUR (4) STOREY, TWENTY (20) DETAIL OF R.C. GUTTER MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE S - 10
DETAIL OF PLANTED COLUMN (PC-1) ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
LEGEND: L1
6mm GUSSET ⅊, Typical
STITCH WELD
R REVISION ON THE DRAWING DETAILS (1/23/2018)

L3
ADDITTIONAL SCHEDULE/ DETAILS OF STRUCTURAL MEMBERS FOR:
SCHEDULE OF MEMBERS AND WELDS SCHEDULE OF MEMBERS AND WELDS
R (EXPOSURE D & V=340 KPH) R (EXPOSURE TYPE B AND V=270 KPH) TRUSS MEMBER
-EXPOSURE CATEGORY B - URBAN AND SUBURBAN AREAS, WOODED
SIZE OF WELDS L2
OR OTHER TERRAIN WITH NUMEROUS CLOSELY SPACED OBSTRUCTION SIZE OF WELDS
HAVING THE SIZE OF SINGLE-FAMILY DWELLING OR LARGER TRUSS MEMBERS TRUSS MEMBERS
HAVING WIND VELOCITY OF 270KPH
MARK LENGTH mm REMARKS MARK LENGTH mm REMARKS
SIZES THICKNESS SIZES THICKNESS
L1 L2 L3 L1 L2 L3
-EXPOSURE CATEGORY D - FLAT, UNOBSTRUCTED AREAS AND/OR
STRUCTURES NEAR THE COASTLINE OR OTHER BODIES OF WATER
HAVING WIND VELOCITY OF 340KPH
A 2∠s - 100 x 100 x 6.35 7mm FULL WELD A 2∠s - 75 x 75 x 6.35 7mm FULL WELD 2 REFERENCE WELD DETAIL
- REVISION OF TRUSS MEMBER DESIGNATIONS
SCALE 1:10 m
B 2∠s - 65 x 65 x 6.35 7mm FULL WELD B 2∠s - 50 x 50 x 6.35 7mm FULL WELD S-11

NOTES ON ROOF CONSTRUCTION :


A B ℄ C
1. IN ACTUAL FABRICATION OF STEEL TRUSSES, MEMBERS MEETING AT POINT SHALL HAVE
THEIR GRAVITY AXIS INTERSECT AS NEARLY AS PRACTICABLE AT A COMMON POINT. 2500 7000
2. THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING, AND
MAKE ACTUAL MEASUREMENTS IN THE FIELD PRIOR TO FABRICATION/INSTALLATION OF
ALL TRUSSES. 1
3. THE FABRICATOR/CONTRACTOR SHALL SUBMIT SHOP DETAILED DRAWINGS PRIOR TO S-12
FABRICATION OF TRUSSES FOR APPROVAL OF THE DIRECTOR, BUREAUS OF DESIGN.
5 ±37
±37 5

0 ±50
±50 0
APEX LINE OF TRUSS
4
0 ±50
±50 0 S-12

0 ±50
±50 0

0 A A ±50
±50 0

0 ±50
±50 0

0 ±50
±50 0
A
A
0 ±50
±50 0
±3150 (VERIFY)

0 ±50
±50 0
A
±50
±500 A 0
B B A
5 ±37
±37 5

A A B 5
B B B
B S-12

B
A B
A
B B

TOP LINE OF ROOF AEAM

A A A A A A A A

RB-4 RB-3 RB-2 RB-3 RB-4

6
2
3 S-12
S-12
S-12

2 EQUAL SPABES = 2500 2 EQUAL SPABES = 2250 4 EQUAL SPABES = 4750

1 DETAIL ELEVATION OF TRUSS 1 R


S-11 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL ELEVATION OF TRUSS-1 ENGINEER II
MODIFIED STANDARD DPWH - DEPED REFERENCE WELD DETAIL CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF MEMBERS AND WELDS(EXPOSURE B) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 11
SCHEDULE OF MEMBERS AND WELDS(EXPOSURE D) ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
W.M.

W.M.
W.M.

150

400
250

400
6mm THICK T.C.
GUSSET ⅊, TYPICAL

300
T.C. T.C.

250

250
6mm THICK
GUSSET ⅊, TYPICAL
W.M.
B.C. B.C. W.M.
W.M. W.M. W.M.
200 200
2 DETAIL 2 3 DETAIL 3 4 DETAIL 4
SCALE 1:10 M SCALE 1:10 M
S-12 S-12 SCALE 1:10 M S-12
1 DETAIL 1
S-12 FULL 6mm 50 100
WELD

A C

FULL 6mm 50 100


6mm WELD T.C.
TYP.

50
50 100
6mm
FULL TYP.
WELD 6mm

50 50
FULL

10mm THICK STEEL ,
25mm THK. LEVELING GROUT T.C. W/ 18mmØ HOLES; TYPICAL
16mm Ø STEEL CROSS-BRACINGS, 10mm THICK STEEL , ⅊ WELD 6mm
25mm THK. LEVELING GROUT W/ STANDARD TURN-BUCKLE W/ 18mmØ HOLES; TYPICAL 16mm Ø CROSS-BRACINGS,
W/ STANDARD TURN-BUCKLE
6mm THK. GUSSET ⅊
AT APEX OF TRUSS ALONG GRID LINE A & C
200 x 300 x 12mm THICK STEEL 300 x 300 x 16mm THK. STEEL
BASE ⅊, W/ 4 - 20mm Ø BASE ⅊, W/ 2 - 20mm Ø x 300mm LONG
RB-3 ANCHOR BOLTS; EACH SIDE
x 300mm
LONG ANCHOR BOLTS 7 DETAIL CONN. OF CROSS-BRACING
SCALE 1:10 M
S-12

125 150
150 x 150 x 6mm SPLICE
ELEVATION ELEVATION 125 x 125 x 50 x 6mm STEEL JOINT ⅊ 30 30 PLATE CONNECTOR (FULL
CONNECTOR, FULL WELD TO TOP CHORD WELD) STAGGERED
LC PURLINS
RB-1
LC PURLINS

150
R. C. G U T T E R ROO

50 50 25
FIN

150
G
RB-3

4 - 6mm Ø x 40mm MACHINE


T.C. BOLTS W/ STD. NUTS
300 10mm Ø SAG RODS @ MID-POINT, &
STAGGERED T.C. WASHERS, SPACED AS SHOWN
50 200 50 4 - 6mm Ø x 40mm MACHINE BOLTS W/ STD.
200 NUTS & WASHERS, SPACED AS SHOWN IN BETWEEN TRUSSES
50 100 50
FULL WELD FULL WELD
8 DETAIL CONN. OF PURLIN TO TOP CHORD 9 DETAIL OF PURLIN SPLICE
SCALE 1 :10M
50

S-12 SCALE 1:10 M S-12


BOTTOM CHORD

.12mmØ SAGRODS W/
300

STANDARD NUT & WASHER


300

50

200 x 300 x 12mm THICK STEEL

50
300 x 300 x 12mm THK. STEEL
BASE ⅊, W/ 4 - 20mm Ø
BASE ⅊, W/ 4 - 20mm Ø x 300mm LONG
x 300mm
LONG ANCHOR BOLTS ANCHOR BOLTS; EACH SIDE
LC
. PURLINS

P L A N P L A N

5 DETAIL OF TRUSS ANCHORAGE 6 DETAIL OF TRUSS ANCHORAGE 10 DET. CONN. OF PURLIN TO SAG ROD
SCALE 1:10 M
S-12 S-12 SCALE 1:10M
S-9 SCALE 1:10M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL SECTIONS, CONNECTIONS & ENGINEER II
MODIFIED STANDARD DPWH - DEPED ANCHORAGES OF TRUSS MEMBERS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 12
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
LEGEND:

R REVISION ON THE DRAWING DETAILS (1/23/2018)


- REVISION OF TRUSS MEMBER DESIGNATION ROOFING

BIGGER SIZE
OF WASHER

PURLINS
NUT

0.49 mm (BMT) LONGSPAN


J -BOLTS @ .PRE-PAINTED CORR. ROOFING
EVERY 3RD CORR. (0.50 mm TCT) NEOPRENE
GASKET
2-1/2

19mm CORR. (MIN)


SIDE LAP
.LC PURLIN 6mmØ J-BOLT SPACED AS SHOWN AT ALL PURLINS
J-SHAPED BOLT
LC PURLIN PANEL 1 PANEL 2

2 J-BOLT SPACING 3 ROOF PANEL SIDE LAP DETAIL 4 ROOFING FIXER 5 ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS
S-13 SCALE 1:10M S-13 SCALE 1:10M S-13 NOT TO SCALE S-13 NOT TO SCALE

A B
℄ C
2500 7000

1
S-12

5 ±37
±37 5

0 ±50
±50 0
APEX LINE OF TRUSS

0 ±50
±50 0

0 ±50
±50 0
±25
0 A A 0
±50

0
±50

0
±50 150mm THK. CHA WALL W/
A 10mmØ VERT. & HOR. AARS
A
0 @ 600mm O.C.
±50
±3150 (VERIFY)

0
±50
A
0
±50
A B
5
±37

5 B A A
B
S-12

B
B
A
B

TOP LINE OF ROOF BEAM

A A A A A

RB-3
RB-4 RB-3 RB-3 RB-3 RA-4

1
2
6 S-12
S-12
S-12

2 EQUAL SPACES = 2500 2 EQUAL SPACES = 2250 1550 3200

1 DETAIL ELEVATION OF TRUSS-2 (GRID LINE 2 & 12) R


SCALE 1:20M
S-13

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL ELEVATION OF TRUSS 2
ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL CONNECTION AND SPACING OF J-BOLT CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC VIEW OF CONNECTION OF ROOFING TO PURLINS MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 13
ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
LEGEND:

R REVISION ON THE DRAWING DETAILS (1/23/2018) B


- DETAILED PLAN OF STAIRWAY COLUM (STC-1)
8 THREADS @ 300mm =2400

4-16mm Ø VERT.BARS with 10mm


Ø TIES; 1 @ 50, 3 @ 100, REST @
200 LANDING
200mm O.C.

150
10mm Ø CHAIR BARS @ 300 mm O.C.
STC-1
C LB-1
1-10mm Ø NOSING BAR

250
400
LB-1 12mm Ø @ TOP & BOT.
BARS 300 mm O.C.

150
300
3750 16mm Ø @ 150mm O.C. MAIN BAR
R
3 DETAIL OF STAIRWAY COLUMN (STC-1)

1575
50 50

ROOF FLOOR LINE S-14 SCALE 1:20 M

175
16mm Ø @ 150mm O.C. MAIN BAR
1575

12mm Ø @ TEMP. BARS 300 mm O.C.

3-25mmØ TOP.BARS AND


LANDING
250 2-25mmØ BOTT. BARS with
10mm Ø TIES; 1 @ 50, 4 @ 100, S-2
LB-1 REST @ 250mm O.C.
1575

400
RC-WALL
G-3
3650

DETAIL OF LANDING BEAM (LB-1)


4TH FLOOR LINE
4 2400

S-14 SCALE 1:20 M


G-3
1575

10mm Ø CHAIR BARS @ 300 mm O.C.

1-10mm Ø NOSING BAR


LANDING SPACED AS SHOWN
S-2

LB-1 50 50
300
1575

G-3

150
1575
STC-1

175
3RD FLOOR LINE

350

16mm Ø @ 150mm O.C. MAIN BAR


G-3
1575

LANDING 12mm Ø @ TEMP. BARS 300 mm O.C.

150
600
LANDING

100 400 100


LB-1

LB-1 12mm Ø @ TOP & BOT.


BARS 300 mm O.C.
4-10mmØ BARS EQUALLY
1575

SPACED AS SHOWN 16mm Ø @ 150mm O.C. MAIN BAR


100

STC-1

2ND FLOOR LINE 8 THREADS @ 300mm =2400


600
800

LANDING

150
G-3
3-10mmØ BARS EQUALLY 10mm Ø CHAIR BARS @ 300 O.C.
1575

SPACED AS SHOWN
100

1-10mm Ø NOSING BAR


SPACED AS SHOWN
LB-1 12mm Ø @ TOP & BOT.
BARS 300 mm O.C.

150
LANDING 300
STC-1
16mm Ø @ 150mm O.C. MAIN BAR

1575
LB-1 50 50
1575

STC-1 16mmØ @ 150mm O.C. MAIN BAR


STC-1 4-10mmØ BARS

12mmØ TEMP. BARS @ 300 mm O.C.


100 100

GROUND FLOOR LINE


GROUND FLOOR

SF-1

100
3650 SF-1
3-10mmØ BARS EQUALLY
SPACED AS SHOWN
100 400 100
1 DET. ELEVATION OF STAIR 3650
S-14 SCALE 1:40 M 3-12mmØ BARS W/ 10mmØ
100 300 100 TRANSVERSE BARS @ 300mm O.C.
R
2 STAIRWAY FOOTING (SF-1) DETAIL
S-14 SCALE 1:20 M

5 DET. SECTION OF STAIR


S-14 SCALE 1:20 M

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAIL ELEVATION OF STAIR ENGINEER II
MODIFIED STANDARD DPWH - DEPED DETAIL SECTION OF STAIR CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) DETAIL PLAN OF LINTEL BEAM MARK ANTHONY H. AGUSTIN APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 14
DETAIL PLAN OF STAIRWAY COLUMN ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING STAIRWAY FOOTING (SF-1) DETAIL CHECKED: SIGNED B 15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
LEGEND:
1 13
R REVISION ON THE DRAWING DETAILS (1/23/2018)
- ADDITIONAL STRUCTURAL DETAIL OF CONCRETE MEDIA AGUA 1 13
150mm THK CHB WALL
ANCHORED TO BEAM
1075 8-250 THREADS @2000

A
10mm Ø CHAIR BARS @ 300 mm O.C.
525

15
DECK ROOF FLOOR LEVEL

0
1-12mm Ø NOSING BAR
SPACED AS SHOWN LANDING
CLASSROOM FLOOR LINE 3-10mm Ø LONG. BAR
WITH 10mm TRANSVERSE BARS

600
SPACED @250mm O.C.
S-4

250

150
RG-2/RB1A 150mm THK CHB WALL

75
RCB-2
ANCHORED TO BEAM

1575

175
3 SPOT DETAIL (MEDIA AGUA) R
12mm Ø @ TEMP. BARS 300 mm O.C.
S-15 SCALE 1:20 M
400 150

4 DETAIL OF ROOF BEAM ALONG GRIDLINE 1 & 13 LANDING


16mm Ø @ 150 mm O.C. TOP AND BOTTOM BARS
S-15 SCALE 1:20 M

RC WALL W/
2-12mmØ VERT. BARS @ 200mm O.C. &
W/ 10mmØ TIE BARS @ 150mm O.C.

8-200mm @ 1575
1 2 4th FLOOR LINE

5000

1100
FROM LANDING TO ROOF DECK FLOOR LINE
G-1C
150mm THK. RC WALL W/ B
2-12mmØ VERT. BARS @ 200mm O.C. &
W/ 10mmØ TIE BARS @ 150mm O.C.

3800
B-1
8-200mm THREADS @ 2000
1000 800
1100

STAIRWELL

16mm Ø TOP & BOT. 10mm Ø CHAIR BARS @ 300 mm O.C.


BARS @ 150 mm O.C.

LANDING 1-12mm Ø NOSING BAR


SPACED AS SHOWN
3800

G-1C G-1C 250


STAIRWELL

175
150mm THK. RC WALL W/

1575
2-12mmØ VERT. BARS @ 200mm O.C. &
W/ 10mmØ TIE. BARS @ 150mm O.C.
B 16mmØ @ 150 mm O.C.
TOP AND BOTTOM BARS

12mmØ TEMP. BARS @ 300 mm O.C.

1 FRAMING PLAN OF STAIR @ ROOF DECK LEVEL 4th FLOOR LINE

16mm Ø @ 150 mm O.C. MAIN BAR


S-15 SCALE 1:40 M

0
15
FROM FOURTH FLOOR LINE TO LANDING
B-1
G-3

2 STAIR DETAIL FROM 4TH FLOOR TO ROOF DECK


SCALE 1:20 M
S-15

REPUBLIC OF THE PHILIPPINES DESIGNED : SIGNED


PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DARREN DC. APOLINAR
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FRAMING PLAN OF STAIR @ FOURTH FLOOR LEVEL ENGINEER II
MODIFIED STANDARD DPWH - DEPED FRAMING PLAN OF STAIR @ ROOF DECK LEVEL CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) STAIR DETAIL FROM 4TH FLOOR TO ROOF DECK MARK ANTHONY H. AGUSTIN
APPROVED WITH SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE BOD
S - 15
DETAIL PLAN OF LINTEL BEAM (LB-1) ENGINEER II
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION
CLASSROOM SCHOOL BUILDING DETAIL PLAN OF MEDIA AGUA CHECKED: SIGNED B
15 90
OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA KATHRINE ANNE C. MACOY CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE,BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13

150 mm Ø PVCSS 150 mm Ø PVCSS


50 mm Ø PVCVS 100 mm Ø PVCDS 100 mm Ø PVCDS 50 mm Ø PVCVS
100 mm Ø PVCSP (TYPICAL) (TYPICAL)
100 mm Ø PVCSP
50 mm Ø PVCVS 50 mm Ø PVCVS

C CO
UD
CO
FD
CO WC FD FD FD FD
WC CO
100 mm Ø PVCWP WC WC STO. FD
HE
WC
100 mm Ø PVCWP

FD FD
50 mm Ø PVCVAC 50 mm Ø PVCVAC
FD
SHE
SD SD FD

CO CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CO

1 2 3 4 5

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
UP UP
B
DN DN

C O R R I D O R C O R R I D O R C O R R I D O R
CD CD CD CD CD CD CD CD CD CD

A
100 mm Ø DS 50 mm Ø PVCDP RD RD
R
(TYPICAL) (TYPICAL)

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018) R
2 SECOND AND THIRDFLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT)
SCALE 1: 100 M.
R P-1
- ADDITIONAL DETAIL OF CISTERN TANK.
- ADDITIONAL PLUMBING LAYOUTS FOR HOME
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM.
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.

1 2 3 4 5 6 7 8 9 10 11 12 13
150 mm Ø PVCSP
TO NEAREST SEWER LINE
(VERIFY SITE CONDITION)
50 mm Ø PVCVS 150 mm Ø PVCSP
100 mm Ø PVCDS
100 mm Ø PVCSP (TYPICAL) 50 mm Ø PVCVS
SEPTIC VAULT
100 mm Ø PVCDS
150 mm Ø PVCSS (SEE DETAIL) (TYPICAL)
100 mm Ø PVCSP
150 mm Ø PVCSS

50 mm Ø PVCVS 50 mm Ø PVCVS

CO
150 mm Ø PVCSP 150 mm Ø PVCSP CO

CB CB CB CB CB CB CB CB CB CB CB CB
100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP CO CO 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP

100
P

C
D

CO
VC

CO

mm
CO CO
UD
ØP

FD FD FD FD LAV WC FD

ØP
SD SD
WC WC WC WC WC
m

FD

VC
0m

UD
PWD PWD

DP
100 mm Ø PVCWP
10

100 mm Ø PVCWP FD
CB
SD HE SD CB
FD
SHE
FD
SD
50 mm Ø PVCVP SD 50 mm Ø PVCVP

HANDWASHING
HANDWASHING

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
100 mm Ø PVCDP

100 mm Ø PVCDP
CO CO
LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
50 mm Ø PVCWP SD
50 mm Ø PVCWP
SD
1 2 3 4 5
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
SD SD

STO. STO.
CB CO CO CB
B
150 mm Ø PVCDP

150 mm Ø PVCDP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A CB CB CB CB CB CB CB CB CB CB
CB CB
150 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP UP UP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 150 mm Ø PVCDP
RAMP UP RAMP UP SLOPE 1:12
LINE OF CANOPY ABOVE

150 mm Ø PVCDP 150 mm Ø PVCDP


TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION)
R
1 GROUND FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT) TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION)
SCALE 1: 100 M.
P-1

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR PLAN (SEWER & DRAINAGE LINE SIGNED
CADD:
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
LAYOUT)
SECOND & THIRD FLOOR PLAN (SEWER & DRAINAGE
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-1
BUILDINGS DIVISION LINE LAYOUT) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL
32 mm Ø PPRC CWL (PERPORATED PIPE)
32 mm Ø PPRC CWL
50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER
32 mm Ø PPRC CWL

C GV

GV

HANDWASHING
GV GV GV
LAV LAV
WC WC WC WC WC WP2
32 mm Ø PPRC CWL
HB
PWD KS
PWD HB

HB KITCHEN HB HB WP1
HB
HE HB
32 mm Ø PPRC CWL SHE
HB GV HB HB HB LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM HB HB HB GV
HB

HANDWASHING
SEE MECHANICAL PLAN HB 65 mm Ø G.I PIPE SCH. 40 HB CISTERN
FHC LANDING LANDING FHC
CAP.= ±60,000
CONCRETE PLATFORM

CONCRETE PLATFORM
HB HB
DINING AREA Liters
2 3 4
LIVING AREA HOME ECONOMIC ROOM (±15,852 Gallons)

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
HB HB

HB HB
1
HB HB
STO. STO.
HB HB

B
25 mm DROP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP
LINE OF CANOPY ABOVE

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)
R 1 (WITH HOME ECONOMICS ROOM - OPTION - 2)
- ADDITIONAL DETAIL OF CISTERN TANK.
- ADDITIONAL PLUMBING LAYOUTS FOR HOME R
SCALE 1: 100 M.
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM. P-1d
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.

1 2 3 4 5 6 7 8 9 10 11 12 13
150 mm Ø PVCSP
50 mm Ø PVCWP TO NEAREST SEWER LINE
(VERIFY SITE CONDITION)
50 mm Ø PVCVS 150 mm Ø PVCSP
100 mm Ø PVCDS
100 mm Ø PVCSP (TYPICAL) 50 mm Ø PVCVS
SEPTIC VAULT
100 mm Ø PVCDS
150 mm Ø PVCSS (SEE DETAIL) (TYPICAL)
100 mm Ø PVCSP
150 mm Ø PVCSS

50 mm Ø PVCVS 50 mm Ø PVCVS

CO
150 mm Ø PVCSP 150 mm Ø PVCSP CO
CB CB CB CB CB CB CB CB CB CB CB CB
100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP CO CO 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP

100
DP

C CO
VC

CO CO

mm
CO
UD
ØP

GT WC FD
FD FD FD FD LAV

Ø
SD
WC WC WC WC WC
m

PV
FD
PWD
0m

UD
PWD

CD
KS
100 mm Ø PVCSP
10

KITCHEN

P
100 mm Ø PVCSP FD
CB
SD HE SD CB
FD
SHE
FD
SD
50 mm Ø PVCVP SD 50 mm Ø PVCVP
HANDWASHING

HANDWASHING
LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM
100 mm Ø PVCDP

100 mm Ø PVCDP
CO CO
LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
50 mm Ø PVCWP 50 mm Ø PVCWP
SD
DINING AREA 2 3 4
SD

LIVING AREA HOME ECONOMIC ROOM


BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
SD 1 SD

STO. STO.
CB CO CO CB
B
150 mm Ø PVCDP

150 mm Ø PVCDP
25 mm DROP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A CB CB CB CB CB CB CB CB CB CB
CB CB
150 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP UP UP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 150 mm Ø PVCDP
RAMP UP SLOPE 1:12
SLOPE 1:12 RAMP UP
LINE OF CANOPY ABOVE

150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
GROUND FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT) 150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION) 1 (WITH HOME ECONOMICS ROOM - OPTION - 2) (VERIFY SITE CONDITION)
R
SCALE 1: 100 M.
P-1d

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) GROUND FLOOR (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1a
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING NOTES:
1. GRADES OF HORIZONTAL PIPING
RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM
GRADE OF NOT LESS THAN TWO PERCENT (2%).

2. CHANGE IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF
FORTY FIVE DEGREES (45°) WYES, LONGSWEEP QUARTER BEND, SIX-EIGHT
OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL
TO VERTICAL, 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS
AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE. TEE AND
CROSSES MAYBE USED IN VENT PIPES.

