Legend Information favorite_border APPENDICES The following appendices provide information for

CODE SECTIONS MY NOTES the application of the commissioning process.


Chapter 5 Commissioning Provider First Version: Feb 2019
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning APPENDICES
process. The following appendices provide

information for the application of the

APPENDIX A Building
arrow_right Commissioning Documentation commissioning process.

arrow_right APPENDIX B Checklists


APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities

APPENDIX D Commissioning
arrow_right Process in the I-Codes

arrow_right APPENDIX E Resources

APPENDIX A
Building Commissioning
Documentation

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 1/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In apps

All Codes
clear Search Type
help
Title Content
Legend Information

CODE SECTIONS MY NOTES


Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning
process.
A1.1 Documentation of Commissioning
Requirements in Applicable Codes
APPENDIX A Building
arrow_right Commissioning Documentation
Code requirements for commissioning should
be documented and completed as required by
arrow_right APPENDIX B Checklists the applicable code or standard.

APPENDIX C Sample Skills, The following documentation should be


arrow_right Knowledge and Abilities provided for each instance of an applicable
commissioning requirement in an applicable
APPENDIX D Commissioning code or standard:
arrow_right Process in the I-Codes
a. Applicable code requirements, with
code section reference numbers and
arrow_right APPENDIX E Resources
including any environmental,
sustainability, or efficiency
requirements of those codes.
b. Description of technical approach to
compliance.
c. Equipment and systems to be
commissioned.
d. Specific process requirements for the
commissioning of each element,
including: logs, reviews, reports,
evaluations, testing and documentation
requirements.
e. Training requirements where required.
f. Documentation requirements.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 2/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! The following checklist in the 2018 IECC can be


A󰍝
used to verify projectsearch
Search acr…
menu
Menu supervised_user_circle completion
commissioning personSign In apps
for specific systems. This checklist is similar to
the commissioning documentation checklist in
All Codes
clear Search Type
help
section 4.7.9 in this guideline. Either or both
Title Content
Legend Information checklists may be used as appropriate to the
CODE SECTIONS MY NOTES AHJ’s compliance requirements.
Chapter 5 Commissioning Provider
Qualifications and Selection COMMISSIONING COMPLIANCE CHECKLIST for
FINAL INSPECTION and CO
APPENDICES The following Project Name:
appendices provide information for
arrow_right the application of the commissioning
Project Address:
Permit Number:
process.
Commissioning
Provider (CxP):
APPENDIX A Building
arrow_right Commissioning Documentation Phone Number:
Company/CxP

arrow_right APPENDIX B Checklists address:


COMMISSIONING
ITEM # APPROVAL
APPENDIX C Sample Skills, DOCUMENTATION
arrow_right Knowledge and Abilities 1. Project Commissioning Requirements
Project
APPENDIX D Commissioning
arrow_right Process in the I-Codes
commissioning
requirements
included in project
arrow_right APPENDIX E Resources contract
documents.
2. Commissioning Plan
Commissioning
Plan with checklists
(before start of
functional testing)
completed.
(Section C408.2.1)
3. Commissioning Plan Utilized
Commissioning
Plan was used
during construction
and includes items
required in Section
408.2.1
4. Systems Adjusting and Balancing

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 3/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING COMPLIANCE CHECKLIST for


A󰍝
menu
Menu
Search acr… search
FINAL INSPECTION Sign In
and CO supervised_user_circle person apps
Systems Adjusting
and Balancing has
All Codes
clear Search Type
help
been completed
Title Content
Legend Information 5. HVAC Equipment

CODE SECTIONS MY NOTES HVAC Equipment


Chapter 5 Commissioning Provider Functional Testing
Qualifications and Selection has been executed.
If applicable,
APPENDICES The following deferred and
appendices provide information for follow-up testing is
arrow_right the application of the commissioning scheduled to be
process. completed on
6. HVAC Controls
APPENDIX A Building
arrow_right Commissioning Documentation
HVAC Controls
Functional Testing
has been executed.
arrow_right APPENDIX B Checklists If applicable,
deferred and
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities follow-up testing is
scheduled to be
completed on
APPENDIX D Commissioning
arrow_right Process in the I-Codes 7. Economizers
Economizer
Functional Testing
arrow_right APPENDIX E Resources has been executed.
If applicable,
deferred and
follow-up testing is
scheduled to be
completed on
8. Service Water Heating
Service Water
Heating Functional
Testing has been
executed. If
applicable, deferred
and follow-up
testing is scheduled
to be completed on
9. Systems Manual

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 4/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING COMPLIANCE CHECKLIST for


A󰍝
menu
Menu
Search acr… search
FINAL INSPECTION Sign In
and CO supervised_user_circle person apps
Project
documentation, and
All Codes
clear Search Type
help
Systems and O&M
Title Content
Legend Information Manual, and
training completed
CODE SECTIONS MY NOTES or scheduled.
Chapter 5 Commissioning Provider
Qualifications and Selection 10. Commissioning Report
Preliminary
APPENDICES The following Commissioning
appendices provide information for Report submitted to
arrow_right the application of the commissioning owner and includes
process. all items required in
Section C408.2.4
APPENDIX A Building
arrow_right Commissioning Documentation Owner/Owner’s Representative Acknowledgement
I hereby certify that the commissioning provider has
provided me with evidence of mechanical, service
arrow_right APPENDIX B Checklists water heating and lighting systems commissioning in
accordance with the 2018 IECC.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Name/Company:
Owner:

APPENDIX D Commissioning Owner’s


arrow_right Process in the I-Codes Representative:
Signature:

arrow_right APPENDIX E Resources Date:

A1.2 Owner’s Project Requirements

Contents.

The contents of the Owner’s Project


Requirements (OPR) should include the
following information applicable to the code
requirements:

1. Facility size; location; user


requirements, including space usage,
occupancy, operation and project
schedules; codes; standards; and
indoor environmental requirements,
including temperature, humidity, and
ventilation.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 5/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

2. Commissioning process requirements,


!
A󰍝
menu
Menu
Search acr… search reviews
including logs, supervised_user_circle reports
personSignand
In
apps
listing of equipment, systems and
assemblies requiring commissioning,
All Codes
clear Search Type
help
with installation evaluation and testing
Title Content
Legend Information requirements.
CODE SECTIONS MY NOTES 3. Commissioned equipment, systems
Chapter 5 Commissioning Provider
and assemblies requirements,
Qualifications and Selection
including maintainability, access, and
APPENDICES The following operational performance requirements.
appendices provide information for 4. Environmental, sustainability and
arrow_right the application of the commissioning efficiency goals and benchmarks for
process.
code requirements.
5. Project documentation requirements
APPENDIX A Building
arrow_right Commissioning Documentation
and formats including; Basis of Design,
Commissioning Plans and Reports,
and the Systems Manual.
arrow_right APPENDIX B Checklists
6. Training requirements for occupants
APPENDIX C Sample Skills, and the owner’s operation and
arrow_right Knowledge and Abilities maintenance personnel.
The OPR documents the functional
APPENDIX D Commissioning
arrow_right Process in the I-Codes
requirements of a project and expectations of
the building use and operation as they relate to
systems being commissioned. The document
arrow_right APPENDIX E Resources describes the physical and functional building
characteristics desired by the owner, and
establishes performance and acceptance
criteria. The OPR is most effective when
developed during predesign and used to
develop the BOD during the design process.
The level of detail and complexity of the OPR
will vary according to building use, type and
systems.

Template CF-1B provides an optional guide for


collecting and documenting the information
associated with the Commissioning Process
activities. Other formats are acceptable.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 6/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! OWNER’S PROJECT REQUIREMENTS


A󰍝
menu
Menu
Search acr… search FORM CF-1B
COMPLIANCE supervised_user_circle
Sign In person apps
Submitted with Permit Application if Required
Project
All Codes
clear Search Type
help
Name:
Title Content
Legend Information Project
Address:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Permit
Qualifications and Selection Number:
PAGE
APPENDICES The following OWNER’S PROJECT NUMBER
appendices provide information for REQUIREMENTS IN
arrow_right the application of the commissioning ITEM # ITEMS OPR DOC.
process.
Project Program
1. Facility size, location,
APPENDIX A Building
arrow_right Commissioning Documentation user requirements,
including space usage,
occupancy, operation
arrow_right APPENDIX B Checklists and project schedules
and codes, standards
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities and indoor environment
requirements, including
temperature, humidity,
APPENDIX D Commissioning
arrow_right Process in the I-Codes
and ventilation.
Commissioning Process
2. Commissioning process
arrow_right APPENDIX E Resources requirements, including
logs, reviews, reports
and listing of
equipment, systems
and assemblies
requiring commissioning
with installation
evaluation and testing
requirements.
Systems and Assemblies

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 7/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! OWNER’S PROJECT REQUIREMENTS


A󰍝
menu
Menu
Search acr… search FORM CF-1B
COMPLIANCE supervised_user_circle
Sign In person apps
Submitted with Permit Application if Required
3. Commissioned
All Codes
clear Search Type
help
equipment, systems
Title Content
Legend Information and assemblies
requirements, and
CODE SECTIONS MY NOTES warranty provisions
Chapter 5 Commissioning Provider
Qualifications and Selection including maintainability,
access, and operational
performance
APPENDICES The following
requirements.
appendices provide information for
arrow_right the application of the commissioning Environmental Quality and Efficiency
process. Requirements
4. Environmental,
APPENDIX A Building sustainability, and
arrow_right Commissioning Documentation efficiency goals and
benchmarks for code

arrow_right APPENDIX B Checklists requirements.


Documentation
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities 5. Project documentation
requirements and
formats including; Basis
APPENDIX D Commissioning of Design,
arrow_right Process in the I-Codes Commissioning Plans
and Reports, and
arrow_right APPENDIX E Resources Systems Manual.
Owner/Owner’s Representative
Acknowledgement
I have reviewed the OPR document and verified
that it meets the owner’s project requirements.
Name:
Company
Name:
Signature:
Date:

Enforcement: At their discretion, building


officials should confirm demonstrated
compliance at plan intake by:

☑ Receipt of a copy of the OPR


document or a form signed by the
owner or owner’s representative
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 8/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! attesting that the OPR has been


A󰍝
menu
Menu
Search acr… search and supervised_user_circle
completed approved personSign In
by the apps
owner.
☑ Receipt
All Codes
clear Search Type
help
of other documents
Title Content required by the applicable code.
Legend Information

CODE SECTIONS MY NOTES A1.3 Basis of Design


Chapter 5 Commissioning Provider
Qualifications and Selection
The Basis of Design (BOD) should be
APPENDICES The following
completed at the start of the design phase of the
appendices provide information for building project, and updated as necessary
arrow_right the application of the commissioning during the design and construction phases.
process.
Contents: The BOD document should include
compliance with the requirements of the
APPENDIX A Building
arrow_right Commissioning Documentation applicable code and the following:

1. Description of the design team’s


arrow_right APPENDIX B Checklists proposed technical method to meet the
requirements.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
2. Coordination of applicable technical,
code and commissioning requirements
APPENDIX D Commissioning for systems and assemblies being
arrow_right Process in the I-Codes commissioned.
3. Design criteria and design assumptions
arrow_right APPENDIX E Resources in agreement with the OPR and code
requirements.
4. Requirements for sustainable design
and other certifications.
5. Requirements that systems,
assemblies, and equipment be located,
installed, commissioned and
maintainable, and that training be
provided to operations and
maintenance staff.
Template CF-1C provides an optional guide for
collecting and documenting the information
associated with the Commissioning Process
activities. Other formats are acceptable.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-pr… 9/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! BASIS OF DESIGN COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF- 1C search supervised_user_circle
Sign In person apps
Submitted with permit application if required
Project
All Codes
clear Search Type
help
Name:
Title Content
Legend Information Project
Address:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Permit
Qualifications and Selection Number:
PAGE
APPENDICES The following NUMBER
appendices provide information for BASIS OF DESIGN IN
arrow_right the application of the commissioning ITEM # ITEMS BOD DOC.
process.
Technical Approach

APPENDIX A Building 1. Description of the


arrow_right Commissioning Documentation design team’s technical
approach to each of the
Owner’s requirements.
arrow_right APPENDIX B Checklists Codes and Commissioning
APPENDIX C Sample Skills, 2. Coordination of
arrow_right Knowledge and Abilities applicable technical and
code requirements as
APPENDIX D Commissioning well as the
arrow_right Process in the I-Codes commissioning
requirements for the
systems and
arrow_right APPENDIX E Resources assemblies being
commissioned.
Assumptions
3. Design criteria and
design assumptions in
agreement with the
OPR and code
requirements.
Sustainability and Related Criteria
4. Requirements for
sustainable design and
other certifications when
required.
Maintenance and Training

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 10/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! BASIS OF DESIGN COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF- 1C search supervised_user_circle
Sign In person apps
Submitted with permit application if required
5. Requirements that
All Codes
clear Search Type
help
systems, assemblies,
Title Content
Legend Information
and equipment be
located, installed,
CODE SECTIONS MY NOTES commissioned and
Chapter 5 Commissioning Provider
Qualifications and Selection maintainable, and that
training be provided to
operations and
APPENDICES The following
maintenance staff.
appendices provide information for
arrow_right the application of the commissioning Owner Acknowledgement
process. I have reviewed the Basis of Design and verified
that it meets the owner’s project requirements.
APPENDIX A Building Name:
arrow_right Commissioning Documentation
Company
Name:
arrow_right APPENDIX B Checklists Signature:
Date:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Enforcement: At their discretion, building
officials should confirm demonstrated
APPENDIX D Commissioning
arrow_right Process in the I-Codes compliance at plan intake by:

☑ Receipt of a copy of the BOD


arrow_right APPENDIX E Resources document or a form signed by the
architect, engineer or designer of
record, attesting that the BOD has
been completed and meets the
requirements of the OPR.
☑ Receipt of other documents
required by the applicable code.

A1.4 Commissioning Plan

Prior to construction permit issuance a


commissioning plan should be completed to
document how the project will be
commissioned.
Commissioning Plan. The Preliminary
Commissioning Plan and Final Commissioning

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 11/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Plan should be provided as required in Sections


A󰍝
A1.4.1 and A1.4.2 search
Search acr…
menu
Menu and shallsupervised_user_circlebe specifically
personSign In apps
created for each individual project.
All Codes
clear Search Type
help
Title A1.4.1 Preliminary Commissioning Plan:
Content
Legend Information
At the time of permit application, a Preliminary
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Commissioning Plan based on applicable codes
Qualifications and Selection should be provided. Contents of the Preliminary
Commissioning Plan shall comply with
APPENDICES The following applicable code requirements and include:
appendices provide information for
arrow_right the application of the commissioning 1. Overview of the proposed
process. commissioning process.
2. Schedules developed for
APPENDIX A Building commissioning activities in the design,
arrow_right Commissioning Documentation construction and occupancy phases of
the project.
arrow_right APPENDIX B Checklists
3. Roles and responsibilities for the
Commissioning Team throughout the
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities project. The responsibilities shall
delineate the duties of the
APPENDIX D Commissioning commissioning provider,
arrow_right Process in the I-Codes commissioning specialists, owner,
inspectors, contractors, suppliers, and
arrow_right APPENDIX E Resources other agencies.
4. Documentation of communication
procedures including the distribution of
the Commissioning Plan and other
documentation during the design and
construction processes, including the
development and utilization of the
Issues and Resolutions Logs and a
preliminary listing of required reports,
reviews and approvals.
5. Design documentation review
procedures, submittal evaluation
procedures and report formats.
6. Preliminary list of operations, systems
and assemblies that will be
commissioned and/or inspected.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 12/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

7. Formats for commissioning checklists,


!
A󰍝
menu
Menu
Search acr… search testing
commissioning supervised_user_circle forms
personSignand
In apps
Commissioning Progress Reports.
8. Guidelines and formats that will be
All Codes
clear Search Type
help
Title used
Content to develop the Systems Manual,
Legend Information Training Plans, and Final
CODE SECTIONS MY NOTES Commissioning Report.
Chapter 5 Commissioning Provider
9. Procedures to be followed when
Qualifications and Selection
evaluation results do not meet the code
APPENDICES The following requirements or construction document
appendices provide information for requirements.
arrow_right the application of the commissioning
process.
A1.4.2 Final Commissioning Plan:

APPENDIX A Building
The Final Commissioning Plan should be
arrow_right Commissioning Documentation completed before the start of functional and
performance testing. It should update the
arrow_right APPENDIX B Checklists Preliminary Commissioning Plan as required
and include the following information:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities 1. A detailed description of
Commissioning Process activities, the
APPENDIX D Commissioning schedule of activities and the list of
arrow_right Process in the I-Codes operations, systems and assemblies
that will be commissioned or inspected,
arrow_right APPENDIX E Resources including evaluation procedures and
performance criteria.
2. A final listing of required reports,
including format, reviews and
approvals.
3. Detailed testing procedures and
checklists for functional testing and
performance testing for all
commissioned systems and
assemblies, including verification of
sequences of operation and, where
relevant, conditions under which the
testing has been performed.
Template CF-2 provides an optional guide for
collecting and documenting the information

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 13/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
associated with the Commissioning Plan
A󰍝
menu
Menu
Search acr…
activities. searchare acceptable.
Other formats supervised_user_circle personSign In apps
COMMISSIONING PLAN COMPLIANCE FORM CF-2
All Codes
clear Search Type
help
Project
Title Content
Name:
Legend Information
Project
CODE SECTIONS MY NOTES Address:
Chapter 5 Commissioning Provider
Qualifications and Selection Permit
Number:
APPENDICES The following PRELIMINARY COMMISSIONING PAGE
appendices provide information for PLAN ITEMS NUMBER I
arrow_right the application of the commissioning ITEM # Submitted with permit application Cx PLAN
process.
General Project Information
1. Overview of the commissioning
APPENDIX A Building
arrow_right Commissioning Documentation
process and schedules developed
for each phase of the project, from
design through occupancy.
arrow_right APPENDIX B Checklists
Roles and Responsibilities

APPENDIX C Sample Skills, 2. General roles and responsibilities


arrow_right Knowledge and Abilities for the Commissioning Team
throughout the project. The
responsibilities shall delineate the
APPENDIX D Commissioning
arrow_right Process in the I-Codes
duties of the commissioning
providers, commissioning
specialists, inspectors, contractors,
arrow_right APPENDIX E Resources suppliers, and other agencies.
Communication Channels
3. Documentation of general
communication channels, including
the distribution of the
Commissioning Plan and
documentation during the design
and construction processes. This
includes the development and
utilization of the Issues and
Resolutions Logs and a preliminary
listing of required reports including
format, reviews and approvals.
Documentation and Submittal Review
4. Project construction design
documentation review and submittal
evaluation procedures and report
formats.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 14/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING PLAN COMPLIANCE FORM CF-2


A󰍝
menu
Menu
Search acr… search
Commissioned Equipment and Systems supervised_user_circle
Sign In person apps
5. The preliminary list of operations,
All Codes
clear Search Type
help
equipment and systems that will be
commissioned and/or inspected,
Title Content
Legend Information including performance criteria.

CODE SECTIONS MY NOTES Checklists, Forms, Logs and Reports


Chapter 5 Commissioning Provider
6. Preliminary format for
Qualifications and Selection
Commissioning checklists and
testing forms and Commissioning
APPENDICES The following Progress Reports.
appendices provide information for
arrow_right the application of the commissioning
Systems Manual, Training Plans and Final Commissioning
Report
process.
7. Guidelines and formats that will be
APPENDIX A Building used to develop the Systems
arrow_right Commissioning Documentation Manual, Training Plans, and Final
Commissioning Report.

arrow_right APPENDIX B Checklists Resolution Process


8. Procedures to follow whenever
APPENDIX C Sample Skills, Commissioning Process evaluation
arrow_right Knowledge and Abilities results do not meet the code
requirements or the construction
APPENDIX D Commissioning document requirements.
arrow_right Process in the I-Codes PAGE
FINAL COMMISSIONING PLAN NUMBER I
arrow_right APPENDIX E Resources ITEM # ITEMS Cx PLAN
1. Detailed description of
Commissioning Process activities,
the schedule of activities and the list
of operations, systems and
assemblies that have been
commissioned or inspected,
including evaluation procedures and
performance criteria.
2. Final listing of required reports
including format, reviews and
approvals.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 15/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING PLAN COMPLIANCE FORM CF-2


A󰍝
menu
Menu
Search acr…
3. search supervised_user_circle
Sign In
Detailed testing procedures and person apps
checklists for functional testing and
performance testing for all
All Codes
clear Search Type
help
commissioned systems and
Title Content
Legend Information
assemblies, including verification of
sequences of operation and, where
CODE SECTIONS MY NOTES relevant, conditions under which the
Chapter 5 Commissioning Provider
Qualifications and Selection testing has been performed.
4. All of the Preliminary
APPENDICES The following Commissioning Plan items have
appendices provide information for been updated as required to reflect
arrow_right the application of the commissioning any project changes.
process. Commissioning Provider Acknowledgement—Preliminary
I have reviewed the Preliminary Commissioning Plan and verifie
APPENDIX A Building that it meets the requirements of this standard for code required
arrow_right Commissioning Documentation commissioning.
Name:
arrow_right APPENDIX B Checklists
Company
Name:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Signature:
Date:
APPENDIX D Commissioning Commissioning Provider Acknowledgement—Final
arrow_right Process in the I-Codes I have reviewed the Final Commissioning Plan and verified that
meets the requirements of this standard for code required
arrow_right APPENDIX E Resources commissioning.
Name:
Company
Name:
Provider
Signature:
Date:

Enforcement: At his discretion, the building


official confirms demonstrated compliance at
plan intake by:
☑ Receipt of a copy of the preliminary
commissioning plan or a form (see
the Commissioning Plan
Compliance Form) signed by the
CxP attesting that the

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 16/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! commissioning plan has been


A󰍝
menu
Menu
Search acr… search
completed. supervised_user_circle personSign In apps
☑ Receipt of other documents required
by the applicable code.
All Codes
clear Search Type
help
Title Content
Legend Information
A1.5 Functional and Performance
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Testing
Qualifications and Selection

APPENDICES The following A1.5.1 Commissioning Testing


appendices provide information for Checklists and test procedures: The following
arrow_right the application of the commissioning should be established and fully documented
process.
prior to testing:

APPENDIX A Building 1. Project-specific construction checklists


arrow_right Commissioning Documentation and commissioning testing procedures.
2. Where test data results are required for
arrow_right APPENDIX B Checklists specific equipment or systems, there
should be an item in the associated
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Construction Checklist for the test data
to be submitted to the Commissioning
APPENDIX D Commissioning
Provider.
arrow_right Process in the I-Codes 3. A listing of the entities responsible for
executing each of the tests.
arrow_right APPENDIX E Resources 4. A uniform and effective process to
document Commissioning testing of
and interaction between commissioned
equipment and systems.
Evaluation: Evaluation of the equipment and
systems shall include the following:

1. Verification that the installed equipment


and systems match those defined in
the construction documents and
approved construction submittals.
2. Verification that the equipment and
systems were properly installed and
are accessible for testing and
maintenance.
3. Verification that test results for the
installed equipment and systems have

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 17/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
been compared to the relevant
A󰍝
menu
Menu
Search requirements
acr… searchof thesupervised_user_circle specifications,
personSign In apps
submittals and codes.
Test reports: Completed test reports including
All Codes
clear Search Type
help
Title
checklists
Content
and test procedures should be
Legend Information submitted to the project team for review and to
CODE SECTIONS MY NOTES the Commissioning Provider for evaluation and
Chapter 5 Commissioning Provider
inclusion in the Commissioning Report.
Qualifications and Selection
Functional and Performance Testing (FPT):
APPENDICES The following Functional Performance Testing documents the
appendices provide information for dynamic functioning operation of equipment and
arrow_right the application of the commissioning
systems with the goal of verifying that the
process.
owner’s project requirements are met. FPT is
based on scope of work and contract
APPENDIX A Building
arrow_right Commissioning Documentation documents. Test procedures are developed and
results documented by the commissioning

arrow_right APPENDIX B Checklists agency. FPT shall demonstrate installation and


operations of each operating components and
APPENDIX C Sample Skills, system-to-system interface in accordance with
arrow_right Knowledge and Abilities the approved design plans and the owner’s
project requirements.
APPENDIX D Commissioning
arrow_right Process in the I-Codes Code required functional and performance
testing usually includes the following systems:
arrow_right APPENDIX E Resources • HVAC systems.
• Plumbing hot water systems.
• Lighting systems.
• Control systems for the above
systems.
Other systems may be added by the local
codes, AHJ, owner or design team.

