Professional Documents
Culture Documents
Settings maintained in DE
BP & Loc. (Local integration settings)
31-aug
create zones and its heirarchy
test FWO cycle
edge-
1. update integration points in sheet
2. update KDD, gaps
3. Put ricefw (which are confirmed and forms, etc. and DO NOT put those devs. which
are not confirmed yet)
taka-san discussion
1. actual forwarding orders - to be removed
2 If one of the product quantity is below 1 Ton, should it be blocked (even for
external/ forecasted or, actual SO/ PO/ STO? - Material Group to be taken
3. Tables TCURM and T001W inconsistent - Assigned Plant to company code
4. Ask for SD team for text schema to pull the usage indicator in SO and MM team
for text schema in PO/ STO for rivision level field
5. How would SO / PO and STO be transferred from S4-ECC to S4-TM (without PI
system) ?
6.