SCENARIOS FOR CHANNELING RUNOFF TO THE OUTLET POINT
DESC PROS CONS QUESTIONS
1
1 CREATE A DIRECT ROUTE FOR THE RUNOFF EITHER
CHANNEL COULD BE CONSTRUCTED NO SO THAT AN INTERIM SOLUTION FOR THE FLOOD ZONE WILL ALSO BE THE ULTIMATE SOLUTION SO SOLUTION WOULD REQUIRE A REVISED CAN THE RIGHT OF WAY BE INCREASED TO IMPROVE THE CROSS SECTION? HOW AS AN EARTHEN CHANNEL OR A ROAD. PRELIMINARY PLAN. WILL RUNOFF TURN WEST AND THEN TURN NORTH TO CROSS AIRWAY AVE? RE-CONSTRUCTION IN THE FUTURE COULD BE MINIMIZED.
2 DEVELOP OAK CLIFFS/SHANNON ROSE TO
TRANSPORT 190 CFS POTENTIALLY KEEPS IMPROVEMENTS WITHIN THE SUBDIVISION. USES PROPOSED ROADS AND LAYOUT - NO PRELIM PLAN REVISIONS REQUIRED. DUE TO OAK CLIFFS SLOPE, TYPE A CURB WOULD BE REQUIRED FOR THE LENGTH. DUE TO OAK CLIFFS SLOPE, TYPE A CURB WOULD BE REQUIRED FOR THE LENGTH.
NO LAYOUT REVISION REQUIRED. POTENTIAL EXISTS TO ROUTE THE RUNOFF
WHAT WILL BE REQUIRED FOR RUNOFF CROSSING WITHIN KINGMAN CROSSING 3 SPLIT OUTLET BETWEEN OAK CLIFFS/SHANNON ROSE AND KINGMAN CROSS BLVD. IN THIS MANNER WITH TEMPORARY MEASURES (DITCHES, BERMS) UNTIL FINAL CONSTRUCTION. POTENTIAL TO MINIMIZE RUNOFF IN INTERIOR ROADS, ADDITIONAL COST FOR CHANNEL IN AIRWAY R-O-W. BLVD (C)? HOW WILL RUNOFF TURN WEST AND THEN TURN NORTH TO CROSS AIRWAY AVE? WILL C.O.K. ALLOW A CONCRETE CHANNEL ALONG AIRWAY? AVOIDING VERTICAL CURVES OR WIDENED PAVING SECTIONS.
AIRWAY: COULD CARRY UP 300 CFS WITH A CHANNEL
(CONCRETE) 2’ DEEP AND APPROX. 12.5’ WIDE ON THE POTENTIAL COMPLICATIONS SOUTH SIDE OF THE RIGHT OF WAY. COMMENTARY
GETTING RUNOFF ON THE SOUTH
A SIDE OF AIRWAY ACROSS TO THE ANY OF THE SOLUTIONS NORTH. THERE IS EXISTING WATER IN A PROPOSED ARE GOING TO RELY AIRWAY. 1 ON HOW WE'RE GETTING RUNOFF D B NORTH ACROSS AIRWAY TO THE EXISTING DRAINAGE PARCEL. RUNOFF IS GOING TO NEED TO BE 2 THERE WILL FOR SURE BE SOME TURNED WEST HERE IN ANY B SCENARIO. MAY REQUIRE LOSS OF A SORT OF CHANNEL ALONG THE SOUTH SIDE OF AIRWAY IN THE LOT, BUT THEY ARE BIG LOTS AND 16+ FT BETWEEN THE SIDEWALK COULD POSSIBLY JUST BE AND THE SOUTH RIGHT OF WAY. REDUCED. IT'S LOGICAL FOR THE NEXT STEP 2 TO BE CONFIRMING THE MAXIMUM POTENTIAL CULVERT CROSSING IF 3 RUNOFF WE WILL BE ABLE TO C CULVERT IS USED FOR RUNOFF CHANNEL ALONG AIRWAY AND GET ALONG KINGMAN CROSSING. 2 UNDER THE ROAD TO THE DRAINAGE PARCEL. THEN EVALUATE THE OPTIONS FOR THE IF 190 CFS IS RUN DOWN OAK CLIFFS SURFACE RUNOFF. D THERE WILL BE AN AREA REQUIRED TO GET IT TO TURN NORTH ACROSS AIRWAY. 1 C
PARCEL C: INPUT 1-24"(Q100=27.77),
PLAINS AVE: CANNOT 1-15"(Q100=12.61), 4-36"(Q100=354) PIPES TOTAL = PARCEL G: OUTLET OF LINES OUTLET PARCEL C 394 CFS IN. AA (2-36" ADS Q100=50.13) AND BECAUSE IT FLOWS EAST B (1-30" ADS Q100=18.18 CFS). (ABOUT 4’ ELEV. DROP) TO BE METERED TO 190 CFS OUT WITH 7.5 Ac*FT TOTAL Q100=68 CFS. STORAGE. A TOP OF 3500 WILL BE ABOUT 4' INV=3502.10 (NOT ASBUILT). ABOVE THE STREET - THE OUTLET OF THE CMPS FROM HMMC SHOULD BE ABOUT 3501.5. IT WILL DIFFICULT WITH THESE ELEVATIONS TO GET MORE RETENTION BY BACKING UP INTO THE HMMC BASINS. THE BASIN AT 6 FT DEEP WILL PROVIDE ADEQUATE RETENTION FOR THE SUBDIVISION REQUIREMENTS PLUS REDUCING THE OUTFLOW.