You are on page 1of 350
GF “Proyecto integral parala construccién de un Centro de a Justicia Penal Federal enCiudad Victoria, Tamaulipas.” INGENIERiADEAIRE ACONDICIONADO MAYO2020 Ubicado en Libramiento Naciones Unidas SIN entre Boulevard Praxedis Balboa y Carretera Cd. Victoria Soto la Marina, Cd. Victoria, Tamaulipas ee Ing. José Lopez Rosario Ced.Prof. 7806584 Project Namo: CAPF CD VICTORIA [prepared by: PROVECTOS Dedicated Outdoor Air System (DOAS) Sizing Summary for 01 VAFPBS107 own 1200p.) Air System information ‘Asystom Name Equipmort Clase — AAP Systom Type ‘Sizing Calculation Information Cletaton Months Siang Osta ‘Number of ones Floor Aree Location Zone CFM Siting nnn, Sum Of ap8 slow rates ‘Space GFM Sizing Indus peak space loads applicable fora Terminal Units alr system without a Dedicated Outdoor Air System (DOAS). a aes oui Raya Program vS00 Page Tar 6 Zone Sizing Summary for 01 VRFPBS1-01 | Project Name: CAPE OD VICTORIA aa 7200 ropa. PROVECTOS "20001 ‘Air Systom information AA Systam Nag nnn: 1 VAFPBSI-DY Nembor of 200 nn if 8 Equipment Css Floor ted nnn iia we AE Systom Type sons Uocaton GB WETORIA, mexico ‘Sizing Calculation Information CCaodtion Mantis occonrnnnecen dam 0 De Zone CFM Sing... Sum of space altow res $Sleng Data sere nvconen= Caled ‘Sonos GM Sang” "s.-- malvidual peak space loads Terminal Unit Sizing Data - Cooling Total [Sens [Gol [Gol] Water Time oil | Col | Entering | Leaving | Flow of toed | toad | op/we | pesws | @ta0-F | Peskcon | Zone zone Name query | amen _| er cA _| (apm tosa | crue [Zone 41a] 263] Bia] 88.0544 [sun 700] 2.08) [Zone 2 ‘4a|___12]_775 7634] 852/803) “hun v700) 219 (Zone 33 Bol _772/e30) 95.1552 [snr r00] 238) [Zane Til 93) 7e2/eti] —66.4/805} [on 600] 2.0 ‘Zone 5 ‘al a6] 77 /ess] 5547503} =| aun 500] 1.85 [Zone 6 G1] 92] s1.0768.0) 556/540) | sun's00] 0.3] [Zone 7 *ea[ 130] 77.6763.5| 557/50. | sun oof 2.24 [Zone 5 si ‘4 _a14/778] 56.135. [nua 500f 87] “Torminal Unit Sizing Data - Heating, Fan, Ventilation Heating | Hig Coll esting | Col Water | Fan On vent ‘cot | Endy Flow | Doaign | Fan Fen | Dion tout | pe” @aoacr | Amiow | motor | Motor | Artow |zone name qenn_| cr) tam | cern _| con) _| cam _|_ craw [Zone 1 ie] 41738 ‘a1 0.000) —_o.coo 223) [Zone i 6771745, 517] 0.000) 0000 34 [Zones 22) 680742) 7 4s] 0.000] ceo 15] zane 4 taf 674/709 z 389] 0.000] 0.00 2 [Zones 07] 681/709 366] o.a00] 0000 2i [Zone 6 12) e534 708] a ‘0.000] 000 30 [zene 2a) 63.172 365] o.000) 000 35 [Zone e 53] 50.0770. 