Professional Documents
Culture Documents
Vyush Agarwal(180881)
ABSTRACT:
This report contains brief explanation of what I have learned in lab 1 and my attempts on solving the first lab exercise: Map Reading.
The objective of this report is to understand map numbering system and to study various details on topographic map(s).
Tree: surveyed
Tree: unsurveyed
Contour
Forest Area
River
canal
Railway Line:single
Railway line:Double
Roads :metallic
Roads :kuchha
Telephone line
Electric Line
Urban Areas
3.4 Finding points on map
Name Longitude Latitude
Surveyed Tree 80◦ 120 26◦ 35.50
Triangulated station for height 80◦ 120 26◦ 35.50
Triangulation control point 80◦ 120 26◦ 35.50