The checklists in Appendix B-1 show some of


the possible systems to be commissioned by
building type. The system and subsystem
commissioning requirements selected in B-1 are
listed in the B-2 checklists.

Prior to all functional testing, pre-functional


verification and start-up documentation should
be provided by the installing contractor and/or

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 18/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! factory-trained personnel for each piece of


A󰍝
menu
Menu
Search acr… search
equipment. This information supervised_user_circle ensures
personSignthe
In apps
operating success of each component and
proper functionality of all system operations.
All Codes
clear Search Type
help
Title ThisContent
information should include, but is not
Legend Information
limited to:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider • Date and responsible party of
Qualifications and Selection installation start up.
• Manufacturer model and serial
APPENDICES The following
number.
appendices provide information for
arrow_right the application of the commissioning • Design and actual operating
process. information, such as voltage,
amperage, wattage, motor
APPENDIX A Building nameplate information, sheave,
arrow_right Commissioning Documentation pulleys, belts and air filters,
revolutions per minute (RPM) of
arrow_right APPENDIX B Checklists
motors and fans, refrigerant
operating conditions, temperature
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities splits, gas pressures, water
pressures, and test and balance
APPENDIX D Commissioning report.
arrow_right Process in the I-Codes • Precautionary measures and
procedures regarding safety
arrow_right APPENDIX E Resources interaction with all personnel.
FPT documentation should address the step-by-
step instruction sequence and modes of each
operation with interconnecting safety interlocks,
temperature sensors, pressure transducers,
building management system (BMS) integration,
lighting controllers, timers and manually
controlled operations.

FPT reports should contain information


addressing each of the building components
tested, testing methods utilized and any
readings and adjustments made.
The functional testing documentation should
incorporate a signature block information format
containing:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 19/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Date.
A󰍝
menu
Menu
Search acr… search party supervised_user_circle
• Responsible identifier. personSign In apps
• Required testing instruments.
All Codes
clear Search Type
help • Measurable pass-fail of testing
Title Content sequence.
Legend Information
• Expected response of operating
CODE SECTIONS MY NOTES parameters.
Chapter 5 Commissioning Provider
Qualifications and Selection • Results of testing that is performed.
• Operating condition of equipment
APPENDICES The following status upon completion of each test
appendices provide information for sequence.
arrow_right the application of the commissioning
process.
A deficiencies list shall be incorporated into the
functional testing documentation; this list will
APPENDIX A Building track and clarify all failed operating sequences
arrow_right Commissioning Documentation and components. The deficiencies list will act as
a living document until all components or
arrow_right APPENDIX B Checklists sequences of operation have been completed.
The building department and building
APPENDIX C Sample Skills, owner/owner’s representative will require all
arrow_right Knowledge and Abilities
parties to perform their duties to correct
deficient items.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
A1.5.2 Sample Compliance Form for Functional
arrow_right APPENDIX E Resources Testing:

Template CF-3 provides an optional guide for


collecting and documenting the information
associated with the Commissioning Testing
activities. It is to be completed at the time of
inspection. Other formats are acceptable.

COMMISSIONING TESTING COMPLIANCE FORM


CF-3 Submitted Before Final Inspection
Project
Name:
Project
Address:
Permit
Number:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 20/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING TESTING COMPLIANCE FORM


A󰍝
menu
Menu
Search
CF-3acr… search supervised_user_circle
Sign In
Submitted Before Final Inspection person apps
PAGE
NUMBER IN
All Codes
clear Search Type
help
Cx
Title Content
Legend Information ITEM COMMISSIONING TESTING
# TESTING ITEMS DOC.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Checklists and Test Procedures
Qualifications and Selection 1. Project-specific
construction checklists
APPENDICES The following and commissioning
appendices provide information for testing procedures
arrow_right the application of the commissioning shall be established
process. for review by owner
and appropriate team
APPENDIX A Building members.
arrow_right Commissioning Documentation 2. The test procedures
shall list the entities
arrow_right APPENDIX B Checklists responsible for
executing each of the
APPENDIX C Sample Skills, tests.
arrow_right Knowledge and Abilities 3. Whenever a test data
result is required for a
APPENDIX D Commissioning specific system or
arrow_right Process in the I-Codes assembly, there shall
be an item in the
arrow_right APPENDIX E Resources associated
Construction Checklist
for the test data to be
submitted to the
Commissioning
Provider.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 21/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING TESTING COMPLIANCE FORM


A󰍝
menu
Menu
Search
CF-3acr… search supervised_user_circle
Sign In
Submitted Before Final Inspection person apps
4. There shall be a
uniform and effective
All Codes
clear Search Type
help
process for
Title Content
Legend Information documentation of
testing to provide
CODE SECTIONS MY NOTES Commissioning testing
Chapter 5 Commissioning Provider
Qualifications and Selection of and interaction
between
commissioned
APPENDICES The following
equipment, systems,
appendices provide information for
arrow_right the application of the commissioning and assemblies.
process. Commissioning team
shall refer to
applicable
APPENDIX A Building
arrow_right Commissioning Documentation
Commissioning
technical resources
tailored to their
arrow_right APPENDIX B Checklists specific projects.
Evaluation
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities 5. Vital information on
the equipment or
APPENDIX D Commissioning materials supplied.
arrow_right Process in the I-Codes Information shall detail
what
equipment/material
arrow_right APPENDIX E Resources was specified and
submitted. What was
actually delivered on
the site shall be
documented and
verified.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 22/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING TESTING COMPLIANCE FORM


A󰍝
menu
Menu
Search
CF-3acr… search supervised_user_circle
Sign In
Submitted Before Final Inspection person apps
6. Proper installation of
the systems and
All Codes
clear Search Type
help
assemblies.
Title Content
Legend Information
Evaluation shall focus
on the physical
CODE SECTIONS MY NOTES installation of the
Chapter 5 Commissioning Provider
Qualifications and Selection systems and
assemblies, on their
ability to meet the
APPENDICES The following
contract documents
appendices provide information for
arrow_right the application of the commissioning
requirements, and on
process. accessibility for
Commissioning,
testing, and
APPENDIX A Building
arrow_right Commissioning Documentation
maintenance
operations.
7. Testing procedures,
arrow_right APPENDIX B Checklists conditions and
successful
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities commissioning testing
results of systems and
assemblies.
APPENDIX D Commissioning
arrow_right Process in the I-Codes Test Reports
8. Completed test

arrow_right APPENDIX E Resources reports including


checklists and test
procedures shall be
submitted to the
project team for
review and the
Commissioning
Provider for evaluation
and inclusion in the
Commissioning
Report.
Commissioning Provider Acknowledgement
I have reviewed the Commissioning Testing
documents and verified that it meets applicable
code requirements.
Name:
Company
Name:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 23/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING TESTING COMPLIANCE FORM


A󰍝
menu
Menu
Search
CF-3acr… search supervised_user_circle
Sign In
Submitted Before Final Inspection person apps
Provider
Signature:
All Codes
clear Search Type
help
Date:
Title Content
Legend Information

CODE SECTIONS MY NOTES


Chapter 5 Commissioning Provider A1.6 Issues and Resolutions Log
Qualifications and Selection

APPENDICES The following A1.6.1 Commissioning Issues and Resolutions


appendices provide information for Logs
arrow_right the application of the commissioning The Commissioning Provider and
process.
Commissioning Team shall develop an Issues
and Resolutions Log with supporting
APPENDIX A Building
arrow_right Commissioning Documentation documentation.
Contents: The contents of the Issues and
arrow_right APPENDIX B Checklists Resolutions Logs shall include:
1. All open and continuing items, with
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities status and responsible person or
organization for resolution.
APPENDIX D Commissioning 2. Procedures to maintain and distribute
arrow_right Process in the I-Codes the Issues and Resolutions log
throughout the project until all issues
arrow_right APPENDIX E Resources are resolved or acknowledged by the
owner.
3. Resolution(s) shall be included in the
log and acknowledged by the owner.
Template CF-4 provides an optional guide for
collecting and documenting the information
associated with the Issues and Resolutions Log
activities. Other formats are acceptable.

COMMISSIONING ISSUES AND RESOLUTIONS


LOG COMPLIANCE FORM
CF-4
Submitted before final inspection
Project
Name:
Project
Address:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 24/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING ISSUES AND RESOLUTIONS


A󰍝
menu
Menu
Search acr… search
LOG COMPLIANCE FORM Sign In supervised_user_circle person apps
CF-4
Submitted before final inspection
All Codes
clear Search Type
help
Permit
Title Content
Number:
Legend Information
COMMISSIONING PAGE
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider ISSUES AND NUMBER IN
Qualifications and Selection RESOLUTIONS LOG Cx ISSUES
ITEM # ITEMS LOG
APPENDICES The following General Project Information
appendices provide information for
arrow_right the application of the commissioning
1. All open and
continuing items, with
process.
status and responsible
person or organization
APPENDIX A Building for resolution.
arrow_right Commissioning Documentation
Log Procedures
2. Procedures to
arrow_right APPENDIX B Checklists maintain the log
throughout the project
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
until all issues are
resolved or accepted
by the Owner.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
Log Distribution
3. Procedures to
distribute the logs to
arrow_right APPENDIX E Resources the Commissioning
Team at intervals
prescribed in the
Commissioning Plan.
Resolution
4. Resolution of each
issue in the log with
final approval by
owner.
Commissioning Provider Acknowledgement
I have reviewed the Issues Log and verified that it
meets the applicable code requirements.
Name:
Company
Name:
Provider
Signature:
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 25/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMISSIONING ISSUES AND RESOLUTIONS


A󰍝
menu
Menu
Search acr… search
LOG COMPLIANCE FORM Sign In supervised_user_circle person apps
CF-4
Submitted before final inspection
All Codes
clear Search Type
help
Date:
Title Content
Legend Information

CODE SECTIONS MY NOTES A1.7 Systems Manual


Chapter 5 Commissioning Provider
Qualifications and Selection
The Systems Manual documents information
APPENDICES The following
focusing on the operation of the building
appendices provide information for systems. This document provides information
arrow_right the application of the commissioning needed to understand, operate, and maintain
process. the equipment and systems; and informs those
not involved in the design and construction of
APPENDIX A Building
the building systems. This document is in
arrow_right Commissioning Documentation
addition to the record construction drawings,
documents, and the O&M manuals supplied by
arrow_right APPENDIX B Checklists the contractor. The systems manual is
APPENDIX C Sample Skills, assembled during the construction phase and is
arrow_right Knowledge and Abilities available during the contractors’ training of the
facility staff. The systems manual shall be
APPENDIX D Commissioning submitted to the owner prior to project
arrow_right Process in the I-Codes completion and if possible before issuance of
the certificate of occupancy. The systems
arrow_right APPENDIX E Resources
manual should include the following information
for all commissioned systems:
1. Table of Contents.
2. Information for each commissioned
equipment element or system
including:
☑ Manufacturer’s operation and
maintenance data for installed
equipment, systems and
assemblies including wiring
diagrams and schematics.
☑ Warranties, where provided.
☑ Contractor, supplier, or service
agency listing and contact
information.
3. Facility Operations documentation
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 26/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
including:
A󰍝
☑ Facilitysearch
Search acr…
menu
Menu supervised_user_circle person
guide, including Sign In
operating apps
plan, building and equipment
operating schedules, setpoints
All Codes
clear Search Type
help
Title Content
and ranges, sequences of
Legend Information operation, and emergency
CODE SECTIONS MY NOTES procedures.
Chapter 5 Commissioning Provider
☑ Maintenance plans, procedures,
Qualifications and Selection
checklists, schedules and
APPENDICES The following records.
appendices provide information for ☑ Janitorial and cleaning plans and
arrow_right the application of the commissioning procedures where required.
process.

A1.7.1 Systems Manual Compliance Forms:


APPENDIX A Building
arrow_right Commissioning Documentation Template CF-5 provides an optional guide for
collecting and documenting the information
arrow_right APPENDIX B Checklists associated with the Issues and Resolutions Log
activities. Other formats are acceptable.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities SYSTEMS MANUAL COMPLIANCE FORM
CF-5
Submitted before Project Completion
APPENDIX D Commissioning
arrow_right Process in the I-Codes Project
Name:

arrow_right APPENDIX E Resources Project


Address:
Permit
Number:
PAGE
NUMBER IN
SYSTEMS MANUAL SYSTEMS
ITEM # ITEMS MANUAL
Table Of Contents
Code-Required Commissioning requirements
1. Listing of all
equipment and
systems required by
applicable codes to be
commissioned.
Record Documents Evaluation

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 27/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! SYSTEMS MANUAL COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF-5 searchSign Insupervised_user_circle person apps
Submitted before Project Completion
2. Construction record
All Codes
clear Search Type
help
documents including
Title Content
Legend Information
record plans,
specifications and
CODE SECTIONS MY NOTES approved submittals.
Chapter 5 Commissioning Provider
Qualifications and Selection Systems and Assemblies Information
3. Facility, systems and
APPENDICES The following assemblies
appendices provide information for information including:
arrow_right the application of the commissioning 1. Manufacturer’s
process. operation and
maintenance
APPENDIX A Building data for
arrow_right Commissioning Documentation installed
equipment.

arrow_right APPENDIX B Checklists systems and


assemblies
APPENDIX C Sample Skills, including
arrow_right Knowledge and Abilities wiring
diagrams and
APPENDIX D Commissioning schematics.
arrow_right Process in the I-Codes 2. Warranties,
where
applicable.
arrow_right APPENDIX E Resources 3. Contractor,
supplier or
service
agency
listing and
contact
information.
Operation Information

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 28/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! SYSTEMS MANUAL COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF-5 searchSign Insupervised_user_circle person apps
Submitted before Project Completion
4. A facility operations
All Codes
clear Search Type
help
guide, including an
Title Content
Legend Information operating plan,
building and
CODE SECTIONS MY NOTES equipment operating
Chapter 5 Commissioning Provider
Qualifications and Selection schedules, set points
and ranges,
sequences of
APPENDICES The following
operation, system and
appendices provide information for
arrow_right the application of the commissioning equipment limitations
process. and emergency
procedures.

APPENDIX A Building 5. Maintenance Plans


arrow_right Commissioning Documentation and Janitorial plans
where required

arrow_right APPENDIX B Checklists Training


6. Where training is
APPENDIX C Sample Skills, provided, training
arrow_right Knowledge and Abilities plans, materials and
records shall be
APPENDIX D Commissioning provided.
arrow_right Process in the I-Codes Preliminary Commissioning Report
7. A preliminary
arrow_right APPENDIX E Resources
commissioning report
including
commissioning plans,
FPT requirements and
results, systems
tested, listing and
plans for equipment
yet to be
commissioned.
Commissioning Provider Acknowledgement
I have reviewed the Systems Manual and verified
that it meets the applicable code requirements.
Name:
Company
Name:
Provider
Signature:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 29/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! SYSTEMS MANUAL COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF-5 search
Sign In supervised_user_circle person apps
Submitted before Project Completion
Date:
All Codes
clear Search Type
help
Title Content
Legend Information
A1.8 Systems Operations Training
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider
Qualifications and Selection
The training of the appropriate maintenance
staff for each equipment type and/or system
APPENDICES The following should be documented in the commissioning
appendices provide information for report and should include the following:
arrow_right the application of the commissioning
process. ☑ System/equipment overview (what
it is, what it does, and with what
APPENDIX A Building other systems and/or equipment it
arrow_right Commissioning Documentation interfaces).
☑ Review and demonstration of
arrow_right APPENDIX B Checklists
servicing/preventive maintenance.
☑ Review of the information in the
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities systems manual.
☑ Review of the record drawings on
APPENDIX D Commissioning the system/equipment.
arrow_right Process in the I-Codes Intent: The systems operation training verifies
that a training program is developed to provide
arrow_right APPENDIX E Resources
training to the appropriate maintenance staff for
each equipment type and/or system, and that
this training program is documented in the
commissioning report. The systems operation
training program is specified in the project
specifications for the major systems listed. The
systems manual, O&M documentation and
record drawings are prepared and available to
the maintenance staff prior to the
implementation of any training or the
development of a written training program. The
training program is to be administered when the
appropriate maintenance staff is made available
to receive training. The written training program
includes: (a) learning goals and objectives for
each session; (b) training agenda, topics and

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 30/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! length of instruction for each session; (c)


A󰍝
menu
Menu
Search acr… searchand qualifications;
instructor information supervised_user_circle personSign (d)
In apps
location of training sessions (on-site, off-site,
manufacturer’s or vendor’s facility); (e)
All Codes
clear Search Type
help
attendance forms; (f) training materials; and (g)
Title Content
Legend Information description on how the training will be archived
CODE SECTIONS MY NOTES for future use. The following details address two
Chapter 5 Commissioning Provider
main facets of Systems Operation Training:
Qualifications and Selection
Systems/equipment overview:
APPENDICES The following
☑ Review the OPR and BOD related
appendices provide information for
arrow_right the application of the commissioning
to the major systems and
process. equipment.
☑ Describe system type and
APPENDIX A Building configuration.
arrow_right Commissioning Documentation
☑ Explain operation all major
systems and equipment, and how
arrow_right APPENDIX B Checklists they interface with other systems
APPENDIX C Sample Skills, and equipment.
arrow_right Knowledge and Abilities ☑ Describe operations of critical
devices, controls and accessories.
APPENDIX D Commissioning
arrow_right ☑ Review locations of the major
Process in the I-Codes
systems and equipment.
☑ Describe operations of the control
arrow_right APPENDIX E Resources
system for each system, location
of critical control elements, and
procedures to properly operate
control system.
☑ Review recommendations for
implementation to reduce energy
and water use.
Review and demonstration of
servicing/preventive maintenance:

☑ Explain location or delivery contact


of the O&M manuals.
☑ Review of all manufacturers’
recommended maintenance
activities to maintain the warranty.
☑ Review and demonstrate frequent
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 31/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
maintenance activities (air filter
A󰍝
menu
Menu
Search acr… search lubrication,
replacement, supervised_user_circle personfan
Signbelt
In apps
inspection and/or replacement,
condenser water treatment, etc.),
All Codes
clear Search Type
help
and suggested schedule.
Title Content
Legend Information
☑ Review and demonstrate typical
CODE SECTIONS MY NOTES servicing procedures and
Chapter 5 Commissioning Provider
Qualifications and Selection
techniques (electrical current,
pressure and flow readings,
APPENDICES The following calibration procedures, point
appendices provide information for trending, power fail restart
arrow_right the application of the commissioning procedures, etc.).
process.
☑ Locate, observe and identify major
equipment, systems, accessories
APPENDIX A Building
arrow_right Commissioning Documentation and controls.Review emergency
shutoffs and procedures.

arrow_right APPENDIX B Checklists Enforcement. At their discretion, building


officials should confirm demonstrated
APPENDIX C Sample Skills, compliance during on-site enforcement by:
arrow_right Knowledge and Abilities
☑ Receipt of a copy of the written
APPENDIX D Commissioning training program and complete
arrow_right Process in the I-Codes attendance forms or a form signed
by the owner or owner’s
arrow_right APPENDIX E Resources representative attesting that the
training program and delivery of
training has been completed.
☑ Receipt of other forms required by
the applicable code or AHJ.

A1.8.1 DOCUMENTATION AND TRAINING SAMPLE


COMPLIANCE FORM
Contract documents: The training of the
operating and maintenance staff of the facility
should be required in the contract documents
and include the development and application of
a training plan.

Contents: The contents of the training plan


should include:
1. An outline of instructional topics
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 32/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! addressing the design, construction,


A󰍝
operation search
Search acr…
menu
Menu and supervised_user_circle personSign Inof
maintenance apps
commissioned systems, assemblies,
and equipment.
All Codes
clear Search Type
help
Title 2. Use
Content and review of the Systems
Legend Information Manual.
CODE SECTIONS MY NOTES 3. Learning objectives. training delivery
Chapter 5 Commissioning Provider
methods, training materials, instructor
Qualifications and Selection
requirements, locations and duration
APPENDICES The following for each instructional topic in
appendices provide information for conformance to the OPR and
arrow_right the application of the commissioning commissioning plan.
process.
4. Requirements and format for training
reports, records and recording criteria.
APPENDIX A Building
arrow_right Commissioning Documentation Records: Archival of instruction, delivery of
instruction, and training materials should be
provided as specified in the Contract
arrow_right APPENDIX B Checklists
Documents and per the OPR and
APPENDIX C Sample Skills, commissioning plan. A copy of the Training
arrow_right Knowledge and Abilities Plan, training materials and records should be
included in the final Systems Manual.
APPENDIX D Commissioning
arrow_right Process in the I-Codes Template CF-6 provides an optional guide for
collecting and documenting the information

arrow_right APPENDIX E Resources associated with the Training activities. Other


formats are acceptable.

TRAINING COMPLIANCE FORM


CF-6
PAGE NUMBER
TRAINING IN
ITEM # ITEMS TRAINING PLAN
Project
Name:
Project
Address:
Permit
Number:
General Training Information

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 33/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! TRAINING COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… search
CF-6 supervised_user_circle personSign In apps
1. Outline of
instructional
All Codes
clear Search Type
help
topics should
Title Content
Legend Information address the
design,
CODE SECTIONS MY NOTES construction,
Chapter 5 Commissioning Provider
Qualifications and Selection operation, and
maintenance of
commissioned
APPENDICES The following
systems,
appendices provide information for
arrow_right the application of the commissioning assemblies, and
process. equipment. A
review and
utilization of the
APPENDIX A Building
arrow_right Commissioning Documentation
Systems Manual
should be
included in the
arrow_right APPENDIX B Checklists training process.
Objectives and Methods
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities 2. Learning
objectives,
APPENDIX D Commissioning training delivery
arrow_right Process in the I-Codes methods, training
materials,
instructor
arrow_right APPENDIX E Resources requirements,
locations and
duration for each
instructional topic
in conformance
to the OPR and
commissioning
plan.
Materials and Records
3. Requirements
and format for
training report,
records and
recording criteria.
Commissioning Agency Acknowledgement

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 34/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! TRAINING COMPLIANCE FORM


A󰍝
menu
Menu
Search acr… CF-6 search supervised_user_circle
Sign In person apps
I have reviewed the Preliminary Commissioning
Plan and verified that it meets the requirements of
All Codes
clear thishelp
Search Type
standard for code required commissioning.
Title Content
Legend Information Name:

CODE SECTIONS MY NOTES Company


Chapter 5 Commissioning Provider Name:
Qualifications and Selection Agency’s
Signature:
APPENDICES The following
Date:
appendices provide information for
arrow_right the application of the commissioning
process.
A1.9 Commissioning Report
APPENDIX A Building Preliminary Commissioning Report. The
arrow_right Commissioning Documentation
preliminary commissioning report should be
delivered to the owner and, if required, the code
arrow_right APPENDIX B Checklists official prior to the final inspection or issuance of
APPENDIX C Sample Skills,
the Certificate of Occupancy and shall include
arrow_right Knowledge and Abilities the following:
1. Table of contents.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
2. Documentation of the commissioning
activities included in the commissioning
plan and those required by code and
arrow_right APPENDIX E Resources by this standard, including any delayed
testing.
3. The final commissioning plan, including
functional test and performance test
procedures used and the criteria for
test acceptance.
4. The list of code-required
commissioning and the design and
submittal reviews required by the
Commissioning Plan.
5. The results of all evaluations, start-up
data, functional tests and performance
tests, and reports for code-required
commissioning.
6. Issue logs and disposition of all
deficiencies found during testing and
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 35/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! evaluation, including corrective


A󰍝
menu
Menu
Search acr… search or proposed.
measures used supervised_user_circle personSign In apps
7. A resolution plan identifying any tests
that are deferred and issues that are
All Codes
clear Search Type
help
Title unresolved or incomplete, plus the
Content
Legend Information conditions for completion and the
CODE SECTIONS MY NOTES individuals responsible for completion.
Chapter 5 Commissioning Provider
Final Commissioning Report. The final
Qualifications and Selection
commissioning report shall be delivered to the
APPENDICES The following owner after final completion of the
appendices provide information for commissioning work required by code and by
arrow_right the application of the commissioning this guideline. The report should include the
process. Commissioning Process activities occurring
after issuance of the Certificate of Occupancy
APPENDIX A Building
arrow_right Commissioning Documentation
and the results from those activities, together
with the contents of the Preliminary
Commissioning Report.
arrow_right APPENDIX B Checklists
APPENDIX C Sample Skills, A1.9.1 COMMISSIONING REPORT SAMPLE
arrow_right Knowledge and Abilities COMPLIANCE FORM
Template CF-7 provides an optional guide for
APPENDIX D Commissioning
arrow_right Process in the I-Codes
collecting and documenting the information
associated with the Commissioning activities.
Other formats are acceptable.
arrow_right APPENDIX E Resources
PRELIMINARY COMMISSIONING REPORT
COMPLIANCE FORM
CF-7
Project
Name:
Project
Address:
Permit
Number:
PAGE
PRELIMINARY NUMBER
COMMISSIONING IN Cx
ITEM # REPORT ITEMS Report
Commissioning Scope

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 36/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! PRELIMINARY COMMISSIONING REPORT


A󰍝
menu
Menu search FORM
Search acr…COMPLIANCE
supervised_user_circle
Sign In person apps
CF-7
1. Documentation of the
All Codes
clear Search Type
help
commissioning activities
Title Content
Legend Information included in the
commissioning plan
CODE SECTIONS MY NOTES required by adopted
Chapter 5 Commissioning Provider
Qualifications and Selection codes and the OPR,
including delayed testing.