2s] .000] 0.000 7 Zone Peak Sensible Loads Tne Zane | Zone cooling | Timeot | Heating | Floor toad | Arca zone Name wet | or [Zeno ao] 4850) [Zone 26] 2260) [zane 3 75| son 700] ‘s| 1450] Zone ‘as[_ Jan 2300] 00] 1940] [Zones ‘ai[ Jan 2300 ‘| 1880) [Zone 6 25|___un 700 taf 15760) [Zone 7 25] Jn 1700 ts[_ 2569 zone 8 Z 6 Jan 20] ‘o0] 120.0 oary Ras Program v5.00 Page Dao Zone Sizing Summary for 01 VAFPBST-07 Jprojct Name: CAPE Cd VICTORIA a By: PROYECTOS 1209. Space Loads and Airflows Tine of cooling | "Posie ‘ir | Heating | Flooe [zone Name ‘Sonaibio | Soneitie | Flow | ‘toad’ | ‘Area | Space. ‘Space Nome mur.| “owen” | “Load” | crm | wry | ey | cre Zane 4 ‘107 LUDGTEGA i Zi] — Jun 700 Er) 4a, wea] 29) [Zane 2 ‘01-02 RESGUAADO DE ADOLE i Tal — Jon 700 3 2a] 2360] a: Zane (01-03 GTO COORD SES 7 7] Jon 1760 36 ie] abo] 29 [zane 4 (01-04 AREADE FUT GREG 7 | Jan 2500) 3 7 0 ETT (Zone 01-05 COORD DE SEG PUP i i] Jan B00) Ec | Tas 133] [Zone 6 01-08 GIRCULAGION 7 @25| san 00] 1a Ta ie7e0) 039 [Zane 7 (1-07 UNIDAD SEGUIMIENTO. i 23 — Jun 700 I 73] 0] aa Zane & ‘0:08 TESTIGO PROTEGIDO 7 53] Jan 00 254) oo] aan] a9] to «A? oily ais Progra v.05 Paae oF 6 Ventilation Sizing Summary for 01 VRFPES1-01 Project Name: GJPF OD VICTORIA ca72004 [Peparegoy: PROVECTOS “2a0en] % sous Sum of Space OA Airiows 2, Space Ventilation Ans 21 Zone: Zone 1 ? ‘Uncorrected {Zone Name Space Name Maximum) ‘Gutdoor A ut loceupar (cr i 50] al 28.3 Fear rsorreted) "rea) Maximum) Outdoor A mut| “(| Ooeupants (cra ize a oH aoe Multiples) 34a] Zone 3 Fear 18 Space Name ‘Afea| _Maximur| mut| (| oceupants| ‘01-05 CTO COORD SEG, i750 2 | Fetgistinct Space Muliplers) Zone 4 Fequted 12/Space Nemo outdoor a mut | (cEuiperaon) 1-04 AREA DE FUT GREC 7 Sa Space Multipliers) 3003| Zones Flor] ‘Ragured] ——Rewuh Fequted ‘Zone Name Space Name ‘Area! Maximur| Outdoor At| Outdoor Ait} Ouldoor Al wut| —_“tes)_ossupants (ceuiperson)| (crwm| * (Cu)| Cao supphy COORD DE SEG PIF i a8 2 Ey oa [a Bal 68 Matters) Testy Rea Progam BOD Page Tae ( 9s obey ieee T (esa oS Toa EL) (a ca) ao lsese lov weer Ir GatwaiOus OOUSSI e010 { 98003 | ears ear (camo woe IS) —— aware a] [a lay soorino_ ay seeping liv Ades |umaen” [sy ‘owen soeds owen 2107 lpnosuiooun_[psanoew nae loa Seuez TeT ee es T (sieydiamn 2500s yu ese co a ao io ese GINaMINOSS GANT or [ey ——— | aaa or [ns] —— Tamas) jsmean05 Eu) Tama liv eerino av seopind. | eopino [ay werino [iy soopino” [ay nééos jumaaxen sy ‘uo coeds oxen ou oeuooun lowunbey |pejndoy” [peunbeg [paunboy'_|umupeo Loos (rane [eos Io (0 ot [pe [oss Ir Isa Tn TeRS) [Wana IS _—_—eraT00o a) FT liv scepino ro Ute teepino ay ooetnD ay kééne juuixen [ooay sun seeds oury ou oan |psanboy puunbog |psunbey|urarsen Loo Tee TeSTTT TET SOLDERS PIRI 520 YOLOIA dO JPN 901 LO-LS@dJUA 10 40} Aseurung Buyzig uoneinUEA ‘Air System Design Load Summary for 01 VRFPBS1-01 Project Name: CJPF OD VICTORIA oan by: PROVECTOS. 