Professional Documents
Culture Documents
CKG-PR-B10-CON-C02-HO1-6000 HANDOVER
MAIN OFFICE BUILDING.ZIP, contains of :
CKG-PR-B10-CON-C02-
HANDOVER MAIN OFFICE BUILDING.pdf
HO1-6000
ASBUILT DRAWING MAIN OFFICE, CANTEEN &
LOCKERS - PILING PLAN.dwg
1.0
MAIN OFFICE, CANTEEN & LOCKERS OVERALL
PILING PLAN R1.0.pdf
1.0
CKG-PR-CON-CE-B00-C01- SITE GRADING MAIN OFFICE, CANTEEN, AND
DRW-1081 LOCKER 1.0.dwg
1.0
CKG-PR-CON-CE-B00-C01- SITE GRADING MAIN OFFICE, CANTEEN, AND
DRW-1081 LOCKER 1.0.pdf
1.0
CKG-PR-B22-CON-C02-
HANDOVER ENERGY BUILDING
HO1-6000
CKG-PR-B31-CON-C02-
HANDOVER PRODUCTION BUILDING
HO1-6000
project.juno@tatamulia.co.id
Reason for Issue
A - Approval P - Preliminary T - Tender
B - Building Consent Q - Scheduling V - Verification
I
C - Construction R - Requested
I - Information S - Shop Drawing
*Size/Media
PROJECT JUNO – PT FRISIAN FLAG INDONESIA
Contract: C01 – Early Works Civil and Piling
Transmittal Notice
Transmittal Number: C01-001
Date: 13 February 2021
Sheet: 2 of 2
We enclose the documents indicated below.
Please destroy or mark superseded all previous issues. Date of Issue
Drawings Y Specs Day 13
Sketches Manuals Month 08
Reports Other Y Year 21
Doc Nº Revision No
Options: A4 / A3 / A2 / A1 / A0 / D (Disk) / CD Disk/CD virus check: Sender: Yes/No Receiver:
Yes/No
Method of Delivery:
Mail: Courier: Messenger: Other: Via Email
Remarks:
Signed: