GF “Proyecto integral parala construccién de un Centro de
a Justicia Penal Federal enCiudad
Victoria, Tamaulipas.”
INGENIERiADEAIRE
ACONDICIONADO
MAYO2020
Ubicado en Libramiento Naciones Unidas SIN entre Boulevard Praxedis
Balboa y Carretera Cd. Victoria Soto la Marina, Cd. Victoria, Tamaulipas
ee
Ing. José Lopez Rosario
Ced.Prof. 7806584Project Namo: CAPF CD VICTORIA
[prepared by: PROVECTOS
Dedicated Outdoor Air System (DOAS) Sizing Summary for 01 VAFPBS107
own
1200p.)
Air System information
‘Asystom Name
Equipmort Clase —
AAP Systom Type
‘Sizing Calculation Information
Cletaton Months
Siang Osta
‘Number of ones
Floor Aree
Location
Zone CFM Siting nnn, Sum Of ap8 slow rates
‘Space GFM Sizing Indus peak space loads
applicable fora Terminal Units alr system without a Dedicated Outdoor Air System (DOAS).
a aes
oui Raya Program vS00
Page Tar 6Zone Sizing Summary for 01 VRFPBS1-01 |
Project Name: CAPE OD VICTORIA aa 7200
ropa. PROVECTOS "20001
‘Air Systom information
AA Systam Nag nnn: 1 VAFPBSI-DY Nembor of 200 nn if 8
Equipment Css Floor ted nnn iia we
AE Systom Type sons Uocaton GB WETORIA, mexico
‘Sizing Calculation Information
CCaodtion Mantis occonrnnnecen dam 0 De Zone CFM Sing... Sum of space altow res
$Sleng Data sere nvconen= Caled ‘Sonos GM Sang” "s.-- malvidual peak space loads
Terminal Unit Sizing Data - Cooling
Total [Sens [Gol [Gol] Water Time
oil | Col | Entering | Leaving | Flow of
toed | toad | op/we | pesws | @ta0-F | Peskcon | Zone
zone Name query | amen _| er cA _| (apm tosa | crue
[Zone 41a] 263] Bia] 88.0544 [sun 700] 2.08)
[Zone 2 ‘4a|___12]_775 7634] 852/803) “hun v700) 219
(Zone 33 Bol _772/e30) 95.1552 [snr r00] 238)
[Zane Til 93) 7e2/eti] —66.4/805} [on 600] 2.0
‘Zone 5 ‘al a6] 77 /ess] 5547503} =| aun 500] 1.85
[Zone 6 G1] 92] s1.0768.0) 556/540) | sun's00] 0.3]
[Zone 7 *ea[ 130] 77.6763.5| 557/50. | sun oof 2.24
[Zone 5 si ‘4 _a14/778] 56.135. [nua 500f 87]
“Torminal Unit Sizing Data - Heating, Fan, Ventilation
Heating | Hig Coll
esting | Col Water | Fan On vent
‘cot | Endy Flow | Doaign | Fan Fen | Dion
tout | pe” @aoacr | Amiow | motor | Motor | Artow
|zone name qenn_| cr) tam | cern _| con) _| cam _|_ craw
[Zone 1 ie] 41738 ‘a1 0.000) —_o.coo 223)
[Zone i 6771745, 517] 0.000) 0000 34
[Zones 22) 680742) 7 4s] 0.000] ceo 15]
zane 4 taf 674/709 z 389] 0.000] 0.00 2
[Zones 07] 681/709 366] o.a00] 0000 2i
[Zone 6 12) e534 708] a ‘0.000] 000 30
[zene 2a) 63.172 365] o.000) 000 35
[Zone e 53] 50.0770. 2s] .000] 0.000 7
Zone Peak Sensible Loads
Tne Zane | Zone
cooling | Timeot | Heating | Floor
toad | Arca
zone Name wet | or
[Zeno ao] 4850)
[Zone 26] 2260)
[zane 3 75| son 700] ‘s| 1450]
Zone ‘as[_ Jan 2300] 00] 1940]
[Zones ‘ai[ Jan 2300 ‘| 1880)
[Zone 6 25|___un 700 taf 15760)
[Zone 7 25] Jn 1700 ts[_ 2569
zone 8 Z 6 Jan 20] ‘o0] 120.0
oary Ras Program v5.00 Page DaoZone Sizing Summary for 01 VAFPBST-07
Jprojct Name: CAPE Cd VICTORIA a
By: PROYECTOS 1209.