1260p. ‘DESIGN GOOLNS ‘DESIGN HEATING [COOLING DATA AT Jun 700 [HEATING DATA AT DES HT [COOUNGOADB/WE 07.3°F/628-F __|MEATING OADB/WB _37.8°F/350°F ‘Seneibie ao ‘Sensibi] Tater [zone Loans (stun, Detats| eT] —_ceTUnA [Wiecow & Skyight Solar Load “sr 7818 E 1571) : a [Wal Tranemesion ‘sor 71580, I 50 | | Poot Tranemeson or] ° 7 On| D E Wincow Trarsmsion sree) 769 7 ier) Bio] | Sight Traneission ore] ° _ on d [Door Loads ‘orr| o _ on d z Poor Transnision 065 | 0 3055 q _ Parions “70318 0 -[_—vo5 | d _ [cling ore o _ ow 5 _ [Overhead ging aa wis _ q a 7 Prask hing owl ° | Ql d 7 [leere Equipment ‘seco w| eae | ol G People 33 S510) iso] ol iG a ection E ° ol d Misesliansoce | ° | d o Safty Factor TET 0 0] | d q [> Total Zane Loads =| raa080| so] 1 ea ql [zene Gondtcring 08147) 7700) 10701 a| [Plenum Wal Load ol a z | d ; Plenum Roof Load orl o z of dl [Plenum Liha Load | d z 0] [Exhaust Far Loud ‘ocr o z GPa | Nensaon Loss wacr| 90 23] Ban crn aie) 7 Nentiaion Fan Load ‘OcFul 0) | ‘GFN a [Space Fan Col Fans | E E i [Duet Hest Gan Lose el | ol q z >> Total Systm Loads [ame ‘Boia z e875) a Femina tnt Cooing “eaa4al 5] 7 9 q [Terminal Une Heating z z E 3575| | b> Total Conditioning [asap wia5) E ‘30075| q Ker: Posie values ae cy fads Positive values are hig Toads Negative values are hig loads Negative values ar cg loade ey aye Progrann OO Dedicated Outdoor Air System (DOAS) Sizing Summary for 02 VAFPES2-02 a con Prooct Nemo: GJPF CO VICTORIA prepared by PROVECTOS O5:t1ps Air System information ‘ArSystom Namo Number of ones. a 10 Ecuipment Clas aro we ANI System Type oC WETORI exo Sizing Calculation Information Calelaten onthe nen ‘Jan to Dee ‘Zone OFM Suing... Sum of space slow rates Sing Date ss Catoutated ‘Space CFM Sizing. Individual pook apace load NOTE: No other data is applicable for a Terminal Units air system without a Dedicated Outdaor Air System (DOAS). owiy rae Progra SOT Page Toe Zone Sizing Summary for 02 VAFPBS2-02 Prciect Name: CJPF CD VICTORIA sy72004 [Prepared by: PROVECTOS. OSB! ‘Air Systom Information [Re Syetom Name mans meonnne OB VRFPBSE.I2 Number of 016 nn Equsmere Css Tecan TM Foor Wea = i [i Slo Type onsen VRE Labo Sizing Calculation information akiion Months nnnnnnnnene dam 9 Dae Zone CFM Suing ‘Sum of space stow rates Sting Date nn 7 Cateeted ‘Space GFM Sting” ---n. inlvidval peak space loads Terminal Unit Sizing Data - Cooling “Total | Sena [Go| Ca] Wator Tine cot | Cot | emoring | Leaving | Flow of tod | toad | oaswe | pa/wa | @100- | Poakcol | Zone {zone Nome, cus) |_awann_| en | oom ood _| crm [Zeno 7 55] 7a. 6u8) 65.1509 un i600] 1.4] Zone 2 Jas] 122] ~ea.0/en0| 55.0/540) ‘un s600] 2.29} [Zones 6 45] 706/650) 550/547 “hn 1500 1. [Zone 7a] 92 779/644) 55.6755. =| oer 1800] 2.1] [Zone 5 sa] 2.8] 7.07639) 552/640) -|_04 1500) 2.25] [zone 6 ‘oo] 2.0] ea.1/747| 557/640) | nu 1500 0. [zone 7 St5[ aso] 7ea/eso) —s5.6/543 [sep 1100) 2.4 Zone sea] 14] Tos rasa) 585/862 [1000 “53 [Zone 8 as 190) 762/623] 350/557] =| 