3. PROHIBITED FITTINGS 13 FHC (SEE MECHANICAL PLAN)


NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL WASTE CISTERN TANK
LINES. THE DRILLINGS AND TAPPINGS OF HOUSE DRAIN, WASTE OR VENT CAP = ±60,000 LITERS
PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED. (±15,852 GALLONS)
MH
4. SLEEVES 12 2
PROVIDE PIPE SLEEVES AT WALLS, COLUMNS OR SLABS ONE SIZE BIGGER 32 mm Ø PPRC CWL GV WP P1
(PERFORATED PIPE) HB
THAN THE ACTUAL SIZE PASSING THROUGH THE WALLS, COLUMNS OR UNDER HB W 32 mm Ø PPRC CWL
WC HB
SLAB TO PROTECT PIPE FROM BREAKAGE. FHC
32 mm Ø PPRC CWL GV
HB
HB
5. PIPE CLEAN-OUTS 11 HB
HB
HB MH
HB HB
PIPE CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS: GV HB GV HB
HB HB
a. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO
AND ONE-HALF DEGREES (22 1/2°).
WC HE ING
LAV
D ND
b. ONE AND ONE-HALF METERS (1.50 m) INSIDE THE PROPERTY LINE BEFORE 10 . 40 PW LA FDC
THE HOUSE DRAINAGE CONNECTION. SCH
P IPE UP
c. EVERY FIFTEEN METERS (15.00 m) IN HORIZONTAL RUN OF PIPES.
G.I ST
O. UP
d. AT THE END OF ANY HORIZONTAL PIPE LINES. mØ
5m
E
AS
DB
9 6 OA
R

OM
KB C
BLA
6. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED. O
SSR
A
7. NOT LESS THAN 300 mm OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF CL 1:
12
5 E
THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB. OP
8 SL
UP
8. NO SEPTIC VAULT MUST BE CONSTRUCTED UNDER THE BUILDING.
40 MP
H. RA
SC
9. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER PIPE E
O
R
G.I
AS

ID
B

AND A LICENSED PLUMBING CONTRACTOR. 7 Ø M


RD
OA
CK
B
R
mm OO
A
BL
R
65 S R O
AS C
CL
4
6

E
AS
DB
5 AR

OM
O
KB

. 40
AC
BL

CH O
ES SR
I P AS
.I P CL
ØG 3
mm
4 65
R
O
ID UP
R
R
O
E
AS
DB
3 A BO
AR C
RE
K
AC

OM
BL
A
RE O V E
CT
U
I CR UP PY A
BO
LE OM
N NO
2 E CO OF
CA
ME
1 E
H O LIN

A
1 RE
LIV ING
A
R
1 ISOMETRIC DIAGRAM (WATER AND FIRE LINE LAYOUT)
SCALE NTS.
KS R P-1f
EA O
G AR ID
R
D DININ R
PW C
O

E
SH

O.
CO
NC
ST
M PU
P LEGEND:
C
RE
TE RA
FLA 12 REVISION OF DRAWING DETAILS (1/23/2018)
1:
TF
OR HA

M
ND
WA
SH UP OP
E R
ING
SL - ADDITIONAL ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT)

UP

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLUMBING NOTES
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1b
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING LEGEND:
CD CORRIDOR DRAIN PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
CO CLEAN OUT
PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
CV CHECK VALVE (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

FD FLOOR DRAIN PVCVP POLYVINYL CHLORIDE VENT PIPE (SERIES 600)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
FDC FIRE DEPARTMENT CONNECTION TO NEAREST SEWER LINE
PVCVS POLYVINYL CHLORIDE VENT STACK (SERIES 600) (VERIFY SITE CONDITION)
FHC FIRE HOSE CABINET (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
13
HB HOSE BIBB PVCVTR POLYVINYL CHLORIDE VENT THROUGH ROOF (SERIES 600)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) 150 mm Ø PVCSS
G.I GALVANIZED IRON 50 mm Ø PVCVS
PVCWP POLYVINYL CHLORIDE WASTE PIPE (SERIES 1000) 100 mm Ø PVCSP 50 mm Ø PVCVS
GT GREASE TRAP (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) 12 P 100 mm Ø PVCSP
V CS
GV GATE VALVE ØP CO 50 mm Ø PVCVP
RD ROOF DRAIN mm CO
150 CD
P SD 50 mm Ø PVCWP
V SD CON
LAV LAVATORY SD SINK DRAIN
11 ØP FD CR
mm WC
ET
EF
100 UD
FD A L
SD TFO
KS KITCHEN SINK UD URINAL DRAIN SP FD SD RM
PVC UD CO SD CB
MH MANHOLE mm
Ø FD WC HE IN G HA
ND 150
WC WATER CLOSET CO D ND
WA
SH
mm
10 150
LAV
PW LA CO
ING

ØP
PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 20 VC
WM WATER METER D
UP P CB
(ISO 15874 / JOINING BY SOCKET FUSION) UP
O.
ST
P E

CS
AS
DB
PPRC CWR POLYPROPYLENE RANDOM COPOLYMER COLD WATER RISER, TYPE 3, PN 20 9 ØP
V AR
KB
O
AC
BL
(ISO 15874 / JOINING BY SOCKET FUSION) M P
mm OO VC
D
150 SR ØP
PVCDP POLYVINYL CHLORIDE DRAIN PIPE (SERIES 1000) AS mm1 2
CL 5 150E 1:
150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
8 SL
OP
(VERIFY SITE CONDITION)
P U P
PVCDS POLYVINYL CHLORIDE DOWNSPOUT (SERIES 1000) V CS MP
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) m ØP RA
m R
150 O
SE
BA
7 ID
RD
OA
KB
LA
C
R
M R
B

ROO C
O
S
AS
CL 4
T
6 UL
VA IL)
T ICE DETA
PE
SE (S CO

E
AS
DB
5 BO
AR
AC
K
BL
CO
O OM
SR
AS
P CL 3
4 CS
Ø PV
mm R
150 O
ID UP
R
R
SE
BA O
3 EA
RD
OA
CK
B C
AR
A

OM
BL

E VE
50 mm Ø PVCWP CT
UR RO BO
P LE O MIC UP PY A
O
VCS C ON AN
ØP FC
2 m M EE 1 EO
m
HO LIN
150

50 mm Ø PVCVS A R
1 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
1 ARE SCALE NTS.
150 mm Ø PVCSS ING P-1e
LIV
50 mm Ø PVCVP EN
CH
100 mm Ø PVCSP CO KIT A O
R
RE ID
FD
LAV
IN GA R
FD WC PW
D DIN O
R
CO C
WC
FD
E
CO
FD WC LAV SH G
SD
DIN
SD
FD
CO LAN LEGEND:
CO SD O. REVISION OF DRAWING DETAILS (1/23/2018)
NC ST P
RE
TE SD MP
U R
C FLA
TF HA
RA - ADDITIONAL ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
OR ND
WA
M SH
100 mm Ø PVCVP UP
ING

CO
50 mm Ø PVCVP
150 UP
CB mm
50 mm Ø PVCWP ØP
VC
DP
B CB

A
150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION)

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
PLUMBING LEGENDS
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1c
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 2) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL
32 mm Ø PPRC CWL (PERPORATED PIPE)
32 mm Ø PPRC CWL
50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER
32 mm Ø PPRC CWL

C
HB GV GV
GV GV GV
LAV LAV
LAV LAV LAV LAV LAV LAV LAV
WC WC WC SHO
WC WC
HB WP2
HB
PWD

DRY WALL
32 mm Ø PPRC CWL PWD
HB HE HB HB
WP1
HB HB
32 mm Ø PPRC CWL SHE LOCKERS
&
HB GV HB HB HB
DRESSING RM. CLASS ROOM CLASS ROOM CLASS ROOM HB HB HB GV
HB

SEE MECHANICAL PLAN 65 mm Ø G.I PIPE SCH. 40 HB CISTERN


HB
FHC LANDING SCIENCE LABORATORY ROOM LANDING FHC
CAP.= ±60,000
HB

CONCRETE PLATFORM
HB
Liters
2 3 4

HANDWASHING
(±15,852 Gallons)

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
HB 1 HB
CONCRETE PLATFORM
HANDWASHING

HB HB

HB HB
STO. STO.
HB HB

B
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP SEE MECHANICAL PLAN

A
RAMP UP UP UP RAMP UP
LINE OF CANOPY ABOVE

LEGEND:
REVISION OF DRAWING DETAILS (1/23/2018)
GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)
R 2 (WITH SCIENCE LABORATORY ROOM - OPTION - 4)
- ADDITIONAL DETAIL OF CISTERN TANK.
R
- ADDITIONAL PLUMBING LAYOUTS FOR HOME SCALE 1: 100 M.
ECONOMICS ROOM AND SCIENCE LABORATORY ROOM.
P-1d
- ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
- REVISION OF FEMALE COMFORT ROOM AT SECOND
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.

1 2 3 4 5 6 7 8 9 10 11 12 13

150 mm Ø PVCSP
TO NEAREST SEWER LINE
(VERIFY SITE CONDITION)
50 mm Ø PVCVS 150 mm Ø PVCSP
100 mm Ø PVCDS
100 mm Ø PVCSP (TYPICAL) 50 mm Ø PVCVS
100 mm Ø PVCDS 50 mm Ø PVCVS
SEPTIC VAULT
150 mm Ø PVCSS 75 mm Ø PVCWP (SEE DETAIL) (TYPICAL)
100 mm Ø PVCSP
150 mm Ø PVCSS

50 mm Ø PVCVS 50 mm Ø PVCVS

CO
150 mm Ø PVCSP 150 mm Ø PVCSP CO
CB CB CB CB CB CB CB CB CB CB CB CB
100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP CO CO 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP

100
P

C
D

CO
VC

CO CO

mm
CO SHO. CO UD
ØP

FD FD FD FD LAV WC FD

ØP
SD LAV LAV LAV LAV LAV LAV LAV SD
WC WC WC FD WC WC
mm

FD
PWD
DRY WALL

VC
PWD
0

DP
HE 100 mm Ø PVCSP
10

100 mm Ø PVCSP FD
SD SD CB
CB
FD
SHE LOCKERS
& FD
SD
50 mm Ø PVCVP DRESSING RM. SD 50 mm Ø PVCVP
CLASS ROOM CLASS ROOM CLASS ROOM
100 mm Ø PVCDP

100 mm Ø PVCDP
CO CO
LANDING SCIENCE LABORATORY ROOM LANDING

CONCRETE PLATFORM
50 mm Ø PVCWP SD
50 mm Ø PVCWP
SD
2 3 4

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
CONCRETE PLATFORM

1
HANDWASHING

SD SD

STO. STO.
CB CO CO CB
B
150 mm Ø PVCDP

150 mm Ø PVCDP
UP UP

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A CB CB CB CB CB CB CB CB CB CB
CB CB
150 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP UP UP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 100 mm Ø PVCDP 150 mm Ø PVCDP
RAMP UP RAMP UP
LINE OF CANOPY ABOVE

150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET GROUND FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT) 150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION) (WITH SCIENCE LABORATORY ROOM - OPTION - 4)
1 (VERIFY SITE CONDITION)
R
SCALE 1: 100 M.
P-1d

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR (SEWER LINE & DRAINAGE LAYOUT) CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) GROUND FLOOR (WATER & FIRE LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1d
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA SCIENCE LABORATORY RM. LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING NOTES:
1. GRADES OF HORIZONTAL PIPING
RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM
GRADE OF NOT LESS THAN TWO PERCENT (2%).

2. CHANGE IN DIRECTION
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF
FORTY FIVE DEGREES (45°) WYES, LONGSWEEP QUARTER BEND, SIX-EIGHT
OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL
TO VERTICAL, 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS
AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE. TEE AND
CROSSES MAYBE USED IN VENT PIPES.
FHC (SEE MECHANICAL PLAN)
3. PROHIBITED FITTINGS CISTERN TANK
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL WASTE CAP = ±60,000 LITERS
LINES. THE DRILLINGS AND TAPPINGS OF HOUSE DRAIN, WASTE OR VENT 13 (±15,852 GALLONS)
PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED. MH

32 mm Ø PPRC CWL 2
4. SLEEVES GV
HB WP P1
PROVIDE PIPE SLEEVES AT WALLS, COLUMNS OR SLABS ONE SIZE BIGGER (PERFORATED PIPE) HB W 32 mm Ø PPRC CWL
WC
12 Ø PPRC CWL
HB FHC
THAN THE ACTUAL SIZE PASSING THROUGH THE WALLS, COLUMNS OR UNDER 32 mm HB
GV HB
SLAB TO PROTECT PIPE FROM BREAKAGE. HB
HB HB MH
HB HB
5. PIPE CLEAN-OUTS GV HB GV HB
HB HB
PIPE CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS: C
a. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO 11 LAV
WC FH
AND ONE-HALF DEGREES (22 1/2°). FDC
. 40
b. ONE AND ONE-HALF METERS (1.50 m) INSIDE THE PROPERTY LINE BEFORE SCH
IPE UP
THE HOUSE DRAINAGE CONNECTION. .I P . UP
c. EVERY FIFTEEN METERS (15.00 m) IN HORIZONTAL RUN OF PIPES. 10 mm
ØG E S
S TO
65
BA
d. AT THE END OF ANY HORIZONTAL PIPE LINES. RD
BO
A

OM
CK A
BL
O
6. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED. SR
AS
9 CL 4
7. NOT LESS THAN 300 mm OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF
THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB. P
M PU
8. NO SEPTIC VAULT MUST BE CONSTRUCTED UNDER THE BUILDING. H. 40 RA
8 E SC R
PIP E
ID
O
G.I
AS
DB
AR
9. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER R

O

OM
KB

m
AC
BL R
AND A LICENSED PLUMBING CONTRACTOR. 65 RO C
O
A SS
7 CL
3

6 SE
BA
RD
OA

. 40
KB
40 M AC

H. OO SCH
BL

C R
ES S PE
PIP AS PI
5 ØG
.I CL Ø G.I 2
m
mm 65
m
65
R
O
ID UP
4 R
R
SE
BA O
RD
OA
CK
B C
BLA
LAV
E
B OV
UP PY A
LAV
3 N O
LAV
O M CA
RO E OF
Y LIN
LAV
T OR
2
LAV
LAB
O RA
R
1 ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT)
LAV E
IENC P-1e SCALE NTS.
50 mm Ø PPRC CWD
SHO
LAV SC
SV
32 mm Ø PPRC CWL L
AL
YW
1 GV
DR
S . O
R
ER RM
GV LAV CK
LO & SING ID
D E S R
HB WC PW DR
O
R
WC C
HB HB
HB WC E
HB HB SH
HB
GV HB HB G
NDIN
GV
HB
FHCLA
O.
LEGEND:
HB ST P
32 mm Ø PPRC CWL HB
M PU REVISION OF DRAWING DETAILS (1/23/2018)
HB RA R
C FO
RM G
AT
HIN
L
AS
DW
HB
- ADDITIONAL ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT)
UP
N
EP T HA
RE
NC
CO
32 mm Ø PPRC CWL
UP

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED PLUMBING NOTES CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC DIAGRAM (WATER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1e
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA HOME ECONOMICS ROOM LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING LEGEND:
CD CORRIDOR DRAIN PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
CO CLEAN OUT
PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
CV CHECK VALVE (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
150mmØ PVCSS / PVCVTR
150mmØ PVC VENT PIPE
FD FLOOR DRAIN PVCVP POLYVINYL CHLORIDE VENT PIPE (SERIES 600) (PROVIDE STAINLESSSTEEL
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) PROTECTION SCREEN) TO NEAREST SEWER LINE
FDC FIRE DEPARTMENT CONNECTION (VERIFY SITE CONDITION)
PVCVS POLYVINYL CHLORIDE VENT STACK (SERIES 600)
FHC FIRE HOSE CABINET (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

HB HOSE BIBB PVCVTR POLYVINYL CHLORIDE VENT THROUGH ROOF (SERIES 600) 13
150 mm Ø PVCSS
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) 50 mm Ø PVCVS
G.I GALVANIZED IRON 100 mm Ø PVCSP 50 mm Ø PVCVS
PVCWP POLYVINYL CHLORIDE WASTE PIPE (SERIES 1000)
100 mm Ø PVCSP
GT GREASE TRAP (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
12 CO 50 mm Ø PVCVP
GV GATE VALVE RD ROOF DRAIN SD
50 mm Ø PVCWP
SD
LAV LAVATORY SD SINK DRAIN UD
FD
SD
11 FD SD
FD ING
SH
WA
ND
M
OR
KS KITCHEN SINK UD URINAL DRAIN UD CO
HA
AT
F
PL CB
CO
FD WC HE DIN
G TE
RE 150
SP
C
C LAV D LAN CO
ON
mm
PW
C
MH MANHOLE WC WATER CLOSET PV ØP
mØ VC
PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 20 WM WATER METER
10 15 0m UP
DP CB
O. UP
(ISO 15874 / JOINING BY SOCKET FUSION) SE
ST
BA D
AR O
P KB
PPRC CWR POLYPROPYLENE RANDOM COPOLYMER COLD WATER RISER, TYPE 3, PN 20 CS
AC
BL

9 V M
(ISO 15874 / JOINING BY SOCKET FUSION) ØP ROO
mm S S RO
P
150 A D 12
PVCDP POLYVINYL CHLORIDE DRAIN PIPE (SERIES 1000) CL 4 25
mm 1: 150 mm Ø PVCDP
PE TO NEAREST DRAINAGE OUTLET
LO
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) S (VERIFY SITE CONDITION)
8 DP UP
PVCDS POLYVINYL CHLORIDE DOWNSPOUT (SERIES 1000) P VCAMP
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) R mmØ R
O 100
SE
BA
ID
RD
OA B
CK A
BL R
7 O M O
R
S RO C
AS
CL 3
LT
VAUIL)
IC ETA
PT E D
6 SE (SE CO

SE
BA D
AR O
KB
AC
BL

5 CO OOM
SR
AS
CL 2

4 O
R
ID UP
R
R
O
E
AS B
CO
RD
CK
BO
A C
LA
150mmØ PVCSS / PVCVTR
B

150mmØ PVC VENT PIPE


3 LAV
VE
LAV BO
(PROVIDE STAINLESSSTEEL P UP PY A
CS N O
PROTECTION SCREEN) V LAV
M 1 CA
ØP ROO OF
mm RY LIN
E
2 150 LAV
TO
A
50 mm Ø PVCVAC
LAV
B OR
LA
50 mm Ø PVCVS
LAV
I E NC
E
1 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
150 mm Ø PVCSS LAV SC DP
R
VC SCALE NTS.
1 P P-1f
50 mm Ø PVCVP
O.
ALL
YW m mØ
SH R 100
DR
100 mm Ø PVCSP CO
S . O
FD ER RM
LAV CK
LO & SING ID
FD D ES R
DR R
CO FD WC PW C
O
WC
FD
E
FD WC SH
CO SD
SD G
CO
N DIN
FD LA
ING
SD O . P
ST
LEGEND:
SH
WA
U
MP
ND
HA
RM
FO SD R A
C EP
LA
T
12 REVISION OF DRAWING DETAILS (1/23/2018)
1:
T
RE
100 mm Ø PVCSP NC
CO UP OP
E R
CO SL - ADDITIONAL ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
50 mm Ø PVCVP
150 UP
CB mm
50 mm Ø PVCWP Ø PV
CD
P
B CB

A
150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION)

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED PLUMBING LEGENDS CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE

BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
P - 1f
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
BUILDINGS DIVISION CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA SCIENCE LABORATORY RM. LAYOUT (OPTION 4) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

150 mm Ø PVCSS / VTR 150 mm Ø PVCSS / VTR


100 mm Ø PVCDS 100 mm Ø PVCDS
(PROVIDE STAINLESS STEEL PROTECTION SCREEN) (PROVIDE STAINLESS STEEL PROTECTION SCREEN)
(TYPICAL) (TYPICAL)

C
DECK ROOF DECK ROOF
75 mm Ø PVCDS 75 mm Ø PVCDS

LINE OF ROOF EAVES ABOVE LINE OF ROOF EAVES ABOVE

DN DN

2 ROOF DECK FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT)


SCALE 1: 100 M.
P-2

1 2 3 4 5 6 7 8 9 10 11 12 13

150 mm Ø PVCSS 150 mm Ø PVCSS


50 mm Ø PVCVS 100 mm Ø PVCDS 100 mm Ø PVCDS 50 mm Ø PVCVS
100 mm Ø PVCSP (TYPICAL) (TYPICAL)
100 mm Ø PVCSP
50 mm Ø PVCVS 50 mm Ø PVCVS

C CO
UD
CO
FD
CO WC FD FD FD FD
WC CO
100 mm Ø PVCWP WC WC STO. FD
HE
WC
100 mm Ø PVCWP

FD FD
50 mm Ø PVCVAC 50 mm Ø PVCVAC
FD
SHE
SD SD FD

CO CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CO

1 2 3 4 5
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
UP UP
B
DN DN

C O R R I D O R C O R R I D O R C O R R I D O R
CD CD CD CD CD CD CD CD CD CD

A
100 mm Ø DS 50 mm Ø PVCDP
(TYPICAL) (TYPICAL)

1 FOURTH FLOOR PLAN (SEWER LINE & DRAINAGE LAYOUT)


SCALE 1: 100 M.
P-2

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR PLAN (SEWER & DRAINAGE LINE SIGNED
CADD:
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
LAYOUT)
ROOF DECK FLOOR PLAN (SEWER & DRAINAGE
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-2
BUILDINGS DIVISION LINE LAYOUT) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL
32 mm Ø PPRC CWL (PERPORATED PIPE)
32 mm Ø PPRC CWL
50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER
32 mm Ø PPRC CWL

C
HB GV GV
GV
LAV LAV

HB
WC WC WC WC WC
HB WP2
32 mm Ø PPRC CWL PWD PWD
HB HB HB
WP1
HB
HE HB
32 mm Ø PPRC CWL SHE
GV HB HB HB
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM HB HB HB GV
HB HB

HANDWASHING
HANDWASHING

SEE MECHANICAL PLAN 65 mm Ø G.I PIPE SCH. 40 HB CISTERN


HB
FHC LANDING LANDING FHC
CAP.= ±60,000
CONCRETE PLATFORM

CONCRETE PLATFORM
HB HB
Liters
1 2 3 4 5
(±15,852 Gallons)

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
HB HB

HB HB

HB HB
STO. STO.
HB HB

B
UP UP FDC
UP C O R R I D O R C O R R I D O R C O R R I D O R UP SEE MECHANICAL PLAN

A
SLOPE 1:12 SLOPE 1:12
UP UP RAMP UP
RAMP UP

2 GROUND FLOOR PLAN (WATER & FIRE LINE LAYOUT)


SCALE 1: 100 M.
P-3

1 2 3 4 5 6 7 8 9 10 11 12 13

100 mm Ø PVCDS 100 mm Ø PVCDS


(TYPICAL) (TYPICAL)

A
DECK ROOF DECK ROOF
75 mm Ø PVCDS 75 mm Ø PVCDS

1 ROOF PLAN (DRAINAGE LAYOUT)


SCALE 1: 100 M.
P-3

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
ROOF PLAN (DRAINAGE LAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
GROUND FLOOR PLAN (WATER & FIRE LAYOUT) SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-3
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL 32 mm Ø PPRC CWL 32 mm Ø PPRC CWL


(PERFORATED PIPE) 50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER

C
GV

WC WC WC STO. HE WC WC

HB GV

32 mm Ø PPRC CWL SHE 32 mm Ø PPRC CWL


GV HB HB HB HB HB HB GV

SEE MECHANICAL PLAN CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM SEE MECHANICAL PLAN
FHC FHC

1 2 3 4 5

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
UP UP
B
DN DN

C O R R I D O R C O R R I D O R C O R R I D O R

2 THIRD FLOOR PLAN (WATER & FIRE LINE LAYOUT)


SCALE 1: 100 M.
P-4

1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL 32 mm Ø PPRC CWL 32 mm Ø PPRC CWL


(PERFORATED PIPE) 50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER

C
GV

WC WC WC STO. HE WC WC

HB GV

32 mm Ø PPRC CWL SHE 32 mm Ø PPRC CWL


GV HB HB HB HB HB HB GV

SEE MECHANICAL PLAN CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM SEE MECHANICAL PLAN
FHC FHC

1 2 3 4 5
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
UP UP
B
DN DN

C O R R I D O R C O R R I D O R C O R R I D O R

1 SECOND FLOOR PLAN (WATER & FIRE LINE LAYOUT)


SCALE 1: 100 M.
P-4

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR PLAN (WATER & FIRE LINELAYOUT) SIGNED
CADD:
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
THIRD FLOOR PLAN (WATER & FIRE LINE LAYOUT) SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-4
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13

ELEVATED WATER TANK ELEVATED WATER TANK


(SEE MECHANICAL PLAN) (SEE MECHANICAL PLAN)

65 mm Ø G.I PIPE SCH. 40

C
GV GV
DECK
ROOF
1
50 mm Ø PPRC CWD DECK 50 mm Ø PPRC CWD
LINE OF ROOF EAVES ABOVE ROOF LINE OF ROOF EAVES ABOVE 2

DN DN

2 ROOF DECK FLOOR PLAN (WATER & FIRE LINE LAYOUT)


SCALE 1: 100 M.
P-5

1 2 3 4 5 6 7 8 9 10 11 12 13

32 mm Ø PPRC CWL 32 mm Ø PPRC CWL 32 mm Ø PPRC CWL


(PERFORATED PIPE) 50 mm Ø PPRC CWD
50 mm Ø PPRC CWD 65 mm Ø G.I SCH. 40 RISER

C
GV

WC WC WC STO. HE WC WC

HB GV

32 mm Ø PPRC CWL SHE 32 mm Ø PPRC CWL


GV HB HB HB HB HB HB GV

SEE MECHANICAL PLAN CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM SEE MECHANICAL PLAN
FHC FHC

1 2 3 4 5
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
UP UP
B
DN DN

C O R R I D O R C O R R I D O R C O R R I D O R

1 FOURTH FLOOR PLAN (WATER & FIRE LINE LAYOUT)


SCALE 1: 100 M.
P-5

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
FOURTH FLOOR PLAN (WATER & FIRE LINELAYOUT)
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
ROOF DECK FLOOR PLAN (WATER & FIRE LINE
LAYOUT)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
150mmØ PVCSS / PVCVTR
150mmØ PVC VENT PIPE 150 mm Ø PVCSS
PLUMBING NOTES: (PROVIDE STAINLESSSTEEL
PROTECTION SCREEN) 50 mm Ø PVCVS
100 mm Ø PVCWP
1. GRADES OF HORIZONTAL PIPING 50 mm Ø PVCVP 50 mm Ø PVCVAC
RUN ALL HORIZONTAL PIPINGS IN PERFECT ALIGNMENT AND AT A FORM 100 mm Ø PVCSP
GRADE OF NOT LESS THAN TWO PERCENT (2%).