Space Loads and Airflows
Tine of
cooling | "Posie ‘ir | Heating | Flooe
[zone Name ‘Sonaibio | Soneitie | Flow | ‘toad’ | ‘Area | Space.
‘Space Nome mur.| “owen” | “Load” | crm | wry | ey | cre
Zane 4
‘107 LUDGTEGA i Zi] — Jun 700 Er) 4a, wea] 29)
[Zane 2
‘01-02 RESGUAADO DE ADOLE i Tal — Jon 700 3 2a] 2360] a:
Zane
(01-03 GTO COORD SES 7 7] Jon 1760 36 ie] abo] 29
[zane 4
(01-04 AREADE FUT GREG 7 | Jan 2500) 3 7 0 ETT
(Zone
01-05 COORD DE SEG PUP i i] Jan B00) Ec | Tas 133]
[Zone 6
01-08 GIRCULAGION 7 @25| san 00] 1a Ta ie7e0) 039
[Zane 7
(1-07 UNIDAD SEGUIMIENTO. i 23 — Jun 700 I 73] 0] aa
Zane &
‘0:08 TESTIGO PROTEGIDO 7 53] Jan 00 254) oo] aan] a9]
to «A?
oily ais Progra v.05 Paae oF 6Ventilation Sizing Summary for 01 VRFPES1-01
Project Name: GJPF OD VICTORIA ca72004
[Peparegoy: PROVECTOS “2a0en]
%
sous Sum of Space OA Airiows
2, Space Ventilation Ans
21 Zone: Zone 1
? ‘Uncorrected
{Zone Name Space Name Maximum) ‘Gutdoor A
ut loceupar (cr
i 50] al
28.3
Fear rsorreted)
"rea) Maximum) Outdoor A
mut| “(| Ooeupants (cra
ize a oH
aoe Multiples) 34a]
Zone 3
Fear
18 Space Name ‘Afea| _Maximur|
mut| (| oceupants|
‘01-05 CTO COORD SEG, i750 2
| Fetgistinct Space Muliplers)
Zone 4
Fequted
12/Space Nemo outdoor a
mut | (cEuiperaon)
1-04 AREA DE FUT GREC 7 Sa
Space Multipliers) 3003|
Zones
Flor] ‘Ragured] ——Rewuh Fequted
‘Zone Name Space Name ‘Area! Maximur| Outdoor At| Outdoor Ait} Ouldoor Al
wut| —_“tes)_ossupants (ceuiperson)| (crwm| * (Cu)| Cao supphy
COORD DE SEG PIF i a8 2 Ey oa [a Bal
68 Matters)
Testy Rea Progam BOD Page Tae
(9s obey
ieee T (esa oS Toa EL)
(a ca) ao lsese lov weer Ir GatwaiOus OOUSSI e010
{ 98003 |
ears ear (camo woe IS) —— aware a] [a
lay soorino_ ay seeping liv Ades |umaen” [sy ‘owen soeds owen 2107
lpnosuiooun_[psanoew nae loa
Seuez TeT ee
es T (sieydiamn 2500s yu
ese co a ao io ese GINaMINOSS GANT
or
[ey ——— | aaa or [ns] —— Tamas) jsmean05 Eu) Tama
liv eerino av seopind. | eopino [ay werino [iy soopino” [ay nééos jumaaxen sy ‘uo coeds oxen ou
oeuooun lowunbey |pejndoy” [peunbeg [paunboy'_|umupeo Loos
(rane
[eos Io (0 ot [pe [oss Ir
Isa Tn TeRS) [Wana IS _—_—eraT00o a) FT
liv scepino ro Ute teepino ay ooetnD ay kééne juuixen [ooay sun seeds oury ou
oan |psanboy puunbog |psunbey|urarsen Loo
Tee TeSTTT
TET SOLDERS PIRI
520 YOLOIA dO JPN 901
LO-LS@dJUA 10 40} Aseurung Buyzig uoneinUEA‘Air System Design Load Summary for 01 VRFPBS1-01
Project Name: CJPF OD VICTORIA oan
by: PROVECTOS. 1260p.