1000 4.09 [Zone 10 1 ‘sa{_77.0/08.1| 561/549) [sep 1100] 2.4 ‘Terminal Unit Sizing Data - Heating, Fan, Ventilation Heating | Goll | Water | Fan ‘OA Vent coit’ | enviva | Flow | Design | Fan Fan | Design tod | 0B. | @200%F | Aittow | Motor | Motor | Ainiow [Zone Name ay | cm _| orm | crm _| cone _| com _| ora [Zone 7] 6.97700) 7 25| ——o.000) a0 a [Zone 2 '38|_61.7/700| z “0 .000) ooo i [Zone 3 os] 6727700] E g2] 0.000] .00] 7| [Zone 35] _67.8/762| z “41i|_o.0o0) 000 2 [Zone 5 ra] —047725| 7 ‘si[ 000] 000 9 Zo00 6 7 nz) 643/700 E ‘s16| ano] c.ooo 300) Zone 7 12] 68.6778. | 207] o.0o0| 1.000 9 Zane 8 si] 68.3/723 z ‘es7| ano) c.000 2 [Zone 9 ‘Sal 60.0/724] ‘sa o.000| 0.00] 2 [Zone 10 sil 675/793] _ Za} o.000| 0.00] i] Zone Peak Sensible Loads Zone Zone] Zone cooling | Timoot | Hosting | Foor Sensible | PeakSenatio | Load | Area \zone Name 7 ast | cootngtoud | _awain | _ it) [Zonet Sal Jan 2300] doled} [Zone 95| Jan 2300] ‘aol 188.0] [zones 44] Jen 2300 of 12309) [Zeno = aif Oat] 27| 1800) zones 2io| New 1a] aif #220) [Zone 6 136] Jan 200] ‘aot e370) e ase Oa 100] a2] sea} [Zone ‘4s|—— Jr 100) 26| 403.) [Zones aa) Jt 100} a7] 177) Tsay Araya Prova 500 Page oT Zone Sizing Summary for 02 VAFPBS2-02, Project Name: CJPF OD VICTORIA cana Propared by PROVECTOS Co:tipr Zone Zone | Zone Cooling | Timeot | Heating | Floor Sensible | Peak Sensi | Load | Area zone Name (ust) _| Cooling Load | carn | _ ce) [Zone 10 53[___Sep 1000 a) Space Loads and Airflows Tame Goong | Peak | ac | Heating | Floor |zone Name Sensible | Sonsitie | Flow | ‘toad’ | ‘ave | Spsco ‘Space Name wu. | “uni | “oad” | cory | cae | fe) | crane Zone # (G20 LACTARIO 7 | Jan 2500] i ‘Go| Treo] 84 [Zone 2 (02:02 SEAVICIO NEDIGO 7 | — Jan 356) a) | __ Taso] 25] [Zone (02:00 SIGNOS VITALES 7 Za] Jana 7a] oa] 23.0] 9 [Zone 4 ‘0200 NEDICO THTULAR 7 ‘il Oat a Zi veo] 7a] Zone 5 ‘92.05 OFICIAL DE PARTES [310] — Nv 409 i 2il___weao] 25 (02.05 GROULAGION 7 735] — Jon 2300 ea Go] earn] 0.0 zone 7 02.67 VESTIULO 7 “| _ Oat 100| 207] a2] wean] a [Zone 02-00 ESGALERA 7 a5] ut 00) i 23] waa] 73) [Zone 9 "02 GO CENTRO DE FOTOCOPL i 783) su 009 = ‘27176 402 [Zeno 10 ‘C210 FUTURO CRECIMIENTO i 53] Sap 1000) Ea 2 eo 3] Fea Realy Program vO Page Sat 6 Ventilation Sizing Summary for 02 VRFPBS2-02 Proc: Name: CJPF.CD VICTORIA cans Prepareduy: PROVECTOS ost ‘Sum of Space OA Aiton 2A Zone: Zone Flea] Tequired] Required) Required) equ {zone Name Space Name ‘ea] Maximum] ‘outdoor Al Outdoor Ar| Outdooe Ar| Outdoor Ai ut.| __“trs|_ccsupamts| (cFitperson]| ~~ (Grumy| " (Grup| eof suppty| aT] 3a Ea ie 2a al 2.2Zone: Zone 2 Fear Tiaximara] —— Required] {Zone Name /Space Name “rea|_Maximurn| Supply Ar| Outdoor Ar mat “(te|_cesupants| _—" (ceun|(ceMiperse [ea] sa) 23 done: Zone 3 Fi] zone Kame / Space Name ‘rea|Maximum| mut.