2. CHANGE IN DIRECTION FD
CO
ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FD WC
FD
FORTY FIVE DEGREES (45°) WYES, LONGSWEEP QUARTER BEND, SIX-EIGHT UD FD WC SD CO
OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL
TO VERTICAL, 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS CO
FD
AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE. TEE AND
CROSSES MAYBE USED IN VENT PIPES.
100 mm Ø PVCWP
50 mm Ø PVCVP 50 mm Ø PVCVAC
3. PROHIBITED FITTINGS
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL WASTE 100 mm Ø PVCSP
LINES. THE DRILLINGS AND TAPPINGS OF HOUSE DRAIN, WASTE OR VENT
PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.
FD
CO
4. SLEEVES FD WC
FD
PROVIDE PIPE SLEEVES AT WALLS, COLUMNS OR SLABS ONE SIZE BIGGER UD FD WC SD CO
THAN THE ACTUAL SIZE PASSING THROUGH THE WALLS, COLUMNS OR UNDER
CO
SLAB TO PROTECT PIPE FROM BREAKAGE. FD

5. PIPE CLEAN-OUTS
PIPE CLEAN-OUTS ARE REQUIRED UNDER THE FOLLOWING CONDITIONS: 100 mm Ø PVCWP
50 mm Ø PVCVP
a. EVERY CHANGE IN HORIZONTAL DIRECTIONS EXCEEDING TWENTY-TWO
AND ONE-HALF DEGREES (22 1/2°). 100 mm Ø PVCSP 50 mm Ø PVCVAC
b. ONE AND ONE-HALF METERS (1.50 m) INSIDE THE PROPERTY LINE BEFORE
THE HOUSE DRAINAGE CONNECTION.
c. EVERY FIFTEEN METERS (15.00 m) IN HORIZONTAL RUN OF PIPES. FD TO NEAREST SEWER LINE
CO (VERIFY SITE CONDITION)
d. AT THE END OF ANY HORIZONTAL PIPE LINES. FD WC
FD
UD FD WC SD
6. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED. 13 CO
CO
FD
7. NOT LESS THAN 300 mm OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF 50 mm Ø PVCVP
THE SEWAGE AND THE UNDER PART OF THE VAULT ROOF SLAB.
100 mm Ø PVCSP
8. NO SEPTIC VAULT MUST BE CONSTRUCTED UNDER THE BUILDING. 12 P 100 mm Ø PVCWP
V CS
ØP CO 50 mm Ø PVCVP
9. ALL PLUMBING WORKS SHALL BE DONE BY A LICENSED MASTER PLUMBER mm
150
CO
SD 50 mm Ø PVCWP
AND A LICENSED PLUMBING CONTRACTOR. SD CON
11 WC
FD C RE
TE
UD FL
A
SD
FD SD TFO
CSP FD RM
PV UD CO SD CB
mm
Ø FD WC HE IN G HA
ND 150
CO D ND
WA
S
mm
10 150
LAV
PW
HIN
150mmØ PVCSS / PVCVTR LA G CO
Ø
150mmØ PVC VENT PIPE PV
CDP CB
(PROVIDE STAINLESSSTEEL UP
PROTECTION SCREEN) O. UP
ST
SP
SE
BA
9 Ø PVC
RD
OA
CK
B
A
50 mm Ø PVCVS BL

mm OOM
150 mm Ø PVCSS 150 SR
50 mm Ø PVCVAC AS
50 mm Ø PVCVP CL 5
E
1:
12 150 mm Ø PVCDP
TO NEAREST DRAINAGE OUTLET
100 mm Ø PVCSP
CO
8 SL
OP
(VERIFY SITE CONDITION)
FD
SP UP
WC
P VC MP
FD
RA
FD
WC
mmØ R
150 O
E
CO WC AS

ID
DB

SD 7 AR
KB
O
BL
AC
R
FD
OM O
R
FD
CO
S RO C
100 mm Ø PVCWP AS
CL 4
T
6 UL
VAAIL)
IC ET
PT E D
50 mm Ø PVCVAC SE (SE CO
50 mm Ø PVCVP
CO
100 mm Ø PVCSP E
AS
FD DB

WC 5 AR
BO
BL
AC
K

OM
FD
CO
THIRD FLOOR LINE WC O
SR
FD
CO WC
AS
SD CL 3
FD
FD
CO
4
100 mm Ø PVCWP R
VERIFY HEIGHT

O
ID UP
R
R
SE
BA O
3 50 mm Ø PVCVAC P
RD
OA B C
CS
CK
50 mm Ø PVCVP
A
BL
PV OM
100 mm Ø PVCSP
CO
m mØ S RO
FD
150 AS UP
FD
WC CL 2
2
SECOND FLOOR LINE
CO WC
FD
WC
1 ISOMETRIC DIAGRAM (SEWER LINE LAYOUT)
SD SCALE NTS.
100 mm Ø PVCWP
FD
FD E
P-6
CO AS
DB R
VERIFY HEIGHT

OA
1 M
KB
AC
BL

R OO
S
50 mm Ø PVCVP AS
100 mm Ø PVCSP CO CL 1 R
O
LAV ID
FD R
D R
CO FD WC PW C
O
FD WC
GROUND FLOOR LINE E
CO
FD WC LAV SH G
SD
SD N DIN
CO LA
FD
CO SD O.
NC
RE
ST UP
TE SD MP
C FLA
TF RA
OR HANDWAS
M
100 mm Ø PVCWP UP
HIN
G

CO
50 mm Ø PVCVP
CB
150 UP
mm
50 mm Ø PVCWP Ø PV
CD
P
B CB
150 mm Ø PVCDP
A TO NEAREST DRAINAGE OUTLET
(VERIFY SITE CONDITION)

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ISOMETRIC DIAGRAM (SEWER LINE LAYOUT) SIGNED
CADD:
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
PLUMBING NOTES SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-6
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
RD
RD

75 mm Ø PVCDS
RD

RD

75 mm Ø PVCDS
RD DRD

ROOF LINE RD
RD
ROOF LINE

75 mm Ø PVCDS
RD
DRD

VERIFY HEIGHT
RD
VERIFY HEIGHT

100 mm Ø PVCDS
RD

75 mm Ø PVCDS
RD
RD

100 mm Ø PVCDS
RD
ROOF DECK FLOOR LINE RD

100 mm Ø PVCDS
RD

100 mm Ø PVCDS
ROOF DECK FLOOR LINE

100 mm Ø PVCDS
RD

VERIFY HEIGHT
RD

100 mm Ø PVCDS
RD

100 mm Ø PVCDS
VERIFY HEIGHT

100 mm Ø PVCDS

100 mm Ø PVCDS
DRD
RD

100 mm Ø PVCDS
100 mm Ø PVCDS RD

100 mm Ø PVCDS
DRD
8 FOURTH FLOOR LINE

RD

100 mm Ø PVCDS
100 mm Ø PVCDS
FOURTH FLOOR LINE

100 mm Ø PVCDS
100 mm Ø PVCDS
100 mm Ø PVCDS

100 mm Ø PVCDS

VERIFY HEIGHT
7 CD
CD

100 mm Ø PVCDS
VERIFY HEIGHT

100 mm Ø PVCDS

100 mm Ø PVCDS

100 mm Ø PVCDS
13
100 mm Ø PVCDS
100 mm Ø PVCDS

6 CD C
CD

100 mm Ø PVCDS
RD

100 mm Ø PVCDS

100 mm Ø PVCDS
THIRD FLOOR LINE
12 CB 100 mm Ø
THIRD FLOOR LINE 5 CD
CD
P
PVCDP CB
D
100 mm Ø PVCDS

CB VC 100

100 mm Ø PVCDS
P CO
N
DP Ø CR mm B
mm

100 mm Ø PVCDS
VC ET
E Ø

VERIFY HEIGHT
ØP 100 CD FLA PV
mm CD 11 TF
OR CD
P
4 100 CD M
A
VERIFY HEIGHT

CD CB CB
CD
P HE DIN
G 150
100 mm Ø PVCDS

HA
CB

100 mm Ø PVCDS
ND

PV WD
WA
N SH
mm
LA

100 mm Ø PVCDS
ING
P Ø P

100 mm Ø PVCDS
CD m ØP
SE
BA
PV 0m VC
RD
CD
10 10
OA

mØ DP CB
KB
CD BL
AC
UP
0m M
3 OO CD

100 mm Ø PVCDS
10 O. UP

100 mm Ø PVCDS
CB

100 mm Ø PVCDS
SR ST
SE
DP
BA
100 mm Ø PVCDS

CB AS
RD
100 mm Ø PVCDS

VC
OA
L
B

ØP
SECOND FLOOR LINE CK

D P C 2
LA B

PV
C mm CD DP
SECOND FLOOR LINE
mØ CD 9 100 O M P VC
2 0m RO mØ 150mm Ø PVCDP

100 mm Ø PVCDS
10 CB

100 mm Ø PVCDS
S m 2
LAS 150E 1 : 1 TO NEAREST DRAINAGE OUTLET

100 mm Ø PVCDS
P
100 mm Ø PVCDS

CB D 5
C

VERIFY HEIGHT
C
100 mm Ø PVCDS

CDP SE
Ø PV SL
OP (VERIFY SITE CONDITION)
V BA

ØP mm
RD
CD P
VERIFY HEIGHT

OA

100 PU
B

m m CD CK A
CD CB
P
OM
BL

100 P
CD CB VCD RAM
1 S RO PV
CB
R Ø P
CB AS mm
Ø
CD
P SE
O mm
CL 100
BA

100
V ID
RD
1 R ØP
OA

D P O m
AC
KB
R
VC
BL

ID 0m CD R
ØP R 8 10 M RD
C
O CD
P CB
m D R DP CB O V
0m PW O VC CB RO R
ØP
10 C Ø P GROUND FLOOR LINE
SS mm

100 mm Ø PVCDS
A 4
mm 100
CDP

GROUND FLOOR LINE CB E 100


CL
SH
Ø PV

P D P CB
IN G CD VC
ND PV CB ØP
m

LA Ø mm
00 m

mm 100
.
100
E
AS
CO TO DB
1

NC S AR

CB P UP
O
KB
R ET CD AC
BL
CB EF M RD P
C 100 LA
TF RA V CD CB
ØP
HA R
mm O RM
ND
WA
SH
UP P
mm
ING
Ø CD
PV
CD
P mm
ØP
V
LEGEND: 3 100

CB 150 m
UP 150
REVISION OF DRAWING DETAILS (1/23/2018) R CB
mØ R ID
O
PV
CD - ADDITIONAL DETAIL OF CISTERN TANK. R UP
P R
B - ADDITIONAL PLUMBING LAYOUTS FOR HOME O
CB C
150mm Ø PVCDP ECONOMICS ROOM AND SCIENCE LABORATORY ROOM.
TO NEAREST DRAINAGE OUTLET - ADDITIONAL CANOPY DRAIN AT SECOND FLOOR PLAN.
A (VERIFY SITE CONDITION) - REVISION OF FEMALE COMFORT ROOM AT SECOND
UP
FLOOR LEFT WING, ADAPTING THREE (3) AND FOUR (4)
STOREY, SCHOOL BUILDING TOILET LAYOUT.
DP
P VCCB
Ø
mm
100

R
1 ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT)
SCALE NTS.
P-7

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ISOMETRIC DIAGRAM (DRAINAGE LINE LAYOUT) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-7
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
PLUMBING LEGEND:
STAINLESS STEEL
CD CORRIDOR DRAIN PVCSP POLYVINYL CHLORIDE SOIL PIPE (SERIES 1000) OVERHEAD WATER TANK
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) GV GV CAP.= ±1,500 GALLONS
CO CLEAN OUT GV 2
1
PVCSS POLYVINYL CHLORIDE SOIL STACK (SERIES 1000)
CV CHECK VALVE (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)

FD FLOOR DRAIN PVCVP POLYVINYL CHLORIDE VENT PIPE (SERIES 600)


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
FDC FIRE DEPARTMENT CONNECTION 50 mm Ø G.I. SCH. 40
) DOWNFEED
PVCVS POLYVINYL CHLORIDE VENT STACK (SERIES 600) IZER 32 mm Ø PPRC CWL
AL
FHC FIRE HOSE CABINET (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) QU 65mmØ G.I. SCH. 40
.4 0 (E RISER
HB HOSE BIBB PVCVTR POLYVINYL CHLORIDE VENT THROUGH ROOF (SERIES 600) S CH 32 mm Ø PPRC CWL GV
E
PIP (PERFORATED PIPE)
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564)
Ø G.I FHC
G.I GALVANIZED IRON mm
WC
PVCWP POLYVINYL CHLORIDE WASTE PIPE (SERIES 1000) 75 WC
GT GREASE TRAP (ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) GV
HB
HB
HB
GV GATE VALVE RD ROOF DRAIN

LAV LAVATORY SD SINK DRAIN


32 mm Ø PPRC CWL
E R)
KS KITCHEN SINK UD URINAL DRAIN ALIZ 65mmØ G.I. SCH. 40
QU RISER
0 (E 32 mm Ø PPRC CWL GV
MH MANHOLE WC WATER CLOSET C H.4 (PERFORATED PIPE)
IP ES FHC
PPRC CWL POLYPROPYLENE RANDOM COPOLYMER COLD WATER LINE, TYPE 3, PN 20 WM WATER METER G.I P WC

(ISO 15874 / JOINING BY SOCKET FUSION) mmØ WC


75
GV
HB 32 mm Ø PPRC CWL
PPRC CWR POLYPROPYLENE RANDOM COPOLYMER COLD WATER RISER, TYPE 3, PN 20 HB
HB
(ISO 15874 / JOINING BY SOCKET FUSION)

PVCDP POLYVINYL CHLORIDE DRAIN PIPE (SERIES 1000) 50 mm Ø PPRC CWD


(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) 32 mm Ø PPRC CWL

R)
PVCDS POLYVINYL CHLORIDE DOWNSPOUT (SERIES 1000) L IZE 32 mm Ø PPRC CWL GV
(ASTM D2729 / ASTM D3311, ISO 4435 / ASTM D2564) UA
(EQ (PERFORATED PIPE)
H .40 FHC
E SC WC

.I PIP WC
G
m mØ 13 GV FHC (SEE MECHANICAL PLAN)
STAINLESS STEEL 75 HB
HB
HB CISTERN TANK
OVERHEAD WATER TANK CAP = ±60,000 LITERS
CAP.= ±1,500 GALLONS (±15,852 GALLONS)
MH
12 2
32 mm Ø PPRC CWL GV WP P1
(PERFORATED PIPE) HB
HB W 32 mm Ø PPRC CWL
WC HB FHC
32 mm Ø PPRC CWL GV
HB
HB

UP
GV 11 HB
HB
HB MH
HB HB
GV HB GV HB
HB HB

LAV
WC HE DIN
G
D AN
ROOF DECK FLOOR LINE 10 . 40 PW L FDC
SCH
P IPE UP
G.I TO
. UP
m mØ E
AS
S
9 65
DB
VERIFY HEIGHT

AR
M BO K
50 mm Ø PPRC CWD OO
AC
BL

S R
32 mm Ø PPRC CWL AS
CL 1:
12
5 O PE
WC
8 SL
WC
P UP
WC
HB . 40 R AM
CH
FOURTH FLOOR LINE HB ES R
HB
.I PIP E
AS O
7 ID
B

ØG
RD
OA
HB M KB
R
m OO
LAC
m R
B

GV FHC 65 S R O
C
AS
32 mm Ø PPRC CWL CL
VERIFY HEIGHT

32 mm Ø PPRC CWL
6

WC
E
AS
WC DB
5 M
AR O

. 40
KB
WC
OO
AC
BL
HB
CH R
THIRD FLOOR LINE HB
HB
IP ES AS
S
G .I P CL
HB
mmØ 3
GV FHC 4 65
32 mm Ø PPRC CWL R
O
VERIFY HEIGHT

ID UP
R
32 mm Ø PPRC CWL R
O
E
AS
DB
3 AR C
OM
BO K
AC
BL
O
WC SR
LAS
WC C UP
WC 2
HB
SECOND FLOOR LINE
2
HB HB

GV FHC
HB

E
AS
1 ISOMETRIC DIAGRAM (WATER AND FIRE LINE LAYOUT)
DB
32 mm Ø PPRC CWL AR
SCALE NTS.
1 M BO
P-8
VERIFY HEIGHT

OO
AC
BL

SR
AS
32 mm Ø PPRC CWL CL
1 R
O
GV LAV ID
D R
R
PW
HB WC
O
WC C
HB HB
WC
HB E
GROUND FLOOR LINE HB
HB
HB SH
GV HB HB
GV FHC
HB
O.
CO
HB
HB
ST UP
32 mm Ø PPRC CWL NC P
R ET
HB
RAM
C E FLA
HB
1:
12
TF HA

UP E
ND
OR
OP
WA
SH
M ING
32 mm Ø PPRC CWL SL

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ISOMETRIC DIAGRAM (WATER & FIRE LINE LAYOUT) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-8
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
SCHEDULE OF TOP SLAB REINFORCEMENT 16 mm Ø HOR. BARS @ 250 mm O.C. 600 1-16 mm Ø BAR (TYP.) 1-16 mm Ø BAR (TYP.) 600
16 mm Ø VERT. BARS @ +/- 300 mm O.C. MH MH
TOP SLAB (TYP.)
MARK CO
FIN. GRADE LINE CO FIN. GRADE LINE
SHORT DIRECTION LONG DIRECTION

300 150

450
16 mm Ø BARS @ 195 mm O. C. BENT-UP 2 OUT 16 mm Ø BARS @ 190 mm O. C. INLET
S-1 16 mm Ø HOR. BARS @
OF 3 @ L/4 FROM FACE OF SUPPORT TEMPERATURE BARS 250 mm O.C.16 mm Ø VERT.
BARS @ +/- 300 mm O.C. (TYP.)

2150
1850
OUTLET LEACHING
DIGESTION CHAMBER CHAMBER
TO NEAREST
SEWER LINE
462 462 (VERIFY)

749.6

749.6
S-2 16 mm Ø BARS @ 225 mm ON CENTER 16 mm Ø BARS @ 190 mm ON CENTER

16 mm Ø BARS AT 259 mm O.C. 16 mm Ø EXTRA BARS 16 mm Ø BARS AT 259 mm O.C. 16 mm Ø EXTRA BARS
CUT-OFF ALTERNATE @ 462 mm 1575 AT +/- 600 mm O.C. CUT-OFF ALTERNATE @ 462 mm 1575 AT +/- 600 mm O.C.
FROM FACE OF SUPPORT FROM FACE OF SUPPORT
150 2500 150 16 mm Ø LONGITUDINAL 150 2500 150 16 mm Ø LONGITUDINAL
2800 BARS AT 269 mm O.C. 2800 BARS AT 269 mm O.C.
480

2-16 mm Ø HANDLE BARS DETAIL SECTION B DETAIL SECTION C


10 mm Ø BARS, E.W.
100

600 600 600 HEAVY DUTY


600 600 600 BRASS CO
HEAVY DUTY BRASS CO COVER MH MH MH COVER (TYPICAL)
40 400 40
MH MH MH (TYPICAL)
REMOVABLE CB COVER FIN. GRADE LINE CO CO CO
FIN. GRADE LINE CO CO CO

450 150
450 150

350

400
100 mm Ø PVC DOWNSPOUT AIR SPACE (350 mm)

450
350

400

450
60 60 Level of scum
40 40 FIN. GRADE LINE OUTLET
OPENING (VERIFY) OUTLET TO NEAREST

1850
TO NEAREST SEWER LINE
1850
VARIES 100

SEWER LINE DIGESTION CHAMBER LEACHING LEACHING


DIGESTION CHAMBER LEACHING LEACHING (VERIFY)
(VERIFY) PROVIDE HOT APPLIED ASPHALT WATERPROOPING CHAMBER CHAMBER
CHAMBER CHAMBER
100 mm THK. CHB WALL W/ 10 mm Ø
HORIZONTAL BARS @ 600 mm O.C
962 787.5 787.5 GRAVEL BED GRAVEL BED

750
(TYPICAL) 2% SLOPE

1100 (VERIFY)

150 mm Ø PVCDP 2% SLOPE

150
(2 % SLOPE) 150 mm Ø PVCDP

150
(2 % SLOPE)

16 mm Ø EXTRA BARS AT 150 mm THK. R. C. WALL WITH 150 mm THK.


+/- 600 mm O.C. 16 mm Ø HOR. BARS AT 250 mm R. C. WALL (TYPICAL)
OUTLET 150 5000 150 1000 150 1000 150
150 5000 150 1000 150 1000 150 O.C. AND 16 mm Ø VERT. BARS
INLET
AT +/-300 mm O.C. (TYPICAL) 7600
7600
200

16 mm Ø BARS AT 259 mm O.C.


100

150 mm THK. BOTTOM SLAB


CUT-OFF ALTERNATE @ 462 mm 150 mm THK. BOTTOM SLAB (TYPICAL)
100

FROM FACE OF SUPPORT (TYPICAL)


DETAIL SECTION A DETAIL SECTION A 100 mm THK. COMPACTED GRAVEL FILL
100 400 100 100 mm THK. COMPACTED
4-12 mm Ø BARS, E.W. 16 mm Ø LONGITUDINAL BARS GRAVEL FILL
600 AT 269 mm O.C.

DETAIL SECTION 7600


7600
150 5000 150 1000 150 1000 150
INLET 150 5000 150 1000 150 1000 150

TOP SLAB R. C. BEAM LEACHING CHAMBER


1-16 mm Ø EXTRA DIAGONAL BAR
(TYPICAL) (TYPICAL)
TYPICAL AT EVERY MH CORNERS 200 mm Ø PVCSP

150
150

150
100 mm Ø PVC DOWNSPOUT
OUTLET CO CO
CO CO
150 mm Ø PVCDP TO NEAREST
(2 % SLOPE)
60 480 60
150 mm Ø PVCDP
(2 % SLOPE)
CO CO
S-2
SEWER LINE
(VERIFY)
A
DIGESTION CHAMBER
S-1 MH MH MH
MH MH MH
60
100

2800
2500

600
2800

2500

2500
600
INLET OUTLET

A
400
600

CO
100

CO
S-2 OUTLET
60

TO NEAREST
150

150
REMOVABLE R.C. SEWER LINE
150

150
COVER WITH 2-16 mm Ø (VERIFY)
100 400 100 600
HANDLE BAR
600
600
200 mm Ø PVCSP

DETAIL PLAN B C
LEACHING CHAMBER
(TYPICAL) 200 mm Ø PVCSP
B C
200 mm Ø PVCSP INLET INLET
INLET INLET

1 DETAIL OF CATCH BASIN DETAIL PLAN (TOP SLAB) DETAIL PLAN (TOP SLAB)
P-6 SCALE 1:20 MTS
1 DETAIL OF SEPTIC VAULT (with REINFORCING BARS) 2 DETAIL OF SEPTIC VAULT
SCALE 1:40 MTS.
P-9 SCALE 1:40 MTS. P-9

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
REUBEN C. RAMOS
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SCHEDULE OF TOP SLAB REINFORCEMENT
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
DETAIL OF CATCH BASIN
DETAIL OF SEPTIC VAULT
SHEILA C. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
P-9
BUILDINGS DIVISION DETAIL OF SEPTIC VAULT (WITH REINFORCING BARS) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 15 90
BONIFACIO DRIVE PORT AREA, MANILA MARYLENE C. SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE OIC, UNDERSECRETARY FOR TECHNICAL SERVICES SECRETARY, DEP ED
ARCHITECT IV
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3775 1225 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1225 3775
3425 1575 1575 3425

C w
c b y
EF EF SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD EF EF
STO. 1
SHE v HE
1 1 1 1
a a S S²vw x v
2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 S²xy
S³abc C D C D C D C D C D
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
d u
1 1
7 8
v DPB DPB 3 v
RISER DOWN TO S3Wv @ DPB RISER DOWN TO S3Wv@
GROUND FLOOR STAIR WELL 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 STAIR WELL GROUND FLOOR
A B A B A B A B A B
RISER UP TO S3Ww @ 1 e f g h i j k l m n o p q r s 1
RISER UP TO S3Ww @
2 1
THIRD FLOOR c DPB DPB t THIRD FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB
S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu
S3Ww S3Wv S²cd S3Ww
B S3Wv
S3WA S3WB S3WA S3WB
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1 1
A B B A B A B A B A B

2 SECOND FLOOR LIGHTING LAYOUT


SCALE 1: 100M.
E-1

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1575 1575 3425

C
b b x
EF EF d SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD EF EF
PWD PWD
c a
SHE HE
1 1 S²cd S²ab 1 1
a a v w
S²ab 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
C D C D C D C D C D S³vwx
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
z u
STAIR WELL 4 5 STAIR WELL
DPA DPA
2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
STO. A B A B A B A B A B STO. 3
RISER UP TO S3Wv @ 1 e f g h i j k l m n o p q r s 1 DPA RISER UP TO S3Wv @
2 1
SECOND FLOOR y DPA DPA t SECOND FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB
S S²yz S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu S
B S3Wv S3Wv
S3WA S3WB
S3WB S3WA
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1 1
A B A B A B A B A B A B

1 GROUND FLOOR LIGHTING LAYOUT (OPTION - 1)


SCALE 1: 100M.
E-1

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT(OPTION- 1)
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SECOND FLOOR LIGHTING LAYOUT CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-1
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3775 1225 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1225 3775
3425 1575 1575 3425

C w
c b y
EF EF SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD EF EF
1 1 1
SHE v x HE v
1 1
a a S S²vw
2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 S²xy
S³abc C D C D C D C D C D
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
d Sd St t
STAIR WELL STAIR WELL
4 5
DPC DPC
RISER DOWN TO S3Wx @ RISER DOWN TO S3Wx @
SECOND FLOOR 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 SECOND FLOOR
C O R R I D O R A B A B A B A B A B C O R R I D O R
RISER UP TO S3Wy @ 1 e f g h i j k l m n o p q r s 1 RISER UP TO S3Wy @
x 2 1 3 x
ROOFDECK DPC DPC ROOFDECK
SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB
DPC
S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss
S3Wy S3Wy
B S3Wx S3Wx
S3WA S3WB S3WA S3WB
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1 1
A B B A B A B A B A B

2 FOURTH FLOOR LIGHTING LAYOUT


SCALE 1: 100M.
E-2

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3775 1225 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1225 3775
3425 1575 1575 3425

C w
c b y
EF EF SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD EF EF
STO. 1
SHE v HE
1 1 1 1
a a S S²vw x v
2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 S²xy
S³abc C D C D C D C D C D
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
d u
1 1
9 10
w DPB DPB 6 w
RISER DOWN TO S3Ww DPB RISER DOWN TO S3Ww
@ GROUND FLOOR STAIR WELL 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 STAIR WELL @ GROUND FLOOR
A B A B A B A B A B
RISER UP TO S3Wx @ 1 e f g h i j k l m n o p q r s 1
RISER UP TO S3Wx @
5 4
THIRD FLOOR c DPB DPB t THIRD FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB
S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu
S3Wx S3Ww S²cd S3Wx
B S3Ww
S3WA S3WB S3WA S3WB
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1 1
A B B A B A B A B A B

1 THIRD FLOOR LIGHTING LAYOUT


SCALE 1: 100M.
E-2

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THIRD FLOOR LIGHTING LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR LIGHTING LAYOUT CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-2
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 1575 3425 600 1000

C
3150

3150
PWD PWD

HANDWASHING

HANDWASHING
SHE HE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
6
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPA
3850

3850
STO.
STO. FACP
"DPA"
"MDP"
B
UP WP WP UP
2500

2500
UP UP

C O R R I D O R C O R R I D O R
A
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

