You are on page 1of 1

NOTES

WINDOWS SCHEDULE Notes :


No . Quantity Elevation opening leaf Frame
surface Fixing
0.800
0.860 8mm
glass clear
fast
Aluminium
bead
Aluminium
fram
section for
FLOORS: Floor finish on 50

0.800

0.860
W01 05 polishing
sand-cement screed on 100
on dpm on a min 150
hardcore.

W02 01 1.000
1.060 8mm
glass-clear
Aluminium
bead
Aluminium
fram FOUNDATIONS :Concrete strip
fast section for
polishing foundation to engineer 's detail .
Depth to be determined on site by

2.060
2.000
engineer (min=750mm)

8mm
SEWERAGE: All drains below groung
E-14 1.500 1.560 glazing
tinted
Aluminium
bead
Aluminium
fram level to be pvc pipes
.
section for
W03 02 polishing Soil pipes above ground to be cast iron

1.100

1.160
Drains taken under the floor slab to be
A B C D E F G
3.650 2.500 1.230 3.520 3.400 2.150 cast iron and be encased in concrete
16.600 2.460
8mm glass
tinted
Aluminium
bead
Aluminium
fram
Inspection eyes to be provided at every
0.150 0.150 2.400
16.300 W04 04
section for
polishing .
7.530 2.370 6.700 100 mm pipes to be

2.000

2.060
0.150
3.500
0.150
2.350
0.150
1.080
0.150
3.370
0.150
3.250
0.150
2.000
0.150 below ground level and 1:80
7.530 2.370 6.700
ground level.

A6 1.200 1.260 8mm glass Aluminium Aluminium


0.150

0.150

0.150

0.150
tinted bead fram .
1 1 ROOF:chromadeck tiles
W02 W04
0.400

section for

0.800

0.860
.
W01
W05 02 polishing
1.400

1.250

1.250

1.400
.
Verandah W.I.C
(Porcelain tiles) (Porcelain tiles)
.
W01

REVISIONS
0.150

0.150
2 2
W03
D03 D01 .
D02 .
Bedroom 01 . Date Description By .
WC (Porcelain tiles)
.
(Porcelain tiles) 3.000 3.060 .
Aluminium Aluminium
Ensuite 8mm glass
2.250

2.100

2.250
Entraince Hall Store (Porcelain tiles) tinted bead fram .
(Porcelain tiles) (Porcelain tiles) section for .
D01 polishing
W02
W03
3.450

Verandah W06 01

2.000

2.060
(Porcelain tiles)

0.150
3 3
W05
D01 D01
1.350

1.350
D01 Passage
(Porcelain tiles)

9.500
D01 D01
8.950
0.150

4 4

3.050
D01
rc beam to the eng rc beam to the eng

W04
Bedroom 03
1.850

1.850
(Porcelain tiles)
12.300

12.000

12.000
12.300
W.I.C
(Porcelain tiles) D01

0.150
rc beam to the eng

5 D01 D01 D01


5
4.200

Dining Lounge
W06

(Porcelain tiles) (Porcelain tiles)

DESIGN
Bedroom 02
2.500

2.350

2.500
(Porcelain tiles)
Ensuite
W01

WC (Porcelain tiles)

(Porcelain tiles)

DOORS SCHEDULE
0.150

0.150

0.150

D04

6 W04 Sliding Door W04 W01 W05 6


No . Quantity Elevation opening leaf Frame
surface Fixing
2.500
2.800

2.650

2.650

2.800 0.910
2.800

Verandah 0.85
(Porcelain tiles)
wood Aluminium
Wood body bead fram
section for
polishing
D 01 12

2.300

2.360
0.300
0.150

0.150

0.150

0.150

7 7
7.530

Project :
A6

0.150 0.150 0.150 0.150 0.150 0.150 0.150


3.000 4.080 3.070 1.850 1.850 1.700
wood and \ wood Aluminium
PROPOSED BOUNDARY WALL
01 bead fram
0.960
Q/RVA/ KOLWEZI
D 02
7.530 9.070 0.900 glass
section for
0.150 0.150 polishing

16.300
16.600

2.300

2.360
3.650 2.500 1.230 3.520 3.400 2.150
A B C D E F G
TITLE : WORKING DRAWINGS

wood
Wood body bead Aluminium
fram DRAWN BY
1.300 1.360
DESIGNED BY : ARCHI RUBEN MUMBA
section for
D 03 01 polishing

BBDC
2.300

2.360
Aluminium Aluminium
4.000 4.060 8mm glass
tinted bead fram
section for
polishing
D 04 01

CLIENT : MAMAN VERONIQUE

2.300

2.360
SCALE : DATE 09/ 04/2021

Dwg NoD040120 /01


GSPublisherVersion 0.16.100.100

You might also like