| (| ecupants zone [53 SIGNOS VTALES a5) al [Total inl. Space Mutipiors) L 2A Zone: Zone 4 Fo] ‘aximamn] —— Roqured] {Zone Name / Space Name ‘Aree| Maximum] Supply Ar| Outdoor A mut.| __“(t8}|_oesupant| (cFuiperson) [Zoned 02.08 MEDICO TTULAR a[1655) aa 555 ‘ola (nck Space Muliliers) 28 Zone: Zones Fao] Waxiwurs] — Required] —Raqured] —Roqured] —Requved] Uncorrected ‘Area| Maximum] Supply | Quidoor | Ouidoor | Outdoor Air| Outdoor Air! Outdoor Ai wue| __“(es| cssupante| "(cra crimperson)| —“(crimy| * (Crup| eeofsuppyy| (Cr [ean 5a) aH ioe} a a a "Total (i Space Mulipors) 30a] onty Analale Proaran v.00 Page oat S ( ) cog weston sehrvy Aner, 20g etey erat oe Hoa eT cc) co oz ase [7 —|oinamoaeo oununsoren 01 suey (ans Tox [OY lsdr==o [oul [aR ly s20pino ay se061n0 lamareen feery ‘sue soeds euen ouez eanbe _|peurbow ls Or enez UOT OTT rae (Grane oS HU S| ince wo 7 | Waso010s 30 0uiN39 e020 e007 (wars Tos rT uw seop1n0 ay seopino [pooestoouy [pwansoy 6 az [oa Ir Imaor jsmeano00 fou) Famer Miyseopino funursen [sore peanbew leet rare 50 30 oo [eacoe [oz aves fn Tag) Tamao)—oaeDT LIS) JURE a) aT a 2cein0 jay YoepIno |i ong a Ade junuixen |ooay lpeunboy _|psunboy [peunbeu — luurupeens woos | [eas coe oo wo levis [0 r Io) RGIS RT ST —— argo Uae |S) —— TRESS i laycerino iw seerina a seonro [iyseomno |iyseopmnd ay nedns [ununren lpuosuiooun osanbog (penribey [paxnbey |psumboy'” [umuncen rans SOIDSROESTaDERII io ‘yescuin dd PO UN 190.) Z0-ZSEdJHA 20 40} Aewuing Buzig UoneIUeA Proect Namo: CJPF CD VICTORIA cos ‘Air System Design Load Summary for 02 VRFPBS2-02 a ropa by: PROVECTOS os ‘DESIGN COOLS ‘DESIGN HEATING [COOLING BATA AT Aug 1400 [HEATING DATA aT DES HIG [COOLING OADB/Wa 90.8% /081°F [HEATING OADS/ WB _97.8°F/35.0°F ‘Sensi Tato ‘Sensi Tater lzone LoADs (eTuny,__(erwh| __detaits|_c@Tum|__(@TUNA| Window & Siig Solar Loads ‘741 eae ‘aa | [Wal Transmission isi | 8941 =| 105 co J oo! Tranemision ‘on o 7 OF d z [Window Transmission ‘arate ed | a74te| E) | Sef Transmission ‘oF 0 _ ore t "| Door Leas ol 0 | «| oor Transnision 01 | 0 wore a z Parions 962 o [1302 a] E Gein ore ° +I o1r| a z [Overhead Lging asa) 330, E o ti E Frask hing owl ° E O 1 [sete Equipment Fiae0 Ww} 7s | ol f Poop 2a Ts 525) dl 1 q eestor coors ° o d hiecolianesus Sarees ° 1 : a] Sally Feetor ware 0 1 ml ol a] [> Total Zane Loads =|__ a0 Boas) : Bare a) Zone Condining| | aaa 5045] | 259] a] Plenum Wal Load ol 0) q q : Plenun Root Load oul 0) | q o 4 [Plenum Ligting Load ox) D d [exhaust Fan Load ‘ocrwl | ‘cau Nensaon Load er cru| ai ‘real esr crn Ez) q [entiation Fan Load ‘ocrul ‘ocr d | [Space Fan Col Fans | of | | o z [Ovet Heat Gan Lose oH | ca q | > Total Systm Loads =| rasa arial “867 q [erminal nt Coosng “| —ased area) 7 —_ q [Terminal tne Heating | ear) : > Total Conditioning [rasa area) | 9607) q Kev: alive valves ae cy loads sitive values are hig fads Negative values are hi loads Negative values are cig loads aeras iy ays Progra 0S Dedicated Outdoor Air System (DOAS) Sizing Summary for 03 VRFPBS3-03 | Project Name: CPF CD VICTORIA oar ri20 Prepared by PROYEGTOS. 