2 GROUND FLOOR POWER LAYOUT (OPTION - 1) PROPOSED OVERHEAD ELECTRICAL


SCALE 1: 100M. SERVICE ENTRANCE (REFER TO
E-3 ELECTRICAL RISER DIAGRAM)
NOTE: VERIFY EXACT LOCATION

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
500 5000 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 5000 500

A
DECK ROOF DECK ROOF

LINE OF ROOF EAVES ABOVE LINE OF ROOF EAVES ABOVE

S3Wy S3Wy
S S
1 DN DN 1
RISER DOWN TO S3Wx @ y y RISER DOWN TO S3Wy @
FOURTH FLOOR FOURTH FLOOR

CONNECT TO NEAREST CONNECT TO NEAREST


1 1
LIGHT OUTLET @ FOURTH x y LIGHT OUTLET @ FOURTH
FLOOR FLOOR

1 ROOF DECK LIGHTING LAYOUT


SCALE 1: 100M.
E-3

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ROOF DECK LIGHTING LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED GROUND FLOOR POWER LAYOUT(OPTION-1) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-3
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1550

3150 STO. HE

3150
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

12
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPB
3850

3850
B
UP DN WP WP DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

2 THIRD FLOOR POWER LAYOUT


SCALE 1: 100M.
E-4

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1550

C
STO. HE
3150

3150
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

11
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPB
3850

3850
"DPB"

B
UP DN WP WP DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

2 SECOND FLOOR POWER LAYOUT


SCALE 1: 100M.
E-4

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SECOND FLOOR POWER LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED THIRD FLOOR POWER LAYOUT CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-4
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
500 5000 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 5000 500

1100
ELEV. 9700.00 mm ELEV. 9700.00 mm
A

4250
3150
DECK ROOF DECK ROOF
AUTOMATIC CIRCUIT BREAKER
B 50AF, 2P, 240VOLTS, 40AT
LINE OF ROOF EAVES ABOVE LINE OF ROOF EAVES ABOVE
IN NEMA 3R ENCLOSURE
400
B
7000

7
DN DPC DN
9500

3850

B
2500

C
1100

2 ROOF DECK POWER LAYOUT


SCALE 1: 100M.
E-5

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1550 1575 3425

C
STO. HE
3150

3150
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
6
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPC
3850

3850
UP UP
B
DN WP WP DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R
FL-2

1 FOURTH FLOOR POWER LAYOUT


SCALE 1: 100M.
E-5

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FOURTH FLOOR POWER LAYOUT
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ROOF DECK POWER LAYOUT CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL NOTES: SCHEDULE OF LOADS AND COMPUTATIONS:
DISTRIBUTION PANELBOARD " DPA " (GROUND FLOOR) DISTRIBUTION PANELBOARD " DPC " (FOURTH FLOOR)
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES, RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH BRANCH BRANCH
THE REQUIREMENTS OF THE LOCAL POWER COMPANY. CKT. VA PER CKT. BREAKER SIZE OF HOMERUN CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT ) LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT )
NO. CKT. NO. CKT.
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V, 60 HERTZ, A.C AF P AT AF P AT

3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR CONNECTION TO THE 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
POWER COMPANY SERVICE POINT.
2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL CONDUIT TO BE USED SHALL BE
3.5mm²,THHN AND 15mm NOMINAL DIAMETER, RESPECTIVELY. LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR-CODED.
3 LIGHTING OUTLETS 1070 20 2 - 3.5mm² THHN IN 15mm Ø C 3 LIGHTING OUTLETS 1080 20 2 - 3.5mm² THHN IN 15mm Ø C
5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN 3.5 mm² IN SIZE.
4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED AT CONVENIENT AND
INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED IN THE SPECIFICATIONS.
5 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 5 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY GROUNDED IN ACCORDANCE
WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE. 6 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 6 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND PURPOSE. 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 3HP, 1Ø, BOOSTER PUMP 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C
7 FACP 1500 20 7 3910 40
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER APPURTENANCES FOR THE ENTIRE
ELECTRICAL INSTALLATION SHALL BE USED. 8 CCTV 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 8 SPARE 1500 20

10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR LEVEL UNLESS NOTED IN 9 SPARE 1500 20 9 SPARE 1500 20
THE PLAN.

a) WALL SWITCHES @ 1300mm 10 SPARE 1500 20 10 SPARE 1500 20


b) WALL CONVENIENCE OUTLETS @ 300 mm
11 SPARE 1500 20 11 SPARE 1500 20
11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY REGISTERED
ELECTRICAL ENGINEER. 12 SPARE 1500 20 12 SPARE 1500 20

TOTAL 15830 MAIN LUGS ONLY: 100AMPS, 2P, 250V, 18KAIC TOTAL 14340 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC

TOTAL CONNECTED LOADS: 15830 VA


ELECTRICAL SYMBOLS: TOTAL CONNECTED LOADS: 14340 VA

15830 14340
I L @ 80% D.F. = (0.80) = 55.06 AMPERES I L @ 85% D.F. = (0.85) + 0.25 (17) = 57.25 AMPERES
230 USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C 230
USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
CEILING LIGHT OUTLET (55.06 A / 115 A )
(57.25 A / 115 A )
REFER TO SCHEDULE OF
CEILING LIGHT OUTLET LIGHTING FIXTURES AND LAMPS DISTRIBUTION PANELBOARD " DPB " (SECOND & THIRD FLOOR) POWER PANELBOARD "PPH"
BRANCH BRANCH
CF CEILING FAN, 60 WATTS, 230V, 60Hz CKT. VA PER CKT. BREAKER SIZE OF HOMERUN CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS CKT. VA PER
NO. CKT. ( WIRES IN CONDUIT ) LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT )
NO. CKT.
AF P AT AF P AT
SCF CEILING FAN CONTROL SWITCH
1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C 1 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS)
S² 2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C 2 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
(10 AMP., 230 VOLTS)
3 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE 3 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C TOTAL 5520 MACB : 50AF, 2P, 250V, 50AT, 10KAIC

(10 AMP., 230 VOLTS)
4 LIGHTING OUTLETS 1260 20 2 - 3.5mm² THHN IN 15mm Ø C
S3W THREE WAY WALL SWITCH (10 AMP., 230 VOLTS) TOTAL CONNECTED LOADS: 4600 VA
5 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS
5520
"WP" DENOTES WEATHERPROOF OUTLET I L @ 100% D.F. = (1.0) + 0.25 (12) = 27 AMPERES
6 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C 230 USE : 2 -8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
SINGLE CONVENIENCE OUTLET, GROUNDING TYPE
EF "EF" DENOTES EXHAUST FAN (15 AMP., 230 VOLTS) 7 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
MAIN DISTRIBUTION PANELBOARD "MDP "
CONCEALED OR EMBEDDED CONDUIT RUN
8 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C BRANCH
UNDERGROUND OR UNDERFLOOR CONDUIT RUN CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT )
9 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C NO. CKT.
AF P AT
CIRCUIT HOMERUN
10 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
1 "DPA" 15830 230 100 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
ENCLOSED CIRCUIT BREAKER
RATING AS SHOWN ON THE PLAN 11 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
2 "DPB" 19580 230 100 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C

PB PULLBOX 12 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
3 "DPC" 14340 230 100 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C

13 SPARE 1500 20
MAIN DISTRIBUTION PANELBOARD 4 "PPH" 5520 230 100 2 50 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C

14 SPARE 1500 20
TOTAL 55270 MACB : 400AF, 2P, 250V, 250AT, 25KAIC
DISTRIBUTION PANELBOARD
15 SPARE 1500 20

M ELECTRIC SERVICE METER TOTAL CONNECTED LOADS: 55270 VA


16 SPARE 1500 20
55270 (0.85) + 0.25 (17) = 208.51 AMPERES
TOTAL 19580 I L @ 85% D.F. = USE : 2 -125mm² THHN + 1 - 30mm² THHN (G) IN 65mm Ø RSC
ELECTRIC SERVICE ENTRANCE MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC 230 (208.51 A / 265 A )

TOTAL CONNECTED LOADS: 19580 VA


GROUNDING SYSTEM
CAPACITY OF TRANSFORMER:
19580 (0.85) = 72.36 AMPERES
I L @ 85% D.F. = DECKROOF
230 KVA = EI @ D.F. = 80%, DIVERSITY FACTOR = 1.10
FACP FIRE ALARM CONTROL PANEL 1000
USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C = (230) (240.30) (0.80) = 40.19 kVA
NOTE:
(72.36 A / 115 A ) 1000 (1.10)
ALL SIZES OF SERVICE FEEDER (WIRES IN CONDUIT)
USE: ONE (1) SET - 50 kVA, 34.5 kV/230V, 1Ø, 60Hz, AC, OISC, POLE MOUNTED, REFER TO SCHEDULE OF LOADS AND COMPUTATIONS
DISTRIBUTION TRANSFORMER
4TH FLOOR
"DPC"
SCHEDULE OF LIGHTING FIXTURES AND LAMPS
SERVICE LATERAL PROVIDED WITH 65mmØ
INSTALLATION/ "TYPE F" CONDULETS FOR 230V, 2-WIRE,
SYMBOLS DESCRIPTION
MOUNTING 60Hz, A.C. TO CONNECT TO AVAILABLE
SURFACED CEILING POWER LINES.
1 ONE (1)-28W, 230V,60Hz AC, FLUORESCENT LIGHTING FIXTURE, BOX TYPE. "MDP"- 3 3RD FLOOR
MOUNTED
REINFORCED CONCRETE ELECTRIC
SURFACED CEILING PEDESTAL 5.00m X 0.30m X 0.30m "DPB"
2 TWO (2)-28W, 230V, 60Hz AC, FLUORESCENT LIGHTING FIXTURE , BOX TYPE

300mm
MOUNTED

3100mm (MIN.) - 5500mm (MAX.)


ONE (1)-18W, 230V, 60Hz AC,COMPACT FLUORESCENT LIGHTING FIXTURE WITH SURFACED CEILING
MEDIUM BASE KEYLESS TYPE PORCELAIN RECEPTACLE MOUNTED ELECTRIC SERVICE
METER (CTC METERING)
"MDP"- 2 2ND FLOOR
ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH POWER FACTOR, PRE-HEAT
NOTE: WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES, PROPOSED: 2.0HP, 1Ø, 230V,
"PPH"
WIRED AND READY FOR USE.
60Hz., AC, WATER PUMP MOTOR
M "DPA" "MDP"
MANHOLE SIZE
AS REQUIRED

1800mm
WP WP

FIN. FLOOR LINE A A


FIN. GRADE LINE
MH
TO "MDP"- 4
1-30mm² THHN IN 20mmØ C. -
2- 125mm² THHN + 1-30mm²THHN(G) CLAMPED TO A 25mmØ X
1-5.5mm² THHN IN 15mmØ C.
IN 65mmØ RSC 3000mm COPPERCLAD AUTOMATIC CIRCUIT BREAKER
A - CLAMPED TO A 16mmØ X
GROUNDING ELECTRODE 50AF, 2P, 240VOLTS, 30AT
2400mm COPPERCLAD
IN NEMA 3R ENCLOSURE
GROUNDING ELECTRODE
ELECTRICAL RISER DIAGRAM B
AUTOMATIC CIRCUIT BREAKER
NOT TO SCALE 50AF, 2P, 240VOLTS, 40AT
IN NEMA 3R ENCLOSURE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-6
BUILDINGS DIVISION SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 1550 3450 600 1000

ACCU-3
C
C
SPO REF 12
8 DPA
3150 PWD 9 DPA PWD

3150
DPA

HANDWASHING

HANDWASHING
KITCHEN HE
SHE
DRY WALL (low partition) - 1200 mm HIGH

LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM


7000

LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
DINING AREA
6
9500

9500
HOME ECONOMIC ROOM
HANDWASHING

HANDWASHING
LIVING AREA

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPA
3850

3850
STO. STO. FACP
7 "DPA"
DPA "MDP"
B
25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP 25 mm DROP
UP WP WP UP
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
FL-1 FL-1
ELEV. 475.00 mm

1600
SLOPE 1:12 SLOPE 1:12
UP UP RAMP UP

M
LEGEND:
AUTOMATIC CIRCUIT BREAKER
C 100AF, 2P, 240VOLTS, 60AT
2 GROUND FLOOR POWER LAYOUT (WITH HOME ECONOMICS ROOM - OPTION - 2) IN NEMA 3R ENCLOSURE
PROPOSED OVERHEAD ELECTRICAL
SERVICE ENTRANCE (REFER TO
SCALE 1: 100M. ELECTRICAL RISER DIAGRAM)
E-7 NOTE: VERIFY EXACT LOCATION

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1575 1575 3425 400

C SEF
b b x x
EF EF d EF SCFC SCFD SCFC SCFD SCFC SCFD SCFC SCFD EF EF EF
PWD PWD
c a
SHE HE
1 1 S²cd S²ab 1 1
a a v w
S²ab 2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
C D C D C D C D S³vwx
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
STAIR WELL z u STAIR WELL
1 1
4 5 v
DPA DPA
2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
STO. A B A B A B A B STO. 3
RISER UP TO S3Wv @ 1 e f g h i j k l m n o p q r s 1 DPA RISER UP TO S3Wv @
2 1
SECOND FLOOR y DPA DPA t SECOND FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB SCFA SCFB
S S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu S
B S3Wv S3Wv
S3WA S3WB
S3WB S3WA
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1 1
A B A B A B A B A B A B
ELEV. 475.00 mm

1 GROUND FLOOR LIGHTING LAYOUT (WITH HOME ECONOMICS ROOM - OPTION - 2)


SCALE 1: 100M.
E-7

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH HOME
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ECONOMICS ROOM - OPTION - 2) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) GROUND FLOOR POWER LAYOUT (WITH HOME MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-7
BUILDINGS DIVISION
ECONOMICS ROOM - OPTION - 2)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL NOTES: SCHEDULE OF LOADS AND COMPUTATIONS:
DISTRIBUTION PANELBOARD " DPA " (GROUND FLOOR) DISTRIBUTION PANELBOARD " DPC " (FOURTH FLOOR)
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES, RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH BRANCH BRANCH
THE REQUIREMENTS OF THE LOCAL POWER COMPANY. CKT. VA PER CKT. BREAKER SIZE OF HOMERUN CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT ) NO. CKT. ( WIRES IN CONDUIT )
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V, 60 HERTZ, A.C AF P AT AF P AT

3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR CONNECTION TO THE 1 LIGHTING OUTLETS 1260 230 100 2 20 2 - 3.5mm² THHN IN 15mm Ø C 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
POWER COMPANY SERVICE POINT.
2 LIGHTING OUTLETS 890 20 2 - 3.5mm² THHN IN 15mm Ø C 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL CONDUIT TO BE USED SHALL BE
3.5mm²,THHN AND 15mm NOMINAL DIAMETER, RESPECTIVELY. LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR-CODED.
3 LIGHTING OUTLETS 1070 20 2 - 3.5mm² THHN IN 15mm Ø C 3 LIGHTING OUTLETS 1080 20 2 - 3.5mm² THHN IN 15mm Ø C
5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN 3.5 mm² IN SIZE.
4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED AT CONVENIENT AND
INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED IN THE SPECIFICATIONS.
5 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 5 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY GROUNDED IN ACCORDANCE
WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE. 6 CONVENIENCE OUTLETS 1440 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 6 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND PURPOSE. 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 3HP, 1Ø, BOOSTER PUMP 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C
7 CONVENIENCE OUTLETS 1440 20 7 3910 40
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER APPURTENANCES FOR THE ENTIRE
ELECTRICAL INSTALLATION SHALL BE USED. 8 REFRIGERATOR 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 8 SPARE 1500 20

10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR LEVEL UNLESS NOTED IN 9 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 9 SPARE 1500 20
THE PLAN.
10 FACP 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 10 SPARE 1500 20
a) WALL SWITCHES @ 1300mm
b) WALL CONVENIENCE OUTLETS @ 300 mm
c) SPECIAL PURPOSE OUTLET @ 300 mm 11 CCTV 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 11 SPARE 1500 20

11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY REGISTERED 12 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C 12 SPARE 1500 20
3.0 TR, 1Ø, SPLIT TYPE ACU 4850
ELECTRICAL ENGINEER.

13 SPARE 1500 20 TOTAL 14340 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC

ELECTRICAL SYMBOLS: 14 SPARE 1500 20 TOTAL CONNECTED LOADS: 14340 VA

15 SPARE 1500 20 14340 (0.85) + 0.25 (17) = 57.25 AMPERES


I L @ 85% D.F. =
230

CEILING LIGHT OUTLET 16 SPARE 1500 20


USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
REFER TO SCHEDULE OF
TOTAL 25650 MAIN LUGS ONLY: 150AMPS, 2P, 250V, 18KAIC (57.25 A / 115 A )
CEILING LIGHT OUTLET LIGHTING FIXTURES AND LAMPS

TOTAL CONNECTED LOADS: 25150 VA


CF CEILING FAN, 60 WATTS, 230V, 60Hz POWER PANELBOARD "PPH"
25650 (0.85) + 0.25 (21.09) = 100.07 AMPERES
I L @ 85% D.F. = BRANCH
SCF 230 USE : 2 - 50mm² THHN + 1 - 14mm² THHN (G) IN 50mm Ø C
CEILING FAN CONTROL SWITCH CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
(100.07 A / 150 A ) LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT )
NO. CKT.
S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE AF P AT
(10 AMP., 230 VOLTS)
DISTRIBUTION PANELBOARD " DPB " (SECOND & THIRD FLOOR)
S² 2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE 1 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
(10 AMP., 230 VOLTS) BRANCH
3 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
S³ LOAD DESCRIPTION VOLTS 2 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
(10 AMP., 230 VOLTS) NO. CKT. ( WIRES IN CONDUIT )
AF P AT
TOTAL 5520 MACB : 50AF, 2P, 250V, 50AT, 10KAIC
S3W THREE WAY WALL SWITCH (10 AMP., 230 VOLTS)
1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS
"WP" DENOTES WEATHERPROOF OUTLET 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C TOTAL CONNECTED LOADS: 4600 VA

SPECIAL PURPOSE OUTLET, GROUNDING TYPE (20 AMP., 300 VOLTS) 3 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C 5520 (1.0) + 0.25 (12) = 27 AMPERES
SP I L @ 100% D.F. =
230 USE : 2 -8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
SINGLE CONVENIENCE OUTLET, GROUNDING TYPE 4 LIGHTING OUTLETS 1260 20 2 - 3.5mm² THHN IN 15mm Ø C
EF "EF" DENOTES EXHAUST FAN (15 AMP., 230 VOLTS)

CONCEALED OR EMBEDDED CONDUIT RUN


MAIN DISTRIBUTION PANELBOARD "MDP "
5 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
BRANCH
UNDERGROUND OR UNDERFLOOR CONDUIT RUN 6 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT )
AF P AT
CIRCUIT HOMERUN 7 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
1 "DPA" 25650 230 225 2 150 2 - 50mm² THHN + 1 - 14mm² THHN (G) IN 50mm Ø C
ENCLOSED CIRCUIT BREAKER 8 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
RATING AS SHOWN ON THE PLAN
2 "DPB" 19580 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
9 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
PB PULLBOX
3 "DPC" 14340 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
10 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
MAIN DISTRIBUTION PANELBOARD 4 "PPH" 5520 230 225 2 50 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
11 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
TOTAL 65090 MACB : 400AF, 2P, 250V, 300AT, 25KAIC
DISTRIBUTION PANELBOARD 12 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

M ELECTRIC SERVICE METER 13 SPARE 1500 20 TOTAL CONNECTED LOADS: 64590 VA

14 SPARE 1500 20 65090


ELECTRIC SERVICE ENTRANCE I L @ 85% D.F. = (0.85) + 0.25 (21.09) = 245.82 AMPERES USE : 2 -150mm² THHN + 1 - 30mm² THHN (G) IN 80mm Ø RSC
230 (245.82 A / 295 A )
15 SPARE 1500 20

GROUNDING SYSTEM
16 SPARE 1500 20 CAPACITY OF TRANSFORMER:

TOTAL 19580 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC KVA = EI @ D.F. = 80%, DIVERSITY FACTOR = 1.10
DECKROOF
FACP FIRE ALARM CONTROL PANEL 1000

TOTAL CONNECTED LOADS: 19580 VA = (230) (283) (0.80) = 47.34 kVA


1000 (1.10) NOTE:
19580 (0.85) = 72.36 AMPERES ALL SIZES OF SERVICE FEEDER (WIRES IN CONDUIT)
I L @ 85% D.F. = USE: ONE (1) SET - 50 kVA, 34.5 kV/230V, 1Ø, 60Hz, AC, OISC, POLE MOUNTED,
230 REFER TO SCHEDULE OF LOADS AND COMPUTATIONS
DISTRIBUTION TRANSFORMER

USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C 4TH FLOOR


SCHEDULE OF LIGHTING FIXTURES AND LAMPS (72.36 A / 115 A ) "DPC"
INSTALLATION/
SYMBOLS DESCRIPTION SERVICE LATERAL PROVIDED WITH 80mmØ
MOUNTING
"TYPE F" CONDULETS FOR 230V, 2-WIRE,
SURFACED CEILING 60Hz, A.C. TO CONNECT TO AVAILABLE
1 ONE (1)-28W, 230V,60Hz AC, FLUORESCENT LIGHTING FIXTURE, BOX TYPE.
MOUNTED
POWER LINES.
"MDP"- 3 3RD FLOOR
SURFACED CEILING
2 TWO (2)-28W, 230V, 60Hz AC, FLUORESCENT LIGHTING FIXTURE , BOX TYPE
MOUNTED
REINFORCED CONCRETE ELECTRIC
PEDESTAL 5.00m X 0.30m X 0.30m "DPB"

300mm
ONE (1)-18W, 230V, 60Hz AC,COMPACT FLUORESCENT LIGHTING FIXTURE WITH SURFACED CEILING

3100mm (MIN.) - 5500mm (MAX.)


MEDIUM BASE KEYLESS TYPE PORCELAIN RECEPTACLE MOUNTED

ELECTRIC SERVICE
ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH POWER FACTOR, PRE-HEAT METER (CTC METERING)
NOTE: WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES, "MDP"- 2 2ND FLOOR
WIRED AND READY FOR USE.
"PPH" PROPOSED: 2.0HP, 1Ø, 230V,
60Hz., AC, WATER PUMP MOTOR
M "DPA" "MDP"
MANHOLE SIZE
AS REQUIRED

1800mm
WP WP

FIN. FLOOR LINE A A


FIN. GRADE LINE
MH
TO "MDP"- 4
1-30mm² THHN IN 20mmØ C. -
2- 150mm² THHN + 1-30mm²THHN(G) CLAMPED TO A 25mmØ X
1-5.5mm² THHN IN 15mmØ C.
IN 80mmØ RSC 3000mm COPPERCLAD AUTOMATIC CIRCUIT BREAKER
A - CLAMPED TO A 16mmØ X
GROUNDING ELECTRODE 50AF, 2P, 240VOLTS, 30AT
2400mm COPPERCLAD
IN NEMA 3R ENCLOSURE
GROUNDING ELECTRODE
ELECTRICAL RISER DIAGRAM B
AUTOMATIC CIRCUIT BREAKER
NOT TO SCALE 50AF, 2P, 240VOLTS, 40AT
IN NEMA 3R ENCLOSURE

AUTOMATIC CIRCUIT BREAKER


C 100AF, 2P, 240VOLTS, 60AT
IN NEMA 3R ENCLOSURE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-8
BUILDINGS DIVISION SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 1550 1550 3450 600 1000

ACCU-3 ACCU-3 ACCU-3


C C C
C
19 18 17
PWD DPA DPA COMPUTER LAB. ROOM DPA PWD
3150

3150
HANDWASHING

HANDWASHING
HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM


7000

LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
5
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPA
3850

3850
PB PB PB PB PB PB PB PB
14 13 12 11 10 9 8 7 FACP
STO. DPA DPA DPA DPA DPA DPA DPA 6 STO.
DPA "DPA"
DPA "MDP"
B
UP WP WP UP
2500

2500
1600 1600
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
ELEV. 475.00 mm

1600
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

M
LEGEND:
AUTOMATIC CIRCUIT BREAKER
C 100AF, 2P, 240VOLTS, 60AT PROPOSED OVERHEAD ELECTRICAL
2 GROUND FLOOR POWER LAYOUT (WITH COMPUTER ROOM - OPTION - 3) IN NEMA 3R ENCLOSURE SERVICE ENTRANCE (REFER TO
ELECTRICAL RISER DIAGRAM)
SCALE 1: 100M.
E-9 NOTE: VERIFY EXACT LOCATION

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1575 1575 3425 400

C
b b x x
EF EF d SCFC SCFD SCFC SCFD SCFC SCFD EF EF EF
PWD PWD
c a
SHE HE
1 1 S²cd S²ab 1 1
a a v w
S²ab 2 2 2 2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
C D C D C D S³vwx
e f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
STAIR WELL z u STAIR WELL
1 1
4 v
DPA
2 2 2 2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
STO. A B A B A B STO. 3
RISER UP TO S3Wv @ 1 e f g h i j k l m n o p q r s 1 DPA RISER UP TO S3Wv @
2 1
SECOND FLOOR y DPA DPA t SECOND FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB
S S²ef Sg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu S
B S3Wv S3Wv
S3WA S3WB
S3WA
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1
A B A B A B A B A B A B

1 GROUND FLOOR LIGHTING LAYOUT (WITH COMPUTER ROOM - OPTION - 3)


SCALE 1: 100M.
E-9

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH COMPUTER
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LABORATORY ROOM - OPTION - 3) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) GROUND FLOOR POWER LAYOUT (WITH COMPUTER MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E-9
BUILDINGS DIVISION
LABORATORY ROOM - OPTION - 3)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL NOTES: SCHEDULE OF LOADS AND COMPUTATIONS:
DISTRIBUTION PANELBOARD " DPC " (FOURTH FLOOR)
DISTRIBUTION PANELBOARD " DPA " (GROUND FLOOR)
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES, RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH BRANCH BRANCH
THE REQUIREMENTS OF THE LOCAL POWER COMPANY. CKT. VA PER CKT. BREAKER SIZE OF HOMERUN CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT ) NO. CKT. ( WIRES IN CONDUIT )
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V, 60 HERTZ, A.C AF P AT AF P AT