‘DESIGN GOOLNS ‘DESIGN HEATING
[COOLING DATA AT Jun 700 [HEATING DATA AT DES HT
[COOUNGOADB/WE 07.3°F/628-F __|MEATING OADB/WB _37.8°F/350°F
‘Seneibie ao ‘Sensibi] Tater
[zone Loans (stun, Detats| eT] —_ceTUnA
[Wiecow & Skyight Solar Load “sr 7818 E 1571) : a
[Wal Tranemesion ‘sor 71580, I 50 | |
Poot Tranemeson or] ° 7 On| D E
Wincow Trarsmsion sree) 769 7 ier) Bio] |
Sight Traneission ore] ° _ on d
[Door Loads ‘orr| o _ on d z
Poor Transnision 065 | 0 3055 q _
Parions “70318 0 -[_—vo5 | d _
[cling ore o _ ow 5 _
[Overhead ging aa wis _ q a 7
Prask hing owl ° | Ql d 7
[leere Equipment ‘seco w| eae | ol G
People 33 S510) iso] ol iG a
ection E ° ol d
Misesliansoce | ° | d o
Safty Factor TET 0 0] | d q
[> Total Zane Loads =| raa080| so] 1 ea ql
[zene Gondtcring 08147) 7700) 10701 a|
[Plenum Wal Load ol a z | d ;
Plenum Roof Load orl o z of dl
[Plenum Liha Load | d z 0]
[Exhaust Far Loud ‘ocr o z GPa |
Nensaon Loss wacr| 90 23] Ban crn aie) 7
Nentiaion Fan Load ‘OcFul 0) | ‘GFN a
[Space Fan Col Fans | E E i
[Duet Hest Gan Lose el | ol q z
>> Total Systm Loads [ame ‘Boia z e875) a
Femina tnt Cooing “eaa4al 5] 7 9 q
[Terminal Une Heating z z E 3575| |
b> Total Conditioning [asap wia5) E ‘30075| q
Ker: Posie values ae cy fads Positive values are hig Toads
Negative values are hig loads Negative values ar cg loade
ey aye Progrann OODedicated Outdoor Air System (DOAS) Sizing Summary for 02 VAFPES2-02 a
con
Prooct Nemo: GJPF CO VICTORIA
prepared by PROVECTOS O5:t1ps
Air System information
‘ArSystom Namo Number of ones. a 10
Ecuipment Clas aro we
ANI System Type oC WETORI exo
Sizing Calculation Information
Calelaten onthe nen ‘Jan to Dee ‘Zone OFM Suing... Sum of space slow rates
Sing Date ss Catoutated ‘Space CFM Sizing. Individual pook apace load
NOTE: No other data is applicable for a Terminal Units air system without a Dedicated Outdaor Air System (DOAS).
owiy rae Progra SOT Page ToeZone Sizing Summary for 02 VAFPBS2-02
Prciect Name: CJPF CD VICTORIA sy72004
[Prepared by: PROVECTOS. OSB!
‘Air Systom Information
[Re Syetom Name mans meonnne OB VRFPBSE.I2 Number of 016 nn
Equsmere Css Tecan TM Foor Wea = i
[i Slo Type onsen VRE Labo
Sizing Calculation information
akiion Months nnnnnnnnene dam 9 Dae Zone CFM Suing ‘Sum of space stow rates
Sting Date nn 7 Cateeted ‘Space GFM Sting” ---n. inlvidval peak space loads
Terminal Unit Sizing Data - Cooling
“Total | Sena [Go| Ca] Wator Tine
cot | Cot | emoring | Leaving | Flow of
tod | toad | oaswe | pa/wa | @100- | Poakcol | Zone
{zone Nome, cus) |_awann_| en | oom ood _| crm
[Zeno 7 55] 7a. 6u8) 65.1509 un i600] 1.4]
Zone 2 Jas] 122] ~ea.0/en0| 55.0/540) ‘un s600] 2.29}
[Zones 6 45] 706/650) 550/547 “hn 1500 1.
[Zone 7a] 92 779/644) 55.6755. =| oer 1800] 2.1]
[Zone 5 sa] 2.8] 7.07639) 552/640) -|_04 1500) 2.25]
[zone 6 ‘oo] 2.0] ea.1/747| 557/640) | nu 1500 0.