APPENDICES The following Commissioning Plan


appendices provide information for 2. A copy of the final
arrow_right the application of the commissioning commissioning plan,
process. including functional and
performance test
APPENDIX A Building procedures used during
arrow_right Commissioning Documentation the commissioning
process and measurable

arrow_right APPENDIX B Checklists criteria for test


acceptance.
APPENDIX C Sample Skills, Design Documents and Reviews
arrow_right Knowledge and Abilities 3. A copy of the design and
submittal reviews as
APPENDIX D Commissioning required by the
arrow_right Process in the I-Codes commissioning plan.
System Evaluations
arrow_right APPENDIX E Resources
4. The results of all
evaluations, start-up
data, functional and
performance tests, and
reports by suppliers,
contractors, inspectors
and commissioning
providers.
Issues and resolutions
5. Issue logs and
disposition of all
deficiencies found during
testing, including details
of corrective measures
used or proposed.
Open Items

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 37/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! PRELIMINARY COMMISSIONING REPORT


A󰍝
menu
Menu search FORM
Search acr…COMPLIANCE
supervised_user_circle
Sign In person apps
CF-7
6. A resolution plan
All Codes
clear Search Type
help
approved by the owner or
Title Content
Legend Information the owner’s
representative identifying
CODE SECTIONS MY NOTES the deferred tests and
Chapter 5 Commissioning Provider
Qualifications and Selection issues that are
unresolved or incomplete
and any required
APPENDICES The following
conditions for completion.
appendices provide information for
arrow_right the application of the commissioning Commissioning Agency Acknowledgement
process. I have reviewed the Commissioning Plan and
verified that it meets the owner’s project
APPENDIX A Building requirements.
arrow_right Commissioning Documentation Name:
Company
arrow_right APPENDIX B Checklists
Name:
Agency’s
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
Signature:
Date:

APPENDIX D Commissioning Owner Acknowledgement


arrow_right Process in the I-Codes I have received and reviewed the preliminary
Commissioning report.

arrow_right APPENDIX E Resources Name:


Company
Name:
Signature:
Date:

Enforcement: At their discretion, building


officials confirm demonstrated compliance by:

☑ Receipt of a copy of the


commissioning report or a form
signed by the owner or owner’s
representative attesting that the
commissioning report has been
completed.
☑ Receipt of other forms required by
the applicable code or AHJ.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 38/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! APPENDIX B
A󰍝
menu
Menu
Search acr… search
Checklistssupervised_user_circle personSign In apps

All Codes
clear Search Type
help
Title Content
Legend Information

CODE SECTIONS MY NOTES


Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning
process.

APPENDIX A Building
arrow_right Commissioning Documentation
B1.0 Commissioning Checklists for
arrow_right APPENDIX B Checklists
Building Types and Functions
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities B1.1 Commercial and Office Building
Commissioning
APPENDIX D Commissioning
arrow_right Process in the I-Codes 1. INTRODUCTION
The Commissioning Process can be utilized

arrow_right APPENDIX E Resources on nearly all building systems. However,


each building project selects specific systems
to undergo commissioning depending on
project type and budget. This is done at
project inception during the development of
the Owner’s Project Requirements. This
listing is used to plan and implement
commissioning during the entire project.
Each building type usually has unique
systems that benefit from commissioning.
2. COMMISSIONING APPLICATION TO
OFFICE FACILITY SYSTEMS
The following chart can be used to make the
initial selection of the systems to be
commissioned. The extent of the selections
will depend on the needs of the project, and
budget and schedule limitations. Detailed
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 39/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
checklists for many of these systems are
A󰍝
menu
Menu
Search
shownacr… search
in Section B2.0. supervised_user_circle personSign In apps
COMMERCIAL AND OFFICE BUILDIN
All Codes
clear Search Type
help
Project:
Title Content
Address:
Legend Information
Owner:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Email/Phone:
Qualifications and Selection Owner’s PM:
Email/Phone:
APPENDICES The following
Cx Provider:
appendices provide information for
arrow_right the application of the commissioning Email/Phone:
process. Date
Initiated:
APPENDIX A Building Date
arrow_right Commissioning Documentation Revised:
System
arrow_right APPENDIX B Checklists Commissioning
Equipment/ Required
APPENDIX C Sample Skills, Item System Y/N
arrow_right Knowledge and Abilities 1. Air conditioning
and ventilation
APPENDIX D Commissioning systems – code
arrow_right Process in the I-Codes required
2. Plumbing hot
arrow_right APPENDIX E Resources
water systems –
code required
3. Plumbing systems
4. Lighting and
control systems –
code required
5. Electrical power
systems
6. Energy monitoring
and management
systems
7. Outdoor air and
energy recovery
systems
8. Landscape
irrigation systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 40/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMERCIAL AND OFFICE BUILDIN


A󰍝
menu
Menu
Search acr…
9. search
Fire protection supervised_user_circle
Sign In person apps
and fire sprinkler
systems
All Codes
clear Search Type
help
10. Fire alarm systems
Title Content
Legend Information 11. Vertical
CODE SECTIONS MY NOTES transportation,
Chapter 5 Commissioning Provider elevators,
Qualifications and Selection escalators
12. Building
APPENDICES The following enclosures
appendices provide information for
arrow_right the application of the commissioning
13. Roofing
process. systems
14 Computer and
APPENDIX A Building data rooms
arrow_right Commissioning Documentation systems
15. Security systems

arrow_right APPENDIX B Checklists 16. Telephone and


communication
APPENDIX C Sample Skills, systems
arrow_right Knowledge and Abilities 17. Renewable
energy systems
APPENDIX D Commissioning
arrow_right Process in the I-Codes
18.
19.

arrow_right APPENDIX E Resources 20.


21.
The approval section below can be used if appl
I have reviewed the equipment list and verified
Name:
Company
Name:
Signature:
Date:

B1.2 Health Care Facilities—Medical Office


Building and Hospital Commissioning

1. INTRODUCTION
The Commissioning Process can be utilized
on nearly all building systems. However,
each building project selects specific systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 41/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! to undergo commissioning depending on


A󰍝
project type and search
Search acr…
menu
Menu budget. supervised_user_circle
This ispersondoneSign In
at apps
project inception during the development of
the Owner’s Project Requirements. This
All Codes
clear Search Type
help
listing is used to plan and implement
Title Content
Legend Information commissioning during the entire project.
CODE SECTIONS MY NOTES Each building type usually has unique
Chapter 5 Commissioning Provider
systems that benefit from commissioning.
Qualifications and Selection
2. COMMISSIONING APPLICATION TO

APPENDICES The following MEDICAL FACILITY SYSTEMS


appendices provide information for The following chart can be used to make the
arrow_right the application of the commissioning initial selection of the systems to be
process.
commissioned. The extent of the selections
will depend on the needs of the project, and
APPENDIX A Building
arrow_right Commissioning Documentation budget and schedule limitations. Detailed
checklists for many of these systems are
shown in Section B2.0.
arrow_right APPENDIX B Checklists
MEDICAL BUILDING AND HOSPITA
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
Project:
Address:

APPENDIX D Commissioning Owner:


arrow_right Process in the I-Codes Email/Phone:
Owner’s PM:
arrow_right APPENDIX E Resources Email/Phone:
Cx Provider:
Email/Phone:
Date
Initiated:
Date
Revised:
System
Commissioning
Equipment/ Required
Item System Y/N
1. Air conditioning and
ventilation systems –
code required
2. Plumbing hot water
systems – code
required

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 42/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! MEDICAL BUILDING AND HOSPITA


A󰍝
menu
Menu
Search acr…
3. search
Plumbing systems supervised_user_circle
Sign In person apps
4. Lighting and control
All Codes
clear Search Type
help
systems- code
required
Title Content
Legend Information 5. Electrical power
CODE SECTIONS MY NOTES systems
Chapter 5 Commissioning Provider
6. Energy monitoring
Qualifications and Selection
and management
systems
APPENDICES The following
7. Outdoor air and
appendices provide information for
arrow_right the application of the commissioning energy recovery
process. systems
8. Landscape irrigation
APPENDIX A Building systems
arrow_right Commissioning Documentation 9. Fire protection and
fire sprinkler systems

arrow_right APPENDIX B Checklists 10. Fire alarm systems


11. Vertical
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
transportation,
elevators, escalators
12. Building enclosures
APPENDIX D Commissioning
arrow_right Process in the I-Codes 13. Computer rooms and
data systems

arrow_right APPENDIX E Resources 14. Security systems


15. Telephone and
communication
systems
16. Medical gas systems
17. Steam systems
18. Central plant
19. Humidification
systems
20. Nurse call systems
21. Renewable Energy
Systems
25.
26.
27.
28.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 43/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! MEDICAL BUILDING AND HOSPITA


A󰍝
menu
Menu
Search acr…
29. search supervised_user_circle
Sign In person apps
30.
All Codes
clear Search Type
help The approval section below can be used if appl
Title Content I have reviewed the equipment list and verified
Legend Information
Name:
CODE SECTIONS MY NOTES Company
Chapter 5 Commissioning Provider
Name:
Qualifications and Selection
Signature:
APPENDICES The following Date:
appendices provide information for
arrow_right the application of the commissioning
process. B1.3 Education Facilities—Schools Pre-K–12
Commissioning
APPENDIX A Building 1. INTRODUCTION
arrow_right Commissioning Documentation The Commissioning Process can be utilized
on nearly all building systems. However,
arrow_right APPENDIX B Checklists
each building project selects specific systems
to undergo commissioning depending on
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities project type and budget. This is done at
project inception during the development of
APPENDIX D Commissioning the Owner’s Project Requirements. This
arrow_right Process in the I-Codes listing is used to plan and implement
commissioning during the entire project.
arrow_right APPENDIX E Resources Each building type usually has unique
systems that benefit from commissioning.
2. COMMISSIONING APPLICATION TO
SCHOOL FACILITY SYSTEMS
The following chart can be used to make the
initial selection of the systems to be
commissioned. The extent of the selections
will depend on the needs of the project, and
budget and schedule limitations. Detailed
checklists for many of these systems are
shown in Section B2.0.

EDUCATION FACILITIES—SCHIOOLS PRE


Project:
Address:
Owner:
Email/Phone:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 44/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! EDUCATION FACILITIES—SCHIOOLS PRE


A󰍝
menu
Menu
Search acr…
Owner’s PM: search supervised_user_circle
Sign In person apps
Email/Phone:
All Codes
clear Cx Provider:
Search Type
help
Title Email/Phone:
Content
Legend Information
Date
CODE SECTIONS MY NOTES Initiated:
Chapter 5 Commissioning Provider
Date
Qualifications and Selection
Revised:

APPENDICES The following System


appendices provide information for Commissioning
arrow_right the application of the commissioning Required
process. Item Equipment/System Y/N
1. Air conditioning and
APPENDIX A Building ventilation
arrow_right Commissioning Documentation systems –
code required

arrow_right APPENDIX B Checklists 2. Plumbing hot water


systems – code
APPENDIX C Sample Skills, required
arrow_right Knowledge and Abilities 3. Plumbing systems
4. Lighting and control
APPENDIX D Commissioning
arrow_right Process in the I-Codes
systems-
code required
5. Electrical power
arrow_right APPENDIX E Resources systems
6. Energy monitoring
and management
systems
7. Outdoor air and
energy recovery
systems
8. Landscape irrigation
systems
9. Fire protection and
fire sprinkler
systems
10. Fire alarm systems
11. Vertical
transportation,
elevators, escalators
12. Building enclosures

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 45/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! EDUCATION FACILITIES—SCHIOOLS PRE


A󰍝
menu
Menu
Search acr…
13. search
Other structures supervised_user_circle
Sign In person apps
14. Computer and data
All Codes
clear Search Type
help
rooms systems

Title 15.Content Security systems


Legend Information
16. Telephone and
CODE SECTIONS MY NOTES communication
Chapter 5 Commissioning Provider
systems
Qualifications and Selection
17. Time clock and
signaling systems
APPENDICES The following
appendices provide information for 18. Medical area and
arrow_right the application of the commissioning isolation systems
process. 19. Humidity control
systems
APPENDIX A Building
arrow_right Commissioning Documentation 20. Laboratory hoods
and exhausts
21. Shop and special
arrow_right APPENDIX B Checklists
exhausts
22.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities 23.
24.
APPENDIX D Commissioning 25.
arrow_right Process in the I-Codes 26.
27.
arrow_right APPENDIX E Resources 28.
29.
The approval section below can be used if appl
I have reviewed the equipment list and verified
Name:
Company
Name:
Signature:
Date:

B1.4 College and University Facilities


Commissioning
1. INTRODUCTION
The Commissioning Process can be utilized
on nearly all building systems. However,

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 46/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
each building project selects specific systems
A󰍝
menu
Menu
Search
to undergo search
acr… commissioning
supervised_user_circledepending
personSign on
In apps
project type and budget. This is done at
project inception during the development of
All Codes
clear Search Type
help
the Owner’s Project Requirements. This
Title Content
Legend Information listing is used to plan and implement
CODE SECTIONS MY NOTES commissioning during the entire project.
Chapter 5 Commissioning Provider
Each building type usually has unique
Qualifications and Selection
systems that benefit from commissioning.

APPENDICES The following 2. COMMISSIONING APPLICATION TO


appendices provide information for UNIVERSITY FACILITY SYSTEMS
arrow_right the application of the commissioning The following chart can be used to make the
process.
initial selection of the systems to be
commissioned. The extent of the selections
APPENDIX A Building
arrow_right Commissioning Documentation
will depend on the needs of the project, and
budget and schedule limitations. Detailed
checklists for many of these systems are
arrow_right APPENDIX B Checklists shown in Section B2.0.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities COLLEGE AND UNIVERSITY FACILIT
Project:

APPENDIX D Commissioning Address:


arrow_right Process in the I-Codes Owner:
Email/Phone:

arrow_right APPENDIX E Resources Owner’s PM:


Email/Phone:
Cx Provider:
Email/Phone:
Date
Initiated:
Date
Revised:
System
Commissionin
Required
Item Equipment/System Y/N
1. Air conditioning and
ventilation systems – code
required

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 47/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COLLEGE AND UNIVERSITY FACILIT


A󰍝
menu
Menu
Search acr…
2. search
Plumbing hot water supervised_user_circle
Sign In person apps
systems –
code required
All Codes
clear Search Type
help
3. Plumbing systems
Title Content
Legend Information 4. Lighting and control
CODE SECTIONS MY NOTES systems – code
Chapter 5 Commissioning Provider required
Qualifications and Selection
5. Electrical power
systems
APPENDICES The following
6. Energy monitoring
appendices provide information for
arrow_right the application of the commissioning and management
process. systems
7. Outdoor air and
APPENDIX A Building energy recovery
arrow_right Commissioning Documentation systems
8. Landscape irrigation

arrow_right APPENDIX B Checklists systems


9. Fire protection and
APPENDIX C Sample Skills, fire sprinkler
arrow_right Knowledge and Abilities systems
10. Fire alarm systems
APPENDIX D Commissioning
arrow_right Process in the I-Codes
11. Vertical
transportation,
elevators, escalators
arrow_right APPENDIX E Resources 12. Building enclosures
13. Computer rooms and
data systems
14. Security systems
15. Telephone and
communication
systems
16. Central plant and
connected systems
17. Shop and special
exhausts
18. Humidity control
systems
19. Central Plant
20.
21.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 48/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COLLEGE AND UNIVERSITY FACILIT


A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In
The approval section below can be used if applperson apps
I have reviewed the equipment list and verified
All Codes
clear Name:
Search Type
help
Title Company
Content
Legend Information Name:
CODE SECTIONS MY NOTES Signature:
Chapter 5 Commissioning Provider
Date:
Qualifications and Selection

APPENDICES The following B1.5 Municipal and State Buildings Commissioning


appendices provide information for
arrow_right the application of the commissioning 1. INTRODUCTION
process. The Commissioning Process can be utilized
on nearly all building systems. However,
APPENDIX A Building each building project selects specific systems
arrow_right Commissioning Documentation to undergo commissioning depending on
project type and budget. This is done at
arrow_right APPENDIX B Checklists
project inception during the development of
the Owner’s Project Requirements. This
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
listing is used to plan and implement
commissioning during the entire project.
APPENDIX D Commissioning Each building type usually has unique
arrow_right Process in the I-Codes systems that benefit from commissioning.
2. COMMISSIONING APPLICATION TO
arrow_right APPENDIX E Resources MUNICIPAL AND STATE FACILITY
SYSTEMS
The following chart can be used to make the
initial selection of the systems to be
commissioned. The extent of the selections
will depend on the needs of the project, and
budget and schedule limitations. Detailed
checklists for many of these systems are
shown in Section B2.0.

MUNICIPAL AND STATE BUILDINGS


Project:
Address:
Owner:
Email/Phone:
Owner’s PM:
Email/Phone:
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 49/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! MUNICIPAL AND STATE BUILDINGS


A󰍝
menu
Menu
Search acr…
Cx Provider: search supervised_user_circle
Sign In person apps
Email/Phone:
All Codes
clear Date
Search Type
help
Title Initiated:
Content
Legend Information
Date
CODE SECTIONS MY NOTES Revised:
Chapter 5 Commissioning Provider
System
Qualifications and Selection
Commissioning
Required
APPENDICES The following
Item Equipment/System Y/N
appendices provide information for
arrow_right the application of the commissioning 1. Air conditioning and
process. ventilation systems –
code required

APPENDIX A Building 2. Plumbing hot water


arrow_right Commissioning Documentation systems – code
required

arrow_right APPENDIX B Checklists 3. Plumbing systems


4. Lighting and control
APPENDIX C Sample Skills, systems – code
arrow_right Knowledge and Abilities required
5. Electrical power
APPENDIX D Commissioning systems
arrow_right Process in the I-Codes
6. Energy monitoring
and management
arrow_right APPENDIX E Resources
systems
7. Outdoor air and
energy recovery
systems
8. Landscape irrigation
systems
9. Fire protection and
fire sprinkler systems
10. Fire alarm systems
11. Vertical
transportation,
elevators, escalators
12. Building enclosures
13.
14. Computer rooms and
data systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 50/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! MUNICIPAL AND STATE BUILDINGS


A󰍝
menu
Menu
Search acr…
15. search
Security systems supervised_user_circle
Sign In person apps
16. Telephone and
All Codes
clear Search Type
help
communication
systems
Title Content
Legend Information 17. Public address
CODE SECTIONS MY NOTES systems
Chapter 5 Commissioning Provider
18. Court systems
Qualifications and Selection
19. Detention areas

APPENDICES The following 20. Smoke control


appendices provide information for systems
arrow_right the application of the commissioning 21. Library systems
process.
22. Humidity control
systems
APPENDIX A Building
arrow_right Commissioning Documentation 23. Fire stations
24. Shops and special
exhaust systems
arrow_right APPENDIX B Checklists 25. Police stations
APPENDIX C Sample Skills, special systems
arrow_right Knowledge and Abilities 26.
27.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
28.
29.
30.
arrow_right APPENDIX E Resources
31.
The approval section below can be used if appl
I have reviewed the equipment list and verified
Name:
Company
Name:
Signature:
Date:

B1.6 Federal Buildings Commissioning


1. INTRODUCTION
The Commissioning Process can be utilized
on nearly all building systems. However,
each building project selects specific systems
to undergo commissioning depending on

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 51/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
project type and budget. This is done at
A󰍝
menu
Menu
Search
projectacr… search thesupervised_user_circledevelopment
inception during personSign Inof apps
the Owner’s Project Requirements. This
listing is used to plan and implement
All Codes
clear Search Type
help
commissioning during the entire project.
Title Content
Legend Information Each building type usually has unique
CODE SECTIONS MY NOTES systems that benefit from commissioning.
Chapter 5 Commissioning Provider
2. COMMISSIONING APPLICATION TO
Qualifications and Selection
FEDERAL FACILITY
SYSTEMS
APPENDICES The following The following chart can be used to make the
appendices provide information for initial selection of the systems to be
arrow_right the application of the commissioning commissioned. The extent of the selections
process. will depend on the needs of the project, and
budget and schedule limitations. Detailed
APPENDIX A Building
arrow_right Commissioning Documentation checklists for many of these systems are
shown in Section B2.0.

arrow_right APPENDIX B Checklists FEDERAL BUILDINGS COM


Project:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
Address:
Owner:

APPENDIX D Commissioning Email/Phone:


arrow_right Process in the I-Codes Owner’s PM:
Email/Phone:
arrow_right APPENDIX E Resources Cx Provider:
Email/Phone:
Date
Initiated:
Date
Revised:
System
Commissioning
Required
Item Equipment/System Y/N
1. Air conditioning and
ventilation systems
2. Plumbing hot water
systems
3. Plumbing systems
4. Lighting and control
systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 52/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! FEDERAL BUILDINGS COM


A󰍝
menu
Menu
Search acr…
5. search
Electrical power supervised_user_circle person
Sign In apps
systems
All Codes
clear 6.
Search Type
help
Energy monitoring and
management systems
Title Content
Legend Information 7. Outdoor air and
CODE SECTIONS MY NOTES energy recovery
Chapter 5 Commissioning Provider systems
Qualifications and Selection
8. Landscape irrigation
systems
APPENDICES The following
9. Fire protection and
appendices provide information for
arrow_right the application of the commissioning fire sprinkler systems
process. 10. Fire alarm systems
11. Vertical
APPENDIX A Building transportation,
arrow_right Commissioning Documentation elevators, escalators
12. Building enclosures
arrow_right APPENDIX B Checklists
13. Roofing systems
14. Computer rooms and
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
data systems
15. Security systems
APPENDIX D Commissioning 16. Telephone and
arrow_right Process in the I-Codes communication systems
17. Public address systems
arrow_right APPENDIX E Resources 18. Court systems
19. Detention facilities
20. Smoke control systems
21. Libraries
22. Humidity control
systems
23. Fire prevention and
operation
24. Shops and special
exhaust systems
25. Law enforcement and
security systems
26.
27.
28.
29.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 53/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! FEDERAL BUILDINGS COM


A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In person
The approval section below can be used if appl apps
I have reviewed the equipment list and verified
All Codes
clear Name:
Search Type
help
Title Company
Content
Legend Information Name:
CODE SECTIONS MY NOTES Signature:
Chapter 5 Commissioning Provider
Date:
Qualifications and Selection

APPENDICES The following B1.7 Industrial Facilities Commissioning


appendices provide information for
arrow_right the application of the commissioning 1. INTRODUCTION
process. The Commissioning Process can be utilized
on nearly all building systems. However,
APPENDIX A Building each building project selects specific systems
arrow_right Commissioning Documentation to undergo commissioning depending on
project type and budget. This is done at
arrow_right APPENDIX B Checklists
project inception during the development of
the Owner’s Project Requirements. This
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
listing is used to plan and implement
commissioning during the entire project.
APPENDIX D Commissioning Each building type usually has unique
arrow_right Process in the I-Codes systems that benefit from commissioning.
2. COMMISSIONING APPLICATION TO
arrow_right APPENDIX E Resources INDUSTRIAL FACILITY SYSTEMS
The following chart can be used to make the
initial selection of the systems to be
commissioned. The extent of the selections
will depend on the needs of the project, and
budget and schedule limitations. Detailed
checklists for many of these systems are
shown in Section B2.0.

INDUSTRIAL FACILITIES COM


Project:
Address:
Owner:
Email/Phone:
Owner’s PM:
Email/Phone:
Cx Provider:
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 54/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! INDUSTRIAL FACILITIES COM


A󰍝
menu
Menu
Search acr…
Email/Phone: search supervised_user_circle
Sign In person apps
Date
Initiated:
All Codes
clear Search Type
help
Title Date
Content
Legend Information Revised:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider System
Qualifications and Selection
Commissioning
Item Equipment/System Required Y/N
APPENDICES The following
1. Air conditioning and
appendices provide information for
arrow_right the application of the commissioning
ventilation systems –
code required
process.
2. Plumbing hot water
APPENDIX A Building systems – code
arrow_right Commissioning Documentation required
3. Plumbing systems

arrow_right APPENDIX B Checklists 4. Lighting and control


systems – code
APPENDIX C Sample Skills, required
arrow_right Knowledge and Abilities 5. Electrical power
systems
APPENDIX D Commissioning
arrow_right Process in the I-Codes 6. Energy monitoring
and management
systems
arrow_right APPENDIX E Resources 7. Outdoor air and
energy recovery
systems
8. Landscape irrigation
systems
9. Fire protection and
fire sprinkler
systems
10. Fire alarm systems
11. Vertical
transportation,
elevators, escalators
12. Building enclosures
13. Roofing systems
14. Computer rooms and
data systems
15. Security systems
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 55/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! INDUSTRIAL FACILITIES COM


A󰍝
menu
Menu
Search acr…
16. search
Telephone and supervised_user_circle
Sign In person apps
communication
systems
All Codes
clear Search Type
help
17. Storage and
Title Content
Legend Information transportation systems

CODE SECTIONS MY NOTES 18. Manufacturing


Chapter 5 Commissioning Provider equipment and
Qualifications and Selection systems
19. Exhaust systems
APPENDICES The following
20. Refrigeration systems
appendices provide information for
arrow_right the application of the commissioning 21. Warehouse and
process. storage systems
22. Chemical storage and
APPENDIX A Building use
arrow_right Commissioning Documentation 23.
24.
arrow_right APPENDIX B Checklists
25.

APPENDIX C Sample Skills, 26.


arrow_right Knowledge and Abilities 27.
28.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
29.
The approval section below can be used if appl
I have reviewed the equipment list and verified
arrow_right APPENDIX E Resources Name:
Company
Name:
Signature:
Date:

B1.8 High-Rise Residential Buildings


Commissioning

1. INTRODUCTION
The Commissioning Process can be utilized
on nearly all building systems. However,
each building project selects specific systems
to undergo commissioning depending on
project type and budget. This is done at
project inception during the development of

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 56/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! the Owner’s Project Requirements. This


A󰍝
listing is used search
Search acr…
menu
Menu to plan supervised_user_circle
and person Sign In
implement apps
commissioning during the entire project.
Each building type usually has unique
All Codes
clear Search Type
help
systems that benefit from commissioning.
Title Content
Legend Information 2. COMMISSIONING APPLICATION TO
CODE SECTIONS MY NOTES HIGH-RISE RESIDENTIAL FACILITY
Chapter 5 Commissioning Provider
SYSTEMS
Qualifications and Selection
The following chart can be used to make the
APPENDICES The following initial selection of the systems to be
appendices provide information for commissioned. The extent of the selections
arrow_right the application of the commissioning will depend on the needs of the project, and
process. budget and schedule limitations. Detailed
checklists for many of these systems are
APPENDIX A Building
arrow_right Commissioning Documentation shown in Section B2.0.

HIGH-RISE RESIDENTIAL BUILDING


arrow_right APPENDIX B Checklists Project:
Address:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
Owner:
Email/Phone:

APPENDIX D Commissioning Owner’s PM:


arrow_right Process in the I-Codes Email/Phone:
Cx Provider:
arrow_right APPENDIX E Resources Email/Phone:
Date
Initiated:
Date
Revised:
System
Commissioning
Required
Item Equipment/System Y/N
1. Air conditioning and
ventilation systems –
code required
2. Plumbing hot water
systems – code
required
3. Plumbing Systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 57/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! HIGH-RISE RESIDENTIAL BUILDING


A󰍝
menu
Menu
Search acr…
4. search supervised_user_circle
Lighting and control
Sign In person apps
systems – code
required
All Codes
clear Search Type
help
5. Electrical power
Title Content
Legend Information systems

CODE SECTIONS MY NOTES 6. Energy monitoring


Chapter 5 Commissioning Provider and management
Qualifications and Selection systems
7. Outdoor air and
APPENDICES The following
energy recovery
appendices provide information for
arrow_right the application of the commissioning
systems

process. 8. Landscape irrigation


systems

APPENDIX A Building 9. Fire protection and


arrow_right Commissioning Documentation fire sprinkler systems
10. Fire alarm systems

arrow_right APPENDIX B Checklists 11. Vertical


transportation,
APPENDIX C Sample Skills, elevators, escalators
arrow_right Knowledge and Abilities 12. Building enclosures
13. Roofing systems
APPENDIX D Commissioning
arrow_right Process in the I-Codes 14. Security systems
15. Telephone and

arrow_right APPENDIX E Resources communication


systems
16.
17.
18.
19.
20.
21.
The approval section below can be used if appl
I have reviewed the equipment list and verified
Name:
Company
Name:
Signature:
Date:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 58/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
A 󰍝 B1.9
menu
Menu
Search
Retailacr… searchArea Commissioning
Building and
supervised_user_circle personSign In apps
1. INTRODUCTION
The Commissioning Process can be utilized
All Codes
clear Search Type
help
on nearly all building systems. However,
Title Content
Legend Information each building project selects specific systems
CODE SECTIONS MY NOTES to undergo commissioning depending on
Chapter 5 Commissioning Provider project type and budget. This is done at
Qualifications and Selection
project inception during the development of
the Owner’s Project Requirements. This
APPENDICES The following
appendices provide information for listing is used to plan and implement
arrow_right the application of the commissioning commissioning during the entire project.
process. Each building type usually has unique
systems that benefit from commissioning.
APPENDIX A Building 2. COMMISSIONING APPLICATION TO
arrow_right Commissioning Documentation
RETAIL BUILDING AND AREA
FACILITY SYSTEMS
arrow_right APPENDIX B Checklists The following chart can be used to make the
APPENDIX C Sample Skills, initial selection of the systems to be
arrow_right Knowledge and Abilities commissioned. The extent of the selections
will depend on the needs of the project, and
APPENDIX D Commissioning budget and schedule limitations. Detailed
arrow_right Process in the I-Codes checklists for many of these systems are
shown in Section B2.0.
arrow_right APPENDIX E Resources
COMMERCIAL AND OFFICE BUILDIN
Project:
Address:
Owner:
Email/Phone:
Owner’s PM:
Email/Phone:
Cx Provider:
Email/Phone:
Date
Initiated:
Date
Revised:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 59/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMERCIAL AND OFFICE BUILDIN


A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In person apps
System
Commissioning
All Codes
clear Search Type
help
Item Equipment/System
Required Y/N
Title Content
Legend Information 1. Air conditioning and
ventilation systems –
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider code required
Qualifications and Selection 2. Plumbing hot water
systems if included –
APPENDICES The following code required
appendices provide information for
arrow_right the application of the commissioning
3. Plumbing systems if
included
process.
4. Lighting and control
systems -code
APPENDIX A Building
arrow_right Commissioning Documentation
required
5. Electrical power
systems
arrow_right APPENDIX B Checklists
6. Energy monitoring
APPENDIX C Sample Skills, and management
arrow_right Knowledge and Abilities systems
7. Outdoor air and
APPENDIX D Commissioning energy recovery
arrow_right Process in the I-Codes systems
8. Special communication
arrow_right APPENDIX E Resources systems
9. Fire protection and
fire sprinkler systems
10. Fire alarm systems
11. Vertical
transportation,
elevators, escalators
if included
12. Building enclosures
13. Roofing systems
14. Computer and data
rooms systems
15. Security systems
16. Telephone and
communication
systems
17.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 60/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! COMMERCIAL AND OFFICE BUILDIN


A󰍝
menu
Menu
Search acr…
18. search supervised_user_circle
Sign In person apps
19.
All Codes
clear 20.
Search Type
help
Title 21.Content
Legend Information
The approval section below can be used if appl
CODE SECTIONS MY NOTES I have reviewed the equipment list and verified
Chapter 5 Commissioning Provider
Qualifications and Selection Name:
Company
APPENDICES The following Name:
appendices provide information for Signature:
arrow_right the application of the commissioning
Date:
process.

APPENDIX A Building B1.10 Justice Buildings Commissioning


arrow_right Commissioning Documentation
1. INTRODUCTION
The Commissioning Process can be utilized
arrow_right APPENDIX B Checklists on nearly all building systems. These projects
APPENDIX C Sample Skills, may include detention, jail or prison buildings,
arrow_right Knowledge and Abilities courthouses, police facilities and other
related facilities. Due to their special
APPENDIX D Commissioning functions and safety requirements, there are
arrow_right Process in the I-Codes unique systems included that must be
commissioned. However, each building
arrow_right APPENDIX E Resources
project selects specific systems to undergo
commissioning. This is done at project
inception during the development of the
Owner’s Project Requirements. This listing is
used to plan and implement commissioning
during the entire project. Each building type
usually has unique systems that benefit from
commissioning.
2. COMMISSIONING APPLICATION TO
FEDERAL FACILITY SYSTEMS
The following chart can be used to make the
initial selection of the systems to be
commissioned. The extent of the selections
will depend on the needs of the project, and
budget and schedule limitations. Detailed

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 61/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! checklists for many of these systems are


A󰍝
menu
Menu
Search acr… search
shown in Section B2.0. supervised_user_circle personSign In apps
JUSTICE BUILDINGS COMM
All Codes
clear Search Type
help
Project:
Title Content
Address:
Legend Information
Owner:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Email/Phone:
Qualifications and Selection Owner’s PM:
Email/Phone:
APPENDICES The following
Cx Provider:
appendices provide information for
arrow_right the application of the commissioning Email/Phone:
process. Date
Initiated:
APPENDIX A Building Date
arrow_right Commissioning Documentation Revised:

System
arrow_right APPENDIX B Checklists Commissioning
Required Y/N
APPENDIX C Sample Skills, Item Equipment/System
arrow_right Knowledge and Abilities 1. Air conditioning and
ventilation systems
APPENDIX D Commissioning
arrow_right Process in the I-Codes 2. Plumbing hot water
systems
3. Plumbing systems
arrow_right APPENDIX E Resources 4. Lighting and control
systems
5. Electrical power
systems
6. Energy monitoring
and management
systems
7. Outdoor air and
energy recovery
systems
8. Landscape irrigation
systems
9. Fire protection and
fire sprinkler systems
10. Fire alarm systems

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 62/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! JUSTICE BUILDINGS COMM


A󰍝
menu
Menu
Search acr…
11. search
Vertical supervised_user_circle person
Sign In apps
transportation,
elevators, escalators
All Codes
clear Search Type
help
12. Building enclosures
Title Content
Legend Information 13. Roofing systems
CODE SECTIONS MY NOTES 14. Computer rooms and
Chapter 5 Commissioning Provider
data systems
Qualifications and Selection
15. Security systems

APPENDICES The following 16. Telephone and


appendices provide information for communication
arrow_right the application of the commissioning systems
process. 17. Public address
systems
APPENDIX A Building 18. Court systems
arrow_right Commissioning Documentation
19. Detention facilities
20. Smoke control
arrow_right APPENDIX B Checklists systems

APPENDIX C Sample Skills, 21. Libraries


arrow_right Knowledge and Abilities 22. Humidity control
systems
APPENDIX D Commissioning 23. Fire prevention and
arrow_right Process in the I-Codes operation
24. Shops and special
arrow_right APPENDIX E Resources exhaust systems
25. Law enforcement
and security systems
26.
27.
28.
The approval section below can be used if appl
I have reviewed the equipment list and verified
Name:
Company
Name:
Signature:
Date:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 63/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! B2.0 Commissioning Functional


A󰍝
menu
Menu
Search acr… search
Systems Checklists supervised_user_circle personSign In apps
The following are lists of systems, equipment,
All Codes
clear Search Type
help
assemblies and components that should be
Title Content
Legend Information tested or verified when installed or where
CODE SECTIONS MY NOTES applicable. These lists can be used to designate
Chapter 5 Commissioning Provider commissioning process items and tracking the
Qualifications and Selection
completion of the process.

APPENDICES The following


appendices provide information for B2.1 Site Development and Land Use
arrow_right the application of the commissioning
process. RELATED SYSTEMS, EQUIPMENT,
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS

APPENDIX A Building Landscape Irrigation:


arrow_right Commissioning Documentation • Landscape irrigation design. Verify:
• Static pressure verification. • Required

arrow_right APPENDIX B Checklists • Point of connection. static pressure


• Backflow prevention. is available.
APPENDIX C Sample Skills, • Flow meter. • Backflow
arrow_right Knowledge and Abilities • O&M manual. prevention.
• O&M manual.
APPENDIX D Commissioning Irrigation Design and Systems:
arrow_right Process in the I-Codes • Irrigation controllers with • Check
weather or moisture-based irrigation
arrow_right APPENDIX E Resources capabilities. controllers for
compliance
with the plans
and
specifications.
• Irrigation design. • Check for
proper
irrigation,
proper water
spray coverage
and
appropriate
overlap and
spacing in
accordance
with the plans

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 64/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Sprinkler head layout at • Check for
perimeter of building. correct
All Codes
clear Search Type
help
sprinkler head
Title Content
Legend Information emitters with
appropriate
CODE SECTIONS MY NOTES head rotation
Chapter 5 Commissioning Provider
Qualifications and Selection to prevent over
spraying onto
building walls.
APPENDICES The following
• Verify
appendices provide information for
arrow_right the application of the commissioning sprinkler head
process. per approved
plans.

APPENDIX A Building Outdoor Ornamental Fountains and Water Features:


arrow_right Commissioning Documentation • System Calibration Verify:
• System Performance • Outdoor

arrow_right APPENDIX B Checklists • Testing of system of related ornamental


components in-pool items fountains and
APPENDIX C Sample Skills, • Testing of mechanical room water features.
arrow_right Knowledge and Abilities Erosion Control Systems • Design of
water feature
APPENDIX D Commissioning or fountain.
arrow_right Process in the I-Codes • Available
water source.
• Available
arrow_right APPENDIX E Resources electrical
voltage.
• Electrical
components.
• Mechanical
components.
• Plumbing
components.
• Calibration of
all
components,
including but
not limited to:
pumps, filters,
chemical
controllers,
motors,
electrical

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 65/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
panels, pipe
installation,
All Codes
clear Search Type
help geo-
Title Content membranes,
Legend Information
surface
CODE SECTIONS MY NOTES materials.
Chapter 5 Commissioning Provider
• Performance
Qualifications and Selection
of leakage
tests.
APPENDICES The following
• Performance
appendices provide information for
arrow_right the application of the commissioning
of the system
as a unit.
process.
• Performance
of all modes of
APPENDIX A Building
arrow_right Commissioning Documentation operation.
• Tests of in-
pool items
arrow_right APPENDIX B Checklists
including, but
not limited to:
APPENDIX C Sample Skills, nozzles,
arrow_right Knowledge and Abilities suction and
inlet fittings,
APPENDIX D Commissioning overflows and
arrow_right Process in the I-Codes weirs, control
valves, lights,
arrow_right APPENDIX E Resources junction boxes,
cord seals and
level sensors.
• Tests of
mechanical
room, including
but not limited
to: control
panel
terminations,
lighting panel,
disconnects
and ground-
fault device
wiring to all
equipment,
valve tags and
flow directional
arrows, piping

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 66/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
and pressure
gauges.
All Codes
clear Search Type
help
Site Drainage:
Title Content
Legend Information • Verify storm
water pollution
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider prevention plan
Qualifications and Selection (SWPPP) ,
where
APPENDICES The following required, is on
appendices provide information for site .
arrow_right the application of the commissioning • Verify
process. drainage
system is
APPENDIX A Building installed in
arrow_right Commissioning Documentation accordance
with site

arrow_right APPENDIX B Checklists drainage plan.


• Check where
required by the
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities plans:
• Silt fencing.
• Construction
APPENDIX D Commissioning
arrow_right Process in the I-Codes drive.
• Erosion
control
arrow_right APPENDIX E Resources blankets.
• Erosion
control straw
logs.
• Observe and
document that
all BMP
pertaining to
erosion control
are
successfully
utilized.
• Observe and
document
during
construction
that all
elements of the
erosion control
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 67/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
plan are in
place such that
All Codes
clear Search Type
help the soil on the
Title Content site is
Legend Information
contained with
CODE SECTIONS MY NOTES no chance of
Chapter 5 Commissioning Provider
run-off.
Qualifications and Selection
• Verify that
collected water
APPENDICES The following
after a rain
appendices provide information for
arrow_right the application of the commissioning
event will move
through the
process.
site in
accordance
APPENDIX A Building
arrow_right Commissioning Documentation
with the site
drainage plan.
• Verify and
arrow_right APPENDIX B Checklists documentation
that the
APPENDIX C Sample Skills, drainage
arrow_right Knowledge and Abilities system
components
APPENDIX D Commissioning meet or
arrow_right Process in the I-Codes exceed those
specified in the
arrow_right APPENDIX E Resources site drainage
plan.
• Verify and
observe that
the O&M and
systems
manuals as
submitted meet
the criteria and
needs of the
end user.
Topography and Grading (cut/fill):
• Grading plan. • Verify that
• Soil analysis/compaction soils reports
plan. are complete
• Site safety plan. and in
• Tree removal/mitigation plan. accordance
• Soil stabilization and erosion with local rules
control plan.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 68/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Revegetation plan, slope- and
control planting. regulations.
All Codes
clear Search Type
help • Equipment utilization plan. • Verify site
Title Content• Ground water and infiltration. waste
Legend Information
reduction plan
CODE SECTIONS MY NOTES is consistent
Chapter 5 Commissioning Provider
with IgCC
Qualifications and Selection
and/or local
ordinance
APPENDICES The following
including tree
appendices provide information for
arrow_right the application of the commissioning
removal.
• Verify
process.
vegetation
meets the
APPENDIX A Building
arrow_right Commissioning Documentation revegetation
plan.
• Verify air
arrow_right APPENDIX B Checklists quality plan is
part of SWPPP
APPENDIX C Sample Skills, or soil erosion
arrow_right Knowledge and Abilities control plan.
• Verify site
APPENDIX D Commissioning safety plan is
arrow_right Process in the I-Codes in place
• Verify that
arrow_right APPENDIX E Resources earth-moving
equipment has
been
maintained and
repaired in
accordance
with the O&M
manual
pertaining to
each piece of
equipment.
• Verify that all
elements of
site erosion
control are
monitored daily
for deficiencies
or necessary
repairs.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 69/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Verify that
areas of fill are
All Codes
clear Search Type
help compacted to a
Title Content level that
Legend Information
meets or
CODE SECTIONS MY NOTES exceeds the
Chapter 5 Commissioning Provider
soil
Qualifications and Selection
compaction
plan.
APPENDICES The following
• Verify that
appendices provide information for
arrow_right the application of the commissioning
sufficient soil
samples
process.
representing a
true cross
APPENDIX A Building
arrow_right Commissioning Documentation section of the
cut and fill
areas, and of
arrow_right APPENDIX B Checklists
the material to
be used as fill,
APPENDIX C Sample Skills, have been
arrow_right Knowledge and Abilities taken and
tested under
APPENDIX D Commissioning the supervision
arrow_right Process in the I-Codes of a certified
soils engineer.
arrow_right APPENDIX E Resources • Verify of all
field and
laboratory tests
of the land to
be covered
with fill to
confirm that
the
characteristics
of the soil,
including its
expansive
qualities, and
bearing value
of the land,
consolidation
potential, can
support the

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 70/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
proposed fill
and structures.
All Codes
clear Search Type
help • Verify
Title Content laboratory
Legend Information
analysis and
CODE SECTIONS MY NOTES related data
Chapter 5 Commissioning Provider
support the
Qualifications and Selection
proposals to
replace, rework
APPENDICES The following
or blend, or to
appendices provide information for
arrow_right the application of the commissioning
stabilize or
modify with
process.
additives
support the
APPENDIX A Building
arrow_right Commissioning Documentation proposed work.
• Verify via
periodic site
arrow_right APPENDIX B Checklists inspections
that the
APPENDIX C Sample Skills, previously
arrow_right Knowledge and Abilities disturbed
areas are
APPENDIX D Commissioning maintaining
arrow_right Process in the I-Codes their slopes
and
arrow_right APPENDIX E Resources compaction
rates.
Land-clearing Debris and Soil Reuse:
• Waste management • Verify that the
communication plan. materials on
• Waste inventory. the site are
• Salvage. handled as
• Disposal. outlined in the
• Source-separated waste
construction, demolition and management
land-clearing recycling. plan.
• Waste management report. • Verify that the
recyclables
and salvage
items are
packaged for
removal and
transported as
outlined in the
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 71/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
waste
management
All Codes
clear Search Type
help plan.
Title Content • Verify that
Legend Information
hazardous
CODE SECTIONS MY NOTES construction
Chapter 5 Commissioning Provider
materials are
Qualifications and Selection
handled as
outlined in the
APPENDICES The following
construction
appendices provide information for
arrow_right the application of the commissioning
waste
management
process.
plan.
• Verify that the
APPENDIX A Building
arrow_right Commissioning Documentation waste
management
goals and the
arrow_right APPENDIX B Checklists waste
prevention
APPENDIX C Sample Skills, goals meet the
arrow_right Knowledge and Abilities requirements
of the waste
APPENDIX D Commissioning management
arrow_right Process in the I-Codes plan.
• Verify that the

arrow_right APPENDIX E Resources waste


inventory
reconciles with
all disposal
manifests or
weight tickets.
• Verify and
document that
the waste
management
report correctly
reflects the
outcome of the
waste
management
plan.
Heat Island Mitigation:
• Energy consumption. • Verify cool
• Air pollutant emissions. roof complies
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 72/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Greenhouse gases. with thermal
• Trees and vegetation. emittance,
All Codes
clear Search Type
help solar
Title Content reflectance, or
Legend Information
SRI values per
CODE SECTIONS MY NOTES the code
Chapter 5 Commissioning Provider
• Verify
Qualifications and Selection
structural and
vegetative
APPENDICES The following
elements of the
appendices provide information for
arrow_right the application of the commissioning
green roof
• Verify the
process.
water quality
as it pertains to
APPENDIX A Building
arrow_right Commissioning Documentation
the mitigation
techniques
utilized in the
arrow_right APPENDIX B Checklists original
construction of
APPENDIX C Sample Skills, the site.
arrow_right Knowledge and Abilities • Verify that the
O&M manual
APPENDIX D Commissioning meets the
arrow_right Process in the I-Codes needs of the
property

arrow_right APPENDIX E Resources owner.