3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR CONNECTION TO THE 1 LIGHTING OUTLETS 1260 230 100 2 20 2 - 3.5mm² THHN IN 15mm Ø C 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
POWER COMPANY SERVICE POINT.
2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL CONDUIT TO BE USED SHALL BE
3.5mm²,THHN AND 15mm NOMINAL DIAMETER, RESPECTIVELY. LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR-CODED.
3 LIGHTING OUTLETS 1070 20 2 - 3.5mm² THHN IN 15mm Ø C 3 LIGHTING OUTLETS 1080 20 2 - 3.5mm² THHN IN 15mm Ø C
5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN 3.5 mm² IN SIZE.
4 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED AT CONVENIENT AND
INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED IN THE SPECIFICATIONS.
5 CONVENIENCE OUTLETS 1440 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 5 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY GROUNDED IN ACCORDANCE
WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE. 6 CONVENIENCE OUTLETS 1800 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 6 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND PURPOSE. 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 3HP, 1Ø, BOOSTER PUMP 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C
7 COMPUTER OUTLETS 1250 20 7 3910 40
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER APPURTENANCES FOR THE ENTIRE
ELECTRICAL INSTALLATION SHALL BE USED. 8 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 8 SPARE 1500 20

10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR LEVEL UNLESS NOTED IN 9 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 9 SPARE 1500 20
THE PLAN.
10 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 10 SPARE 1500 20
a) WALL SWITCHES @ 1300mm
b) WALL CONVENIENCE OUTLETS @ 300 mm
11 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 11 SPARE 1500 20
11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY REGISTERED
ELECTRICAL ENGINEER. 12 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 12 SPARE 1500 20

13 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C TOTAL 14340 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC

ELECTRICAL SYMBOLS: 14 COMPUTER OUTLETS 1250 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C TOTAL CONNECTED LOADS: 14340 VA

15 FACP 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 14340


I L @ 85% D.F. = (0.85) + 0.25 (17) = 57.25 AMPERES
230
USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
16 CCTV 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C (57.25 A / 115 A )
CEILING LIGHT OUTLET
REFER TO SCHEDULE OF
17 SPARE 1500 20 POWER PANELBOARD "PPH"
CEILING LIGHT OUTLET LIGHTING FIXTURES AND LAMPS
BRANCH
18 SPARE 1500 20
CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
CF CEILING FAN, 60 WATTS, 230V, 60Hz LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT )
19 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C AF P AT
SCF CEILING FAN CONTROL SWITCH
20 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C 1 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS)
21 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C 2 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
S² 2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS)
22 SPARE 4850 60 TOTAL 5520 MACB : 50AF, 2P, 250V, 50AT, 10KAIC
S³ 3 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS)
TOTAL 42710 MAIN LUGS ONLY: 200AMPS, 2P, 250V, 22KAIC
TOTAL CONNECTED LOADS: 4600 VA
S3W THREE WAY WALL SWITCH (10 AMP., 230 VOLTS)
TOTAL CONNECTED LOADS: 42710 VA
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS 5520
I L @ 100% D.F. = (1.0) + 0.25 (12) = 27 AMPERES
"WP" DENOTES WEATHERPROOF OUTLET 42710 230 USE : 2 -8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
I L @ 90% D.F. = (0.90) + 0.25 (21.09) = 172.40 AMPERES
230 USE : 2 - 80mm² THHN + 1 - 22mm² THHN (G) IN 50mm Ø C
SINGLE CONVENIENCE OUTLET, GROUNDING TYPE
(172.40 A / 205 A )
EF "EF" DENOTES EXHAUST FAN (15 AMP., 230 VOLTS) MAIN DISTRIBUTION PANELBOARD "MDP "
CONCEALED OR EMBEDDED CONDUIT RUN DISTRIBUTION PANELBOARD " DPB " (SECOND & THIRD FLOOR) BRANCH
CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
UNDERGROUND OR UNDERFLOOR CONDUIT RUN BRANCH LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT )
CKT. VA PER CKT. BREAKER SIZE OF HOMERUN AF P AT
LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT )
CIRCUIT HOMERUN AF P AT
1 "DPA" 42710 230 225 2 200 2 - 80mm² THHN + 1 - 22mm² THHN (G) IN 50mm Ø C

ENCLOSED CIRCUIT BREAKER 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
RATING AS SHOWN ON THE PLAN 2 "DPB" 19580 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C

2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C


PB PULLBOX 3 "DPC" 14340 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C

3 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C


4 "PPH" 5520 230 225 2 50 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
MAIN DISTRIBUTION PANELBOARD
4 LIGHTING OUTLETS 1260 20 2 - 3.5mm² THHN IN 15mm Ø C
TOTAL 82150 MACB : 400AF, 2P, 250V, 400AT, 42KAIC

DISTRIBUTION PANELBOARD 5 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C


TOTAL CONNECTED LOADS: 82150 VA
M ELECTRIC SERVICE METER 6 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C
82150 (0.90) + 0.25 (21.09) = 326.73 AMPERES
7 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C I L @ 90% D.F. = USE : 2 -250mm² THHN + 1 - 50mm² THHN (G) IN 90mm Ø RSC
230 (326.73 A / 400 A )
ELECTRIC SERVICE ENTRANCE
8 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

GROUNDING SYSTEM CAPACITY OF TRANSFORMER:


9 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
KVA = EI @ D.F. = 80%, DIVERSITY FACTOR = 1.10 DECKROOF
10 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 1000
FACP FIRE ALARM CONTROL PANEL = (230) (357.17) (0.80) = 59.74 kVA
NOTE:
11 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 1000 (1.10)
ALL SIZES OF SERVICE FEEDER (WIRES IN CONDUIT)
USE: ONE (1) SET - 65 kVA, 34.5 kV/230V, 1Ø, 60Hz, AC, OISC, POLE MOUNTED, REFER TO SCHEDULE OF LOADS AND COMPUTATIONS
12 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
DISTRIBUTION TRANSFORMER
4TH FLOOR
13 SPARE 1500 20
"DPC"
14 SPARE 1500 20
SERVICE LATERAL PROVIDED WITH 90mmØ
"TYPE F" CONDULETS FOR 230V, 2-WIRE,
SCHEDULE OF LIGHTING FIXTURES AND LAMPS 15 SPARE 1500 20 60Hz, A.C. TO CONNECT TO AVAILABLE
POWER LINES.
INSTALLATION/ "MDP"- 3 3RD FLOOR
SYMBOLS DESCRIPTION 16 SPARE 1500 20
MOUNTING REINFORCED CONCRETE ELECTRIC
PEDESTAL 5.00m X 0.30m X 0.30m "DPB"
SURFACED CEILING

300mm
1 ONE (1)-28W, 230V,60Hz AC, FLUORESCENT LIGHTING FIXTURE, BOX TYPE. TOTAL 19580 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC
MOUNTED

3100mm (MIN.) - 5500mm (MAX.)


SURFACED CEILING TOTAL CONNECTED LOADS: 19580 VA
2 TWO (2)-28W, 230V, 60Hz AC, FLUORESCENT LIGHTING FIXTURE , BOX TYPE
MOUNTED
ELECTRIC SERVICE
METER (CTC METERING) PROPOSED: 2.0HP, 1Ø, 230V,
19580 (0.85) = 72.36 AMPERES "MDP"- 2 2ND FLOOR 60Hz., AC, WATER PUMP MOTOR
ONE (1)-18W, 230V, 60Hz AC,COMPACT FLUORESCENT LIGHTING FIXTURE WITH SURFACED CEILING I L @ 85% D.F. = USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
230
MEDIUM BASE KEYLESS TYPE PORCELAIN RECEPTACLE MOUNTED "PPH"
(72.36 A / 115 A )
M "DPA" "MDP"
ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH POWER FACTOR, PRE-HEAT
NOTE: WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES, MANHOLE SIZE
WIRED AND READY FOR USE. AS REQUIRED

1800mm
WP WP

FIN. FLOOR LINE A A


FIN. GRADE LINE
MH
TO "MDP"- 4
1-50mm² THHN IN 25mmØ C. -
2- 250mm² THHN + 1-50mm²THHN(G) CLAMPED TO A 25mmØ X
1-5.5mm² THHN IN 15mmØ C.
IN 90mmØ RSC 3000mm COPPERCLAD AUTOMATIC CIRCUIT BREAKER
A - CLAMPED TO A 16mmØ X
GROUNDING ELECTRODE 50AF, 2P, 240VOLTS, 30AT
2400mm COPPERCLAD
IN NEMA 3R ENCLOSURE
GROUNDING ELECTRODE
ELECTRICAL RISER DIAGRAM B
AUTOMATIC CIRCUIT BREAKER
NOT TO SCALE 50AF, 2P, 240VOLTS, 40AT
IN NEMA 3R ENCLOSURE

AUTOMATIC CIRCUIT BREAKER


C 100AF, 2P, 240VOLTS, 60AT
IN NEMA 3R ENCLOSURE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E - 10
BUILDINGS DIVISION SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
400 1000

ACCU-3 ACCU-3 ACCU-3


C C C
C
SPO SPO
SHO. 15 16 17
9 10 11 PWD
PWD DPA DPA DPA

DRY WALL
DPA DPA
3150

3150
DPA

HANDWASHING
HE
SHE LOCKERS
&

HANDWASHING
DRESSING RM.
CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING SCIENCE LABORATORY ROOM LANDING

CONCRETE PLATFORM
2 3 4 5
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
DPA
CONCRETE PLATFORM
3850

3850
HANDWASHING

6 7 8 FACP
STO. STO.
"DPA"
SPO DPA SPO DPA SPO DPA
"MDP"
B
UP WP WP UP
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
1200
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

1500 3600 M
LEGEND:
AUTOMATIC CIRCUIT BREAKER
C 100AF, 2P, 240VOLTS, 60AT
PROPOSED OVERHEAD ELECTRICAL
IN NEMA 3R ENCLOSURE
SERVICE ENTRANCE (REFER TO
ELECTRICAL RISER DIAGRAM)
NOTE: VERIFY EXACT LOCATION

2 GROUND FLOOR POWER LAYOUT(WITH SCIENCE LABORATORY ROOM - OPTION - 4)


SCALE 1: 100M.
E-10

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1575 1575 3425 400

C
b b x x
EF EF d SCFC SCFD SCFC SCFD SCFC SCFD EF EF EF
PWD w
Svw
v PWD
c a
SHE HE
1 1 S²cd S²ab 1 1
a a v w
S²ab 2 2 2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
2 C D C D C D S³vwx
f g h i j k l m n o p q r s
1 CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1
STAIR WELL z S u STAIR WELL
1 1
4 v
S²ab DPA
b
EF
2 2 2 2 2 2 CF 2 CF 2 2 CF 2 CF 2 2 CF 2 CF 2
STO. 2 A B A B A B STO. 3
RISER UP TO S3Wv @ 1 f g h i j k l m n o p q r s 1 DPA RISER UP TO S3Wv @
b 2 1
SECOND FLOOR y EF DPA DPA t SECOND FLOOR
SCFA SCFB SCFA SCFB SCFA SCFB
S S²fg S²hi Sj S²kl Sm S²no Sp S²qr Ss S²tu S
B S3Wv S3Wv
S3WA S3WB
S3WA
C O R R I D O R C O R R I D O R C O R R I D O R
1 1 1 1 1 1 1 1 1 1 1
A B A B A B A B A B A B

1 GROUND FLOOR LIGHTING LAYOUT (WITH SCIENCE LABORATORY ROOM - OPTION - 4)


SCALE 1: 100M.
E-10

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR LIGHTING LAYOUT (WITH SCIENCE
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LABORATORY ROOM - OPTION - 4) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) GROUND FLOOR POWER LAYOUT (WITH SCIENCE MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E - 11
BUILDINGS DIVISION
LABORATORY ROOM - OPTION - 4)
JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 12 90
ERIBERTO B. SIOSON OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
GENERAL NOTES: SCHEDULE OF LOADS AND COMPUTATIONS:
DISTRIBUTION PANELBOARD " DPC " (FOURTH FLOOR)
DISTRIBUTION PANELBOARD " DPA " (GROUND FLOOR)
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF THE PHILIPPINE
ELECTRICAL CODE, EXISTING APPLICABLE ORDINANCES, RULES AND REGULATIONS OF THE LOCAL GOVERNMENT AND WITH BRANCH BRANCH
THE REQUIREMENTS OF THE LOCAL POWER COMPANY. CKT. VA PER CKT. BREAKER SIZE OF HOMERUN CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT ) LOAD DESCRIPTION VOLTS ( WIRES IN CONDUIT )
NO. CKT. NO. CKT.
2. THE TYPE OF SERVICE POWER SUPPLY TO BE USED SHALL BE SINGLE-PHASE, 2-WIRE, 230V, 60 HERTZ, A.C AF P AT AF P AT

3. THE CONTRACTOR SHALL VERIFY AND ORIENT THE ACTUAL LOCATION OF SERVICE ENTRANCE FOR CONNECTION TO THE 1 LIGHTING OUTLETS 1260 230 100 2 20 2 - 3.5mm² THHN IN 15mm Ø C 1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
POWER COMPANY SERVICE POINT.
2 LIGHTING OUTLETS 885 20 2 - 3.5mm² THHN IN 15mm Ø C 2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C
4. UNLESS OTHERWISE SPECIFIED, THE MINIMUM SIZES OF WIRE AND GALVANIZED RIGID STEEL CONDUIT TO BE USED SHALL BE
3.5mm²,THHN AND 15mm NOMINAL DIAMETER, RESPECTIVELY. LIKEWISE ALL ELECTRICAL WIRES SHALL BE COLOR-CODED.
3 LIGHTING OUTLETS 1070 20 2 - 3.5mm² THHN IN 15mm Ø C 3 LIGHTING OUTLETS 1080 20 2 - 3.5mm² THHN IN 15mm Ø C
5. ALL LIGHTING CIRCUIT HOMERUNS AND CONVENIENCE OUTLETS SHALL BE WIRED WITH NOT LESS THAN 3.5 mm² IN SIZE.
4 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 4 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
6. WHEREVER REQUIRED AND NECESSARY, PULL OR JUNCTION BOXES SHALL BE INSTALLED AT CONVENIENT AND
INCONSPICUOUS LOCATION, ALTHOUGH SUCH BOXES ARE NOT SHOWN ON THE PLAN NOR MENTIONED IN THE SPECIFICATIONS.
5 CONVENIENCE OUTLETS 1440 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 5 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
7. ALL NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE PROPERLY GROUNDED IN ACCORDANCE
WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE. 6 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 6 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

8. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND OF THE APPROVED TYPE FOR LOCATION AND PURPOSE. 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 3HP, 1Ø, BOOSTER PUMP 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C
7 SPECIAL PURPOSE OUTLET 3000 30 7 3910 40
9. STANDARD TYPE OF ACCESSORIES, SPLICING DEVICES, TERMINATIONS AND OTHER APPURTENANCES FOR THE ENTIRE
ELECTRICAL INSTALLATION SHALL BE USED. 8 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 8 SPARE 1500 20

10. ALL WALL OUTLETS SHALL BE INSTALLED AT THE FOLLOWING HEIGHTS ABOVE THE FINISHED FLOOR LEVEL UNLESS NOTED IN 9 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 9 SPARE 1500 20
THE PLAN.
10 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 10 SPARE 1500 20
a) WALL SWITCHES @ 1300mm
b) WALL CONVENIENCE OUTLETS @ 300 mm
c) SPECIAL PURPOSE OUTLETS @ 300 mm 11 SPECIAL PURPOSE OUTLET 3000 30 2 - 5.5mm² THHN + 1 - 5.5mm² THHN (G) IN 15mm Ø C 11 SPARE 1500 20

11. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT AND IMMEDIATE SUPERVISION OF A DULY REGISTERED 12 FACP 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 12 SPARE 1500 20
ELECTRICAL ENGINEER.

13 CCTV 1500 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C TOTAL 14340 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC
ELECTRICAL SYMBOLS:
14 SPARE 1500 20 TOTAL CONNECTED LOADS: 14340 VA

15 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C 14340
I L @ 85% D.F. = (0.85) + 0.25 (17) = 57.25 AMPERES
CEILING LIGHT OUTLET 230
USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
REFER TO SCHEDULE OF 16 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C (57.25 A / 115 A )
CEILING LIGHT OUTLET LIGHTING FIXTURES AND LAMPS
17 3.0 TR, 1Ø, SPLIT TYPE ACU 4850 60 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
POWER PANELBOARD "PPH"
CF CEILING FAN, 60 WATTS, 230V, 60Hz BRANCH
18 SPARE 4850 60
CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS
NO. CKT. ( WIRES IN CONDUIT )
SCF CEILING FAN CONTROL SWITCH TOTAL 47455 MAIN LUGS ONLY: 225AMPS, 2P, 250V, 22KAIC AF P AT

S SINGLE POLE WALL SWITCH IN ONE SWITCH PLATE TOTAL CONNECTED LOADS: 47455 VA 1 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
(10 AMP., 230 VOLTS)
S² 2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS) 47455 2 2.0HP, 1Ø, 230V, WATER PUMP MOTOR 2760 230 50 2 30 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
I L @ 90% D.F. = (0.90) + 0.25 (21.09) = 190.97 AMPERES
230 USE : 2 - 100mm² THHN + 1 - 30mm² THHN (G) IN 50mm Ø C
S³ 3 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
(10 AMP., 230 VOLTS) (190.97 A / 225 A ) TOTAL 5520 MACB : 50AF, 2P, 250V, 50AT, 10KAIC

S3W THREE WAY WALL SWITCH (10 AMP., 230 VOLTS) DISTRIBUTION PANELBOARD " DPB " (SECOND & THIRD FLOOR)
TOTAL CONNECTED LOADS: 4600 VA
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS BRANCH
CKT. VA PER CKT. BREAKER SIZE OF HOMERUN
"WP" DENOTES WEATHERPROOF OUTLET LOAD DESCRIPTION VOLTS 5520
NO. CKT. ( WIRES IN CONDUIT ) I L @ 100% D.F. = (1.0) + 0.25 (12) = 27 AMPERES
AF P AT 230 USE : 2 -8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C
SPECIAL PURPOSE OUTLET, GROUNDING TYPE (20 AMP., 300 VOLTS)
SP
1 LIGHTING OUTLETS 1260 230 50 2 20 2 - 3.5mm² THHN IN 15mm Ø C
SINGLE CONVENIENCE OUTLET, GROUNDING TYPE MAIN DISTRIBUTION PANELBOARD "MDP "
EF "EF" DENOTES EXHAUST FAN (15 AMP., 230 VOLTS)
2 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C BRANCH
CONCEALED OR EMBEDDED CONDUIT RUN CKT. BREAKER
CKT. VA PER SIZE OF HOMERUN
LOAD DESCRIPTION VOLTS
3 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C NO. CKT. ( WIRES IN CONDUIT )
UNDERGROUND OR UNDERFLOOR CONDUIT RUN AF P AT

4 LIGHTING OUTLETS 1260 20 2 - 3.5mm² THHN IN 15mm Ø C


CIRCUIT HOMERUN 1 "DPA" 47455 230 225 2 225 2 - 100mm² THHN + 1 - 30mm² THHN (G) IN 50mm Ø C

5 LIGHTING OUTLETS 840 20 2 - 3.5mm² THHN IN 15mm Ø C


ENCLOSED CIRCUIT BREAKER 2 "DPB" 19580 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
RATING AS SHOWN ON THE PLAN
6 LIGHTING OUTLETS 1030 20 2 - 3.5mm² THHN IN 15mm Ø C
3 "DPC" 14340 230 225 2 100 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C
PB PULLBOX
7 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
4 "PPH" 5520 230 225 2 50 2 - 8.0mm² THHN + 1 - 5.5mm² THHN (G) IN 20mm Ø C

MAIN DISTRIBUTION PANELBOARD 8 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
TOTAL 86895 MACB : 400AF, 2P, 250V, 400AT, 42KAIC

9 CEILING FAN OUTLETS 600 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
DISTRIBUTION PANELBOARD
TOTAL CONNECTED LOADS: 82150 VA
10 CEILING FAN OUTLETS 900 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C
M ELECTRIC SERVICE METER
86895
I L @ 90% D.F. = (0.90) + 0.25 (21.09) = 345.30 AMPERES USE : 2 -250mm² THHN + 1 - 50mm² THHN (G) IN 90mm Ø RSC
11 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C 230 (345.30 A / 400 A )
ELECTRIC SERVICE ENTRANCE
12 CONVENIENCE OUTLETS 2160 20 2 - 3.5mm² THHN + 1 - 3.5mm² THHN (G) IN 15mm Ø C

CAPACITY OF TRANSFORMER:
GROUNDING SYSTEM 13 SPARE 1500 20
KVA = EI @ D.F. = 80%, DIVERSITY FACTOR = 1.10 DECKROOF
14 SPARE 1500 20 1000

FACP = (230) (377.80) (0.80) = 63.20 kVA


FIRE ALARM CONTROL PANEL NOTE:
15 SPARE 1500 20 1000 (1.10)
ALL SIZES OF SERVICE FEEDER (WIRES IN CONDUIT)
USE: ONE (1) SET - 65 kVA, 34.5 kV/230V, 1Ø, 60Hz, AC, OISC, POLE MOUNTED, REFER TO SCHEDULE OF LOADS AND COMPUTATIONS
16 SPARE 1500 20
DISTRIBUTION TRANSFORMER
4TH FLOOR
SCHEDULE OF LIGHTING FIXTURES AND LAMPS TOTAL 19580 MAIN ACB: 100AF, 2P, 100AT, 250V, 18KAIC
"DPC"
INSTALLATION/
SYMBOLS DESCRIPTION TOTAL CONNECTED LOADS: 19580 VA SERVICE LATERAL PROVIDED WITH 90mmØ
MOUNTING
"TYPE F" CONDULETS FOR 230V, 2-WIRE,
SURFACED CEILING 19580 60Hz, A.C. TO CONNECT TO AVAILABLE
1 ONE (1)-28W, 230V,60Hz AC, FLUORESCENT LIGHTING FIXTURE, BOX TYPE. (0.85) = 72.36 AMPERES
MOUNTED I L @ 85% D.F. =
230 USE : 2 - 30mm² THHN + 1 - 8.0mm² THHN (G) IN 40mm Ø C POWER LINES.
"MDP"- 3 3RD FLOOR
SURFACED CEILING
(72.36 A / 115 A )
2 TWO (2)-28W, 230V, 60Hz AC, FLUORESCENT LIGHTING FIXTURE , BOX TYPE REINFORCED CONCRETE ELECTRIC
MOUNTED
PEDESTAL 5.00m X 0.30m X 0.30m "DPB"

300mm
ONE (1)-18W, 230V, 60Hz AC,COMPACT FLUORESCENT LIGHTING FIXTURE WITH SURFACED CEILING

3100mm (MIN.) - 5500mm (MAX.)