2p ‘ir Systom Information Ar System Name 03 VRFPaS3-03 Equpment clase ‘Ae System Type Stzing Caleulation Information Caelation Months enema ta Boe Sting Data I Giestates ‘Numbse of zee Floor Wed Location Zo00 CFM Sing ‘Space OFM Siang ‘Sum of space srtlow rates inaividual peak space lode NOTE: No other data is applicable for a Terminal Units alr system without a Dedicated Outdoor Air System (DOAS). ay Ras Pera vEOD Page Tat @ Zone Sizing Summary for 03 VAFPBS3-03 reject Name: CJPF CD VICTORIA oanzr prepared by: PROVECTOS 1ztips ‘ie System information ‘ArSystom Rane Nubor of 2008. Equpmert Clee Flor eon ‘Ar System Type = Location ‘Sizing Calculation Information Cleulation Months on Zone CEM Siting .-- Sum of space aifow rates Siting Dale en ‘Space CFM Sing Mndlvidual peak space fonds ‘Torminat Unit Sizing Data Cooling otal | Sens] Ca [Cait [Water Tine colt Got | Entering | Leaving | Flow of tod | toad | vs/we | ve/we | @100-F | Peakcot | Zone Zone Name wow) | ery _| cr cA_| oom, Load __|_crune [Zane 1 13 ‘Go| 7a a9) 62/850) [sa 700] 8 Zone 2 7a wai] 772/642] 555/543] =| oer 500) 2.2 [Zone 3 ‘a| 16) 770/640] 855/543] [nov 00) 2. [Zone 490[_18a)_772/002] 557/546) Nov 1400) 2.06 [Zone 6 ‘sa|___284] 004/67.8| 86.2/55.1 Sop 1500 2.6 (Zone 6 ti ai) 72/665] —66.0/560) sul1700) 0 ‘orminal Unit Sizing Data - Heating, Fan, Ventilation Heating Hig Gof Heating | Cot Water | Fan On vent Cot | Enitvg Flow | Design | Fan Fan | Design Lose pa” @zo-F | ation | motor | Motor | Airlow [Zone Name ay _| cf gom_| corm _|_ eum _| aw _|_ (orm [Zone 1 a2) 662/780 z ai] 0.000] 00] a [zone 2 Bal 679/735 [3604] —— 1.000] ——a00] 2s} [Zone 3 ‘33[ era 72 720] o.000] 000 45 [Zone 34|_ 678/726 | 79] o.000) 000 “5 [Zones 7a) 687 71.9 E si] oom) 0000 | zone 3a) 655/758 _ ‘s| 0.000) 0000 3 ‘Zone Peak Sensible Loads - Zone Zone | Zone cooling | Timeot | Hosting | Floor Senaible | PeakSeneitie | toad | Area zone Name si) | Cootng Lord | _wBH) | _ [zene o[ Jun 700 Za] 2068] [Zone2 7a4| Now woo] ia] 76a] [Zone 159] Dee Ho tal 3990) [zono- = 150 Nov Ho i7[ 8900) [Zones ‘2n.a| Now 100} 2i| a2] [Zone & a 75 Jun 170 EE) ‘Space Loads and Alrflows Tine af cooling | 'Feak | Ar | Hosting | Foor zone Name Senainte | sensible | Flow | ‘Load’ | Area | Spaco, Space Name wmut.| “ewsiy’ | tose” | corm | aac | ‘wey _|_ crm [zone ‘05:07 SALA PRIVADA ENTRE i 0] an 70] a Z| 2000] 1.88] [zone 2 ‘08-02 DEFENSORIA PUBLICA a[__—7a4| eau|___t1a] sesso] 220) ey Aras Program v.00 Zone Sizing Summary for 03 VAFPBS3-03 Proc Name: CPF CD VICTORIA oad Propatad ty: PROVECTOS. 