[zone 7 St5[ aso] 7ea/eso) —s5.6/543 [sep 1100) 2.4
Zone sea] 14] Tos rasa) 585/862 [1000 “53
[Zone 8 as 190) 762/623] 350/557] =| 1000 4.09
[Zone 10 1 ‘sa{_77.0/08.1| 561/549) [sep 1100] 2.4
‘Terminal Unit Sizing Data - Heating, Fan, Ventilation
Heating | Goll | Water | Fan ‘OA Vent
coit’ | enviva | Flow | Design | Fan Fan | Design
tod | 0B. | @200%F | Aittow | Motor | Motor | Ainiow
[Zone Name ay | cm _| orm | crm _| cone _| com _| ora
[Zone 7] 6.97700) 7 25| ——o.000) a0 a
[Zone 2 '38|_61.7/700| z “0 .000) ooo i
[Zone 3 os] 6727700] E g2] 0.000] .00] 7|
[Zone 35] _67.8/762| z “41i|_o.0o0) 000 2
[Zone 5 ra] —047725| 7 ‘si[ 000] 000 9
Zo00 6 7 nz) 643/700 E ‘s16| ano] c.ooo 300)
Zone 7 12] 68.6778. | 207] o.0o0| 1.000 9
Zane 8 si] 68.3/723 z ‘es7| ano) c.000 2
[Zone 9 ‘Sal 60.0/724] ‘sa o.000| 0.00] 2
[Zone 10 sil 675/793] _ Za} o.000| 0.00] i]
Zone Peak Sensible Loads
Zone Zone] Zone
cooling | Timoot | Hosting | Foor
Sensible | PeakSenatio | Load | Area
\zone Name 7 ast | cootngtoud | _awain | _ it)
[Zonet Sal Jan 2300] doled}
[Zone 95| Jan 2300] ‘aol 188.0]
[zones 44] Jen 2300 of 12309)
[Zeno = aif Oat] 27| 1800)
zones 2io| New 1a] aif #220)
[Zone 6 136] Jan 200] ‘aot e370) e
ase Oa 100] a2] sea}
[Zone ‘4s|—— Jr 100) 26| 403.)
[Zones aa) Jt 100} a7] 177)
Tsay Araya Prova 500 Page oTZone Sizing Summary for 02 VAFPBS2-02,
Project Name: CJPF OD VICTORIA cana
Propared by PROVECTOS Co:tipr
Zone Zone | Zone
Cooling | Timeot | Heating | Floor
Sensible | Peak Sensi | Load | Area
zone Name (ust) _| Cooling Load | carn | _ ce)
[Zone 10 53[___Sep 1000 a)
Space Loads and Airflows
Tame
Goong | Peak | ac | Heating | Floor
|zone Name Sensible | Sonsitie | Flow | ‘toad’ | ‘ave | Spsco
‘Space Name wu. | “uni | “oad” | cory | cae | fe) | crane
Zone #
(G20 LACTARIO 7 | Jan 2500] i ‘Go| Treo] 84
[Zone 2
(02:02 SEAVICIO NEDIGO 7 | — Jan 356) a) | __ Taso] 25]
[Zone
(02:00 SIGNOS VITALES 7 Za] Jana 7a] oa] 23.0] 9
[Zone 4
‘0200 NEDICO THTULAR 7 ‘il Oat a Zi veo] 7a]
Zone 5
‘92.05 OFICIAL DE PARTES [310] — Nv 409 i 2il___weao] 25
(02.05 GROULAGION 7 735] — Jon 2300 ea Go] earn] 0.0
zone 7
02.67 VESTIULO 7 “| _ Oat 100| 207] a2] wean] a
[Zone
02-00 ESGALERA 7 a5] ut 00) i 23] waa] 73)
[Zone 9
"02 GO CENTRO DE FOTOCOPL i 783) su 009 = ‘27176 402
[Zeno 10
‘C210 FUTURO CRECIMIENTO i 53] Sap 1000) Ea 2 eo 3]
Fea Realy Program vO Page Sat 6Ventilation Sizing Summary for 02 VRFPBS2-02
Proc: Name: CJPF.CD VICTORIA cans
Prepareduy: PROVECTOS ost
‘Sum of Space OA Aiton
2A Zone: Zone
Flea] Tequired] Required) Required) equ
{zone Name Space Name ‘ea] Maximum] ‘outdoor Al Outdoor Ar| Outdooe Ar| Outdoor Ai
ut.| __“trs|_ccsupamts| (cFitperson]| ~~ (Grumy| " (Grup| eof suppty|
aT] 3a Ea ie 2a al
2.2Zone: Zone 2
Fear Tiaximara] —— Required]
{Zone Name /Space Name “rea|_Maximurn| Supply Ar| Outdoor Ar
mat “(te|_cesupants| _—" (ceun|(ceMiperse
[ea] sa)
23 done: Zone 3
Fi]
zone Kame / Space Name ‘rea|Maximum|
mut.| (| ecupants
zone
[53 SIGNOS VTALES a5) al
[Total inl. Space Mutipiors) L
2A Zone: Zone 4
Fo] ‘aximamn] —— Roqured]
{Zone Name / Space Name ‘Aree| Maximum] Supply Ar| Outdoor A
mut.| __“(t8}|_oesupant| (cFuiperson)
[Zoned
02.08 MEDICO TTULAR a[1655) aa 555
‘ola (nck Space Muliliers)