MEDIUM BASE KEYLESS TYPE PORCELAIN RECEPTACLE MOUNTED

ELECTRIC SERVICE
NOTE: ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH POWER FACTOR, PRE-HEAT METER (CTC METERING) PROPOSED: 2.0HP, 1Ø, 230V,
WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES,
"MDP"- 2 2ND FLOOR 60Hz., AC, WATER PUMP MOTOR
WIRED AND READY FOR USE.
"PPH"
M "DPA" "MDP"
MANHOLE SIZE
AS REQUIRED

1800mm
WP WP

FIN. FLOOR LINE A A


FIN. GRADE LINE
MH
TO "MDP"- 4
1-50mm² THHN IN 25mmØ C. -
2- 250mm² THHN + 1-50mm²THHN(G) CLAMPED TO A 25mmØ X
1-5.5mm² THHN IN 15mmØ C.
IN 90mmØ RSC 3000mm COPPERCLAD AUTOMATIC CIRCUIT BREAKER
A - CLAMPED TO A 16mmØ X
GROUNDING ELECTRODE 50AF, 2P, 240VOLTS, 30AT
2400mm COPPERCLAD
IN NEMA 3R ENCLOSURE
GROUNDING ELECTRODE
ELECTRICAL RISER DIAGRAM B
AUTOMATIC CIRCUIT BREAKER
NOT TO SCALE 50AF, 2P, 240VOLTS, 40AT
IN NEMA 3R ENCLOSURE

AUTOMATIC CIRCUIT BREAKER


C 100AF, 2P, 240VOLTS, 60AT
IN NEMA 3R ENCLOSURE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SIGNED SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
MARU BRYAN T. ZAPLAN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ELECTRICAL SYMBOLS CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SCHEDULE OF LOADS MARU BRYAN T. ZAPLAN
ENGINEER II
APPROVED WITH SIGNATURE BOD
E - 12
BUILDINGS DIVISION SCHEDULE OF LIGHTING FIXTURES AND LAMPS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING ELECTRICAL RISER DIAGRAM CHECKED: SIGNED
OIC, UNDERSECRETARY FOR B 12 90
BONIFACIO DRIVE PORT AREA, MANILA ERIBERTO B. SIOSON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER IV TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1550

C
STO. STO.
3150

3150
SHE SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
TO DDR LOCATED TO DDR LOCATED
AT STORAGE ROOM AT STORAGE ROOM

B
RISER DN TO SIMILAR TO FACP TO FACP
F F
UP DN
OUTLET AT GRND FLR
B B DN UP
CCTV 3 CCTV 4
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

B SECOND FLOOR PLAN


SCALE 1: 100 M.
EC-1a

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 600 1000

2
C A-4

PWD PWD
3150

3150
HANDWASHING

HANDWASHING
HE
SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FL-1
LANDING LANDING
SD SD SD SD SD
CONCRETE PLATFORM

CONCRETE PLATFORM
TO FACP
1 2 3 4 5
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
FACP DDR
TTC

TO DDR LOCATED STO. STO. TO DDR LOCATED


AT STORAGE ROOM AT STORAGE ROOM

B
RISER UP TO SIMILAR
UP OUTLET AT 2ND FLR
UP
CCTV 1 CCTV 2
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

SLOPE 1:12 SLOPE 1:12


RAMP UP UP UP RAMP UP
ELEV. 0.00 mm

5
A-5

A GROUND FLOOR PLAN


SCALE 1: 100 M.
EC-1a

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
GROUND FLOOR FIRE DETECTION AND ALARM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SYSTEM CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SECOND FLOOR FIRE DETECTION AND ALARM SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-1a
BUILDINGS DIVISION SYSTEM JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING GROUND FLOOR CCTV SYSTEM CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA SECOND FLOOR CCTV SYSTEM CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
3425 1550 1550 3446

C
STO. STO.
3150

3150
D-3a BD-1 BD-1
SHE SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
TO DDR LOCATED TO DDR LOCATED
AT STORAGE ROOM AT STORAGE ROOM

B
RISER DN TO SIMILAR
UP DN
OUTLET AT GRND FLR
DN UP
CCTV 3 CCTV 4
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

B SECOND FLOOR PLAN


SCALE 1: 100 M.
EC-1b

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 600 1000

2
C A-4

KITCHEN PWD
PWD
3150

3150
TO FACP
HD
HANDWASHING

HANDWASHING
HE
SHE OPERABLE PARTITION

DRY WALL (low partition) - 1200 mm HIGH


CLASS ROOM CLASS ROOM CLASS ROOM
LECTURE AREA
7000

FL-1
LANDING LANDING
SD SD SD SD
CONCRETE PLATFORM

CONCRETE PLATFORM
DINING AREA LIVING AREA
2 3 4
9500

9500
HOME ECONOMIC ROOM
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
SD
3850

3850
1
TTC

TO DDR LOCATED STO. STO. TO DDR LOCATED


DDR

AT STORAGE ROOM AT STORAGE ROOM

B
RISER UP TO SIMILAR
UP OUTLET AT 2ND FLR
UP
CCTV 1 CCTV 2
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

5
A-5

A GROUND FLOOR PLAN WITH HOME ECONOMICS ROOM


SCALE 1: 100 M.
EC-1b

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
GROUND FLOOR FIRE DETECTION AND ALARM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SYSTEM WITH HOME ECONOMICS ROOM CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SECOND FLOOR FIRE DETECTION AND ALARM SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-1b
BUILDINGS DIVISION SYSTEM JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING GROUND FLOOR CCTV SYSTEM CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA SECOND FLOOR CCTV SYSTEM CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1550 3446

3150 STO. STO.

3150
BD-1 BD-1
SHE SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
TO DDR LOCATED TO DDR LOCATED
AT STORAGE ROOM AT STORAGE ROOM

B
RISER DN TO SIMILAR
UP DN
OUTLET AT GRND FLR
DN UP
CCTV 3 CCTV 4
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

B SECOND FLOOR PLAN


SCALE 1: 100 M.
EC-1c

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 600 1000

2
C A-4
TO EXISTING
TELCO

PWD PWD
COMPUTER LABORATORY ROOM
3150

3150
HANDWASHING

HANDWASHING
BD-1 BD-1
HE
SHE TO EXISTING
1
TELCO
CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
SD SD SD SD SD
CONCRETE PLATFORM

CONCRETE PLATFORM
TO FACP
2 3 4
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
TTC

TO DDR LOCATED STO. TO DDR LOCATED


DDR

AT STORAGE ROOM STO. AT STORAGE ROOM

B
RISER UP TO SIMILAR
UP OUTLET AT 2ND FLR
UP
CCTV 1 CCTV 2

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP
INCOMING
TELEPHONE & DATA
LINES (SEE NOTE 1) A
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

5
A-5

A GROUND FLOOR PLAN WITH COMPUTER LABORATORY


SCALE 1: 100 M.
EC-1c

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
GROUND FLOOR FIRE DETECTION AND ALARM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SYSTEM WITH COMPUTER LABORATORY CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SECOND FLOOR FIRE DETECTION AND ALARM SYSTEM SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-1c
BUILDINGS DIVISION GROUND FLOOR CCTV SYSTEM JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SECOND FLOOR CCTV SYSTEM CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1550 3446

C
STO. STO.
3150

3150
BD-1 BD-1
SHE SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
FL-1
7000

LANDING LANDING
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
TO DDR LOCATED TO DDR LOCATED
AT STORAGE ROOM AT STORAGE ROOM

B
RISER DN TO SIMILAR
UP DN
OUTLET AT GRND FLR
DN UP
CCTV 3 CCTV 4
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

B SECOND FLOOR PLAN


SCALE 1: 100 M.
EC-1b

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 400 1200 1100 2200 400 1000

C
(low partition) - 1800 mm HIGH

SHO.
PWD PWD
DRY WALL
3150

3150
HANDWASHING
HE
SHE LOCKERS
& CLASS ROOM CLASS ROOM CLASS ROOM FL-3
HANDWASHING

DRESSING RM.
7000

LANDING SCIENCE LABORATORY ROOM LANDING


SD SD SD SD SD

CONCRETE PLATFORM
EWF-1
D-2 TO FACP
2 3 4
9500

9500
HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
1
CONCRETE PLATFORM
3850

3850
HANDWASHING

TTC

TO DDR LOCATED
AT STORAGE ROOM
STO. STO. TO DDR LOCATED
AT STORAGE ROOM

B
RISER UP TO SIMILAR
UP OUTLET AT 2ND FLR
UP
CCTV 1 CCTV 2
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
SLOPE 1:12 SLOPE 1:12
RAMP UP UP UP RAMP UP

1500 3600 3600 1500

A GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM - OPTION - 4)


SCALE 1: 100 M.
EC-1d

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
GROUND FLOOR FIRE DETECTION AND ALARM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SYSTEM WITH SCIENCE LABORATORY CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) SECOND FLOOR FIRE DETECTION AND ALARM SYSTEM SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-1d
BUILDINGS DIVISION GROUND FLOOR CCTV SYSTEM JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SECOND FLOOR CCTV SYSTEM CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575 3425

C
STO. STO.
3150

3150
SHE SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
DN UP
B
PB RISER DN TO SIMILAR 25 mm DROP PB
DN
OUTLET AT 2ND FLR
DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

CORRIDOR

B FOURTH FLOOR PLAN


SCALE 1: 100 M.
EC-2

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575 3425

C
STO. STO.
3150

3150
SHE SHE
FL-3
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
SD SD SD SD SD
TO FACP
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
DN UP
B
PB RISER DN TO SIMILAR PB
DN
OUTLET AT 2ND FLR
DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

CORRIDOR

A THIRD FLOOR PLAN


SCALE 1: 100 M.
EC-2

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
THIRD FLOOR AND FOURTH FLOOR SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FIRE DETECTION AND ALARM SYSTEM CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-2
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
LEGEND & SYMBOLS:
SYMBOL D E S C R I P T I O N S

FACP FIRE ALARM CONTROL PANEL

B B
F MANUAL PULL STATION

VIBRATING BELL OUTLET, 230mm DIAMETER, 230V, 60HZ TO BE


B
INSTALLED @ 300mm BELOW CEILING LINE
SD 5 SETS
F "PB" F
PULLBOX
PB

SD SMOKE DETECTOR
FOURTH FLOOR LEVEL

15mmØ C HD HEAT DETECTOR

B B

SD 5 SETS
F "PB" F

THIRD FLOOR LEVEL

15mmØ C

B B

SD 5 SETS
F "PB" F

SECOND FLOOR LEVEL

B 15mmØ C B
NOTE:
"FACP"
HASHMARKS DENOTE NUMBER
OF 2.0mm² THHN in 15mmØ "PB"
SD 5 SETS
CONDUIT F F
TO DP
20mmØ C
GROUND FLOOR LEVEL
15mmØ C 15mmØ C
FINISHED GRADE LINE

TO "FACP" TO "FACP" TO "FACP"

( SCHOOL BUILDING , COMPUTER LABORATORY &


1 FIRE ALARM SYSTEM RISER DIAGRAM SCIENCE LABORATORY )
EC-3a NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
FIRE DETECTION AND ALARM SYSTEM WITH SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED COMPUTER LABORATORY RISER DIAGRAM CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20) (OPTION 1, 3 & 4 ) SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-3a
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
LEGEND & SYMBOLS:
SYMBOL D E S C R I P T I O N S

FACP FIRE ALARM CONTROL PANEL

B B
F MANUAL PULL STATION

VIBRATING BELL OUTLET, 230mm DIAMETER, 230V, 60HZ TO BE


B
INSTALLED @ 300mm BELOW CEILING LINE
SD 5 SETS
F "PB" F
PULLBOX
PB

SD SMOKE DETECTOR
FOURTH FLOOR LEVEL

15mmØ C HD HEAT DETECTOR

B B

SD 5 SETS
F "PB" F

THIRD FLOOR LEVEL

15mmØ C

B B

SD 5 SETS
F "PB" F

SECOND FLOOR LEVEL

B 15mmØ C B
NOTE:
"FACP"
HASHMARKS DENOTE NUMBER
OF 2.0mm² THHN in 15mmØ "PB"
SD 5 SETS HD 1 SET
CONDUIT F F
TO DP
20mmØ C
GROUND FLOOR LEVEL
15mmØ C 15mmØ C
FINISHED GRADE LINE

TO "FACP" TO "FACP" TO "FACP"

1 FIRE ALARM SYSTEM RISER DIAGRAM (HOME ECONOMICS ROOM)


EC-3b NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
FIRE DETECTION AND ALARM SYSTEM WITH HOME SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED ECONOMICS RISER DIAGRAM (OPTION 2 ) CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-3b
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
TTC

PABX

UPS

PB

1 NETWORK CABLING CONDUIT RISER DIAGRAM


EC-4 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
VOICE AND DATA SYSTEM RISER DIAGRAM SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-4
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
LEGEND & SYMBOLS:
SYMBOL D E S C R I P T I O N S
FOURTH FLOOR LEVEL
J JUNCTION BOX

CCTV CAMERA (COLOR DOME CAMERA)

CCTV CAMERA (WALL MOUNTED IP-CCTV CAMERA DOME))

PULLBOX
PB

THIRD FLOOR LEVEL DDR DIGITAL DISK RECORDER (TYPICAL)

2-WIRE, CCTV CABLE IN EACH 32mmØ

1-8
CCTV 3 CCTV 4

32mmØ C

SECOND FLOOR LEVEL L2 SWITCH

DDR
(8 CHANNEL)

CCTV 1 CCTV 2
L2 SWITCH
32mmØ C NETWORK

DDR
TO DIGITAL DISK
GROUND FLOOR LEVEL RECORDER

FINISHED GRADE LINE


TO DPS - 8
(2-3.5mm² THHN + 1-3.5mm² THHN(G) IN 15mmØ)
RGB MONITOR

1 CCTV SINGLE RISER DIAGRAM 1 CCTV SINGLE LINE DIAGRAM


EC-5 NOT TO SCALE EC-5 NOT TO SCALE

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
CLOSED CIRCUIT TELEVISION RISER DIAGRAM SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE BOD
EC-5
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED B 10 90
WILFRED M. NAPIZA OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
A DOME TYPE CAMERA MOUNTING DETAIL
SCALE NTS
EC 06

B CCTV MOUNTING DETAIL (WALL MOUNTED)


EC 06 SCALE NTS

SMOKE/HEAT DETECTOR MOUNTING DETAIL


C ON DROP CEILING W/ CONDUIT EMBEDDED
EC 06 SCALE NTS

D FIRE ALARM MANUAL PULL STATION AND HORN DETAIL


EC 06 SCALE NTS

REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: DESIGNED: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ELECTRONIC
MISCELLANEOUS DETAIL 1 SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED CADD: SIGNED
BUREAU OF DESIGN FOUR (4) STOREY, TWENTY (20)
SHEILA S. BONDOC
ENGINEERING ASSISTANT
APPROVED WITH SIGNATURE
BOD
EC-6
BUILDINGS DIVISION JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING CHECKED: SIGNED OIC, UNDERSECRETARY FOR
B 10 90
BONIFACIO DRIVE PORT AREA, MANILA WILFRED M. NAPIZA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE, BOD SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
GENERAL NOTES: 1 2 3 4 5 6 7 8 9 10 11 12 13
1. ALL WORKS SHOULD BE DONE IN ACCORDANCE 55000
WITH THE LATEST EDITION OF THE NATIONAL 5000 9000 9000 9000 9000 9000 5000
FIRE PROTECTION ASSOCIATION (NFPA) CODES
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
NO. 13 & 20, NATIONAL FIRE BUILDING CODE OF
THE PHILIPPINES.

2. ALL WORKS SHALL BE EXECUTED IN-CLOSE


COORDINATION WITH ALL OTHER TRADES. THE
ARCHITECT AND THE ENGINEER SHALL BE
NOTIFIED IMMEDIATELY OF ANY CONFLICT.
C
3. THE CONTRACTOR SHALL SUBMIT CATALOGUE /
BROCHURES SUBJECT FOR FURTHER TECHNICAL STO.
EVALUATION BY THE CONCERNED AUTHORITY HE

3150
(BOD) PRIOR TO PROCUREMENT / INSTALLATION RISER RISER
OF THE EQUIPMENT/UNIT. UP / DOWN SHE UP / DOWN

4. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM

7000
OTHERWISE NOTED. LANDING LANDING FHC

5. PIPE SLEEVES SHALL BE PROVIDED FOR ALL


1 2 3 4 5
9500

PIPES PASSING THRU SLABS, WALLS & BEAMS.

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR 3850
ALL TESTING AND COMMISSIONING FOR ALL
EQUIPMENT INSTALLED.
FE FE FE FE FE
B
UP DN FE FE DN UP
2500

C O R R I D O R C O R R I D O R C O R R I D O R

LEGEND: A
FIRE HOSE
CABINET WITH
RISER
FIRE EXTINGUISHER AND FIRE HOSE CABINET LAYOUT
SIAMESE TWIN /
FIRE DEPARTMENT
CONNECTION
2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
FP-1
EQUALIZER PIPE

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 3425 600 1000

63mm Ø G.I. SCH.40

PWD PWD
HANDWASHING
3150

HANDWASHING
HE RISER UP
RISER SHE
UP CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC FHC
1 2 3 4 5
CONCRETE PLATFORM

CONCRETE PLATFORM
LANDING LANDING
9500

HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

STO. STO.
FE FE FE FE FE
B
UP FE FE UP
2500

UP C O R R I D O R C O R R I D O R C O R R I D O R

A
100 X 63 X 63mm
1600

RAMP UP UP UP RAMP UP SIAMESE TWIN


FIRE DEPT.
FIRE EXTINGUISHER AND CONNECTION
FIRE HOSE CABINET LAYOUT
1500 3600 1 GROUND FLOOR PLAN
SCALE 1:100M
FP-1

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR FE AND FHC LAYOUT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 1
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) TYPICAL SECOND AND THIRD FLOOR FE AND CHECKED: JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SIGNED B 8 90
FHC LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575

C
STO.
HE

3150
RISER
SHE DOWN
RISER
DOWN
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC

1 2 3 4 5
9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

FE FE FE FE FE
UP UP
B
DN FE FE DN
2500

C O R R I D O R C O R R I D O R C O R R I D O R

1 FIRE EXTINGUISHER AND


13 FIRE HOSE CABINET LAYOUT
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
1 FOURTH FLOOR PLAN
FIRE HOSE CABINET (FHC) SCALE 1:100M
FP-4

FOURTH FLOOR LINE


FIRE EXTINGUISHER
SCHEDULE OF EQUIPMENT
WEIGHT
TYPE MAXIMUM VOLUME
DESIGNATION QUANTITY DISCHARGE RANGE DIAMETER EXTINGUISHING AGENT REMARKS
(LOCATION) OF PROTECTION
GROSS AGENT

FE 36 18.8 lbs. 10 LBS WALL MOUNTED 6.00 m. 15.2 cm. 51 m³ HCFC 123 ENVIRONMENT FRIENDLY, BRAND NEW AND READY FOR SERVICE

THIRD FLOOR LINE

G.A. No.16 STEEL BODY WITH WHITE PAINT FINISH

0.20
INTERIOR AND RED PAINT FINISH EXTERIOR
10 LBS. CO FIRE
EXTINGUISHER ALUMINUM FRAME FOR 3mm THK. FULL GLASS

SECOND FLOOR LINE 38mmØ ANGLE VALVE, BRONZE FINISH

mm SEMI-AUTOMATIC FIREHOSE RACK


63mm Ø G.I. SCH.40 50
38PLAIN STRAIGHT NOOZLE

0.90
6 mm x 50 mm

800 mm (H)
FLAT BAR 38mmØ X 30m FIREHOSE,
WALL 100% POLYESTER SINGLE JACKETED
BRACKET AND SYNTHETIC RUBBER LINING,
UL/FM APPROVED
12mmØ
BOLT SCREW
100mm Ø G.I. SCH.40

1.50
RISER PIPE (TYP.) G.A. 16 RED GLOSSY POLYESTER COATED STEEL
175 0.70
m CYLINDER 9Kg. ABC TYPE PORTABLE FIRE
m
EXTINGUISHER WITH HOSE, SQUEEZE GRIP
GROUND FLOOR LINE CONTROL NOZZLE AND DISCHARGE HORN
ELEVATION CONTENT PRESSURIZED AT APPROX. 195 P.S.I.

1500
WALL UL LISTED/FM APPROVED
100mm Ø FIN. FLOOR LINE
SIAMESE TWIN
CONNECTION PIPE WALL BRACKET WALL MOUNTED
100 X 63 X 63mm FIN.ISH FLOOR LINE
SIAMESE TWIN
FIRE HOSE CABINET (FHC)
2 DRY STAND PIPE RISER DIAGRAM CONNECTION 3 DET. OF FIRE DEPT. CONNECTION 4 FIRE EXTINGUISHER DETAIL 5 FIRE HOSE CABINET DETAIL
NOT TO SCALE FP-4 NOT TO SCALE NOT TO SCALE NOT TO SCALE
FP-4 FP-4 FP-4

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 2
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
GENERAL NOTES: 1 2 3 4 5 6 7 8 9 10 11 12 13
1. ALL WORKS SHOULD BE DONE IN ACCORDANCE 55000
WITH THE LATEST EDITION OF THE NATIONAL 5000 9000 9000 9000 9000 9000 5000
FIRE PROTECTION ASSOCIATION (NFPA) CODES
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
NO. 13 & 20, NATIONAL FIRE BUILDING CODE OF
THE PHILIPPINES.

2. ALL WORKS SHALL BE EXECUTED IN-CLOSE


COORDINATION WITH ALL OTHER TRADES. THE
ARCHITECT AND THE ENGINEER SHALL BE
NOTIFIED IMMEDIATELY OF ANY CONFLICT.
C
3. THE CONTRACTOR SHALL SUBMIT CATALOGUE /
BROCHURES SUBJECT FOR FURTHER TECHNICAL STO.
EVALUATION BY THE CONCERNED AUTHORITY HE

3150
(BOD) PRIOR TO PROCUREMENT / INSTALLATION RISER RISER
OF THE EQUIPMENT/UNIT. UP / DOWN SHE UP / DOWN

4. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM

7000
OTHERWISE NOTED. LANDING LANDING FHC

5. PIPE SLEEVES SHALL BE PROVIDED FOR ALL


1 2 3 4 5
9500

PIPES PASSING THRU SLABS, WALLS & BEAMS.

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL TESTING AND COMMISSIONING FOR ALL
EQUIPMENT INSTALLED.
FE FE FE FE FE
B
UP DN FE FE DN UP
2500

C O R R I D O R C O R R I D O R C O R R I D O R

LEGEND: A
FIRE HOSE
CABINET WITH
RISER
FIRE EXTINGUISHER AND FIRE HOSE CABINET LAYOUT
SIAMESE TWIN /
FIRE DEPARTMENT
CONNECTION
2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
FP-3
EQUALIZER PIPE

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 1550 1550 600 1000

63mm Ø G.I. SCH.40

PWD PWD
3150

HANDWASHING

HANDWASHING
KITCHEN HE RISER UP
RISER SHE
UP DRY WALL (low partition) - 1200 mm HIGH
LECTURE AREA CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC LANDING LANDING FHC


CONCRETE PLATFORM

CONCRETE PLATFORM
HOME ECONOMIC 2 3 4
DINING AREA
ROOM
9500

HANDWASHING

HANDWASHING
LIVING AREA

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

STO. STO.
FE FE FE FE FE
B
UP FE FE UP
2500

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
100 X 63 X 63mm
1600

1200

RAMP UP UP UP RAMP UP SIAMESE TWIN


FIRE DEPT.
CONNECTION

FIRE EXTINGUISHER AND


1500 3900 3900 1500
FIRE HOSE CABINET LAYOUT
1 GROUND FLOOR PLAN(WITH HOME ECONOMICS ROOM - OPTION - 2)
SCALE 1:100M
FP-3

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 3
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575

C
STO.
HE

3150
RISER
SHE DOWN
RISER
DOWN
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC

1 2 3 4 5
9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

FE FE FE FE FE
UP UP
B
DN FE FE DN
2500

C O R R I D O R C O R R I D O R C O R R I D O R

1 FIRE EXTINGUISHER AND


13 FIRE HOSE CABINET LAYOUT
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
1 FOURTH FLOOR PLAN
FIRE HOSE CABINET (FHC) SCALE 1:100M
FP-4

FOURTH FLOOR LINE


FIRE EXTINGUISHER
SCHEDULE OF EQUIPMENT
WEIGHT
TYPE MAXIMUM VOLUME
DESIGNATION QUANTITY DISCHARGE RANGE DIAMETER EXTINGUISHING AGENT REMARKS
(LOCATION) OF PROTECTION
GROSS AGENT

FE 36 18.8 lbs. 10 LBS WALL MOUNTED 6.00 m. 15.2 cm. 51 m³ HCFC 123 ENVIRONMENT FRIENDLY, BRAND NEW AND READY FOR SERVICE

THIRD FLOOR LINE

G.A. No.16 STEEL BODY WITH WHITE PAINT FINISH

0.20
10 LBS. CO FIRE INTERIOR AND RED PAINT FINISH EXTERIOR
EXTINGUISHER ALUMINUM FRAME FOR 3mm THK. FULL GLASS

SECOND FLOOR LINE 38mmØ ANGLE VALVE, BRONZE FINISH

mm SEMI-AUTOMATIC FIREHOSE RACK


63mm Ø G.I. SCH.40 50
38PLAIN STRAIGHT NOOZLE

0.90
6 mm x 50 mm

800 mm (H)
FLAT BAR 38mmØ X 30m FIREHOSE,
WALL 100% POLYESTER SINGLE JACKETED
BRACKET AND SYNTHETIC RUBBER LINING,
UL/FM APPROVED
12mmØ
BOLT SCREW
100mm Ø G.I. SCH.40

1.50
RISER PIPE (TYP.) G.A. 16 RED GLOSSY POLYESTER COATED STEEL
175 0.70
mm CYLINDER 9Kg. ABC TYPE PORTABLE FIRE
EXTINGUISHER WITH HOSE, SQUEEZE GRIP
GROUND FLOOR LINE CONTROL NOZZLE AND DISCHARGE HORN
ELEVATION CONTENT PRESSURIZED AT APPROX. 195 P.S.I.

1500
WALL UL LISTED/FM APPROVED
100mm Ø FIN. FLOOR LINE
SIAMESE TWIN
CONNECTION PIPE WALL BRACKET WALL MOUNTED
100 X 63 X 63mm FIN.ISH FLOOR LINE
SIAMESE TWIN
FIRE HOSE CABINET (FHC)
2 DRY STAND PIPE RISER DIAGRAM CONNECTION 3 DET. OF FIRE DEPT. CONNECTION 4 FIRE EXTINGUISHER DETAIL 5 FIRE HOSE CABINET DETAIL
NOT TO SCALE FP-4 NOT TO SCALE NOT TO SCALE NOT TO SCALE
FP-4 FP-4 FP-4

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 4
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
GENERAL NOTES: 1 2 3 4 5 6 7 8 9 10 11 12 13
1. ALL WORKS SHOULD BE DONE IN ACCORDANCE 55000
WITH THE LATEST EDITION OF THE NATIONAL 5000 9000 9000 9000 9000 9000 5000
FIRE PROTECTION ASSOCIATION (NFPA) CODES
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
NO. 13 & 20, NATIONAL FIRE BUILDING CODE OF
THE PHILIPPINES.