• Check and
document the
energy
consumption
savings as
they pertain to
the mitigation
techniques
used in the
construction of
the site.
• Check and
document the
decreased air
pollutant
emissions and
greenhouse
gases

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 73/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
produced and
released as
All Codes
clear Search Type
help they pertain to
Title Content the mitigation
Legend Information
techniques
CODE SECTIONS MY NOTES utilized in the
Chapter 5 Commissioning Provider
original
Qualifications and Selection
construction of
the site.
APPENDICES The following
• Verify and
appendices provide information for
arrow_right the application of the commissioning
document the
water quality
process.
as it pertains to
the mitigation
APPENDIX A Building
arrow_right Commissioning Documentation techniques
utilized in the
original
arrow_right APPENDIX B Checklists construction of
the site.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Lighting:
• Site lighting. • Verify exterior
• Security lighting. lighting meets
APPENDIX D Commissioning
arrow_right Process in the I-Codes • Area lighting. light pollution
• Landscape lighting. plan.
• Sports lighting. • Check and
arrow_right APPENDIX E Resources
document that
all fixtures are
in compliance
with IES
definitions.
• Check
peripheral
vision
enhancement.
• Check and
document that
the smallest
wattage lamp
source
available is
used to meet
the desired
lighting levels.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 74/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Check and
document that
All Codes
clear Search Type
help the ratios of
Title Content illuminance
Legend Information
and luminance
CODE SECTIONS MY NOTES values are in
Chapter 5 Commissioning Provider
compliance
Qualifications and Selection
with the IES
Lighting
APPENDICES The following
Handbook,
appendices provide information for
arrow_right the application of the commissioning
Tenth Edition.
• Verify that all
process.
fixtures
installed have
APPENDIX A Building
arrow_right Commissioning Documentation been either
selected from
the specified
arrow_right APPENDIX B Checklists
product group
or submitted as
APPENDIX C Sample Skills, approved
arrow_right Knowledge and Abilities alternatives, as
approved by
APPENDIX D Commissioning the governing
arrow_right Process in the I-Codes body of the
local area.
arrow_right APPENDIX E Resources • Check and
document that
primary entry
lighting,
exterior
emergency
egress lighting,
service area
lighting,
surface
parking,
parking garage
and roadways
are in
compliance
with the final
lighting
commissioning
plan.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 75/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Verify and
document that
All Codes
clear Search Type
help the O&M
Title Content manual meets
Legend Information
the goals of the
CODE SECTIONS MY NOTES owner.
Chapter 5 Commissioning Provider
Qualifications and Selection Brownfield Mitigation:
• Baseline risk assessment. • Verify and
APPENDICES The following • Corrective action plan. document that
appendices provide information for • Remedial action plan. the baseline
arrow_right the application of the commissioning • Remedial risk
process. investigation/feasibility study. assessment
clearly and
APPENDIX A Building correctly
arrow_right Commissioning Documentation identifies and
evaluates the

arrow_right APPENDIX B Checklists threat to


human health
APPENDIX C Sample Skills, and the
arrow_right Knowledge and Abilities environment.
• Verify and
document that
APPENDIX D Commissioning
arrow_right Process in the I-Codes the
recommended
cleanup criteria
arrow_right APPENDIX E Resources and
alternatives for
remediation
are aligned
with the extent
of
contamination
on the site.
• Observe,
verify and
document that
the cleanup of
the site is at a
level
determined to
be health
protective for
its intended
use.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 76/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In person apps
B2.2 Materials (Architectural Building Assembly)

All Codes
clear Search Type
help
Title RELATED
Content SYSTEMS, EQUIPMENT,
TASKS/COMM
Legend Information ASSEMBLIES AND COMPONENTS
CODE SECTIONS MY NOTES Foundations subsoil drainage • Verify
Chapter 5 Commissioning Provider
system. complia
Qualifications and Selection
with app
Foundation dampproofing and
waterproofing. plans,
APPENDICES The following specific
appendices provide information for Flashing at exterior doors, skylights,
arrow_right the application of the commissioning wall flashing and drainage systems.
and
constru
process.
Exterior wall coverings. docume
Optional systems:
APPENDIX A Building
arrow_right Commissioning Documentation • Meet O
• Moisture envelopes. BOD, C
specific
arrow_right APPENDIX B Checklists • Check
APPENDIX C Sample Skills, proper
arrow_right Knowledge and Abilities drainag
system
• Exterior below-grade walls. exterior
APPENDIX D Commissioning
arrow_right Process in the I-Codes perimet
keep wa
from en
arrow_right APPENDIX E Resources the build
• Check
thermal
resistan
insulatio
where
required
• External floor and soffits,
• Check
slab-on-grade.
IECC, w
applicab
• Slabs:
drainag
moistur
penetra
• Exterior walls. • Check
drawing
wall ass
requirem

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 77/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

and any
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign
transmi
In apps
class (S
requirem
All Codes
clear Search Type
help in accor
Title Content with AS
Legend Information
E90 and
CODE SECTIONS MY NOTES ASTM E
Chapter 5 Commissioning Provider • Check
Qualifications and Selection complia
with app
APPENDICES The following sections
appendices provide information for Internat
arrow_right the application of the commissioning Building
process. Code® (
• Exterior glazed window Drawing review
APPENDIX A Building
arrow_right Commissioning Documentation
fenestration: windows, glazed contractor sub
doors and skylights. reviews:
• Check
arrow_right APPENDIX B Checklists fenestra
product
APPENDIX C Sample Skills, labeled
arrow_right Knowledge and Abilities U-facto
NFRC 1
APPENDIX D Commissioning solar he
arrow_right Process in the I-Codes coefficie
(SHGC)

arrow_right APPENDIX E Resources NFRC 2


and
certifica
the air
infiltratio
requirem
0.3 cfm/
other
approve
standar
• Check
proper f
and cau
at walls
roof
assemb
Glazed doors:
• Check
proper

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 78/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

flashing
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In an apps
seals
gaskets
proper p
All Codes
clear Search Type
help force, if
Title Content provide
Legend Information
a closer
CODE SECTIONS MY NOTES • Check
Chapter 5 Commissioning Provider proper d
Qualifications and Selection swing.
• Check
APPENDICES The following STC
appendices provide information for requirem
arrow_right the application of the commissioning if applic
process.
Check for:
• A labe
APPENDIX A Building
arrow_right Commissioning Documentation certifica
issued b
Nationa
arrow_right APPENDIX B Checklists Fenestr
Rating C
APPENDIX C Sample Skills, (NFRC)
arrow_right Knowledge and Abilities glazing
fabricat
APPENDIX D Commissioning verifying
arrow_right Process in the I-Codes complia
with the

arrow_right APPENDIX E Resources default


Factor o
• Site-built fenestration: curtain
SHGC;
walls and storefront systems,
label
and atrium roof systems.
certifica
verifying
complia
with an
compon
modelin
approac
(CMA) o
approve
standar
• Prope
swing.
• Applic
STC
requirem

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 79/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

• Field-fabricated • Check
!
A󰍝
menu
Menu
Searchfenestrations:
acr… search
fenestration
supervised_user_circle personSign
complia
In apps
made at the site, not with the
preformed or cut. default
All Codes
clear Search Type
help factor a
Title Content default
Legend Information
in accor
CODE SECTIONS MY NOTES with the
Chapter 5 Commissioning Provider applicab
Qualifications and Selection
approve
standar
APPENDICES The following
• Exterior doors • Check
appendices provide information for
arrow_right the application of the commissioning
proper f
installat
process.
header,
and floo
APPENDIX A Building
arrow_right Commissioning Documentation • Check
factor
requirem
arrow_right APPENDIX B Checklists for swin
and non
APPENDIX C Sample Skills, swingin
arrow_right Knowledge and Abilities doors.
• Check
APPENDIX D Commissioning appropr
arrow_right Process in the I-Codes manufa
referenc
arrow_right APPENDIX E Resources standar
(Americ
Architec
Manufa
Associa
(AAMA)
Canadia
Standar
Associa
(CSA);
Window
Door
Manufa
Associa
(WDMA
other
approve
standar

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 80/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

product
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign
sheets.
In apps
• Check
proper
All Codes
clear Search Type
help installat
Title Content accorda
Legend Information
• Sealants, control joints and with the
CODE SECTIONS MY NOTES flashing (stationary and manufa
Chapter 5 Commissioning Provider
moveable). written
Qualifications and Selection
instruct
• Check
APPENDICES The following
proper f
appendices provide information for
arrow_right the application of the commissioning
installat

process. • Check
proper
APPENDIX A Building anchori
arrow_right Commissioning Documentation building
proper f
at wall
arrow_right APPENDIX B Checklists • Shading devices (stationary
connect
and moveable).
• At
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities mechan
devices
for prop
APPENDIX D Commissioning
arrow_right Process in the I-Codes installat
and con
• Check
arrow_right APPENDIX E Resources
proper
anchori
accorda
with
constru
• Structural systems.
docume
includin
metal
connect
and bea
support
• Materials and finishes. • Check
complia
with allo
volatile
organic
compou
limits an

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 81/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

proper
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign
manufa
In apps
installat
applicat
All Codes
clear Search Type
help • Review
Title Content product
Legend Information
sheets.
CODE SECTIONS MY NOTES
For SI: 1 cubic foot per minute per square foot = 0.00508 m3/(s · m2).
Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following Other Project Requirements:


appendices provide information for
arrow_right the application of the commissioning
RELATED SYSTEMS, EQUIPMENT,
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
process.
• Structural systems. • Check for
proper
APPENDIX A Building
arrow_right Commissioning Documentation anchoring in
accordance
with the
arrow_right APPENDIX B Checklists construction
documents,
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities including metal
connectors and
beam
APPENDIX D Commissioning supports.
arrow_right Process in the I-Codes
• Structural requirements for • Prefunctional
mechanical systems and checklists, site
arrow_right APPENDIX E Resources renewable energy systems. observations
and
construction
testing.

B2.3 Energy—Management and Monitoring


Systems

RELATED SYSTEMS, EQUIPMENT,


ASSEMBLIES AND COMPONENTS TASKS/COMMEN
• Workstation graphic displays. Verify the following are
• Public display systems. consistent with the
commissioning plan:
• Central
• Systems design
processing/monitoring
• System specific
hardware and software.
• System submitt
• Network • System installa
communications/alarm
functions.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 82/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSign In apps
TASKS/COMMEN
• User interface with • System pre-sta
emergency medical services. inspection check
All Codes
clear Search Type
help
• Monitoring functions required
• System function
Title Content performance test
Legend Information for facility operations.
• Systems trainin
CODE SECTIONS MY NOTES • Local control panels and
Conduct or verify the fo
Chapter 5 Commissioning Provider individual monitoring points.
• Device Point to
Qualifications and Selection
Integrated Automation checkout (Static
Instrumentation for HVAC Testing).
APPENDICES The following Systems: • Device Point to
appendices provide information for
arrow_right the application of the commissioning
• Actuators and operators.
• Sensors and transmitters.
checkout (Dynam
Testing).
process.
• Control valves. • Sensor calibrat
• Control dampers. • Valve and dam
APPENDIX A Building
arrow_right Commissioning Documentation • Flow meters. stroke setup and
Integrated Automation • Coil valve leak
Instrumentation for Plumbing • Isolation valve o
arrow_right APPENDIX B Checklists Systems: system valve lea
• Domestic water metering. check.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
• Graywater metering.
• Fuel system (gas, oil)
metering.
APPENDIX D Commissioning
arrow_right Process in the I-Codes Integrated Automation
Instrumentation and Terminal
Devices for Electrical Systems:
arrow_right APPENDIX E Resources • Power meters.
• Kilowatt (kW) transducers.
• Current sensors.
• Battery monitors.
• Lighting relays.
• UPS monitors.
Integrated Automation of
Renewable Energy Systems:
• Solar photovoltaic.
• Wind generation.
• Geothermal.
• Building management
systems.
• Electrical systems.
• Lighting systems.
• Alternative power systems.
• On-site renewable energy.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 83/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSign In apps
TASKS/COMMEN
• Whole-building energy
analysis.
All Codes
clear Search Type
help
• Controllability of lighting
Title Content
Legend Information systems.

CODE SECTIONS MY NOTES • Controllability of thermal


Chapter 5 Commissioning Provider systems.
Qualifications and Selection

APPENDICES The following B2.4 Energy—HVAC Systems


appendices provide information for
arrow_right the application of the commissioning
RELATED SYSTEMS, EQUIPMENT,
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
process.
Instrumentation and Control for (tasks included on
APPENDIX A Building HVAC: previous page)
arrow_right Commissioning Documentation • Actuators and operators.
• Sensors and transmitters.
• Control valves.
arrow_right APPENDIX B Checklists • Control dampers.
• Direct-digital control system.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities Unitary HVAC Equipment: Verify:
• Packaged terminal air • Air system
conditioners. balancing.
APPENDIX D Commissioning
arrow_right Process in the I-Codes • Room air conditioners. • Hydronic system
• Self-contained air balancing.
conditioners. • Duct system
arrow_right APPENDIX E Resources • Computer room air testing.
conditioners. • Mechanical
• Split-system air conditioners. system manuals
• Air-source unitary heat and construction
pumps. documents
• Water-source unitary heat required by the
pumps. O&M manual are
Humidity Control Equipment: submitted.
• Humidifiers. • Functional
• Heated-pan humidifiers. performance
• Wetted-element humidifiers. testing of HVAC
• Atomizing humidifiers. equipment and
• Direct-steam-injection associated
humidifiers. controls and
• Jacketed, steam humidifiers. control systems.
• Self-contained steam Verify:
humidifiers. • Acceptance of
HVAC systems
and
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 84/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
• Portable humidifiers, equipment/syste
mechanical dehumidification verification repor
All Codes
clear Search Type
help units. • Preparation and
Title Content• Outdoor, mechanical distribution of fin
Legend Information
dehumidification units. HVAC system ha
CODE SECTIONS MY NOTES • Indoor, mechanical been completed.
Chapter 5 Commissioning Provider
dehumidification units. • Owner has bee
Qualifications and Selection
• Portable dehumidifiers. provided with
• Desiccant dehumidification construction
APPENDICES The following
units. document
appendices provide information for
arrow_right the application of the commissioning
requirements
including
process.
drawings,
manuals,
APPENDIX A Building
arrow_right Commissioning Documentation balancing reports
and
commissioning
arrow_right APPENDIX B Checklists reports, and such
documents have
APPENDIX C Sample Skills, been provided.
arrow_right Knowledge and Abilities • Air-handling
system access.
APPENDIX D Commissioning • Air-handling
arrow_right Process in the I-Codes system filters.
• Temperature

arrow_right APPENDIX E Resources and humidity in


occupied spaces
• Specific indoor
air quality and
pollutant control
measures.
• Listing,
instillation and
venting of
fireplaces and
combustion
appliances.
• Mechanical and
emergency
generator
equipment
located outside
building or locate
where exposed t

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 85/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
exterior
environment.
All Codes
clear Search Type
help
Convection Heating and Cooling Verify:
Title Content
Legend Information Units: • Air system
• Chilled beams. balancing.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider • Air coils. • Hydronic system
Qualifications and Selection • Fan coil units. balancing.
• Unit ventilators. • Mechanical
APPENDICES The following • Induction units. system manuals
appendices provide information for • Radiators convectors. construction
arrow_right the application of the commissioning • Finned-tube radiation documents
process. heaters. required by the
• Unit heaters. O&M and
APPENDIX A Building • Cabinet unit heaters. systems manual
arrow_right Commissioning Documentation • Propeller unit heaters. are submitted.
• Wall and ceiling unit heaters. • Functional
• Water-to-water heat pumps. performance
arrow_right APPENDIX B Checklists Humidity Control Equipment: testing of HVAC
• Humidifiers. equipment and
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Heated-pan humidifiers. associated
• Wetted-element humidifiers. controls and
• Atomizing humidifiers. control systems.
APPENDIX D Commissioning
arrow_right Process in the I-Codes
• Direct-steam-injection • Acceptance of
HVAC systems
humidifiers.
• Jacketed, steam humidifiers. and
arrow_right APPENDIX E Resources • Self-contained steam equipment/syste
humidifiers. verification repor
• Portable humidifiers. • Preparation and
• Mechanical dehumidification distribution of fin
units. HVAC system ha
• Outdoor, mechanical been completed.
dehumidification units. • Owner has bee
• Indoor, mechanical proved with
dehumidification units. construction
• Portable dehumidifiers. document
• Desiccant dehumidification requirements
units. including
drawings,
manuals,
balancing reports
and
commissioning
reports, and such

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 86/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Radiant Heating Units: documents have
• Radiant-heating electric been provided.
All Codes
clear Search Type
help
cables. • Air-handling
Title Content system access.
Legend Information • Radiant-heating electric mats.
• Radiant-heating hydronic • Air-handling
CODE SECTIONS MY NOTES piping. system filters.
Chapter 5 Commissioning Provider
• Radiant-heating electric • Temperature
Qualifications and Selection
panels. and humidity in
• Gas-fired radiant heaters. occupied spaces
APPENDICES The following
• Electric radiant heaters. • Specific indoor
appendices provide information for
arrow_right the application of the commissioning
air quality and
pollutant control
process.
measures.
• Listing,
APPENDIX A Building
arrow_right Commissioning Documentation
instillation and
venting of
fireplaces and
arrow_right APPENDIX B Checklists combustion
appliances.
APPENDIX C Sample Skills, • Mechanical and
arrow_right Knowledge and Abilities emergency
generator
APPENDIX D Commissioning equipment
arrow_right Process in the I-Codes located outside
building or locate
arrow_right APPENDIX E Resources where exposed t
exterior
environment.
Central Heating Equipment— Verify:
Breechings, Chimneys and Stacks: • Air system
• Draft control devices. balancing and a
• Draft-induction fans. means for
• Vent dampers. providing the
• Barometric dampers. system balancing
• Fabricated breechings and • Hydronic system
accessories. balancing and a
• Fabricated stacks. means for
• Gas vents. providing the
• Insulated sectional chimneys. system balancing
• Flue-gas filtration equipment. • Duct system
• Gaseous filtration. testing.
• Particulate filtration. • Mechanical
system manuals
and construction

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 87/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
documents
required by the
All Codes
clear Search Type
help O&M manual are
Title Content submitted.
Legend Information
• Functional
CODE SECTIONS MY NOTES performance
Chapter 5 Commissioning Provider
testing of HVAC
Qualifications and Selection
equipment and
associated
APPENDICES The following
controls and
appendices provide information for
arrow_right the application of the commissioning
control systems.
• Acceptance of
process.
HVAC systems
and
APPENDIX A Building
arrow_right Commissioning Documentation equipment/syste
verification repor
• Preparation and
arrow_right APPENDIX B Checklists distribution of fin
HVAC system ha
APPENDIX C Sample Skills, been completed.
arrow_right Knowledge and Abilities • Owner has bee
apprised of
APPENDIX D Commissioning construction
arrow_right Process in the I-Codes document
requirements
arrow_right APPENDIX E Resources including
drawings,
manuals,
balancing reports
and
commissioning
reports, and such
documents have
been provided.
• Air-handling
system access.
• Air-handling
system filters.
• Temperature
and humidity in
occupied spaces
• Specific indoor
air quality and

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 88/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
pollutant control
measures.
All Codes
clear Search Type
help • Listing,
Title Content instillation and
Legend Information
venting of
CODE SECTIONS MY NOTES fireplaces and
Chapter 5 Commissioning Provider
combustion
Qualifications and Selection
appliances.
• Mechanical and
APPENDICES The following
emergency
appendices provide information for
arrow_right the application of the commissioning
generator
equipment
process.
located outside
building or locate
APPENDIX A Building
arrow_right Commissioning Documentation where exposed t
exterior
environment.
arrow_right APPENDIX B Checklists
Fuel-fired Heaters: Verify:
• Fuel-fired duct heaters. • Air system
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
• Oil-fired duct heaters. balancing and a
• Gas-fired duct heaters. means for
• Gas-fired radiant heaters. providing the
APPENDIX D Commissioning
arrow_right Process in the I-Codes • Fuel-fired unit heaters.
• Oil-fired unit heaters.
system balancing
• Hydronic system
• Gas-fired unit heaters. balancing and a
arrow_right APPENDIX E Resources Furnaces: means for
• Electric-resistance furnaces. providing the
• Fuel-fired furnaces. system balancing
• Gas-fired furnaces. • Duct system
• Oil-fired furnaces. testing.
• Mechanical
Heat Exchangers for HVAC:
system manuals
• Steam-to-steam heat
and construction
exchangers, steam-to-water
documents
heat exchangers.
required by the
• Liquid-to-liquid heat
O&M manual are
exchangers.
submitted.
• Plate-type, liquid-to-liquid
• Functional
heat exchangers.
performance
• Shell-type, liquid-to-liquid
testing of HVAC
heat exchangers.
equipment and
• Direct-geo-exchange heat
associated
exchangers.
controls and
control systems.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 89/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Heating Boiler Feedwater • Acceptance of
Equipment: HVAC systems
All Codes
clear Search Type
help
• Boiler feedwater pumps. and
Title Content equipment/syste
Legend Information • De-aerators.
verification repor
Heating Boilers:
CODE SECTIONS MY NOTES • Preparation and
Chapter 5 Commissioning Provider • Electric boilers.
distribution of fin
Qualifications and Selection • Condensing boilers.
HVAC system ha
• Stainless-steel condensing
been completed.
APPENDICES The following boilers.
• Owner has bee
appendices provide information for • Aluminum condensing
arrow_right the application of the commissioning boilers.
apprised of
construction
process. • Low-mass boilers.
document
• Pulse combustion boilers.
requirements
APPENDIX A Building • Cast-iron boilers.
arrow_right Commissioning Documentation • Water-tube boilers.
including
drawings,
• Finned water-tube boilers.
manuals,
• Steel water-tube boilers.
arrow_right APPENDIX B Checklists
• Copper water-tube boilers.
balancing reports
and
• Fire-tube boilers.
APPENDIX C Sample Skills, commissioning
arrow_right Knowledge and Abilities
• Scotch marine boilers.
reports, and such
• Steel fire-tube boilers.
documents have
• Boiler blowdown systems.
APPENDIX D Commissioning been provided.
arrow_right Process in the I-Codes • Air-handling
system access.
arrow_right APPENDIX E Resources • Air-handling
system filters.
• Temperature
and humidity in
occupied spaces
• Specific indoor
air quality and
pollutant control
measures.
• Listing,
instillation and
venting of
fireplaces and
combustion
appliances.
• Mechanical and
emergency
generator
equipment

