Optimization
Sampling, Company’s
Capabilities, and Consumer
Needs
Measure
Conclude
Understand Analyze
Company, Situation,
Complication, and Key Root causes and potential
Question solution.
Understand - TransJakarta’s Profile and condition
SITUATION
SAMPLING
Persentase Riders Percentage per Bus Corridor
Bus Transjakarta 2016[7]
• Parreto Chart is used to take 2 samples that 90,8
100
categorized as crowded and normal corridors. 84,39 90
76,97
80
• Pareto chart function is to highlight the most
70
important among a set of factors with rules of
(%) Penumpang
thumb 80/20. 60
50
• 1 sample in Crowded corridors represent the 40
80% and 1 sample in normal corridors
30
represent the 20%. 22,1
20
10
0
I IX V VII VIII III VI II IV X XI XII
Koridor
Sample 1 Sample 2
Corridor 1 Corridor 4
Blok M- Kota
P.Gadung-Dukuh Atas
19 Station 18 Station
15,48 km routes 12,33 km routes
Measures - Understanding the current Gap
CAPABILITIES VS NEEDS
Assumption: Peak Hours (40% from daily), 1 way, passenger ride max half routes (50%)*
x
Not Meet SLA
192 Buses 60 Seats 12598 Riders
Corridor 1 Overcapt 6 People
(Crowded) =
PerBus
11520 Rider SLA 15 Mins
x
Meet SLA
53 Buses 60 Seats
Corridor 4
(Normal) 3480 Riders Overcapt 6
= People PerBus
3180 Rider SLA 30 Mins
Money
The Limited and price problems
Should be more convenient to be solve • Expensive
Than external problems that don’t have certainty Alternative
yet
Analyze - Finding Potential (Multi- perspectives) solution
City
Contract with other Jaklingo Operator non-BRT, to
provide rented or new buses
High
[3] https://www.transjakarta.co.id/transjakarta-berlakukan-pola-operasional-baru-selama-psbb/
[4] https://www.transjakarta.co.id/kurangi-potensi-interaksi-secara-fisik-kapasitas-layanan-transportasi-umum-di-jakarta-diturunkan-secara-ekstrem-transjakarta-hanya-
operasikan-13-rute-hingga-30-maret-2020/
[5] https://www.transjakarta.co.id/gage-mulai-senin-tije-luncurkan-tambahan-155-unit-armada-pada-10-ruas-koridor-yang-bersinggungan-dan-
mengoperasikan-3-rute-tambahan-pada-non-koridor/
[6] https://nationalgeographic.grid.id/read/132064283/antrian-panjang-transportasi-massal-tak-semua-bisa-kerja-dari-rumah?page=all
[7] https://databoks.katadata.co.id/datapublish/2016/09/06/koridor-i-blok-m-kota-jalur-transjakarta-paling-sibuk
Appendix
A.1 A.2
Capacity Needs
X 22%
Rider per Corridor
(Yearly) [5]
/ 365 days
871 Buses (% Rider 2016 per Corridor)[7]
192 Buses
Operated
x 40 % / 2
(Peak hours assumption)
(Riders only 50% full
routes assumption)
X 6%
(% Rider 2016 per Corridor)[7] 53 Buses
Logically Approved since Riders in early station
can complement the rider in latest station routes