2. ALL WORKS SHALL BE EXECUTED IN-CLOSE


COORDINATION WITH ALL OTHER TRADES. THE
ARCHITECT AND THE ENGINEER SHALL BE
NOTIFIED IMMEDIATELY OF ANY CONFLICT.
C
3. THE CONTRACTOR SHALL SUBMIT CATALOGUE /
BROCHURES SUBJECT FOR FURTHER TECHNICAL STO.
EVALUATION BY THE CONCERNED AUTHORITY HE

3150
(BOD) PRIOR TO PROCUREMENT / INSTALLATION RISER RISER
OF THE EQUIPMENT/UNIT. UP / DOWN SHE UP / DOWN

4. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM

7000
OTHERWISE NOTED. LANDING LANDING FHC

5. PIPE SLEEVES SHALL BE PROVIDED FOR ALL 1 2 3 4 5


PIPES PASSING THRU SLABS, WALLS & BEAMS. 9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL TESTING AND COMMISSIONING FOR ALL
EQUIPMENT INSTALLED.
FE FE FE FE FE
B
UP DN FE FE DN UP
2500

C O R R I D O R C O R R I D O R C O R R I D O R

LEGEND: A
FIRE HOSE
CABINET WITH
RISER
FIRE EXTINGUISHER AND FIRE HOSE CABINET LAYOUT
SIAMESE TWIN /
FIRE DEPARTMENT
CONNECTION
2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
FP-5
EQUALIZER PIPE

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 1550 600 1000

63mm Ø G.I. SCH.40

PWD PWD
3150

HANDWASHING

HANDWASHING
HE RISER UP
RISER SHE
UP CLASS ROOM CLASS ROOM CLASS ROOM
COMPUTER LABORATORY ROOM
7000

FHC LANDING 1 LANDING FHC


2 3 4
CONCRETE PLATFORM

CONCRETE PLATFORM
9500

HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

STO. STO.
FE FE FE FE FE
B
UP FE FE UP
2500

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
100 X 63 X 63mm
1600

1200

SLOPE 1:12
RAMP UP UP UP RAMP UP SIAMESE TWIN
FIRE DEPT.
CONNECTION
FIRE EXTINGUISHER AND
1500 3900 FIRE HOSE CABINET LAYOUT 3900 1500

1 GROUND FLOOR PLAN(WITH COMPUTER LABORATORY ROOM - OPTION - 3)


SCALE 1: 100M
FP-5

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGEND CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR FE AND FHC LAYOUT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 5
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) TYPICAL SECOND AND THIRD FLOOR FE AND CHECKED: JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING SIGNED B 8 90
FHC LAYOUT CORNELIO T. EVANGELISTA JR.4 CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE
OIC, UNDERSECRETARY FOR
SECRETARY, DEP ED
BONIFACIO DRIVE PORT AREA, MANILA
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575

C
STO.
HE

3150
RISER
SHE DOWN
RISER
DOWN
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC

1 2 3 4 5
9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

FE FE FE FE FE
UP UP
B
DN FE FE DN
2500

C O R R I D O R C O R R I D O R C O R R I D O R

1 FIRE EXTINGUISHER AND


13 FIRE HOSE CABINET LAYOUT
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
1 FOURTH FLOOR PLAN
FIRE HOSE CABINET (FHC) SCALE 1: 100M
FP-6

FOURTH FLOOR LINE


FIRE EXTINGUISHER
SCHEDULE OF EQUIPMENT
WEIGHT
TYPE MAXIMUM VOLUME
DESIGNATION QUANTITY DISCHARGE RANGE DIAMETER EXTINGUISHING AGENT REMARKS
(LOCATION) OF PROTECTION
GROSS AGENT

FE 36 18.8 lbs. 10 LBS WALL MOUNTED 6.00 m. 15.2 cm. 51 m³ HCFC 123 ENVIRONMENT FRIENDLY, BRAND NEW AND READY FOR SERVICE

THIRD FLOOR LINE

G.A. No.16 STEEL BODY WITH WHITE PAINT FINISH

0.20
10 LBS. CO FIRE INTERIOR AND RED PAINT FINISH EXTERIOR
EXTINGUISHER ALUMINUM FRAME FOR 3mm THK. FULL GLASS

SECOND FLOOR LINE 38mmØ ANGLE VALVE, BRONZE FINISH

mm SEMI-AUTOMATIC FIREHOSE RACK


63mm Ø G.I. SCH.40 50
38PLAIN STRAIGHT NOOZLE

0.90
6 mm x 50 mm

800 mm (H)
FLAT BAR 38mmØ X 30m FIREHOSE,
WALL 100% POLYESTER SINGLE JACKETED
BRACKET AND SYNTHETIC RUBBER LINING,
UL/FM APPROVED
12mmØ
BOLT SCREW
100mm Ø G.I. SCH.40

1.50
RISER PIPE (TYP.) G.A. 16 RED GLOSSY POLYESTER COATED STEEL
175 0.70
mm CYLINDER 4.5 Kg. ABC TYPE PORTABLE FIRE
EXTINGUISHER WITH HOSE, SQUEEZE GRIP
GROUND FLOOR LINE CONTROL NOZZLE AND DISCHARGE HORN
ELEVATION CONTENT PRESSURIZED AT APPROX. 195 P.S.I.

1500
WALL UL LISTED/FM APPROVED
100mm Ø FIN. FLOOR LINE
SIAMESE TWIN
CONNECTION PIPE WALL BRACKET WALL MOUNTED
100 X 63 X 63mm FIN.ISH FLOOR LINE
SIAMESE TWIN
FIRE HOSE CABINET (FHC)
2 DRY STAND PIPE RISER DIAGRAM CONNECTION 3 DET. OF FIRE DEPT. CONNECTION 4 FIRE EXTINGUISHER DETAIL 5 FIRE HOSE CABINET DETAIL
NOT TO SCALE FP-6 NOT TO SCALE NOT TO SCALE NOT TO SCALE
FP-6 FP-6 FP-6

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 6
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
GENERAL NOTES: 1 2 3 4 5 6 7 8 9 10 11 12 13
1. ALL WORKS SHOULD BE DONE IN ACCORDANCE 55000
WITH THE LATEST EDITION OF THE NATIONAL 5000 9000 9000 9000 9000 9000 5000
FIRE PROTECTION ASSOCIATION (NFPA) CODES
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
NO. 13 & 20, NATIONAL FIRE BUILDING CODE OF
THE PHILIPPINES.

2. ALL WORKS SHALL BE EXECUTED IN-CLOSE


COORDINATION WITH ALL OTHER TRADES. THE
ARCHITECT AND THE ENGINEER SHALL BE
NOTIFIED IMMEDIATELY OF ANY CONFLICT.
C
3. THE CONTRACTOR SHALL SUBMIT CATALOGUE /
BROCHURES SUBJECT FOR FURTHER TECHNICAL STO.
EVALUATION BY THE CONCERNED AUTHORITY HE

3150
(BOD) PRIOR TO PROCUREMENT / INSTALLATION RISER RISER
OF THE EQUIPMENT/UNIT. UP / DOWN SHE UP / DOWN

4. ALL PIPE SIZES ARE IN MILLIMETERS UNLESS


CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM

7000
OTHERWISE NOTED. LANDING LANDING FHC

5. PIPE SLEEVES SHALL BE PROVIDED FOR ALL 1 2 3 4 5


PIPES PASSING THRU SLABS, WALLS & BEAMS. 9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ALL TESTING AND COMMISSIONING FOR ALL
EQUIPMENT INSTALLED.
FE FE FE FE FE
B
UP DN FE FE DN UP
2500

C O R R I D O R C O R R I D O R C O R R I D O R

LEGEND: A
FIRE HOSE
CABINET WITH
RISER
FIRE EXTINGUISHER AND FIRE HOSE CABINET LAYOUT
SIAMESE TWIN /
FIRE DEPARTMENT
CONNECTION
2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100 M
FP-7
EQUALIZER PIPE

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1000 600 3450 1550 1200 1550 600 1000

63mm Ø G.I. SCH.40

C
SHO.
PWD PWD
3150

LOCKERS
HANDWASHING

HANDWASHING
&
DRESSING RM. HE RISER UP
RISER SHE
UP CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC LANDING SCIENCE LABORATORY ROOM LANDING FHC


2 3 4
CONCRETE PLATFORM

CONCRETE PLATFORM
9500

HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
1
3850

STO. FE STO.
FE FE FE FE FE
B
UP FE UP
2500

UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
100 X 63 X 63mm
1600

1200

SLOPE 1:12
RAMP UP UP UP RAMP UP SIAMESE TWIN
FIRE DEPT.
CONNECTION

FIRE EXTINGUISHER AND


1500 3900 3900 1500
FIRE HOSE CABINET LAYOUT
1 GROUND FLOOR PLAN (WITH SCIENCE LABORATORY ROOM - OPTION - 4)
SCALE 1: 100M
FP-7

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT ENGINEERING ASSISTANT
EB FUMAR BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 7
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
1575

C
STO.
HE
3150 RISER
SHE DOWN
RISER
DOWN
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

FHC

1 2 3 4 5
9500

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

FE FE FE FE FE
UP UP
B
DN FE FE DN
2500

C O R R I D O R C O R R I D O R C O R R I D O R

1 FIRE EXTINGUISHER AND


13 FIRE HOSE CABINET LAYOUT
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
1 FOURTH FLOOR PLAN
FIRE HOSE CABINET (FHC) SCALE 1:100M
FP-8

FOURTH FLOOR LINE


FIRE EXTINGUISHER
SCHEDULE OF EQUIPMENT
WEIGHT
TYPE MAXIMUM VOLUME
DESIGNATION QUANTITY DISCHARGE RANGE DIAMETER EXTINGUISHING AGENT REMARKS
(LOCATION) OF PROTECTION
GROSS AGENT

FE 36 18.8 lbs. 10 LBS WALL MOUNTED 6.00 m. 15.2 cm. 51 m³ HCFC 123 ENVIRONMENT FRIENDLY, BRAND NEW AND READY FOR SERVICE

THIRD FLOOR LINE

G.A. No.16 STEEL BODY WITH WHITE PAINT FINISH

0.20
10 LBS. CO FIRE INTERIOR AND RED PAINT FINISH EXTERIOR
EXTINGUISHER ALUMINUM FRAME FOR 3mm THK. FULL GLASS

SECOND FLOOR LINE 38mmØ ANGLE VALVE, BRONZE FINISH

mm SEMI-AUTOMATIC FIREHOSE RACK


63mm Ø G.I. SCH.40 50
38PLAIN STRAIGHT NOOZLE

0.90
6 mm x 50 mm

800 mm (H)
FLAT BAR 38mmØ X 30m FIREHOSE,
WALL 100% POLYESTER SINGLE JACKETED
BRACKET AND SYNTHETIC RUBBER LINING,
UL/FM APPROVED
12mmØ
BOLT SCREW
100mm Ø G.I. SCH.40

1.50
RISER PIPE (TYP.) G.A. 16 RED GLOSSY POLYESTER COATED STEEL
175 0.70
mm CYLINDER 4.5 Kg. ABC TYPE PORTABLE FIRE
EXTINGUISHER WITH HOSE, SQUEEZE GRIP
GROUND FLOOR LINE CONTROL NOZZLE AND DISCHARGE HORN
ELEVATION CONTENT PRESSURIZED AT APPROX. 195 P.S.I.

1500
WALL UL LISTED/FM APPROVED
100mm Ø FIN. FLOOR LINE
SIAMESE TWIN
CONNECTION PIPE WALL BRACKET WALL MOUNTED
100 X 63 X 63mm FIN.ISH FLOOR LINE
SIAMESE TWIN
FIRE HOSE CABINET (FHC)
2 DRY STAND PIPE RISER DIAGRAM CONNECTION 3 DET. OF FIRE DEPT. CONNECTION 4 FIRE EXTINGUISHER DETAIL 5 FIRE HOSE CABINET DETAIL
NOT TO SCALE FP-8 NOT TO SCALE NOT TO SCALE NOT TO SCALE
FP-8 FP-8 FP-8

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED FOURTH FLOOR FE AND FHC LAYOUT CADD: SIGNED SIGNED
BUREAU OF DESIGN SCHEDULE OF EQUIPMENT
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
FP- 8
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) MISCELLANEOUS DETAILS JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3425 1550 1550 3446 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER
LOUVERS / VENT CAP
LOUVERS / VENT CAP

C
STO. EF1
EF1 EF1 EF1
3150

3150
CF CF CF CF CF CF CF CF CF CF
HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

FE
B
UP DN DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT


2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100 M.
M-1

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 1550 1575 3425 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER LOUVERS / VENT CAP
LOUVERS / VENT CAP

C
EF1
EF1 EF1 EF1 EF1
3150

3150
PWD CF CF CF CF CF CF CF CF CF CF PWD HE
HANDWASHING

HANDWASHING
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
1 2 3 4 5
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

STO. STO.

B
UP UP
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
RAMP UP UP UP RAMP UP

VENTILATION & CEILING FAN LAYOUT


1500 3600 1 GROUND FLOOR PLAN 3600 1500

SCALE 1: 100 M.
M-1

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF EQUIPMENTS CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR AIR CONDITIONING AND EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-1
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) VENTILATION LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING TYPICAL SECOND AND THIRD FLOOR CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA VENTILATION AND CEILING FAN LAYOUT CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
GENERAL NOTES SCHEDULE OF EQUIPMENT
1. CONTRACTOR IS ADVISED TO VISIT AND SURVEY THE PLACE OF INSTALLATION.
EXHAUST FAN
LEGENDS: DESIGNATION QTY.
CAPACITY
TYPE
STATIC MOTOR RATING
2. ALL AIR CONDITIONING UNITS AND VENTILATING UNITS TO BE SUPPLIED SHALL BE NEW AND CMH CFM PRESSURE RPM KW
VOLTS PHASE HERTZ
REMARKS
APPROVED PRODUCTS OF REPUTABLE MANUFACTURERS. CEILING
AUTOMATIC SHUTTER LOUVERS ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
EF1 17 170 100
CASSETTE
2.54mm H2O 800 0.02 230 SINGLE 60 STANDARD ACCESSORIES,READY FOR SERVICE.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE CLOSELY HIS WORK EXHAUST FANS
WITH THE OTHER TRADES CONCERNED.

4. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND FOR ACCOUNT OF THE CEILING FANS
CONTRACTOR.
CEILING FAN (OSCILLATING 360°)
CONSUMPTION AIR VELOCITY AIR DELIVERY WEIGHT REMARKS
5. AS-BUILT PLANS SHALL BE PROVIDED BY THIS CONTRACTOR AFTER COMPLETION OF WORKS. DESIGNATION QTY. Hz 3
(W) (m/min) (ft/min)
3
(m /min) (ft /min) (kg)
Hi 57.7 - 70.5 ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
6. ALL INSTALLATION WORKS SHALL BE DONE IN A NEAT AND WORK- MANLIKE MANNER. CF 80 60 277 909 86 3037 4.3
Lo 26.6 - 32.5 STANDARD ACCESSORIES,READY FOR SERVICE.

²
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
300 X 300mm
300 X 300mm
AUTOMATIC SHUTTER
AUTOMATIC SHUTTER 3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3425 LOUVERS / VENT CAP
LOUVERS / VENT CAP
1575 3175
1550

C
STO. EF1
EF1 EF1 EF1
HE
3150

3150
CF CF CF CF CF CF CF CF CF CF

SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

DN UP
B
DN DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT


1 FOURTH FLOOR PLAN
SCALE 1:100M
M-2
INTERIOR SIDE
OF BUILDING WALL
ITEM A B C D E

VENT CAP 190 106 23 147 53

CORD OUTLET INSTALLATION ORIFICE Ø4.5 FIXING


DESIGNATION A B C D E F G H I J K L M HOLE HOLES SPRING
WIRE
K PLATE
EXHAUST CONNECTION TO GUARD
EF1 354 126 140 200 135 230 268 13 300 108 13 108 13 FAN FRAME TOP
GRILL EXHAUST PIPE MOTOR

ØD
ØA
F sq. J

AIR FLOW
M

C
G sq.

FAN DRAIN HOLE B E


EXHAUST BLADE
D

EF-1
D

FAN CASING
E

STORMPROOF
E

STAINLESS STEEL
H

POWER VENTILATION CAP


H

EXHAUST B CORD
I sq. FAN BLADE

FRONT VIEW SIDE VIEW BOTTOM VIEW

CEILING MOUNTED (CASSETTE TYPE) EXHAUST AIR DUCT

2 EXHAUST FAN DETAIL 3 EXHAUST FAN (WALL MOUNTED) DETAIL 4 VENT CAP DETAIL
NOT TO SCALE SCALE NTS NOT TO SCALE
M-2 M-2 M-2

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGENDS
CADD: SIGNED SIGNED
BUREAU OF DESIGN FOURTH FLOOR VENTILATION AND CEILING FAN
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-2
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
SCHEDULE OF EQUIPMENT
SCHEDULE OF SPLIT TYPE AIR CONDITIONER (CEILING SUSPENDED) EXHAUST FAN
CAPACITY STATIC MOTOR RATING
INDOOR UNIT REMARKS DESIGNATION QTY. TYPE PRESSURE RPM KW REMARKS
CMH CFM VOLTS PHASE HERTZ
COOLING CAPACITY DIMENSION AIR FLOW ELECTRICAL DATA ALL UNITS SHALL BE BRAND NEW & CEILING ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
DESIGNATION QTY. CURRENT (A) COMPLETE ELECTRONIC (REMOTE)CONTROL EF1 17 170 100
CASSETTE
2.54mm H2O 800 0.02 230 SINGLE 60 STANDARD ACCESSORIES,READY FOR SERVICE.
BTU/hr kJ/hr HxWxD m³ / hr POWER INPUT (kW) EER VOLTS PHASE HERTZ WITH STANDARD ACCESSORIES,
STARTING RUNNING READY FOR SERVICE.
FCU-3
1 36,000 37,980 206 x 1280 x 660 1320 3.88 9.8 90 18.7 220 SINGLE 60 NOTE : ALL FAN COIL UNITS (FCUS) SHALL BE PROVIDED
(CS) WITH EVAPORATOR DRAIN PIPE.

OUTDOOR UNIT LOCATION


CONSUMPTION AIR VELOCITY AIR DELIVERY WEIGHT REMARKS
COMPRESSOR DESIGNATION QTY. Hz 3
DIMENSION FAN MOTOR OUTPUT PIPING CONNECTIONS WEIGHT (W) (m/min) (ft/min)
3
(m /min) (ft /min) (kg)
DESIGNATION QTY. (W x Qty) REFRIGERANT
Type QTY. HxWxD MAX LENGTH (m) LIQUID (mm) GAS (mm) (kg) GROUND FLOOR @ THE BACK OF Hi 57.7 - 70.5 ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
CF 76 60 277 909 86 3037 4.3
HERMETIC COMPUTER ROOM ²

Lo 26.6 - 32.5 STANDARD ACCESSORIES,READY FOR SERVICE.


ACCU-3 1 1 960 x 990 x 360 200 X 1 30 410 A 90
SCROLL

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3425 1550 1550 3446 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER
LOUVERS / VENT CAP
LOUVERS / VENT CAP

C
STO. EF1
EF1 EF1 EF1
3150

3150
CF CF CF CF CF CF CF CF CF CF
HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

FE
B
UP DN DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT


2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
M-3

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 1550 1550 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER LOUVERS / VENT CAP
LOUVERS / VENT CAP

ACCU-3
EF2
C
200 X200

FCU-3 EF1
EF1 EF1 (CS) EF1 EF1
3150

3150
PWD CF CF CF CF CF CF CF CF PWD
HANDWASHING

HANDWASHING
KITCHEN HE
SHE
DRY WALL (low partition) - 1200 mm HIGH
LECTURE AREA
CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
HOME ECONOMIC
DINING AREA 4
ROOM
9500

9500
HANDWASHING

HANDWASHING
LIVING AREA
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
1
CF CF CF CF CF CF CF CF

STO. STO.

B
UP UP
VERIFY EXACT
2500

2500
UP LOCATION OF HOOD C O R R I D O R C O R R I D O R C O R R I D O R UP
(SEE DETAIL)

A
1600

1600
1200

RAMP UP UP UP RAMP UP

VENTILATION, CEILING FAN &


1500 3900
AIRCONDITIONING LAYOUT 3900 1500
1 GROUND FLOOR PLAN(WITH HOME ECONOMICS ROOM - OPTION - 2)
SCALE 1:100M
M-3

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF EQUIPMENTS CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR AIR CONDITIONING AND EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-3
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) VENTILATION LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING TYPICAL SECOND AND THIRD FLOOR CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA VENTILATION AND CEILING FAN LAYOUT CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
300 X 300mm
300 X 300mm
AUTOMATIC SHUTTER
AUTOMATIC SHUTTER 3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3425 LOUVERS / VENT CAP
LOUVERS / VENT CAP
1575 3175
1550

C
STO. EF1
EF1 EF1 EF1
HE
3150

3150
CF CF CF CF CF CF CF CF CF CF

SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

DN UP
B
DN DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT

GENERAL NOTES 1 FOURTH FLOOR PLAN


SCALE 1:100M
M-4
INTERIOR SIDE
OF BUILDING WALL
ORIFICE
1. CONTRACTOR IS ADVISED TO VISIT AND SURVEY THE PLACE OF WIRE
WALL GUARD
INSTALLATION. FAN
MOTOR
SECOND FLOOR LINE FRAME
2. ALL AIR CONDITIONING UNITS AND VENTILATING UNITS TO BE SUPPLIED
SHALL BE NEW AND APPROVED PRODUCTS OF REPUTABLE EF2 200 X 200 CEILING LINE AIR FLOW
MANUFACTURERS.

200 X 200
FAN

100 VERIFY
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BLADE
COORDINATE CLOSELY HIS WORK WITH THE OTHER TRADES
CONCERNED. DESIGNATION A B C D E F G H I J K L M

150
POWER
E
EF1 354 126 140 200 135 230 268 13 300 108 13 108 13 CORD
4. REFRIGERANT SUCTION LINES SHALL BE INSULATED WITH 25 mm THICK
PREMOULDED ELASTOMERIC RUBBER INSULATION AS MANUFACTURED 600
H
3mm THICK
BY "ARMAFLEX",AEROFLEX OR APPROVED EQUAL. STAINLESS STEEL
EXHAUST FAN (WALL MOUNTED) DETAIL

VERIFY
4
5. INDIVIDUAL WEATHER PROOF TYPE CIRCUIT BREAKER SHALL BE FRONT VIEW CORD OUTLET INSTALLATION
SCALE NTS
PROVIDED PROVIDED FOR ALL CONDENSING UNITS. EXHAUST K HOLE
KITCHEN
M-4
F sq. J GRILL CONNECTION TO
6. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH EXHAUST PIPE GROUND FLOOR LINE
INSULATION TYPICAL TO REFRIGERANT PIPING. (REFER TO PIPE
INSULATION DETAIL.) 3 EXHAUST HOOD DETAIL ENCLOSED CIRCUIT BREAKER

M
G sq.

EXHAUST IN NEMA 3R ENCLOSURE


A

L
D

7. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH EF-1 M-4 NOT TO SCALE (SIZE AS REQUIRED)
FAN CASING
E

INSULATION TYPICAL TO REFRIGERANT PIPING.(REFER TO PIPE


INSULATION DETAIL.)
H

CONCRETE SLAB VERIFY MINIMUM SPACE


8. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND FOR I sq. B ITEM A B C D E
EXHAUST WITH EQUIPMENT SUPPLIER
ACCOUNT OF THE CONTRACTOR.
SIDE VIEW FAN BLADE BOTTOM VIEW VENT CAP 190 106 23 147 53
9. AS-BUILT PLANS SHALL BE PROVIDED BY THIS CONTRACTOR AFTER
COMPLETION OF WORKS. CEILING MOUNTED (CASSETTE TYPE) 4PCS-12mm Ø
ACCU STORMPROOF
DYNA BOLT EQUIPMENT BASE
10. ALL INSTALLATION WORKS SHALL BE DONE IN A NEAT AND WORK-
MANLIKE MANNER.
2 EXHAUST FAN DETAIL 12mmØ ROUND
NUT
STAINLESS STEEL
VENTILATION CAP
NOT TO SCALE NEOPRENE VIB.
M-4 BAR HANGER ISOLATOR
11. ALL REFRIGERANT SUCTION LINES EXPOSED INDOORS AND/OR
EXPOSED TO WEATHER SHOULD BE PROVIDED WITH GAUGE #24
ALUMINUM CLADDING. (SUBMIT SHOP DRAWING PRIOR TO 50 x 50 x 6mm
INSTALLATION) CONDUIT
VIBRATION ISOLATOR ANGLE BAR PIPE
A
12. ALL ACCU's AND FCU's SHALL BE PROVIDED WITH ANGULAR BAR LINE OF CEILING
FLR. SLAB WALL
SUPPORTS. (SUBMIT SHOP DRAWING PRIOR TO INSTALLATION) MAX. LOAD DIMENSIONS IN MM. EXHAUST
FCU 1400 X 195 mm

300
H

(LBS) L W H A B C D E AIR DUCT


SUPPLY AIR
E

SECTION - A 35 TO 120 WEATHER TIGHT


LEGENDS: 1400 X 195 mm
REMOVABLE SERVICE PANEL METAL FLEXIBLE Ø4.5 FIXING
"B" NC TAP DIMENSION SAME SIZE OF FCU HOLES SPRING
RETURN AIR CONDUIT
PLATE
ANGLE CONNECTOR
FAN COIL UNITS 135 TO 380 TOP
680

ØD
2400

ØA
W

EXHAUST FANS A
250 TO 1100 800
PROVIDE VIBRATOR ISOLATOR
CONDUIT PIPE TO

0.30 M
AIR COOLED CONDENSING UNITS C ACCU PEDESTAL WITH CIRCUIT HOMERUN C
1500 TO 4000 50 x 50 x6mm ANGLE BAR (SIZE AS REQUIRED) DRAIN B E
L
HOLE
16mm Ø
CEILING FANS PLAN FINISHED FLOOR LINE
FLR. SLAB
EXPANSION BOLT

AUTOMATIC SHUTTER LOUVERS


5 VIBRATION ISOLATOR DETAIL (CONE-TYPE) 6 DET. OF CEILING SUSPENDED FCU 7 ACCU MOUNTING DETAIL 8 VENT CAP DETAIL
M-4 NOT TO SCALE M-4 NOT TO SCALE M-4 NOT TO SCALE M-4 NOT TO SCALE

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGENDS
CADD: SIGNED SIGNED
BUREAU OF DESIGN FOURTH FLOOR VENTILATION AND CEILING FAN
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-4
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
SCHEDULE OF EQUIPMENT
SCHEDULE OF SPLIT TYPE AIR CONDITIONER (CEILING SUSPENDED) EXHAUST FAN
CAPACITY STATIC MOTOR RATING
INDOOR UNIT REMARKS DESIGNATION QTY. TYPE PRESSURE RPM KW REMARKS
CMH CFM VOLTS PHASE HERTZ
COOLING CAPACITY DIMENSION AIR FLOW ELECTRICAL DATA ALL UNITS SHALL BE BRAND NEW & CEILING ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
DESIGNATION QTY. CURRENT (A) COMPLETE ELECTRONIC (REMOTE)CONTROL EF1 17 170 100
CASSETTE
2.54mm H2O 800 0.02 230 SINGLE 60 STANDARD ACCESSORIES,READY FOR SERVICE.
BTU/hr kJ/hr HxWxD m³ / hr POWER INPUT (kW) EER VOLTS PHASE HERTZ WITH STANDARD ACCESSORIES,
STARTING RUNNING READY FOR SERVICE.
FCU-3
3 36,000 37,980 206 x 1280 x 660 1320 3.88 9.8 90 18.7 220 SINGLE 60 NOTE : ALL FAN COIL UNITS (FCUS) SHALL BE PROVIDED
(CS) WITH EVAPORATOR DRAIN PIPE.

OUTDOOR UNIT LOCATION


CONSUMPTION AIR VELOCITY AIR DELIVERY WEIGHT REMARKS
COMPRESSOR DESIGNATION QTY. Hz 3
DIMENSION FAN MOTOR OUTPUT PIPING CONNECTIONS WEIGHT (W) (m/min) (ft/min)
3
(m /min) (ft /min) (kg)
DESIGNATION QTY. (W x Qty) REFRIGERANT
Type QTY. HxWxD MAX LENGTH (m) LIQUID (mm) GAS (mm) (kg) GROUND FLOOR @ THE BACK OF Hi 57.7 - 70.5 ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
CF 72 60 277 909 86 3037 4.3
HERMETIC COMPUTER ROOM Lo 26.6 - 32.5 STANDARD ACCESSORIES,READY FOR SERVICE.