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 90/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Solar Energy Heating Equipment: located outside
• Heating solar collectors. building or locate
All Codes
clear Search Type
help
• Heating solar flat-plate where exposed t
Title Content exterior
Legend Information
collectors.
• Heating solar concentrating environment.
CODE SECTIONS MY NOTES collectors.
Chapter 5 Commissioning Provider
Qualifications and Selection • Heating solar vacuum-tube
collectors.
• Packaged solar heating
APPENDICES The following
equipment.
appendices provide information for
arrow_right the application of the commissioning Central Cooling Equipment: Verify:
process. • Refrigerant compressors. • Air system
• Centrifugal refrigerant balancing and a
APPENDIX A Building compressors. means for
arrow_right Commissioning Documentation • Noncondensable, gas-purge providing the
equipment. system balancing
• Reciprocating refrigerant • Hydronic system
arrow_right APPENDIX B Checklists compressors. balancing and a
• Scroll refrigerant means for
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
compressors. providing the
• Rotary-screw refrigerant system balancing
compressors. • Duct system
APPENDIX D Commissioning
arrow_right Process in the I-Codes • Compressor and condenser testing.
units packaged air/water- • Mechanical
cooled refrigerant compressor system manuals
arrow_right APPENDIX E Resources and condenser units. and construction
Cooling Towers: documents
• Forced-draft cooling towers. required by the
• Open-circuit, forced-draft O&M manual are
cooling towers. submitted.
• Closed-circuit, forced-draft • Functional
cooling towers. performance
• Natural-draft cooling towers. testing of HVAC
• Liquid coolers. equipment and
associated
Packaged Water Chillers
controls and
• Absorption water chillers.
control systems.
• Direct-fired absorption water
• Acceptance of
chillers.
HVAC systems
• Indirect-fired absorption water
and
chillers.
equipment/syste
• Centrifugal water chillers.
verification repor
• Air-cooled centrifugal water
• Preparation and
chillers.
distribution of fin
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 91/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
• Water-cooled centrifugal HVAC system ha
water chillers reciprocating been completed.
All Codes
clear Search Type
help water chillers. • Owner has bee
Title Content• Scroll water chillers. apprised of
Legend Information
• Rotary-screw water chillers. construction
CODE SECTIONS MY NOTES document
Chapter 5 Commissioning Provider
requirements
Qualifications and Selection
including
drawings,
APPENDICES The following
manuals,
appendices provide information for
arrow_right the application of the commissioning
balancing reports
and
process.
commissioning
reports, and such
APPENDIX A Building
arrow_right Commissioning Documentation documents have
been provided.
• Air-handling
arrow_right APPENDIX B Checklists system access.
• Air-handling
APPENDIX C Sample Skills, system filters.
arrow_right Knowledge and Abilities • Temperature
and humidity in
APPENDIX D Commissioning occupied spaces
arrow_right Process in the I-Codes • Specific indoor
air quality and

arrow_right APPENDIX E Resources pollutant control


measures.
• Listing,
instillation and
venting of
fireplaces and
combustion
appliances.
• Mechanical and
emergency
generator
equipment
located outside
building or locate
where exposed t
exterior
environment.
Thermal Storage: Verify:

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 92/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

• Chilled-water
RELATED SYSTEMS, thermal
EQUIPMENT,
!
A󰍝 Search acr… AND search
menu
Menu
storage.
ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
• Ice thermal storage. • Hydronic system
• Ice-slurry thermal storage. balancing and a
All Codes
clear Search Type
help means for
Title Content providing the
Legend Information
system balancing
CODE SECTIONS MY NOTES • Duct system
Chapter 5 Commissioning Provider
testing.
Qualifications and Selection
• Mechanical
system manuals
APPENDICES The following
and construction
appendices provide information for
arrow_right the application of the commissioning
documents
required by the
process.
O&M manual are
submitted.
APPENDIX A Building
arrow_right Commissioning Documentation • Functional
performance
testing of HVAC
arrow_right APPENDIX B Checklists equipment and
associated
APPENDIX C Sample Skills, controls and
arrow_right Knowledge and Abilities control systems.
• Acceptance of
APPENDIX D Commissioning HVAC systems
arrow_right Process in the I-Codes and
equipment/syste

arrow_right APPENDIX E Resources verification repor


• Preparation and
distribution of fin
HVAC system ha
been completed.
• Owner has bee
apprised of
construction
document
requirements
including
drawings,
manuals,
balancing reports
and
commissioning
reports, and such
documents have
been provided.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 93/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
• Air-handling
system access.
All Codes
clear Search Type
help • Air-handling
Title Content system filters.
Legend Information
• Temperature
CODE SECTIONS MY NOTES and humidity in
Chapter 5 Commissioning Provider
occupied spaces
Qualifications and Selection
• Specific indoor
air quality and
APPENDICES The following
pollutant control
appendices provide information for
arrow_right the application of the commissioning
measures.
• Listing,
process.
instillation and
venting of
APPENDIX A Building
arrow_right Commissioning Documentation
fireplaces and
combustion
appliances.
arrow_right APPENDIX B Checklists • Mechanical and
emergency
APPENDIX C Sample Skills, generator
arrow_right Knowledge and Abilities equipment
located outside
APPENDIX D Commissioning building or locate
arrow_right Process in the I-Codes where exposed t
exterior

arrow_right APPENDIX E Resources environment.


Air Outlets and Inlets: Verify:
• Diffusers, registers and • Air system
grilles. balancing
• HVAC gravity ventilators. • Hydronic system
• HVAC gravity dome balancing
ventilators. • Duct system
• HVAC gravity-louvered testing.
penthouse ventilators. • Mechanical
• HVAC gravity up-blast system manuals
ventilators. and construction
Air Terminal Units: documents
• Constant-air-volume units. required by the
• VAV units. O&M and
systems manuals
are submitted.
• Functional
performance
testing of HVAC

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 94/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Electronic Air Cleaners: equipment and
• Washable electronic air associated
All Codes
clear Search Type
help
cleaners. controls and
Title Content control systems.
Legend Information • Self-contained electronic air
cleaners. • Acceptance of
CODE SECTIONS MY NOTES HVAC systems
Chapter 5 Commissioning Provider Gas-phase Air Filtration:
and
Qualifications and Selection • Activated-carbon air filtration.
equipment/syste
• Chemically impregnated
verification repor
APPENDICES The following adsorption air filtration.
• Preparation and
appendices provide information for • Catalytic-adsorption air
arrow_right the application of the commissioning filtration.
distribution of fin
HVAC system ha
process. HVAC Air Cleaning Devices—
been completed.
Particulate Air Filtration:
• Owner has bee
APPENDIX A Building • Panel air filters.
arrow_right Commissioning Documentation • Renewable-media air filters.
apprised of
construction
• Washable air filters.
document
arrow_right APPENDIX B Checklists • Extended surface filters.
requirements
• High-efficiency particulate
including
APPENDIX C Sample Skills, filtration.
drawings,
arrow_right Knowledge and Abilities HVAC Air Distribution: manuals,
• Dampers. balancing reports
APPENDIX D Commissioning • Volume-control dampers. and
arrow_right Process in the I-Codes • Fire dampers. commissioning
• Smoke-control dampers. reports, and such
arrow_right APPENDIX E Resources • Backdraft dampers.
• Duct silencers.
documents have
been provided.
• Turning vanes. • Air-handling
• Duct- access doors. system access.
• HVAC fans. • Air-handling
• Axial HVAC fans. system filters.
• Centrifugal HVAC fans. • Temperature
• HVAC power ventilators. and humidity in
• Air curtains. occupied spaces
Special Exhaust Systems: • Specific indoor
• Dust-collection systems. air quality and
• Sawdust collection systems. pollutant control
• Engine exhaust systems. measures.
• Positive-pressure engine • Listing,
exhaust systems. instillation and
• Mechanical engine exhaust venting of
systems. fireplaces and
combustion
appliances.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 95/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Ventilation Hoods: • Mechanical and
• Commercial kitchen hoods. emergency
All Codes
clear Search Type
help
• Listed commercial kitchen generator
Title Content equipment
Legend Information hoods.
• Standard commercial kitchen located outside
CODE SECTIONS MY NOTES hoods. building or locate
Chapter 5 Commissioning Provider
• Fume hoods. where exposed t
Qualifications and Selection
exterior
environment.
APPENDICES The following
• Verify
appendices provide information for
arrow_right the application of the commissioning
compliance with
local codes.
process.
HVAC Piping and Pumps; Hydronic Verify:
APPENDIX A Building Piping and Pumps: • Installation
arrow_right Commissioning Documentation • Hydronic piping. complies with
• Underground hydronic piping. contract
• Above-ground hydronic document.
arrow_right APPENDIX B Checklists piping. • Flushing and
• Ground-loop heat-pump cleaning plan
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities piping. submitted and
• Hydronic piping specialties. approved.
• Hydronic pumps. • System properl
APPENDIX D Commissioning
arrow_right Process in the I-Codes • In-line centrifugal hydronic
pumps.
flushed and
cleaned and tem
• Base-mounted, centrifugal piping removed.
arrow_right APPENDIX E Resources hydronic pumps. • Piping pressure
• Vertical-mounted, double- tested according
suction centrifugal hydronic to contract
pumps. document.
• Vertical-turbine hydronic • Isolation valves
pump, automatic. provided at all
HVAC Water Treatment: branches and
• Water treatment for Closed- main takeoffs as
loop hydronic systems. required by the
• Water treatment for open contract
hydronic systems. documents.
• Water treatment for steam • Valves installed
system feedwater. in the proper
direction.
• Valves requiring
a positive shut-o
do not leak when
closed at normal

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 96/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personTASKS/COMMENTS
Sign In apps
Internal Combustion Engine operating
Piping: pressure.
All Codes
clear Search Type
help
• Internal combustion engine • Valves tagged
Title Content and valve
Legend Information remote-radiator coolant piping.
• Internal combustion engine schedule
CODE SECTIONS MY NOTES exhaust piping. submitted and
Chapter 5 Commissioning Provider
displayed per
Qualifications and Selection Refrigerant Piping:
contract
• Refrigerant piping valves.
documents.
APPENDICES The following • Refrigerant piping specialties.
• Temperature,
appendices provide information for • Refrigerant safety relief valve
arrow_right the application of the commissioning discharge piping.
pressure and flow
gauges and
process. • Refrigerants.
sensors installed
Steam and Condensate Piping and
• Piping gauges,
APPENDIX A Building Pumps:
arrow_right Commissioning Documentation • Steam and condensate pump
BAS and
associated pane
units.
temperature and
arrow_right APPENDIX B Checklists • Steam and condensate
pressure readou
heating piping.
match
APPENDIX C Sample Skills, • Steam and condensate
arrow_right Knowledge and Abilities heating piping specialties.
• Steam condensate pumps.
APPENDIX D Commissioning • Electric-driven steam
arrow_right Process in the I-Codes condensate pumps.
• Pressure-powered steam
condensate pumps.
arrow_right APPENDIX E Resources
B2.5 Energy—Lighting and Electrical Systems

RELATED SYSTEMS, EQUIPMENT,


ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
Lighting and Electrical:
• Automatic demand-reduction • Verify devices
control system functionality. installed per
• Plug load controls. manufacturer’s
instructions and
• Connection of appliances to
specifications
switched receptacles.
• Verification of transformer
nameplate efficiency.
• Lamps (lighting installations).
• Ballasts (lighting
installations).

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 97/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Lighting control systems (low • Verify a
voltage). representative
All Codes
clear Search Type
help
sample of
Title Content
Legend Information zones for
sweep warning
CODE SECTIONS MY NOTES effectiveness,
Chapter 5 Commissioning Provider
Qualifications and Selection override
capability and
zone size.
APPENDICES The following
• Test accuracy
appendices provide information for
arrow_right the application of the commissioning of schedule,
process. sweep warning
system and
sweep override
APPENDIX A Building
arrow_right Commissioning Documentation
switches.
• Automatic daylight • Verify
harvesting. photosensors
arrow_right APPENDIX B Checklists are properly
placed and
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities aimed.
• Verify daylight
control zones
APPENDIX D Commissioning
arrow_right Process in the I-Codes correspond to
available
daylight.
arrow_right APPENDIX E Resources
• Calibrate
dimming set
points without
the presence of
daylighting.
• Calibrate
dimming gain in
presence of
daylighting.
• Calibrate
switching dead-
bands and set
points.
• Performance
test a
representative
sample of
daylight zones.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 98/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Occupancy and vacancy • Calibrate
sensors. sensitivity
All Codes
clear Search Type
help
sensor and
Title Content
Legend Information time delay
adjustment.
CODE SECTIONS MY NOTES • Performance
Chapter 5 Commissioning Provider
Qualifications and Selection test a
representative
sample of
APPENDICES The following
control zones,
appendices provide information for
arrow_right the application of the commissioning including entry
process. tests, hand-
motion tests
and perimeter
APPENDIX A Building
arrow_right Commissioning Documentation
tests.
Optional Items:

arrow_right APPENDIX B Checklists Medium-voltage: • Verify


• Substations. coordination
APPENDIX C Sample Skills, • Switches. study is
arrow_right Knowledge and Abilities • Circuit breakers. complete, and
• Switchgear. that breaker
APPENDIX D Commissioning • Switchboards. and relay
arrow_right Process in the I-Codes • Panel boards. settings are set
• Emergency systems. in accordance
with the study.
arrow_right APPENDIX E Resources • Witness
factory tests, as
appropriate.
• Ensure all
necessary
representatives
are present
(e.g., installer,
factory
representative).
• Review start-
up checklist.
• Test
transformers.
• Test
protective
devices.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-p… 99/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Test control
circuits (e.g.,
All Codes
clear Search Type
help potential
Title Content transformers
Legend Information
and current
CODE SECTIONS MY NOTES transformers).
Chapter 5 Commissioning Provider
• Test
Qualifications and Selection
switchgear
(e.g., electrical
APPENDICES The following
and mechanical
appendices provide information for
arrow_right the application of the commissioning
operations).
• Test circuit
process.
breakers.
• Local
APPENDIX A Building
arrow_right Commissioning Documentation operational
tests.
• Remote
arrow_right APPENDIX B Checklists
operational
tests, if
APPENDIX C Sample Skills, applicable.
arrow_right Knowledge and Abilities • Verify training
of operating
APPENDIX D Commissioning personnel for
arrow_right Process in the I-Codes O&M of
equipment.
arrow_right APPENDIX E Resources Low-voltage: • Verify
• Substations. coordination
• Disconnects. study is
• Circuit breakers. complete, and
• Motor control centers. that breaker
• Panel boards. and relay
• Emergency systems. settings are set
in accordance
with the study.
• Witness
factory tests, as
appropriate.
• Ensure all
necessary
representatives
are present
(e.g., installer,
factory
representative).

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 100/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Review start-
up checklist.
All Codes
clear Search Type
help • Test
Title Content transformers.
Legend Information
• Test
CODE SECTIONS MY NOTES protective
Chapter 5 Commissioning Provider
devices (e.g.,
Qualifications and Selection
potential
transformers
APPENDICES The following
and current
appendices provide information for
arrow_right the application of the commissioning
transformers).
• Test control
process.
circuits.
• Test
APPENDIX A Building
arrow_right Commissioning Documentation switchgear
(e.g., electrical
and mechanical
arrow_right APPENDIX B Checklists operations.
• Test circuit
APPENDIX C Sample Skills, breakers.
arrow_right Knowledge and Abilities • Local
operational
APPENDIX D Commissioning tests.
arrow_right Process in the I-Codes • Remote
operational

arrow_right APPENDIX E Resources tests, if


applicable.
• Verify training
of operating
personnel for
O&M of
equipment.
Motors, motor starters and drives • Witnessing of
(VFD). factory tests, as
appropriate.
• Ensure all
necessary
representatives
are present,
e.g., installer,
factory
representative,
etc.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 101/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Review start-
up checklist.
All Codes
clear Search Type
help • Verify motor
Title Content and starter data
Legend Information
match
CODE SECTIONS MY NOTES specification
Chapter 5 Commissioning Provider
and each other.
Qualifications and Selection
• Inspect the
installation.
APPENDICES The following
• Take voltage
appendices provide information for
arrow_right the application of the commissioning
and current
reading;
process.
compare with
nameplate and
APPENDIX A Building
arrow_right Commissioning Documentation manufacture’s
specifications.
• Test for
arrow_right APPENDIX B Checklists proper motor
rotation; if VFD,
APPENDIX C Sample Skills, verify proper
arrow_right Knowledge and Abilities motor rotation
when in VFD
APPENDIX D Commissioning bypass mode.
arrow_right Process in the I-Codes • Conduct local
operational

arrow_right APPENDIX E Resources tests.


• Conduct
remote
operational
tests, if
applicable.
• Verify training
of operating
personnel for
O&M of
equipment.
• Monitor
operations.
Emergency generators and • Verify
distribution systems. coordination
study is
complete, and
that breaker
and relay

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 102/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
settings are set
in accordance
All Codes
clear Search Type
help with the study.
Title Content • Witness
Legend Information
factory tests, as
CODE SECTIONS MY NOTES appropriate.
Chapter 5 Commissioning Provider
• Ensure all
Qualifications and Selection
necessary
representatives
APPENDICES The following
are present
appendices provide information for
arrow_right the application of the commissioning
(e.g., installer,
factory
process.
representative).
• Review start-
APPENDIX A Building
arrow_right Commissioning Documentation
up checklist
and factory
commissioning
arrow_right APPENDIX B Checklists plan.
• Inspect the
APPENDIX C Sample Skills, installation.
arrow_right Knowledge and Abilities • Follow factory
commissioning
APPENDIX D Commissioning plan.
arrow_right Process in the I-Codes • Conduct local
operational

arrow_right APPENDIX E Resources tests.


• Conduct
remote
operational
tests, if
applicable.
• Conduct load
and duration
tests
(increasing
loads over
increasing
durations).
• Verify training
of operating
personnel for
O&M of
equipment.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 103/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Monitor
operation.
All Codes
clear Search Type
help
UPS. • Witness
Title Content
Legend Information factory tests, as
appropriate.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider • Ensure all
Qualifications and Selection necessary
representatives
are present
APPENDICES The following
appendices provide information for (e.g., installer,
arrow_right the application of the commissioning factory
process. representative).
• Review start-
up checklist
APPENDIX A Building
arrow_right Commissioning Documentation and factory
commissioning
plan.
arrow_right APPENDIX B Checklists • Inspect the
installation.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Follow factory
commissioning
plans (transfer
APPENDIX D Commissioning
arrow_right Process in the I-Codes
testing, to
generator, to
bypass, to
arrow_right APPENDIX E Resources maintenance
bypass, etc.).
• Verify training
of operating
personnel for
O&M of
equipment.
• Monitor
operation.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 104/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Grounding equipment and building • See IEEE 81.
grounding systems. • Ensure all
All Codes
clear Search Type
help
necessary
Title Content
Legend Information
representatives
are present
CODE SECTIONS MY NOTES (e.g., installer,
Chapter 5 Commissioning Provider
Qualifications and Selection factory
representative).
• Inspect the
APPENDICES The following
installation.
appendices provide information for
arrow_right the application of the commissioning
• Verify training
process. of operating
personnel for
O&M of
APPENDIX A Building
arrow_right Commissioning Documentation
equipment.
Lightning protection equipment and • Ensure all
systems. necessary
arrow_right APPENDIX B Checklists representatives
are present
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities (e.g., installer,
factory
representative).
APPENDIX D Commissioning
arrow_right Process in the I-Codes
• Inspect the
installation.
• Ensure
arrow_right APPENDIX E Resources
installer is
listed by UL,
and that a
master label
application is
submitted to UL
for the
installation.
• Ensure owner
signs the
master label
application.
• Ensure
receipt of
master label
from the
installer.
• Place master
label on the
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 105/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
protected
structure, as
All Codes
clear Search Type
help requested.
Title Content • Take voltage
Legend Information
and current
CODE SECTIONS MY NOTES reading;
Chapter 5 Commissioning Provider
compare with
Qualifications and Selection
nameplate and
manufacture’s
APPENDICES The following
specifications.
appendices provide information for
arrow_right the application of the commissioning
• Test for
proper motor
process.
rotation; if VFD,
verify proper
APPENDIX A Building
arrow_right Commissioning Documentation
motor rotation
when in VFD
bypass mode.
arrow_right APPENDIX B Checklists • Verify training
of operating
APPENDIX C Sample Skills, personnel for
arrow_right Knowledge and Abilities O&M of
equipment.
APPENDIX D Commissioning • Monitor
arrow_right Process in the I-Codes operation.

arrow_right APPENDIX E Resources B2.6 Energy—Other Electrical and Communication


Systems (Telecom, Intercom, Public Address,
Television, Video, etc.)

RELATED SYSTEMS, EQUIPMENT,


ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
Optional items:
Medium-voltage: • Verify
• Transformers. coordination
• Substations. study is
• Switches. complete, and
• Circuit breakers. that breaker,
• Switchgear. fuse and relay
• Switchboards. settings are set
• Panel boards. in accordance
• Emergency systems. with the study.
• Witness
factory tests, as

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 106/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
appropriate.
• Ensure all
All Codes
clear Search Type
help necessary
Title Content representatives
Legend Information
are present
CODE SECTIONS MY NOTES (e.g., installer,
Chapter 5 Commissioning Provider
factory
Qualifications and Selection
representative).
• Review start-
APPENDICES The following
up checklist.
appendices provide information for
arrow_right the application of the commissioning
• Test
transformers.
process.
• Test
protective
APPENDIX A Building
arrow_right Commissioning Documentation
devices.
• Test control
circuits (e.g.,
arrow_right APPENDIX B Checklists
potential
transformers
APPENDIX C Sample Skills, and current
arrow_right Knowledge and Abilities transformers).
• Test
APPENDIX D Commissioning switchgear
arrow_right Process in the I-Codes (e.g., electrical
and mechanical
arrow_right APPENDIX E Resources operation).
• Test circuit
breakers.
• Conduct local
operational
tests.
• Conduct
remote
operational
tests, if
applicable.
• Test all
mechanical
connections
using an
infrared camera
after initial
energizing and
after the

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 107/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
system is
loaded.
All Codes
clear Search Type
help • Verify training
Title Content of operating
Legend Information
personnel for
CODE SECTIONS MY NOTES O&M of
Chapter 5 Commissioning Provider
equipment.
Qualifications and Selection
Low-voltage: • Verify
APPENDICES The following • Transformers. coordination
appendices provide information for • Substations. study is
arrow_right the application of the commissioning • Disconnects. complete, and
process. • Bus duct. that breaker,
• Circuit breakers (air circuit fuse and relay
APPENDIX A Building breakers not molded case settings are set
arrow_right Commissioning Documentation circuit breakers). in accordance
• Motor control centers. with the study.
• Panel boards. • Witness
arrow_right APPENDIX B Checklists • Emergency systems. factory tests, as
appropriate.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
• Ensure all
necessary
representatives
APPENDIX D Commissioning
arrow_right Process in the I-Codes are present
(e.g., installer,
factory
arrow_right APPENDIX E Resources representative).
• Review start-
up checklist.
• Test
transformers.
• Test
protective
devices (e.g.,
potential
transformers
and current
transformers).
• Test control
circuits.
• Test
switchgear
(e.g., electrical
and mechanical
operation).