28 Zone: Zones
Fao] Waxiwurs] — Required] —Raqured] —Roqured] —Requved] Uncorrected
‘Area| Maximum] Supply | Quidoor | Ouidoor | Outdoor Air| Outdoor Air! Outdoor Ai
wue| __“(es| cssupante| "(cra crimperson)| —“(crimy| * (Crup| eeofsuppyy| (Cr
[ean 5a) aH ioe} a a a
"Total (i Space Mulipors) 30a]
onty Analale Proaran v.00 Page oat S
( )cog weston sehrvy Aner,
20g etey
erat oe Hoa eT
cc) co oz ase [7 —|oinamoaeo oununsoren
01 suey
(ans Tox [OY lsdr==o [oul [aR
ly s20pino ay se061n0 lamareen feery ‘sue soeds euen ouez
eanbe _|peurbow ls
Or enez UOT OTT
rae (Grane oS HU S|
ince wo 7 | Waso010s 30 0uiN39 e020
e007
(wars Tos rT
uw seop1n0 ay seopino
[pooestoouy [pwansoy
6 az [oa Ir
Imaor jsmeano00 fou) Famer
Miyseopino funursen [sore
peanbew leet
rare
50 30 oo [eacoe [oz aves fn
Tag) Tamao)—oaeDT LIS) JURE a) aT
a 2cein0 jay YoepIno |i ong a Ade junuixen |ooay
lpeunboy _|psunboy [peunbeu — luurupeens woos |
[eas
coe oo wo levis [0 r
Io) RGIS RT ST —— argo Uae |S) —— TRESS i
laycerino iw seerina a seonro [iyseomno |iyseopmnd ay nedns [ununren
lpuosuiooun osanbog (penribey [paxnbey |psumboy'” [umuncen
rans SOIDSROESTaDERII
io ‘yescuin dd PO UN 190.)
Z0-ZSEdJHA 20 40} Aewuing Buzig UoneIUeAProect Namo: CJPF CD VICTORIA cos
‘Air System Design Load Summary for 02 VRFPBS2-02 a
ropa by: PROVECTOS os
‘DESIGN COOLS ‘DESIGN HEATING
[COOLING BATA AT Aug 1400 [HEATING DATA aT DES HIG
[COOLING OADB/Wa 90.8% /081°F [HEATING OADS/ WB _97.8°F/35.0°F
‘Sensi Tato ‘Sensi Tater
lzone LoADs (eTuny,__(erwh| __detaits|_c@Tum|__(@TUNA|
Window & Siig Solar Loads ‘741 eae ‘aa |
[Wal Transmission isi | 8941 =| 105 co J
oo! Tranemision ‘on o 7 OF d z
[Window Transmission ‘arate ed | a74te| E) |
Sef Transmission ‘oF 0 _ ore t "|
Door Leas ol 0 | «|
oor Transnision 01 | 0 wore a z
Parions 962 o [1302 a] E
Gein ore ° +I o1r| a z
[Overhead Lging asa) 330, E o ti E
Frask hing owl ° E O 1
[sete Equipment Fiae0 Ww} 7s | ol f
Poop 2a Ts 525) dl 1 q
eestor coors ° o d
hiecolianesus Sarees ° 1 : a]
Sally Feetor ware 0 1 ml ol a]
[> Total Zane Loads =|__ a0 Boas) : Bare a)
Zone Condining| | aaa 5045] | 259] a]
Plenum Wal Load ol 0) q q :
Plenun Root Load oul 0) | q o 4
[Plenum Ligting Load ox) D d
[exhaust Fan Load ‘ocrwl | ‘cau
Nensaon Load er cru| ai ‘real esr crn Ez) q
[entiation Fan Load ‘ocrul ‘ocr d |
[Space Fan Col Fans | of | | o z
[Ovet Heat Gan Lose oH | ca q |
> Total Systm Loads =| rasa arial “867 q
[erminal nt Coosng “| —ased area) 7 —_ q
[Terminal tne Heating | ear) :
> Total Conditioning [rasa area) | 9607) q
Kev: alive valves ae cy loads sitive values are hig fads
Negative values are hi loads Negative values are cig loads
aeras
iy ays Progra 0SDedicated Outdoor Air System (DOAS) Sizing Summary for 03 VRFPBS3-03 |
Project Name: CPF CD VICTORIA oar ri20
Prepared by PROYEGTOS. 2p
‘ir Systom Information
Ar System Name 03 VRFPaS3-03
Equpment clase
‘Ae System Type
Stzing Caleulation Information
Caelation Months enema ta Boe
Sting Data I Giestates
‘Numbse of zee
Floor Wed
Location
Zo00 CFM Sing
‘Space OFM Siang
‘Sum of space srtlow rates
inaividual peak space lode
NOTE: No other data is applicable for a Terminal Units alr system without a Dedicated Outdoor Air System (DOAS).