12:1ipal Tins of cooling | Peak | air [zone Name Sonsbio | snabie | Flow ‘space "space Name wwut.| “owsey” | “toss | (ce orwne 13-08 POLICIA PROGESAL 4 1539) Dec 1409 aah wo] _29 [Zone 4 ‘(3-04 FIGGALIA GENERAL 7 5) Now a9 Ga “7|-saa) 20 [Zones (08-06 SLADE USOS MOLT i] 23) — few a0 wal Zila] 2:8 [Zone 6 103.06 CIRGULACION 7 7 73 an 1709 sl Fa Me oy Ralls Proararn 500 Page SE of Project Name: CJPF OD VICTORIA Prepared by: PROVECTOS Ventilation Sizing Summary for 03 VRFPBS3-03, ‘Sum af Space OA Aiiows Real zone Name / Space Name outdoor Ar] Mut cot suppty {zone 7 02-01 SALA PRINADA ENTRE. 7 Tal ‘elas ick Space Mulilies) 2.2 Zone: Zone 2 Fea] ‘aximum] Required] aquired] Required] —Raquirea] Uncorrected {Zone Name Space Name ‘Area| Maximum] Supply Ar| Outdoor Ar| Outdoor Ar| Outdoor Alr| Outdoor Alr| uteoor Ar] wu.| —“(ee| oesupants| """[¢ran|(cFuiperson]| "(CriNN]| "" (CFMD| eof supply] (CFU) [yess] skal a0 50 oa 2 3 20] 3504.1 2530] 23 Zone: Zone3 Floor Maximum] Required] Required] Required] Roqured|Uncerrestt ‘Zone Name / Space Name rea} Maximum) Supply A) Outdoor Ar] Ouldoor All| Outdoor Ar| Outdoor Ar| Outdoor Ai mut.| —“tty| Oseupants| “Pcemn| crmtperson)|_“(crn|_ "(crm oot supply] (Cra Zoned (8.05 FOLIGIA PROOESAL i] —a590) 50 7a] Ey Oe oa a rr) [Falls (nck Space Multipters) 71937 asa 2.4 Zone: Zone 4 Fear equres] Unsorted Zone Name / Space Name ‘rea|Maximur| Outdoor Air] Outdoor Ar| mut.| "(| occupant eof supply] (Cru Zonet FISCAL GENERAL, Taso a oa a nel. Space Mutiplors) aaa 2, Fear Waxinur) Required) Required) Required) Required] Uncorrected] me ‘Area| Maximum] Supply Air] Outdoor Alr| Outdoor Alr| Outdoor Alr| Outdoor Ar] Outdoor A Mut.| _"(f3| Oocuparte| "(Gem (cFMiperson)|_(Crwte)|_ (CFM (% of euppiy]| (GFW ones (5-05 SALA DE USOS MULT isa] aa} airs} 59 i) 3a Bal a5] [Foals (inc. Space Mules] 3178) 7535 aaiy Aras Program vE00 Page tae Sees _00°Sn wesBoug sisKreuy Aunon ee Gara oe Toa eT] ee [oo go sv loz [osee fr TNODNINOHID: ia) (reas Tom [aS] —— [eM ERTS GT FAT ly 209RIN0 lay zo0pino law zeopino | 4oopINO liv Aédng —unapey |sery ‘oun eed owen su02| lpsieauocun |psunbey |peanoey |psanboy nay Looks Paez Tez Te SOLDEKO YS 7a PSR \wndouoin a2 aero eueN ea £0-ESAdsUA £0 10} Arewuung Bulzis uoNeUEA ‘Air System Design Load Summary for 03 VRFPBS3-03 zal is Prec Nemo: CJPF CO VICTORIA sir tepared by: PROVECTOS, ira ‘DESIGN GOOLNG ‘BESIGH EATING [COOLING DATA AT Sep 1500 [HEATING DATA AT DES HT [SOONG OADB/WE. 98.4°F/822°F [HEATING OADB/WB_370°F/35.0°F ‘Senaio] Later] ‘Sensible Tate lzone LoaDs Dotate| __(GTUM}| TUR | _Detals|_ TUN] _cBrUhn |Windon & Sy Sear Leads 236 867 | 256 : Wal Transmission "as0 | 297 "288 “rasa [Roo Trarenission On| q z On| A : [Window Trananioion er oat | Bes 25) : sight Transmision on o on| q E (Door Loads ‘on o on q oor Tranenissicn ae23 | 0] wasn 0 _ [Parations coo] Hi z 138. 