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 108/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
• Test circuit
breakers.
All Codes
clear Search Type
help • Conduct local
Title Content operational
Legend Information
tests.
CODE SECTIONS MY NOTES • Conduct
Chapter 5 Commissioning Provider
remote
Qualifications and Selection
operational
tests, if
APPENDICES The following
applicable.
appendices provide information for
arrow_right the application of the commissioning
• Test all
mechanical
process.
connections
using an
APPENDIX A Building
arrow_right Commissioning Documentation infrared camera
after initial
energizing and
arrow_right APPENDIX B Checklists
after the
system is
APPENDIX C Sample Skills, loaded.
arrow_right Knowledge and Abilities • Verify training
of operating
APPENDIX D Commissioning personnel for
arrow_right Process in the I-Codes O&M of
equipment.
arrow_right APPENDIX E Resources Motors, motor starters and drives • Witness
(VFD). factory tests, as
appropriate.
• Ensure all
necessary
representatives
are present
(e.g., installer,
factory
representative).
• Review start-
up checklist.
• Verify motor
and starter data
match
specification
and each other.
• Inspect the
installation.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 109/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
• Take voltage
and current
All Codes
clear Search Type
help reading,
Title Content compare with
Legend Information
nameplate and
CODE SECTIONS MY NOTES manufacturer’s
Chapter 5 Commissioning Provider
specifications.
Qualifications and Selection
• Test for
proper motor
APPENDICES The following
rotation; if VFD,
appendices provide information for
arrow_right the application of the commissioning
verify motor
proper motor
process.
rotation when
in VFD bypass
APPENDIX A Building
arrow_right Commissioning Documentation mode.
• Conduct local
operational
arrow_right APPENDIX B Checklists
tests.
• Conduct
APPENDIX C Sample Skills, remote
arrow_right Knowledge and Abilities operational
tests, if
APPENDIX D Commissioning applicable.
arrow_right Process in the I-Codes • Verify training
of operating
arrow_right APPENDIX E Resources personnel for
O&M of
equipment.
• Monitor
operation.
Emergency generators and • Verify
distribution systems. coordination
study is
complete, and
that breaker,
fuse and relay
settings are set
in accordance
with the study.
• Witness
factory tests, as
appropriate.
• Ensure all
necessary

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 110/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
representatives
are present
All Codes
clear Search Type
help (e.g., installer,
Title Content factory
Legend Information
representative).
CODE SECTIONS MY NOTES • Review start-
Chapter 5 Commissioning Provider
up checklist
Qualifications and Selection
and factory
commissioning
APPENDICES The following
plan.
appendices provide information for
arrow_right the application of the commissioning
• Inspect the
installation.
process.
• Follow factory
commissioning
APPENDIX A Building
arrow_right Commissioning Documentation plan.
• Conduct local
operational
arrow_right APPENDIX B Checklists tests.
• Conduct
APPENDIX C Sample Skills, remote
arrow_right Knowledge and Abilities operational
tests, if
APPENDIX D Commissioning applicable.
arrow_right Process in the I-Codes • Test all
mechanical
arrow_right APPENDIX E Resources connections
using an
infrared camera
after initial
energizing and
after the
system is
loaded.
• Conduct load
and duration
tests
(increasing
loads over
increasing
durations).
• Verify training
of operating
personnel for

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 111/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
O&M of
equipment.
All Codes
clear Search Type
help • Monitor
Title Content operation.
Legend Information

CODE SECTIONS MY NOTES


Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning
process.

APPENDIX A Building
arrow_right Commissioning Documentation

arrow_right APPENDIX B Checklists


APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
APPENDIX D Commissioning
arrow_right Process in the I-Codes

arrow_right APPENDIX E Resources

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 112/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
UPS. • Witness
factory tests, as
All Codes
clear Search Type
help
appropriate.
Title Content
Legend Information
• Ensure all
necessary
CODE SECTIONS MY NOTES representatives
Chapter 5 Commissioning Provider
Qualifications and Selection are present
(e.g., installer,
factory
APPENDICES The following
representative).
appendices provide information for
arrow_right the application of the commissioning
• Review start-
process. up checklist
and factory
commissioning
APPENDIX A Building
arrow_right Commissioning Documentation plan.
• Inspect the
installation.
arrow_right APPENDIX B Checklists • Follow factory
commissioning
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities plans (transfer
testing, to
generator, to
APPENDIX D Commissioning bypass, to
arrow_right Process in the I-Codes maintenance
bypass, etc.).
arrow_right APPENDIX E Resources • Test all
mechanical
connections
using an
infrared camera
after initial
energizing and
after the
system is
loaded.
• Verify training
of operating
personnel for
O&M of
equipment.
• Monitor
operation.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 113/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
Grounding equipment and building • Ensure all
grounding systems. necessary
All Codes
clear Search Type
help
representatives
Title Content
Legend Information
are present
(e.g., installer,
CODE SECTIONS MY NOTES factory
Chapter 5 Commissioning Provider
Qualifications and Selection representative).
• Inspect the
installation.
APPENDICES The following
• Verify training
appendices provide information for
arrow_right the application of the commissioning
of operating
process. personnel for
O&M of
equipment.
APPENDIX A Building
arrow_right Commissioning Documentation Lightning protection equipment • Ensure all
and systems. necessary
representatives
arrow_right APPENDIX B Checklists are present
(e.g., installer,
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities factory
representative).
• Inspect the
APPENDIX D Commissioning
arrow_right Process in the I-Codes
installation.
• Ensure
installer is
arrow_right APPENDIX E Resources
listed by UL
and that a
master label
application is
submitted to UL
for the
installation.
• Ensure
building owner
signs the
master label
application.
• Ensure
receipt of
master label
from the
installer.
• Place master
label on the
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 114/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝
menu
Menu
Search acr…AND COMPONENTS
ASSEMBLIES search supervised_user_circle person
Sign In
TASKS/COMMENTS apps
protected
structure, as
All Codes
clear Search Type
help requested.
Title Content • Take voltage
Legend Information
and current
CODE SECTIONS MY NOTES reading,
Chapter 5 Commissioning Provider
compare with
Qualifications and Selection
nameplate and
manufactures
APPENDICES The following
specifications.
appendices provide information for
arrow_right the application of the commissioning
• Test for
proper motor
process.
rotation; if VFD,
verify proper
APPENDIX A Building
arrow_right Commissioning Documentation
motor rotation
when in VFD
bypass mode.
arrow_right APPENDIX B Checklists • Verify training
of operating
APPENDIX C Sample Skills, personnel for
arrow_right Knowledge and Abilities O&M of
equipment.
APPENDIX D Commissioning • Monitor
arrow_right Process in the I-Codes operation.

arrow_right APPENDIX E Resources B2.7 Water—Plumbing Systems (Water


Distribution, Sanitary/Storm Water, Rainwater,
Graywater, etc.)

RELATED SYSTEMS, EQUIPMENT,


ASSEMBLIES AND COMPONENTS TASKS/COMME
Verify:
• In complianc
Facility Water Distribution Piping:
contract docum
• Domestic water piping.
• Flushing and
• Domestic water piping
cleaning plan
specialties.
submitted and
• Domestic water pumps.
approved.
• Domestic water-packaged
• Piping press
booster pumps.
tested accordi
contract docum

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 115/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Facility potable-water-storage tanks. • Installed in
compliance wi
All Codes
clear Search Type
help
contract docum
Title Content
Legend Information Facility Sanitary Sewerage: Verify:
• Sanitary waste piping • In complianc
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider specialties. contract docum
Qualifications and Selection • Sanitary drains. • Flushing and
• Fats, oils and grease disposal cleaning plan
APPENDICES The following systems. submitted and
appendices provide information for • Grease removal devices. approved.
arrow_right the application of the commissioning • Backwater valves. • System prop
process. • Air admittance valves. flushed and cl
• Sanitary waste interceptors and and temp pipin
APPENDIX A Building separators. removed.
arrow_right Commissioning Documentation • Sanitary sewerage pumps. • Piping press
• Wet pit-mounted, vertical tested accordi
sewerage pumps. contract docum
arrow_right APPENDIX B Checklists • Submersible sewerage pumps.
• Sewerage pump basins and
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities pits.
• Facility septic tanks.
• Facility gray water tanks.
APPENDIX D Commissioning
arrow_right Process in the I-Codes

arrow_right APPENDIX E Resources

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 116/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Facility Storm Drainage: Verify:
• Facility storm drainage piping. • In complianc
All Codes
clear Search Type
help
• Sump pump discharge piping. contract docum
Title Content
Legend Information
• Sump pumps. • Flushing and
• Submersible sump pumps. cleaning plan
CODE SECTIONS MY NOTES • Sump pump basins and pits. submitted and
Chapter 5 Commissioning Provider
Qualifications and Selection • Packaged, pedestal drainage approved.
pump units. • System prop
• Packaged, submersible flushed and cl
APPENDICES The following
drainage pump units. and temp pipin
appendices provide information for
arrow_right the application of the commissioning
• Rainwater storage tanks. removed.
process. • Piping press
tested accordi
contract docum
APPENDIX A Building
arrow_right Commissioning Documentation
• Valves instal
the proper dire
• Valves that r
arrow_right APPENDIX B Checklists positive shut-o
not leak when
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
at normal ope
pressure.
• Valves tagge
APPENDIX D Commissioning valve schedule
arrow_right Process in the I-Codes submitted and
displayed per
arrow_right APPENDIX E Resources contract docum

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 117/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Domestic Water Heat Exchangers: Verify:
• Instantaneous domestic water • Compliance
All Codes
clear Search Type
help
heat exchangers. manufacturer’
Title Content
Legend Information • Heating fluid-in-coil, recommended
instantaneous domestic water checkout and
CODE SECTIONS MY NOTES heat exchangers. procedures.
Chapter 5 Commissioning Provider
Qualifications and Selection • Domestic water-in-coil, • Manufacture
instantaneous domestic water recommended
heat exchangers. parts are prov
APPENDICES The following
• Heating fluid, instantaneous • Equipment la
appendices provide information for
arrow_right the application of the commissioning domestic water heat exchangers. permanently a
process. • Circulating, domestic water heat • Pumps in pla
exchangers. properly suppo
• Circulating, compact domestic •
APPENDIX A Building
arrow_right Commissioning Documentation
water heat exchangers. Pressure/temp
• Circulating, storage domestic relief valves in
water heat exchangers. per contract
arrow_right APPENDIX B Checklists • Noncirculating, domestic water documents.
heat exchangers. • Shaft seal is
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
• Noncirculating, storage
domestic water heat exchangers.
free.
• Insulation ins
• Domestic water brazed-plate per contract
APPENDIX D Commissioning heat exchangers. documents.
arrow_right Process in the I-Codes • Domestic water frame-and-plate • All electrical
heat exchangers. connections a
arrow_right APPENDIX E Resources • Domestic water heat reclaimers. • Grounding in
and operation
• Safeties insta
and operation
• Control syste
interlocks con
and functional
• Pump rotates
correct directio
• Temperature
pressure gaug
sensors instal
contract docum

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 118/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Domestic Water Softeners; Verify:
Domestic Water Filtration Equipment; • Compliance
All Codes
clear Search Type
help
Electric Domestic Water Heaters: manufacturer’
Title Content
Legend Information • Instantaneous electric domestic recommended
water heaters. checkout and
CODE SECTIONS MY NOTES • Flow-control, instantaneous procedures.
Chapter 5 Commissioning Provider
Qualifications and Selection electric domestic water heaters. • Manufacture
• Thermostat-control, recommended
instantaneous electric domestic parts are prov
APPENDICES The following
water heaters. • Equipment la
appendices provide information for
arrow_right the application of the commissioning • Electric domestic water heaters. permanently a
process. • Small-capacity electric domestic • Pumps in pla
water heaters. properly suppo
• Residential, storage electric •
APPENDIX A Building
arrow_right Commissioning Documentation
domestic water heaters. Pressure/temp
• Collector-to-tank, solar-electric relief valves in
domestic water heaters. per contract
arrow_right APPENDIX B Checklists • Collector-to-tank, heat- documents.
exchanger-coil, solar-electric • Shaft seal is
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
domestic water heaters.
• Light-commercial electric
free.
• Insulation ins
domestic water heaters. per contract
APPENDIX D Commissioning • Commercial domestic water documents.
arrow_right Process in the I-Codes electric booster heaters. • All electrical
• Commercial storage electric connections a
arrow_right APPENDIX E Resources domestic water heaters. • Grounding in
and operation
• Safeties insta
and operation
• Control syste
interlocks con
and functional
• Pump rotates
correct directio
• Temperature
pressure gage
sensors instal
contract docum

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 119/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Fuel-fired Domestic Water Heaters:
• Instantaneous, tankless, gas
All Codes
clear Search Type
help
domestic water heaters.
Title Content
Legend Information • Residential gas domestic water
heaters.
CODE SECTIONS MY NOTES • Residential, atmospheric, gas
Chapter 5 Commissioning Provider
Qualifications and Selection domestic water heaters.
• Residential, direct-vent, gas
domestic water heaters.
APPENDICES The following
• Residential, power-vent, gas
appendices provide information for
arrow_right the application of the commissioning domestic water heaters.
process. • Commercial gas domestic water
heaters.
• Commercial, atmospheric, gas
APPENDIX A Building
arrow_right Commissioning Documentation domestic water heaters.
• Commercial, power-burner, gas
domestic water heaters.
arrow_right APPENDIX B Checklists • Commercial, power-vent, gas
domestic water heaters.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Commercial, high-efficiency, gas
domestic water heaters.
• Commercial, coil-type, finned-
APPENDIX D Commissioning tube, gas domestic water heaters.
arrow_right Process in the I-Codes • Commercial, grid-type, finned-
tube, gas domestic water heaters.
arrow_right APPENDIX E Resources • Oil-fired domestic water
heaters.
• Large-capacity, oil-fired
domestic water heaters.
• Dual fuel-fired domestic water
heaters.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 120/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Commercial Plumbing Fixtures: Verify:
• Commercial water closets, • Installation is
All Codes
clear Search Type
help
urinals and bidets. manufacturer’
Title Content
Legend Information • Commercial water closets. instructions.
• Commercial urinals. • Pipe fittings
CODE SECTIONS MY NOTES • Commercial lavatories and complete and
Chapter 5 Commissioning Provider
Qualifications and Selection sinks. properly suppo
• Commercial lavatories. • Faucet/Flush
• Commercial sinks. handles secur
APPENDICES The following
• Commercial bathtubs. properly aligne
appendices provide information for
arrow_right the application of the commissioning • Commercial showers. • Associated tr
process. • Commercial disposers. accessories
• Wash fountains. consistent with
• Commercial faucets, supplies contract docum
APPENDIX A Building
arrow_right Commissioning Documentation and trim. • Joints betwe
• Flushometers. fixtures, walls
floors and cou
arrow_right APPENDIX B Checklists sealed.
• Insulation ins
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities per contract
documents.
• Fixtures cons
APPENDIX D Commissioning with ADA.
arrow_right Process in the I-Codes • Water pressu
meets contrac
arrow_right APPENDIX E Resources documents.
• Hot water
temperature m
contract docum
• Automatic flu
valves and se
verified for pro
operation and
sensitivity
adjustment.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 121/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Emergency Plumbing Fixtures: Verify:
• Emergency showers. • Installation is
All Codes
clear Search Type
help
• Eyewash equipment. manufacturer’
Title Content
Legend Information • Self-contained eyewash instructions.
equipment. • Water pressu
CODE SECTIONS MY NOTES meets contrac
Chapter 5 Commissioning Provider
Qualifications and Selection documents.
• Hot water
temperature m
APPENDICES The following
contract docum
appendices provide information for
arrow_right the application of the commissioning Drinking Fountains and Water Verify:
process. Coolers: • Installation is
• Drinking fountains. manufacturer’
APPENDIX A Building • Pressure water coolers. instructions.
arrow_right Commissioning Documentation • Water-station water coolers. • Water pressu
• Remote water coolers. meets contrac
documents.
arrow_right APPENDIX B Checklists • Water tempe
meets contrac
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
documents.
Fountain Plumbing Systems: Verify:
APPENDIX D Commissioning • Fountain piping. • Compliance
arrow_right Process in the I-Codes • Fountain pumps. manufacturer’
• Fountain water treatment recommended
equipment. checkout and
arrow_right APPENDIX E Resources • Fountain equipment controls. procedures.
• Manufacture
recommended
parts are prov
• Equipment la
permanently a
• Pumps in pla
properly suppo

Pressure/temp
relief valves in
per contract
documents.
• Shaft seal is
free.
• Insulation ins
per contract
documents.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 122/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… ANDsearch
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle personSignTASKS/COMME
In apps
Swimming Pool Plumbing Systems: • All electrical
• Swimming pool pumps. connections a
All Codes
clear Search Type
help
• Swimming pool water treatment • Grounding in
Title Content and operation
Legend Information
equipment.
• Swimming pool equipment • Safeties insta
CODE SECTIONS MY NOTES controls. and operation
Chapter 5 Commissioning Provider
• Control syste
Qualifications and Selection
interlocks con
and functional
APPENDICES The following
• Pump rotates
appendices provide information for
arrow_right the application of the commissioning
correct directio

process.

B2.8 Indoor Environmental Quality


APPENDIX A Building
arrow_right Commissioning Documentation
For IEQ requirements for individual systems
see:

arrow_right APPENDIX B Checklists ☑ Section B2.4, Energy—HVAC


systems.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
Optional systems:

☑ Section B2.2, Materials


APPENDIX D Commissioning (Architectural Building Assembly).
arrow_right Process in the I-Codes
B2.9 Water-Based Fire Protection Systems
arrow_right APPENDIX E Resources
RELATED SYSTEMS, EQUIPMENT,
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
General: Person must be
familiar with the
governing laws,
codes, regulations, or
standards.
• Building permit and building Verify type of system
inspection record on site. to be installed in
accordance with
governing laws,
codes, regulations, or
standards and the
owner.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 123/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Approved fire sprinkler Commissioning
plans/shop drawings, hydraulic provider shall be
All Codes
clear Search Type
help
calculations and architectural proficient in all
Title Content
Legend Information
plans shall be on site. applicable codes.
See NFPA 3, NFPA 4,
CODE SECTIONS MY NOTES NFPA 12, NFPA 12A,
Chapter 5 Commissioning Provider
Qualifications and Selection NFPA 13, NFPA 13D,
NFPA 13R, NFPA 14,
NFPA 15, NFPA 16,
APPENDICES The following
NFPA 17, NFPA 17A,
appendices provide information for
arrow_right the application of the commissioning
NFPA 20, NFPA 22,
process. NFPA 24, NFPA 25,
NFPA 30, NFPA 30B,
NFPA 33, NFPA 45,
APPENDIX A Building
arrow_right Commissioning Documentation
NFPA 54, NFPA 90A,
NFPA 90B, NFPA 92,
NFPA 96, NFPA 211,
arrow_right APPENDIX B Checklists NFPA 214, NFPA
307, NFPA 409,
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
NFPA 750, NFPA
853, and NFPA 2001.
• All materials and equipment. Verify all materials
APPENDIX D Commissioning
arrow_right Process in the I-Codes
and equipment used
are listed and
approved in
arrow_right APPENDIX E Resources
accordance with the
owner’s needs as
well as governing
laws, codes,
regulations or
standard.
Overhead piping: See NFPA 13,
Standard for the
Installation of
Sprinkler Systems.
• All piping. Witness hydrostatic
test for all piping
systems.
• Pipe sizing. Verify pipe sizes are
in accordance with
the approved plans.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 124/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Sprinklers. Verify sprinkler
spacing and positions
All Codes
clear Search Type
help
are in accordance
Title Content
Legend Information
with the approved
plans, listing and
CODE SECTIONS MY NOTES locally adopted
Chapter 5 Commissioning Provider
Qualifications and Selection codes.
• Hangers. Verify spacing is in
APPENDICES The following accordance with the
appendices provide information for approved plans and
arrow_right the application of the commissioning listing.
process. • Seismic bracing. Verify spacing is in
accordance with the
APPENDIX A Building approved plans and
arrow_right Commissioning Documentation listing.
• Branch line supports Verify spacing is in
arrow_right APPENDIX B Checklists accordance with the
approved plans.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Flow switches. Verify location, listing
and operation.
• Inspector’s test connection. Witness operation
APPENDIX D Commissioning
arrow_right Process in the I-Codes
and verify
annunciation of alarm
in required time.
arrow_right APPENDIX E Resources
• Sprinkler control valves and Witness operation
tamper switches. and verify
annunciation of alarm
in required time.
• Sprinkler Fire Alarm control Witness operation
panel indication. and verify
annunciation of alarm
in required time.
• Drainage for riser drain and Verify drain pipe size.
inspector’s test.
Underground Piping: See NFPA 24,
Standard for the
Installation of Private
Fire Service Mains.
• Underground pipe. Witness hydrostatic
test for all piping.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 125/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Pipe size. Verify pipe size
installed in
All Codes
clear Search Type
help
accordance with the
Title Content
Legend Information
approved plans, and
in accordance with
CODE SECTIONS MY NOTES the owner’s project
Chapter 5 Commissioning Provider
Qualifications and Selection documents as well as
governing laws,
codes, regulations or
APPENDICES The following
standard.
appendices provide information for
arrow_right the application of the commissioning • Depth of cover. Verify pipe is installed
process. to proper depth.
• Piping restrain. Verify pipe is
APPENDIX A Building restrained properly.
arrow_right Commissioning Documentation • Fire department inlet Verify fire department
connection. connection (FDC)
arrow_right APPENDIX B Checklists piping is properly
sized.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Back flush fire department
inlet connections.
Witness flushing.

• Pipe flushing. Witness flushing.


APPENDIX D Commissioning
arrow_right Process in the I-Codes • Protection for mechanical Verify pipe is
damage. protected properly
from mechanical
arrow_right APPENDIX E Resources damage.
Standpipe Systems: See NFPA 14.
Standard for the
Installation of
Standpipe and Hose
Systems.
• Underground piping. Witness hydrostatic
test.
• Pipe sizing. Verify pipe size
installed in
accordance with the
approved plans.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 126/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Hangers. Verify hangers are
installed in
All Codes
clear Search Type
help
accordance with the
Title Content
Legend Information approved plans and
listing, and locally
CODE SECTIONS MY NOTES adopted codes.
Chapter 5 Commissioning Provider
Qualifications and Selection • Seismic bracing. Verify braces are
installed in
APPENDICES The following accordance with the
appendices provide information for approved plans and
arrow_right the application of the commissioning listing, and locally
process. adopted codes.
• Standpipe. Verify standpipe
APPENDIX A Building outlets are installed in
arrow_right Commissioning Documentation accordance with
locally adopted

arrow_right APPENDIX B Checklists codes.


• Isolation valves and access. Verify standpipe
APPENDIX C Sample Skills, outlets are installed in
arrow_right Knowledge and Abilities accordance with
locally adopted
APPENDIX D Commissioning codes.
arrow_right Process in the I-Codes • Flush and flow test. Witness test meets
flow requirements in
arrow_right APPENDIX E Resources accordance with
locally adopted
codes.
• Hose connection and Check for listing,
pressure rating. damage, leakage,
missing caps and
obstructions.
Fire Pump Systems: See NFPA 20,
Standard for the
Installation of
Stationary Pumps for
Fire Protection.
• Certified curve for the fire Obtain certified curve
pump. from pump
manufacturer.
• Fire pump identification Compare approved
number. plans and curve to
pump nameplate.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 127/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Pump room: floor drain, Verify drainage,
ventilation and rating. ventilation and rating
All Codes
clear Search Type
help
of room is adequate
Title Content
Legend Information inspection by others.
• Pipe hangers. Verify hanger location
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider in accordance with
Qualifications and Selection the approved plan
and installed in
APPENDICES The following accordance with
appendices provide information for locally adopted
arrow_right the application of the commissioning codes.
process. • Seismic bracing. Verify braces in
accordance with the
APPENDIX A Building approved plan and
arrow_right Commissioning Documentation locally adopted
codes.

arrow_right APPENDIX B Checklists • Test header outlets. Verify location pipe


size in accordance
APPENDIX C Sample Skills, with the approved
arrow_right Knowledge and Abilities plan and installed in
accordance with
APPENDIX D Commissioning locally adopted
arrow_right Process in the I-Codes codes.
• Relief valves Verify size and
arrow_right APPENDIX E Resources location in
accordance with the
approved plans and
installed in
accordance with
locally adopted
codes.
• Jockey pump. Verify suction and
discharge is installed
in correct locations in
accordance with
locally adopted
codes.
• Controller and pressure- Verify installation in
sensing piping. accordance with
locally adopted
codes.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 128/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Water Storage Tank: See NFPA 22,
Standard for Water
All Codes
clear Search Type
help
Tanks for Private Fire
Title Content
Legend Information Protection.
• Water in tank. Check water level
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider and water condition.
Qualifications and Selection • Water level alarms. Verify high- and low-
level alarms.
APPENDICES The following • Water level indicators. Verify location,
appendices provide information for
arrow_right the application of the commissioning
accuracy and
freedom of
process.
movement.
• Drain valve. Verify flow.
APPENDIX A Building
arrow_right Commissioning Documentation • Tank vent. Verify size in
accordance with the
approved plan and
arrow_right APPENDIX B Checklists vent screen.