ay Ras Pera vEOD
Page Tat @Zone Sizing Summary for 03 VAFPBS3-03
reject Name: CJPF CD VICTORIA oanzr
prepared by: PROVECTOS 1ztips
‘ie System information
‘ArSystom Rane Nubor of 2008.
Equpmert Clee Flor eon
‘Ar System Type = Location
‘Sizing Calculation Information
Cleulation Months on Zone CEM Siting .-- Sum of space aifow rates
Siting Dale en ‘Space CFM Sing Mndlvidual peak space fonds
‘Torminat Unit Sizing Data Cooling
otal | Sens] Ca [Cait [Water Tine
colt Got | Entering | Leaving | Flow of
tod | toad | vs/we | ve/we | @100-F | Peakcot | Zone
Zone Name wow) | ery _| cr cA_| oom, Load __|_crune
[Zane 1 13 ‘Go| 7a a9) 62/850) [sa 700] 8
Zone 2 7a wai] 772/642] 555/543] =| oer 500) 2.2
[Zone 3 ‘a| 16) 770/640] 855/543] [nov 00) 2.
[Zone 490[_18a)_772/002] 557/546) Nov 1400) 2.06
[Zone 6 ‘sa|___284] 004/67.8| 86.2/55.1 Sop 1500 2.6
(Zone 6 ti ai) 72/665] —66.0/560) sul1700) 0
‘orminal Unit Sizing Data - Heating, Fan, Ventilation
Heating Hig Gof
Heating | Cot Water | Fan On vent
Cot | Enitvg Flow | Design | Fan Fan | Design
Lose pa” @zo-F | ation | motor | Motor | Airlow
[Zone Name ay _| cf gom_| corm _|_ eum _| aw _|_ (orm
[Zone 1 a2) 662/780 z ai] 0.000] 00] a
[zone 2 Bal 679/735 [3604] —— 1.000] ——a00] 2s}
[Zone 3 ‘33[ era 72 720] o.000] 000 45
[Zone 34|_ 678/726 | 79] o.000) 000 “5
[Zones 7a) 687 71.9 E si] oom) 0000 |
zone 3a) 655/758 _ ‘s| 0.000) 0000 3
‘Zone Peak Sensible Loads
- Zone Zone | Zone
cooling | Timeot | Hosting | Floor
Senaible | PeakSeneitie | toad | Area
zone Name si) | Cootng Lord | _wBH) | _
[zene o[ Jun 700 Za] 2068]
[Zone2 7a4| Now woo] ia] 76a]
[Zone 159] Dee Ho tal 3990)
[zono- = 150 Nov Ho i7[ 8900)
[Zones ‘2n.a| Now 100} 2i| a2]
[Zone & a 75 Jun 170 EE)
‘Space Loads and Alrflows
Tine af
cooling | 'Feak | Ar | Hosting | Foor
zone Name Senainte | sensible | Flow | ‘Load’ | Area | Spaco,
Space Name wmut.| “ewsiy’ | tose” | corm | aac | ‘wey _|_ crm
[zone
‘05:07 SALA PRIVADA ENTRE i 0] an 70] a Z| 2000] 1.88]
[zone 2
‘08-02 DEFENSORIA PUBLICA a[__—7a4| eau|___t1a] sesso] 220)
ey Aras Program v.00Zone Sizing Summary for 03 VAFPBS3-03
Proc Name: CPF CD VICTORIA oad
Propatad ty: PROVECTOS. 12:1ipal
Tins of
cooling | Peak | air
[zone Name Sonsbio | snabie | Flow ‘space
"space Name wwut.| “owsey” | “toss | (ce orwne
13-08 POLICIA PROGESAL 4 1539) Dec 1409 aah wo] _29
[Zone 4
‘(3-04 FIGGALIA GENERAL 7 5) Now a9 Ga “7|-saa) 20
[Zones
(08-06 SLADE USOS MOLT i] 23) — few a0 wal Zila] 2:8
[Zone 6
103.06 CIRGULACION 7 7 73 an 1709 sl Fa
Me
oy Ralls Proararn 500 Page SEof
Project Name: CJPF OD VICTORIA