0) [Gating on OD _ | 0] : [Overhead Lighting now ea _ q fi Fras Lihang owl o 7 q d E Elerie Equpt 72200 85 z q q | [Peon 7 18086 16185) q o A entation | ° a d [Miscalneccs 0 d : d Stet Factor oa 2 D | d 0] [> Total Zono Lead [| T6795) : Bassa) q [Zone Conetiring [rea 16195 z 275) o Plenum Wal Loss oa | ql 7 [Plenum Roo! Load or a 7 a) d Plu ging Load | o | 0) dl sma Pat La ‘oF a 0G 0 Vente Lond es crv i 32366] —__695.GF8 Zai00| al entiation Fan Load ‘ocr q ‘GFN [Space Fan Cal Fane : q | no : [Duct Hest Gan /Loce os d of ol | b> Total System toads [| 7 a [Fesminal Unit Coaing 40044 o [Teil Unit Heating q | 7 b> Tota Conationing | 60a "568 : 23575) q kay: Positive values are cl loads sive values are hig ids Negative values are hg loads Negative vluos are clg load oy ays Progra v5.0 Page 66 reject Name: GJPF CD VICTORIA Dedicated Outdoor Air System (DOAS) Sizing Summary for 04 VRFINST-07 os ‘ou iape| [prepared by: PROVECTOS ‘Air Systom Information, ‘Sizing Calculation information santo Dee Caletaion Months Calevieted Siang Date Zone CFM Sizing ‘Space CFM Sing ‘ED VICTORIA, Mexico ‘Sum of space srlow ates inalvidual peak space lode 2 Fir te NOTE: No other data is applicable fora Terminal Units air eystom without a Dedicated Outdoor Air System (DOAS). ory Anata Program vS00 Page Toa Zone Sizing Summary for 04 VRFINS1-07 Jrojct Name: GJPF CD VICTORIA cari7r2004 lerepared by: PROYECTOS 01:14 Air Systom information ‘Airsystom Name OA VRFINS ET ‘Numba ones cee B Equpmont Css va TERM Floor Area Total zone Loads |r, a0) z 07) q [Zone Centering [775 S220) = q [Penum Wall Load ol a | a o 7 Pin Root Lad ‘onl a | ol d z ‘ox “ ol o oer a) z ‘Gra “| was.cru| 82 ave] siscr "eae a Ventlation Fan Load ‘OCF ‘OGFW i [Grace Fon Cod Fane | a a] [Duet Heat Gan Lose ol z ol a b> Total System Loads -|_—7 ara) 7 Baars) a| Hema Une Cooing 2aeai 37a6a) D 5 [Femara Une Hoang E : : Baa] : [> Total Conditioning | aa “ara | ‘276 7 [key: Positive waluss ar cy Wade oslive values are hi Toads Nagative values are ig loads Negative valves are cg load Toa Ravi Program v5.00 Page toro Dedicated Outdoor Air System (DOAS) Sizing Summary for 05 VRFINS2-02 Project Name: CIPF CD VICTORIA [Prepared by: PROVEGTOS 08:47a, Air System Information ‘Ni System Nam wr eonner 08 VRFINS202 theo A Eauipment Class sees TERM venta 18800. ‘Ai Systm Type a SB WieTORIA, mexico Sizing Calculation Information Calculation Months Zone CFM Sizing a... Sum of space arlow rales Siang Data ne ‘Space CFM Sizing... Indlvidtal peak space loads NOTE: No other datas applicable fora Terminal Units air system without a Dedicated Outdoor Ai Systom (DOAS), Toy Anais Program v.00 Page 1 a6

You might also like