Professional Documents
Culture Documents
LOAD(T/m)
TRIANGULAR
P1 P2 Load (T/m)
w
Support Bending
UDL Reactions Moment
w
a1
a b
a2 a
Reaction Right
Reaction Left
Beam No.
continuity
"L" OR "R"
"L" OR "R"
"L" OR "R"
"L" OR "R"
"L" OR "R"
Span (M)
Max
(T/m)
(T/m)
(T/m)
(MT)
(MT)
a1 b1 a2 b2 a3 b3 a1 a2 a3 a4 a5 a B.M.
(T.M)
Remark
R.C.C. Beam Schedule
Proposed Residential Building at Vile
Project :- Parle (East)
Job No. :- 1002 Floor Lev:- 2nd
Date:- 5/4/2004 Input by:- Siddique
Grade of Concrete (Fck) (N/mm2) 20
Grade of steel (Fe) (N/mm )
2
415