Prepared by: PROVECTOS
Ventilation Sizing Summary for 03 VRFPBS3-03,
‘Sum af Space OA Aiiows
Real
zone Name / Space Name outdoor Ar]
Mut cot suppty
{zone 7
02-01 SALA PRINADA ENTRE. 7 Tal
‘elas ick Space Mulilies)
2.2 Zone: Zone 2
Fea] ‘aximum] Required] aquired] Required] —Raquirea] Uncorrected
{Zone Name Space Name ‘Area| Maximum] Supply Ar| Outdoor Ar| Outdoor Ar| Outdoor Alr| Outdoor Alr| uteoor Ar]
wu.| —“(ee| oesupants| """[¢ran|(cFuiperson]| "(CriNN]| "" (CFMD| eof supply] (CFU)
[yess] skal a0 50 oa 2 3 20]
3504.1 2530]
23 Zone: Zone3
Floor Maximum] Required] Required] Required] Roqured|Uncerrestt
‘Zone Name / Space Name rea} Maximum) Supply A) Outdoor Ar] Ouldoor All| Outdoor Ar| Outdoor Ar| Outdoor Ai
mut.| —“tty| Oseupants| “Pcemn| crmtperson)|_“(crn|_ "(crm oot supply] (Cra
Zoned
(8.05 FOLIGIA PROOESAL i] —a590) 50 7a] Ey Oe oa a rr)
[Falls (nck Space Multipters) 71937 asa
2.4 Zone: Zone 4
Fear equres] Unsorted
Zone Name / Space Name ‘rea|Maximur| Outdoor Air] Outdoor Ar|
mut.| "(| occupant eof supply] (Cru
Zonet
FISCAL GENERAL, Taso a oa a
nel. Space Mutiplors) aaa
2,
Fear Waxinur) Required) Required) Required) Required] Uncorrected]
me ‘Area| Maximum] Supply Air] Outdoor Alr| Outdoor Alr| Outdoor Alr| Outdoor Ar] Outdoor A
Mut.| _"(f3| Oocuparte| "(Gem (cFMiperson)|_(Crwte)|_ (CFM (% of euppiy]| (GFW
ones
(5-05 SALA DE USOS MULT isa] aa} airs} 59 i) 3a Bal a5]
[Foals (inc. Space Mules] 3178) 7535
aaiy Aras Program vE00
Page taeSees _00°Sn wesBoug sisKreuy Aunon
ee Gara oe Toa eT]
ee [oo go sv loz [osee fr TNODNINOHID:
ia) (reas Tom [aS] —— [eM ERTS GT FAT
ly 209RIN0 lay zo0pino law zeopino | 4oopINO liv Aédng —unapey |sery ‘oun eed owen su02|
lpsieauocun |psunbey |peanoey |psanboy nay Looks
Paez Tez Te
SOLDEKO YS 7a PSR
\wndouoin a2 aero eueN ea
£0-ESAdsUA £0 10} Arewuung Bulzis uoNeUEA‘Air System Design Load Summary for 03 VRFPBS3-03 zal
is
Prec Nemo: CJPF CO VICTORIA sir
tepared by: PROVECTOS, ira
‘DESIGN GOOLNG ‘BESIGH EATING
[COOLING DATA AT Sep 1500 [HEATING DATA AT DES HT
[SOONG OADB/WE. 98.4°F/822°F [HEATING OADB/WB_370°F/35.0°F
‘Senaio] Later] ‘Sensible Tate
lzone LoaDs Dotate| __(GTUM}| TUR | _Detals|_ TUN] _cBrUhn
|Windon & Sy Sear Leads 236 867 | 256 :
Wal Transmission "as0 | 297 "288 “rasa
[Roo Trarenission On| q z On| A :
[Window Trananioion er oat | Bes 25) :
sight Transmision on o on| q E
(Door Loads ‘on o on q
oor Tranenissicn ae23 | 0] wasn 0 _
[Parations coo] Hi z 138. 0)
[Gating on OD _ | 0] :
[Overhead Lighting now ea _ q fi
Fras Lihang owl o 7 q d E
Elerie Equpt 72200 85 z q q |