²
ACCU-3 3 3 960 x 990 x 360 200 X 3 30 410 A 90
SCROLL

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3425 1550 1550 3446 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER
LOUVERS / VENT CAP
LOUVERS / VENT CAP

C
STO. EF1
EF1 EF1 EF1
3150

3150
CF CF CF CF CF CF CF CF CF CF
HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

FE
B
UP DN DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT


2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1: 100M.
M-1

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3450 1550 1550 600 1000 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER LOUVERS / VENT CAP
LOUVERS / VENT CAP

ACCU-3 ACCU-3 ACCU-3

C
EF1
EF1 FCU-3 FCU-3 FCU-3
EF1 EF1 EF1
(CS) (CS) (CS)
3150

3150
PWD CF CF CF CF CF CF PWD
HANDWASHING

HANDWASHING
HE
SHE
COMPUTER LABORATORY ROOM
CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING 1 LANDING
CONCRETE PLATFORM

CONCRETE PLATFORM
2 3 4
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF

STO. STO.

B
UP UP
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
1200

SLOPE 1:12
RAMP UP UP UP RAMP UP

VENTILATION, CEILING FAN &


AIRCONDITIONING LAYOUT
1500 3900
1 GROUND FLOOR PLAN(WITH COMPUTER LABORATORY ROOM - OPTION - 3) 3900 1500

SCALE 1: 100M
M-5

REPUBLIC OF THE PHILIPPINES


DESIGNED: SIGNED
PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF EQUIPMENTS CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR AIR CONDITIONING AND EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-5
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) VENTILATION LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING TYPICAL SECOND AND THIRD FLOOR CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA VENTILATION AND CEILING FAN LAYOUT CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
300 X 300mm
300 X 300mm
AUTOMATIC SHUTTER
AUTOMATIC SHUTTER 3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3425 LOUVERS / VENT CAP
LOUVERS / VENT CAP
1575 3175
1550

C
STO. EF1
EF1 EF1 EF1
HE

3150

3150
CF CF CF CF CF CF CF CF CF CF

SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

DN UP
B
DN DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT

GENERAL NOTES 1 FOURTH FLOOR PLAN


SCALE 1:100M
M-6
INTERIOR SIDE
OF BUILDING WALL
ORIFICE
1. CONTRACTOR IS ADVISED TO VISIT AND SURVEY THE PLACE OF WIRE
GUARD
INSTALLATION. FAN
MOTOR
FRAME
2. ALL AIR CONDITIONING UNITS AND VENTILATING UNITS TO BE SUPPLIED
SHALL BE NEW AND APPROVED PRODUCTS OF REPUTABLE
AIR FLOW
MANUFACTURERS.
DESIGNATION A B C D E F G H I J K L M

D
FAN
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BLADE

E
COORDINATE CLOSELY HIS WORK WITH THE OTHER TRADES EF1 354 126 140 200 135 230 268 13 300 108 13 108 13
CONCERNED.

H
POWER
CORD
4. REFRIGERANT SUCTION LINES SHALL BE INSULATED WITH 25 mm THICK
PREMOULDED ELASTOMERIC RUBBER INSULATION AS MANUFACTURED FRONT VIEW CORD OUTLET INSTALLATION
EXHAUST K HOLE
BY "ARMAFLEX",AEROFLEX OR APPROVED EQUAL.
F sq. J GRILL CONNECTION TO
3 EXHAUST FAN (WALL MOUNTED) DETAIL
5. INDIVIDUAL WEATHER PROOF TYPE CIRCUIT BREAKER SHALL BE EXHAUST PIPE SCALE NTS
PROVIDED PROVIDED FOR ALL CONDENSING UNITS. M-6

M
G sq.
6. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH EXHAUST

L
D

INSULATION TYPICAL TO REFRIGERANT PIPING. (REFER TO PIPE EF-1


FAN CASING
E

INSULATION DETAIL.) ENCLOSED CIRCUIT BREAKER


IN NEMA 3R ENCLOSURE
H

7. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH (SIZE AS REQUIRED)
INSULATION TYPICAL TO REFRIGERANT PIPING.(REFER TO PIPE I sq. B
INSULATION DETAIL.) EXHAUST
SIDE VIEW FAN BLADE BOTTOM VIEW CONCRETE SLAB VERIFY MINIMUM SPACE
8. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND FOR WITH EQUIPMENT SUPPLIER ITEM A B C D E
ACCOUNT OF THE CONTRACTOR. CEILING MOUNTED (CASSETTE TYPE)
VENT CAP 190 106 23 147 53
9. AS-BUILT PLANS SHALL BE PROVIDED BY THIS CONTRACTOR AFTER
COMPLETION OF WORKS.
2 EXHAUST FAN DETAIL 4PCS-12mm Ø
NOT TO SCALE ACCU STORMPROOF
M-6 DYNA BOLT EQUIPMENT BASE STAINLESS STEEL
10. ALL INSTALLATION WORKS SHALL BE DONE IN A NEAT AND WORK- NUT
VENTILATION CAP
MANLIKE MANNER. 12mmØ ROUND NEOPRENE VIB.
BAR HANGER ISOLATOR
11. ALL REFRIGERANT SUCTION LINES EXPOSED INDOORS AND/OR
EXPOSED TO WEATHER SHOULD BE PROVIDED WITH GAUGE #24
ALUMINUM CLADDING. (SUBMIT SHOP DRAWING PRIOR TO 50 x 50 x 6mm
INSTALLATION) CONDUIT
VIBRATION ISOLATOR ANGLE BAR PIPE
A
12. ALL ACCU's AND FCU's SHALL BE PROVIDED WITH ANGULAR BAR LINE OF CEILING
FLR. SLAB WALL
SUPPORTS. (SUBMIT SHOP DRAWING PRIOR TO INSTALLATION) MAX. LOAD DIMENSIONS IN MM. EXHAUST
FCU 1400 X 195 mm

300
H

(LBS) L W H A B C D E AIR DUCT


SUPPLY AIR
E

SECTION - A 35 TO 120 WEATHER TIGHT


LEGENDS: 1400 X 195 mm
REMOVABLE SERVICE PANEL METAL FLEXIBLE Ø4.5 FIXING
"B" NC TAP DIMENSION SAME SIZE OF FCU HOLES SPRING
RETURN AIR CONDUIT
PLATE
ANGLE CONNECTOR
FAN COIL UNITS 135 TO 380 TOP
680

ØD
2400

ØA
W

EXHAUST FANS A
250 TO 1100 800
PROVIDE VIBRATOR ISOLATOR
CONDUIT PIPE TO

0.30 M
AIR COOLED CONDENSING UNITS C ACCU PEDESTAL WITH CIRCUIT HOMERUN C
1500 TO 4000 50 x 50 x6mm ANGLE BAR (SIZE AS REQUIRED) DRAIN B E
L
HOLE
16mm Ø
CEILING FANS PLAN FINISHED FLOOR LINE
FLR. SLAB
EXPANSION BOLT

AUTOMATIC SHUTTER LOUVERS


4 VIBRATION ISOLATOR DETAIL (CONE-TYPE) 5 DET. OF CEILING SUSPENDED FCU 6 ACCU MOUNTING DETAIL 7 VENT CAP DETAIL
M-6 NOT TO SCALE M-6 NOT TO SCALE M-6 NOT TO SCALE M-6 NOT TO SCALE

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGENDS
CADD: SIGNED SIGNED
BUREAU OF DESIGN FOURTH FLOOR VENTILATION AND CEILING FAN
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-6
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
SCHEDULE OF EQUIPMENT
SCHEDULE OF SPLIT TYPE AIR CONDITIONER (CEILING SUSPENDED) EXHAUST FAN
CAPACITY STATIC MOTOR RATING
INDOOR UNIT REMARKS DESIGNATION QTY. TYPE PRESSURE RPM KW REMARKS
CMH CFM VOLTS PHASE HERTZ
COOLING CAPACITY DIMENSION AIR FLOW ELECTRICAL DATA ALL UNITS SHALL BE BRAND NEW & CEILING ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
DESIGNATION QTY. CURRENT (A) COMPLETE ELECTRONIC (REMOTE)CONTROL EF1 21 170 100
CASSETTE
2.54mm H2O 800 0.02 230 SINGLE 60 STANDARD ACCESSORIES,READY FOR SERVICE.
BTU/hr kJ/hr HxWxD m³ / hr POWER INPUT (kW) EER VOLTS PHASE HERTZ WITH STANDARD ACCESSORIES,
STARTING RUNNING READY FOR SERVICE.
FCU-3
3 36,000 37,980 206 x 1280 x 660 1320 3.88 9.8 90 18.7 220 SINGLE 60 NOTE : ALL FAN COIL UNITS (FCUS) SHALL BE PROVIDED
(CS) WITH EVAPORATOR DRAIN PIPE.

OUTDOOR UNIT LOCATION


CONSUMPTION AIR VELOCITY AIR DELIVERY WEIGHT REMARKS
COMPRESSOR DESIGNATION QTY. Hz 3
DIMENSION FAN MOTOR OUTPUT PIPING CONNECTIONS WEIGHT (W) (m/min) (ft/min)
3
(m /min) (ft /min) (kg)
DESIGNATION QTY. (W x Qty) REFRIGERANT
Type QTY. HxWxD MAX LENGTH (m) LIQUID (mm) GAS (mm) (kg) GROUND FLOOR @ THE BACK OF Hi 57.7 - 70.5 ALL UNITS SHALL BE BRAND NEW ,& COMPLETE WITH
CF 72 60 277 909 86 3037 4.3
HERMETIC COMPUTER ROOM ²

Lo 26.6 - 32.5 STANDARD ACCESSORIES,READY FOR SERVICE.


ACCU-3 3 3 960 x 990 x 360 200 X 3 30 410 A 90
SCROLL

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3425 1550 1550 3446 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER
LOUVERS / VENT CAP
LOUVERS / VENT CAP

C
STO. EF1
EF1 EF1 EF1
3150

3150
CF CF CF CF CF CF CF CF CF CF
HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

LANDING LANDING

1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

FE
B
UP DN DN UP
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT


2 TYPICAL SECOND AND THIRD FLOOR PLAN
SCALE 1:100M.
M-7

1 2 3 4 5 6 7 8 9 10 11 12 13
55000
5000 9000 9000 9000 9000 9000 5000
3175 1825 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3175
300 X 300mm
300 X 300mm 3450 1550 1200 1550 600 1000 AUTOMATIC SHUTTER
AUTOMATIC SHUTTER LOUVERS / VENT CAP
LOUVERS / VENT CAP

ACCU-3 ACCU-3 ACCU-3

C
EF1
EF1 FCU-3 FCU-3 FCU-3
EF1 EF1 EF1
(CS) (CS) (CS)
3150

3150
LOCKERS
PWD CF CF CF CF CF CF PWD
HANDWASHING

HANDWASHING
&
DRESSING RM. HE
SHE

CLASS ROOM CLASS ROOM CLASS ROOM


7000

LANDING SCIENCE LABORATORY ROOM LANDING


CONCRETE PLATFORM

CONCRETE PLATFORM
2 3 4
9500

9500
HANDWASHING

HANDWASHING
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
1
3850

3850
EF1
CF CF CF CF CF CF
EF1
STO. STO.

B
UP UP
2500

2500
UP C O R R I D O R C O R R I D O R C O R R I D O R UP

A
1600

1600
1200

SLOPE 1:12
RAMP UP UP UP RAMP UP

VENTILATION, CEILING FAN &


AIRCONDITIONING LAYOUT
1500 3900
1 GROUND FLOOR PLAN(WITH SCIENCE LABORATORY ROOM - OPTION - 4) 3900 1500

SCALE 1: 100M.
M-7

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED SCHEDULE OF EQUIPMENTS CADD: SIGNED SIGNED
BUREAU OF DESIGN GROUND FLOOR AIR CONDITIONING AND EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-7
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) VENTILATION LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING TYPICAL SECOND AND THIRD FLOOR CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA VENTILATION AND CEILING FAN LAYOUT CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
1 2 3 4 5 6 7 8 9 10 11 12 13
55000
300 X 300mm
300 X 300mm
AUTOMATIC SHUTTER
AUTOMATIC SHUTTER 3800 1200 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 1825 3425 LOUVERS / VENT CAP
LOUVERS / VENT CAP
1575 3175
1550

C
STO. EF1
EF1 EF1 EF1
HE

3150

3150
CF CF CF CF CF CF CF CF CF CF

SHE
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
7000

1000
1 2 3 4 5
9500

9500
BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE

BLACKBOARD BASE
3850

3850
CF CF CF CF CF CF CF CF CF CF

DN UP
B
DN DN
2500

2500
C O R R I D O R C O R R I D O R C O R R I D O R

VENTILATION & CEILING FAN LAYOUT

GENERAL NOTES 1 FOURTH FLOOR PLAN


SCALE 1:100M
M-8
INTERIOR SIDE
OF BUILDING WALL
ORIFICE
1. CONTRACTOR IS ADVISED TO VISIT AND SURVEY THE PLACE OF WIRE
GUARD
INSTALLATION. FAN
MOTOR
FRAME
2. ALL AIR CONDITIONING UNITS AND VENTILATING UNITS TO BE SUPPLIED
SHALL BE NEW AND APPROVED PRODUCTS OF REPUTABLE
AIR FLOW
MANUFACTURERS.
DESIGNATION A B C D E F G H I J K L M

D
FAN
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO BLADE

E
COORDINATE CLOSELY HIS WORK WITH THE OTHER TRADES EF1 354 126 140 200 135 230 268 13 300 108 13 108 13
CONCERNED.

H
POWER
CORD
4. REFRIGERANT SUCTION LINES SHALL BE INSULATED WITH 25 mm THICK
PREMOULDED ELASTOMERIC RUBBER INSULATION AS MANUFACTURED FRONT VIEW CORD OUTLET INSTALLATION
EXHAUST K HOLE
BY "ARMAFLEX",AEROFLEX OR APPROVED EQUAL.
F sq. J GRILL CONNECTION TO
3 EXHAUST FAN (WALL MOUNTED) DETAIL
5. INDIVIDUAL WEATHER PROOF TYPE CIRCUIT BREAKER SHALL BE EXHAUST PIPE SCALE NTS
PROVIDED PROVIDED FOR ALL CONDENSING UNITS. M-8

M
G sq.
6. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH EXHAUST

L
D

INSULATION TYPICAL TO REFRIGERANT PIPING. (REFER TO PIPE EF-1


FAN CASING
E

INSULATION DETAIL.) ENCLOSED CIRCUIT BREAKER


IN NEMA 3R ENCLOSURE
H

7. ALL EXPOSED DRAIN LINES TO THE CEILING SHALL BE PROVIDED WITH (SIZE AS REQUIRED)
INSULATION TYPICAL TO REFRIGERANT PIPING.(REFER TO PIPE I sq. B
INSULATION DETAIL.) EXHAUST
SIDE VIEW FAN BLADE BOTTOM VIEW CONCRETE SLAB VERIFY MINIMUM SPACE
8. ALL NECESSARY GOVERNMENT PERMITS SHALL BE SECURED AND FOR WITH EQUIPMENT SUPPLIER ITEM A B C D E
ACCOUNT OF THE CONTRACTOR. CEILING MOUNTED (CASSETTE TYPE)
VENT CAP 190 106 23 147 53
9. AS-BUILT PLANS SHALL BE PROVIDED BY THIS CONTRACTOR AFTER
COMPLETION OF WORKS.
2 EXHAUST FAN DETAIL 4PCS-12mm Ø
NOT TO SCALE ACCU STORMPROOF
M-8 DYNA BOLT EQUIPMENT BASE STAINLESS STEEL
10. ALL INSTALLATION WORKS SHALL BE DONE IN A NEAT AND WORK- NUT
VENTILATION CAP
MANLIKE MANNER. 12mmØ ROUND NEOPRENE VIB.
BAR HANGER ISOLATOR
11. ALL REFRIGERANT SUCTION LINES EXPOSED INDOORS AND/OR
EXPOSED TO WEATHER SHOULD BE PROVIDED WITH GAUGE #24
ALUMINUM CLADDING. (SUBMIT SHOP DRAWING PRIOR TO 50 x 50 x 6mm
INSTALLATION) CONDUIT
VIBRATION ISOLATOR ANGLE BAR PIPE
A
12. ALL ACCU's AND FCU's SHALL BE PROVIDED WITH ANGULAR BAR LINE OF CEILING
FLR. SLAB WALL
SUPPORTS. (SUBMIT SHOP DRAWING PRIOR TO INSTALLATION) MAX. LOAD DIMENSIONS IN MM. EXHAUST
FCU 1400 X 195 mm

300
H

(LBS) L W H A B C D E AIR DUCT


SUPPLY AIR
E

SECTION - A 35 TO 120 WEATHER TIGHT


LEGENDS: 1400 X 195 mm
REMOVABLE SERVICE PANEL METAL FLEXIBLE Ø4.5 FIXING
"B" NC TAP DIMENSION SAME SIZE OF FCU HOLES SPRING
RETURN AIR CONDUIT
PLATE
ANGLE CONNECTOR
FAN COIL UNITS 135 TO 380 TOP
680

ØD
2400

ØA
W

EXHAUST FANS A
250 TO 1100 800
PROVIDE VIBRATOR ISOLATOR
CONDUIT PIPE TO

0.30 M
AIR COOLED CONDENSING UNITS C ACCU PEDESTAL WITH CIRCUIT HOMERUN C
1500 TO 4000 50 x 50 x6mm ANGLE BAR (SIZE AS REQUIRED) DRAIN B E
L
HOLE
16mm Ø
CEILING FANS PLAN FINISHED FLOOR LINE
FLR. SLAB
EXPANSION BOLT

AUTOMATIC SHUTTER LOUVERS


4 VIBRATION ISOLATOR DETAIL (CONE-TYPE) 5 DET. OF CEILING SUSPENDED FCU 6 ACCU MOUNTING DETAIL 7 VENT CAP DETAIL
M-8 NOT TO SCALE M-8 NOT TO SCALE M-8 NOT TO SCALE M-8 NOT TO SCALE

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GENERAL NOTES
ENGINEER II
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
MODIFIED STANDARD DPWH - DEPED LEGENDS
CADD: SIGNED SIGNED
BUREAU OF DESIGN FOURTH FLOOR VENTILATION AND CEILING FAN
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
M-8
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) LAYOUT JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS
CHECKED: SIGNED B 8 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH
SCHEDULE OF EQUIPMENT
WATER PUMP
AIR VENT
50mmØ MOTOR RATING
OVER FLOW STANDARD MANHOLE CAPACITY TDH
DESIGNATION QTY. TYPE REMARKS
PIPE L / min. / (gpm) (meters)
RPM KW (hp) VOLTS PHASE HERTZ

END - SUCTION
BRAND NEW AND OF THE APPROVED TYPE, 1 2 12 13
WP 2 302.8(80) 27 3500 2.24(3) 230 SINGLE 60 COMPLETE WITH STANDARD ACCESSORIES,
CENTRIFUGAL
READY FOR SERVICE
STAINLESS STEEL 500
500 5000 5000
BOOSTER PUMP OVERHEAD WATER TANK
CUT IN - CUT CAP.=2,000 GALLONS
CAPACITY TDH OFF MOTOR RATING (7570 LITERS)
GV DESIGNATION QTY TYPE REMARKS
L / min. / (gpm) (meters) PRESSURE
KW (hp)
(Psi) VOLTS PHASE HERTZ
BRAND NEW AND OF THE APPROVED TYPE, 2800 2800

1100
50mmØ G.I. PIPE SCH. 40 RISER
(TO DRAINAGE SYSTEM) BP 1 227(60) 1 SET DUPLEX 38 40 - 60 2.24(3) 230 SINGLE 60 COMPLETE WITH STANDARD ACCESSORIES, DOWN
READY FOR SERVICE A EQUALIZER PIPE
DECK 75 mm Ø G. I. PIPE SCH. 40 BOOSTER PUMP
GV

4250

1900

1900
(3Hp,60 GPM,TDH 38m/
ROOF 125ft)

3150
50mmØ G.I. PIPE SCH. 40 1
AIR VENT

850
LINE OF ROOF
(DISTRIBUTION LINE) 50mmØ EAVES ABOVE 2

OVER FLOW STANDARD

7000
OV STA PIPE MANHOLE DN DN
ER INL
CA HEA ESS
P.= D W ST

9500
2,0 A EE ELECTRODES
(75 00 G TER T L

3850
A WITH HOLDER 50mmØ PIPE-CONNECT DOWN
70
LIT LLON ANK NOTE : TO RISER (DRYPIPE)
FIRE HOSE CABINET (FHC)
ER
S) S IN CASE OF FIRE OPEN
GATE VALVE 1&2 AND
RUN/START BOOSTER
GV B PUMP

2500
50mmØ G.I. PIPE SCH. 40
(TO DRAINAGE SYSTEM) GV
GV1
C

1100
TO 50mmØ G.I. PIPE SCH. 40
TO GV2
MC MC MCB MC MC PUMP "1" (DISTRIBUTION LINE) BP
PUMP "2"
STANDARD MANHOLE STAINLESS STEEL
ALT OVERHEAD WATER TANK
1&2 CAP.= ±2,500 GALLONS) (SHOWING OVERHEAD WATER TANK)
50mmØ PIPE-CONNECT
DOWN TO RISER (DRYPIPE)
FIRE HOSE CABINET (FHC) 2800 5 PARTIAL ROOF DECK PLAN
1 1 AIR VENT SCALE 1: 100 M.

65mmØ G.I. PIPE SCH. 40


WP-1

(DISCHARGE LINE PIPE)


P P
8 6 2 2 6 8 LEGEND :
9 7 7 9
3 GATE VALVE 12 13
300 1000
50mmØ G.I. PIPE SCH. 40 63mmØ G.I. PIPE SCH. 40
S 4 3 S 1000
BH TYPE BW TYPE ( OVER FLOW PIPE ) ( DISCHARGE PIPE )

1900
5 CHECK VALVE
2 RH RELAY RH RELAY 5000

1000
PRESSURE GUAGE 1825 3175 MANHOLE
50mmØ G.I. PIPE SCH. 40 600 x 600mm

1000
CONCRETE
ELECTRODE (DISTRIBUTION LINE) 1575 3425 RISER UP TO
TEE SADDLE OVERHEAD
HOLDER DECK ROOF LINE
WATER TANK

ELBOW C
50mmØ G.I. PIPE SCH. 40
( TO DRAINAGE SYSTEM ) WP2
ELECTRODE FOOT VALVE PWD
300

3150
1000

HOLDER WP1
1600

HANDWASHING
HWL
HE
IWL GROUND LWL LOW WATER LEVEL 3 ELEVATION OF OVERHEAD WATER TANK
2800

LWL
SCALE NTS
WP-1

7000
IWL INTERMEDIATE WATER LEVEL CISTERN
OVERHEAD WATER TANK LANDING
CAP.= ±60,000

CONCRETE PLATFORM
CAP.= 2,000 GALLONS Liters
HWL HIGH WATER LEVEL MANHOLE

8000
(7,570 LITERS)

9500

HANDWASHING
(±15,852 Gallons)

BLACKBOARD BASE
WP2 600 x 600mm

3850
MCB MAIN CIRCUIT BREAKER 0
800 EV
EL
CB CIRCUIT BREAKER WP1 NDL
OU
1900 500 GR STO.
D
MC MAGNETIC HE
OPERATION : FINIS B
CONTACTOR
UP
FOOT

2500
1. WATER LEVEL BELOW LOW WATER LEVEL (LWL) ELECTRODE, PUMPS "1" & "2" START TO OPERATE
UP
3000

UP TO HIGH WATER LEVEL (HWL) ELECTRODES & STOPS. CISTERN VALVE


CAP.= 60,000 Liters 3000
2500

(±15,852 Gallons) A
2. WATER LEVEL BELOW INTERMEDIATE WATER LEVEL (IWL) ELECTRODE EITHER PUMP "1" OR "2"

1600
OPERATES AS INDICATED BY ALTERNATOR & RELAY RH, FURTHER DRAIN OF WATER BELOW RAMP UP
LOW WATER LEVEL (LWL ELECTRODE WILL START PUMP "1" & "2" AS INDICATED BY RELAY 2RH.

3600 1500
3. ALTERNATOR ALTERNATE THE OPERATION OF PUMPS "1" & "2" AT SPECIFIC TIME SCHEDULE OF 300
0
OPERATION. NOTE : VERIFY EXACT LOCATION OF CISTERN /PUMP ROOM SUBJECT TO SITE CONDITION AND LOCAL WATER UTILITY SOURCE

(SHOWING LOCATION OF CISTERN)


1 SCHEMATIC DIAGRAM OF WATER LEVEL CONTROL 2 ISOMETRIC DIAGRAM OF WATER PUMPING SYSTEM 4 PARTIAL GROUND FLOOR PLAN
SCALE 1: 100 M.
WP-1 SCALE NTS WP-1 SCALE NTS WP-1

DESIGNED: SIGNED
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: CONCURRED: SET NO. SHEET NO.
BENJAMIN R. GALMAK
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENGINEER II
MODIFIED STANDARD DPWH - DEPED SCHEDULES OF EQUIPMENT CADD: SIGNED
SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
SIGNED
BUREAU OF DESIGN ISOMETRIC DIAGRAM OF WATER PUMPING
SYSTEM
EB FUMAR
ENGINEERING ASSISTANT
BR GALMAK
ENGINEER II
APPROVED WITH SIGNATURE BOD
WP- 1
BUILDINGS DIVISION FOUR (4) STOREY, TWENTY (20) JOSEPHINE P. ISTURIS LEA N. DELFINADO GILBERTO S. REYES LEONOR M. BRIONES
CLASSROOM SCHOOL BUILDING MISCELLANEOUS DETAILS CHECKED: SIGNED B 1 90
CORNELIO T. EVANGELISTA JR.4 OIC, UNDERSECRETARY FOR
BONIFACIO DRIVE PORT AREA, MANILA CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE SECRETARY, DEP ED
ENGINEER III TECHNICAL SERVICES, DPWH

You might also like