[Peon 7 18086 16185) q o A
entation | ° a d
[Miscalneccs 0 d : d
Stet Factor oa 2 D | d 0]
[> Total Zono Lead [| T6795) : Bassa) q
[Zone Conetiring [rea 16195 z 275) o
Plenum Wal Loss oa | ql 7
[Plenum Roo! Load or a 7 a) d
Plu ging Load | o | 0) dl
sma Pat La ‘oF a 0G 0
Vente Lond es crv i 32366] —__695.GF8 Zai00| al
entiation Fan Load ‘ocr q ‘GFN
[Space Fan Cal Fane : q | no :
[Duct Hest Gan /Loce os d of ol |
b> Total System toads [| 7 a
[Fesminal Unit Coaing 40044 o
[Teil Unit Heating q | 7
b> Tota Conationing | 60a "568 : 23575) q
kay: Positive values are cl loads sive values are hig ids
Negative values are hg loads Negative vluos are clg load
oy ays Progra v5.0 Page 66reject Name: GJPF CD VICTORIA
Dedicated Outdoor Air System (DOAS) Sizing Summary for 04 VRFINST-07
os
‘ou iape|
[prepared by: PROVECTOS
‘Air Systom Information,
‘Sizing Calculation information
santo Dee
Caletaion Months
Calevieted
Siang Date
Zone CFM Sizing
‘Space CFM Sing
‘ED VICTORIA, Mexico
‘Sum of space srlow ates
inalvidual peak space lode
2
Fir te
NOTE: No other data is applicable fora Terminal Units air eystom without a Dedicated Outdoor Air System (DOAS).
ory Anata Program vS00
Page ToaZone Sizing Summary for 04 VRFINS1-07
Jrojct Name: GJPF CD VICTORIA cari7r2004
lerepared by: PROYECTOS 01:14
Air Systom information
‘Airsystom Name OA VRFINS ET ‘Numba ones cee B
Equpmont Css va TERM Floor Area Total zone Loads |r, a0) z 07) q
[Zone Centering [775 S220) = q
[Penum Wall Load ol a | a o 7
Pin Root Lad ‘onl a | ol d z
‘ox “ ol o
oer a) z ‘Gra “|
was.cru| 82 ave] siscr "eae a
Ventlation Fan Load ‘OCF ‘OGFW i
[Grace Fon Cod Fane | a a]
[Duet Heat Gan Lose ol z ol a
b> Total System Loads -|_—7 ara) 7 Baars) a|
Hema Une Cooing 2aeai 37a6a) D 5
[Femara Une Hoang E : : Baa] :
[> Total Conditioning | aa “ara | ‘276 7
[key: Positive waluss ar cy Wade oslive values are hi Toads
Nagative values are ig loads
Negative valves are cg load
Toa Ravi Program v5.00
Page toroDedicated Outdoor Air System (DOAS) Sizing Summary for 05 VRFINS2-02
Project Name: CIPF CD VICTORIA
[Prepared by: PROVEGTOS 08:47a,
Air System Information
‘Ni System Nam wr eonner 08 VRFINS202 theo A
Eauipment Class sees TERM venta 18800.
‘Ai Systm Type a SB WieTORIA, mexico
Sizing Calculation Information
Calculation Months Zone CFM Sizing a... Sum of space arlow rales
Siang Data ne ‘Space CFM Sizing... Indlvidtal peak space loads
NOTE: No other datas applicable fora Terminal Units air system without a Dedicated Outdoor Ai Systom (DOAS),
Toy Anais Program v.00 Page 1 a6