APPENDIX C Sample Skills, • Tank overflow. Verify size in


arrow_right Knowledge and Abilities accordance with the
approved plan.
APPENDIX D Commissioning • Supervised alarms. Verify connection to a
arrow_right Process in the I-Codes constantly attended
location.

arrow_right APPENDIX E Resources • Tank exterior. Inspect exterior paint,


foundation,
supporting structure,
catwalk or ladders.
• Area around the tank. Verify it is free of
combustible storage,
trash, debris or other
materials that could
present a fire
exposure hazard.
• Expansion joints. Verify listing and
check for cracks.
Pre-action Automatic Sprinkler See NFPA 13,
Systems: Standard for the
Installation of
Sprinkler Systems.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 129/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Control valves (locked or • Verify listing.
supervised). • Verify
All Codes
clear Search Type
help
position.
Title Content
Legend Information • Water flow alarm devices. • Operate to
verify initiation
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider and receipt of
Qualifications and Selection alarm.
• Verify alarm
APPENDICES The following test valve
appendices provide information for alignment and
arrow_right the application of the commissioning tamper switch.
process. • Pre-action valve and trim. • Inspect
exterior of
APPENDIX A Building valves, gauges
arrow_right Commissioning Documentation and trim
alignment.

arrow_right APPENDIX B Checklists • Verify valve


pressure and
APPENDIX C Sample Skills, legibility of
arrow_right Knowledge and Abilities hydraulic
nameplate.
APPENDIX D Commissioning • Main drain. Conduct main drain
arrow_right Process in the I-Codes test to verify supply
(valve position).

arrow_right APPENDIX E Resources • FDC. • Verify


accessibility
and condition.
• Check for
obstructions,
and missing or
removed caps.
Deluge Sprinkler Systems: See NFPA 13,
Standard for the
Installation of
Sprinkler Systems.
• Control valves (locked or • Verify listing.
supervised). • Verify position
(open/close).

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 130/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Water flow alarms devices. • Operate to
verify initiation
All Codes
clear Search Type
help
and receipt of
Title Content
Legend Information alarm.
• Verify alarm
CODE SECTIONS MY NOTES test valve
Chapter 5 Commissioning Provider
Qualifications and Selection alignment and
tamper switch.

APPENDICES The following • FDC. • Inspect


appendices provide information for exterior of
arrow_right the application of the commissioning valves, gauges
process. and trim
alignment.
APPENDIX A Building • Verify valve
arrow_right Commissioning Documentation pressure and
legibility of
hydraulic
arrow_right APPENDIX B Checklists nameplate.

APPENDIX C Sample Skills, • Main drain. Conduct main drain


arrow_right Knowledge and Abilities test to verify supply
(valve position).
APPENDIX D Commissioning • FDC. • Verify
arrow_right Process in the I-Codes accessibility
and condition.

arrow_right APPENDIX E Resources • Check for


obstructions,
and missing or
removed caps.
Dry Pipe Automatic Sprinkler See NFPA 13,
Systems: Standard for the
Installation of
Sprinkler Systems.
• Control valves. • Verify listing.
• Verify position
(open/close).

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 131/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Water flow alarm devices. • Verify listing.
• Operate to
All Codes
clear Search Type
help
verify initiation
Title Content
Legend Information and receipt of
alarm.
CODE SECTIONS MY NOTES • Verify alarm
Chapter 5 Commissioning Provider
Qualifications and Selection test valve
alignment and
tamper switch.
APPENDICES The following
appendices provide information for • Dry pip alarm valve and trim. • Verify listing.
arrow_right the application of the commissioning • Visually
process. inspect exterior
of valves,
APPENDIX A Building gauges and
arrow_right Commissioning Documentation trim alignment.
• Verify valve
pressure and
arrow_right APPENDIX B Checklists legibility of
hydraulic
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
nameplate.
• Main drain. Conduct main drain
APPENDIX D Commissioning test to verify supply
arrow_right Process in the I-Codes (valve position).
• FDC. • Verify

arrow_right APPENDIX E Resources accessibility


and condition.
• Check for
obstructions,
and missing or
removed caps.

B2.10 Fire Alarms (See NFPA 72, National Fire


Alarm and Signaling Code)

RELATED SYSTEMS, EQUIPMENT,


ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
Approved plans. Verify plans are on
site.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 132/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Pretest sheet. Make sure forms are
completed by
All Codes
clear Search Type
help
installation
Title Content
Legend Information
contractors and field
inspectors.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Fire Alarm (FA) system. Verify permanent
Qualifications and Selection power is provided to
FA and accessory
APPENDICES The following systems.
appendices provide information for Test booklet/list of devices. Verify FA device list is
arrow_right the application of the commissioning prepared, accurate
process. and categorized by
type of device and by
APPENDIX A Building floor, and on site.
arrow_right Commissioning Documentation Approved sequence of operations. Verify the sequence
of operation is
Operating instructions posted for FA
arrow_right APPENDIX B Checklists
system.
accurate and posted
adjacent to FA panel.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities FA panels. Verify the presence of
labels that include
electrical circuit
APPENDIX D Commissioning number.
arrow_right Process in the I-Codes
FA electrical circuits. Verify that circuits
serving FA system
arrow_right APPENDIX E Resources have lock devices.
Batteries in FA system. Verify all batteries
have installation
dates.
Panel layout in fire control room. Verify that layout
accurately depicts
location of life safety
systems.
Construction of fire control room. Inspect to verify fire
control room has the
correct fire rating.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 133/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Access keys. Obtain keys for
building access; fire
All Codes
clear Search Type
help
control room and FA
Title Content
Legend Information
panels/manual pull
stations for key box. A
CODE SECTIONS MY NOTES lock box shall be
Chapter 5 Commissioning Provider
Qualifications and Selection provided at building
entrance and at fire
control room with
APPENDICES The following
required access keys.
appendices provide information for
arrow_right the application of the commissioning Matrix annunciator. Verify the annunciator
process. panel matches the
approved plans.
APPENDIX A Building Remote annunciators, if provided. Verify that
arrow_right Commissioning Documentation annunciation is
synchronized with

arrow_right APPENDIX B Checklists (matches) activated


devices.
APPENDIX C Sample Skills, Fire alarm control panel (FACP) to Verify electrical
arrow_right Knowledge and Abilities monitor connection to matrix/remote supervision of circuits
annunciators. to remote
APPENDIX D Commissioning annunciator.
arrow_right Process in the I-Codes FACP. System shall be free
of device and
arrow_right APPENDIX E Resources supervisory troubles.
FACP to monitor ground faults/power Verify that ground-
supply-battery troubles. fault power
supply/battery
troubles/notification
FACP to monitor on initiating and
circuits annunciate as
notification circuits.
trouble signals to
FACP.
FACP to monitor fire pump, water Verify that FACP
storage tank levels, fuel, emergency indicates trouble on
generator, smoke control panel non-normal status of
switch status’s supervisory signals. these systems.
FACP to monitor elevator heat shunt Verify proper
trip breaker as supervisory signal. operation to match
Primary and alternate floor elevator approved fire
recall programming. department plans.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 134/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Central Station Signaling System Verify signals from
(CSSS). FACP are properly
All Codes
clear Search Type
help
sent by CSSS to
Title Content
Legend Information
monitor company and
verify that the monitor
CODE SECTIONS MY NOTES company has correct
Chapter 5 Commissioning Provider
Qualifications and Selection jurisdictional contact.
24-hour battery test. To be performed (5 or
APPENDICES The following 15 minutes). Perform
appendices provide information for voltage check after
arrow_right the application of the commissioning discharge test.
process. Voice evacuation, where required. Test all zones,
elevators and
APPENDIX A Building stairwells to make
arrow_right Commissioning Documentation sure they operate as
indicated on the voice

arrow_right APPENDIX B Checklists evacuation panel.


Voice evacuation/notification zones Verify proper
APPENDIX C Sample Skills, shall match each other and be tested. operation.
arrow_right Knowledge and Abilities Fire-fighter communication system. Shall be tested
(sound powered,
APPENDIX D Commissioning amplified, bi-
arrow_right Process in the I-Codes directional antenna
(BDA), etc.). Test
arrow_right APPENDIX E Resources handsets and input
jacks.
Handsets. Verify proper number
of handsets is
provided for fire-
fighter
communication
system.
Initiating devices. All initiating devices
to be tested to verify
programming and
sequence of
operations. All
initiating devices to
be installed in
accordance with
NFPA 72.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 135/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Subsequent alarm/sequence of Test programming
operation. and verify sequence
All Codes
clear Search Type
help
of operation,
Title Content
Legend Information including: Fire alarm
control panel (FACP)
CODE SECTIONS MY NOTES programming,
Chapter 5 Commissioning Provider
Qualifications and Selection annunciation on
matrix annunciator,
signal sent to CSSS,
APPENDICES The following
smoke control
appendices provide information for
arrow_right the application of the commissioning activation, activation
process. of notification
devices, magnetic
door holder release,
APPENDIX A Building
arrow_right Commissioning Documentation
activation of
smoke/fire dampers,
HVAC shutdown,
arrow_right APPENDIX B Checklists audio-visual shunt,
elevator recall,
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
release of door locks
in the path of egress,
release of stairwell
APPENDIX D Commissioning door locks,
arrow_right Process in the I-Codes restoration of egress
lighting in assembly
arrow_right APPENDIX E Resources occupancies.
Duct detectors. Remote light-emitting
diodes (LEDs) for
duct detectors to be
tested.
Elevator lobby door locks. Elevator lobby door
locking systems to be
tested.
Flow devices and tamper devices. Test all water flow
devices and tampers.
Verify the correct
signal to the FACP.
Special extinguishing systems (e.g., Test
preaction and deluge systems). interaction/connection
of special
extinguishing
systems to FACP.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 136/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Inspect signage on FA panels, doors Ensure signage is in
to rooms with FA panels inside. accordance with the
All Codes
clear Search Type
help
approved plans.
Title Content
Legend Information Notification devices. Inspect correct
locations in
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider accordance with the
Qualifications and Selection approved plans.
Notification device
APPENDICES The following candela ratings to be
appendices provide information for inspected. Audibility
arrow_right the application of the commissioning and Intelligibility
process. levels to be tested for
notification devices.
APPENDIX A Building Mass notification systems. Shall be tested for
arrow_right Commissioning Documentation proper operation.

arrow_right APPENDIX B Checklists B2.11 Elevators


APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities RELATED SYSTEMS, EQUIPMENT,
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
Building permit and building Verify Documents
APPENDIX D Commissioning
arrow_right Process in the I-Codes
inspection record on site.
Approved elevator plans shall be on
site.
arrow_right APPENDIX E Resources All materials and equipment shall be
listed/approved.
Elevator speed. Verify contract speed.
Stopping zones. Verify zones with the
manufacturers testing
procedures and
specifications.
Door open speed. Measure door open
speed time.
Short hold open. Verify door operation
in accordance with
the manufacturer’s
specifications.
Interrupted ray hold. Verify operation of
door reopening
device.
Nudging hold open. Verify operation.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 137/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
Stall pressure. Measure door torque.

All Codes
clear Long hold open.
Search Type
help
Measure door-open
time in accordance
Title Content
Legend Information with the
manufacturer’s
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider specifications.
Qualifications and Selection Lanterns call notification. Verify operation of
hall lantern functions
APPENDICES The following [in accordance with
appendices provide information for the Americans with
arrow_right the application of the commissioning Disabilities Act
process. (ADA)].
Acceleration. Verify car
APPENDIX A Building
arrow_right Commissioning Documentation
acceleration
specification with the
manufacturer.
arrow_right APPENDIX B Checklists Quality of stop. Subjection to the
manufacturer’s
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities specifications.
Door operation (how smooth). Subjective to the
manufacturer’s
APPENDIX D Commissioning
arrow_right Process in the I-Codes
specifications.
Door-open buttons. Verify operation of
door-open buttons.
arrow_right APPENDIX E Resources Alarm buttons. Verify operation of
alarm buttons.
Emergency light. Verify operation of
emergency lighting.
Fire service, Phase 1. Verify operation.
Fire service, Phase 2.
Standby power.
Telephone.
Intercom.
Car lighting guarded/mounted. Car interior lighting in
accordance with
locally adopted codes
and the
manufacturer’s
specifications.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 138/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
False call cancel. If provide, verify
operation.
All Codes
clear Search Type
help
Seismic operators. Verify operation.
Title Content
Legend Information Door restriction.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider
Qualifications and Selection B2.12 Escalators

RELATED SYSTEMS, EQUIPMENT,


APPENDICES The following
ASSEMBLIES AND COMPONENTS TASKS/COMMENTS
appendices provide information for
arrow_right the application of the commissioning General: Verify Documents
process. • Building permit and building
inspection record on site.
APPENDIX A Building • Approved escalator plans
arrow_right Commissioning Documentation shall be on site.
• All materials and equipment
arrow_right APPENDIX B Checklists
shall be listed/approved.
External Evaluation:
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Handrail. Inspect condition,
tracking and
clearances.
APPENDIX D Commissioning
arrow_right Process in the I-Codes • Handrail entry devices. Inspect operation of
safety devices.

arrow_right APPENDIX E Resources • Comb-plate Inspect in accordance


condition/contrast. with the
manufacturer’s
specifications.
• Indexing of steps/alignment in Inspect in accordance
comb teeth. with the
manufacturer’s
specifications.
• Floor plates and landing Tripping hazards,
plates. lighting, mounted in
accordance with the
manufacturer’s
specifications.
• Deck. Mounted, anti-slide,
gaps and edge
hazards in
accordance with the
specifications.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 139/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Balustrade panels. Mounted in
accordance with the
All Codes
clear Search Type
help
manufacturer’s
Title Content
Legend Information specifications.
• Skirt panels. Check with locally
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider adopted codes for
Qualifications and Selection compliance with the
performance index
APPENDICES The following and the
appendices provide information for manufacturer’s
arrow_right the application of the commissioning specifications.
process. • Skirt brushes. Inspect operation of
• Emergency stop switches safety devices.
APPENDIX A Building
arrow_right Commissioning Documentation and audible alarms.
• Start switches/direction Inspect markings and
reversal. operation of safety
arrow_right APPENDIX B Checklists device.
• Comb-plate lighting. Meet illumination
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
requirements.
• Under-step demarcation Verify operation of the
APPENDIX D Commissioning lighting. demarcation
arrow_right Process in the I-Codes (minimum two green
lights).

arrow_right APPENDIX E Resources • General lighting


requirements.
Verify minimum
illumination levels [5
foot-candles (53.82
lux)].
• Steps. Check tread
clearances.
• Ride quality. Verify compliance
with the
manufacturer’s
specifications.
• Newel ends. Check for entry
guards and
operations.
• Deck barricades. Install in accordance
with locally adopted
codes: low-deck
escalators.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 140/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Ceiling guards at Verify proper
intersections. installation.
All Codes
clear Search Type
help
• Caution signage. Verify location and
Title Content
Legend Information verbiage.

CODE SECTIONS MY NOTES • Testing:


Chapter 5 Commissioning Provider
• Measured speed steps. Verify speed of steps
Qualifications and Selection
within the
manufacturer’s
APPENDICES The following specifications .
appendices provide information for
arrow_right the application of the commissioning
• Handrails. Verify speed of
process. handrail.
• Stop-slide directions, both Verify for consistency
APPENDIX A Building directions if possible—load/no with the
arrow_right Commissioning Documentation load. manufacturer’s
specifications.

arrow_right APPENDIX B Checklists • Stop-chain length—10 steps In accordance with


nose-to-nose. the manufacturer’s
APPENDIX C Sample Skills, specifications.
arrow_right Knowledge and Abilities • Handrail—speed monitoring Inspect operation of
devices. safety devices in
APPENDIX D Commissioning accordance with
arrow_right Process in the I-Codes locally adopted
codes.

arrow_right APPENDIX E Resources • Skirt-to-step clearance. Verify minimum and


maximum required
clearances.
Internal Evaluations:
• Skirt switches. Inspect operation of
• Track pressure switches. safety devices.

• Machine—lubrication, gears, In accordance with


bearings and couplings. the manufacturer’s
specifications.
• Machine area stop switches. Inspect operation of
safety devices in
accordance with
locally adopted
codes.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 141/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! RELATED SYSTEMS, EQUIPMENT,


A󰍝 Search acr… AND search
menu
Menu ASSEMBLIES COMPONENTS supervised_user_circle person Sign In apps
TASKS/COMMENTS
• Brakes. In accordance with
locally adopted codes
All Codes
clear Search Type
help
and the
Title Content
Legend Information manufacturer’s
specifications.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider • Machine break torque. Measure break
Qualifications and Selection torque.
• Handrail chain-tensioning Check tensioning
APPENDICES The following systems. devices.
appendices provide information for
arrow_right the application of the commissioning
• Handrail chain lubrication. Check automatic lube
in accordance with
process.
• Step chain lubrication. the manufacturer’s
specifications.
APPENDIX A Building
arrow_right Commissioning Documentation
• Broken drive—chain devices. Check operation of
safety devices.
• Step rollers. Check that they meet
arrow_right APPENDIX B Checklists the manufacturer’s
specifications.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities • Step up-thrust devices. Inspect operation of
safety devices.
APPENDIX D Commissioning • Pit light. Verify operation and
arrow_right Process in the I-Codes • Pit receptacle. location.

• Missing step devices. Inspect operation of


arrow_right APPENDIX E Resources safety devices.
• Pit stop switches. Inspect operation of
safety devices.
• Step guard. Verify position and
materials.
• Broken step-chain devices Inspect operation of
(step-chain tension carriage safety devices.
switches).
• Step level devices.
• Comb-step impact devices.
• Access cover switches.
• Step lateral displacement
devices.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 142/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In apps
APPENDIX C
Sample Skills, Knowledge and Abilities
All Codes
clear Search Type
help
Title Content
Legend Information

CODE SECTIONS MY NOTES


Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning
process.

APPENDIX A Building
arrow_right Commissioning Documentation

arrow_right APPENDIX B Checklists


C1.0 Commissioning Provider Skills
APPENDIX C Sample Skills, and Qualifications
arrow_right Knowledge and Abilities
The following listings include sample skills,
APPENDIX D Commissioning knowledge and abilities that Commissioning
arrow_right Process in the I-Codes Providers and inspectors should have or be
familiar with to facilitate the commissioning
arrow_right APPENDIX E Resources
process in the specific area listed.
Commissioning Providers should also be well-
versed in the tasks listed in the appropriate
subsections of Section B2.0.

C1.1 Site Development and Land Use


The CxP should have knowledge of:

☑ Landscape design and systems.


☑ Codes, standards and local
regulations pertaining to landscape
irrigation systems.
☑ Codes, standards and local
regulations pertaining to outdoor
fountains and water features.
☑ Codes, principles and practices

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 143/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! pertaining to controlling sediment,


A󰍝
erosion search
Search acr…
menu
Menu supervised_user_circle storm
and other personSign In
water apps
pollutants.
☑ Hydrology, water quality, air quality,
All Codes
clear Search Type
help
Title Content habitat conservation and site
Legend Information grading.
CODE SECTIONS MY NOTES ☑ Codes, standards and principles
Chapter 5 Commissioning Provider
Qualifications and Selection
pertaining to topography and site
grading.
APPENDICES The following ☑ Codes, standards and local
appendices provide information for regulations pertaining to
arrow_right the application of the commissioning construction waste management.
process.
☑ Codes, standards and local
regulations pertaining to heat island
APPENDIX A Building
arrow_right Commissioning Documentation mitigation.
☑ Codes, standards and local
arrow_right APPENDIX B Checklists regulations pertaining to outdoor and
site lighting.
APPENDIX C Sample Skills, ☑ Flood plain development.
arrow_right Knowledge and Abilities
The Building Official, in evaluating the CxP, may
consider one or more of the qualifications in this
APPENDIX D Commissioning
arrow_right Process in the I-Codes list:

☑ Third party certification acceptable


arrow_right APPENDIX E Resources to the AHJ
☑ State licensure or reciprocity may
not be a manufacturer of
components; may not be the
installer.
☑ Prior experience within the
landscape irrigation industry.
☑ Civil Engineer.
☑ National Pollutant Discharge
Elimination System Level 1A
Certification.
☑ Civil engineer experienced and
knowledgeable in the practice of soil
engineering (soils engineer).
☑ Professional Certification:
International Waste Manager –

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 144/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Technical Status, or equal.


A󰍝
☑ Building search
Search acr…
menu
Menu supervised_user_circleCommissioning
personSign In apps
Certifications with experience
requirements.
All Codes
clear Search Type
help
Title Content
Legend Information
C1.2 Materials (Architectural Building Assembly)
CODE SECTIONS MY NOTES The CxP should have knowledge of:
Chapter 5 Commissioning Provider
Qualifications and Selection ☑ Third-party certification acceptable
to the AHJ.
APPENDICES The following
☑ The International Building
appendices provide information for
arrow_right the application of the commissioning Code (IBC®).
®

process. ☑ Building assemblies.


☑ Architectural detailing.
APPENDIX A Building ☑ Energy codes, ASHRAE 90.1 and
arrow_right Commissioning Documentation
related standards
☑ Safety Data Sheets (SDS) and other
arrow_right APPENDIX B Checklists product verification.
APPENDIX C Sample Skills, ☑ Egress requirements.
arrow_right Knowledge and Abilities ☑ NFPA 101, Life Safety Code.
The Building Official, when evaluating the CxP,
APPENDIX D Commissioning
arrow_right Process in the I-Codes
may consider one or more of the qualifications
in this list:

arrow_right APPENDIX E Resources ☑ Licensed architect.


☑ Licensed engineer.
☑ ICC certified inspector.
☑ ICC certified CALGreen inspector.

C1.3 Energy

C1.3.1 Management and monitoring systems:


The CxP should have knowledge of:

☑ Energy policy.
☑ Codes and standards.
☑ Energy audits.
♦ Benchmarking.
♦ General audit.
♦ Investment-grade audit.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 145/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

☑ Life cycle analysis.


!
A󰍝
menu
Menu
Search acr…
☑ Energy search
supervised_user_circle
financing, personSign In
accounting apps
and economics.
All Codes
clear Search Type
help
☑ Building automation and control
Title Content systems.
Legend Information
☑ Energy procurement.
CODE SECTIONS MY NOTES ☑ Green buildings, LEED and
Chapter 5 Commissioning Provider
Qualifications and Selection Energy Star.
The Building official, in evaluating the CxP,
APPENDICES The following may consider one or more of the
appendices provide information for qualifications in this list:
arrow_right the application of the commissioning
process. ☑ Green Building Engineer
certification of Licensed
APPENDIX A Building Engineer.
arrow_right Commissioning Documentation
C1.3.2 HVAC systems:
arrow_right APPENDIX B Checklists
The CxP should have knowledge of:
APPENDIX C Sample Skills, ☑ Design and construction phase
arrow_right Knowledge and Abilities commissioning processes.
☑ Construction communication
APPENDIX D Commissioning
arrow_right Process in the I-Codes
protocol.
☑ Facility requirements.
☑ Sustainability and energy
arrow_right APPENDIX E Resources
requirements.
☑ Facility design and construction
requirements.
☑ Design conditions (climatic
conditions, room conditions,
temperature humidity levels,
pressure requirements, etc.).
☑ Design methods, techniques
and software applications.
☑ National, state and local building
codes, standards and
guidelines.
☑ Schematic, design
development, construction
phase documents.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 146/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

☑ Design of mechanical, electrical


!
A󰍝
menu
Menu search
Search acr… and plumbing
supervised_user_circle personSign In
systems. apps
☑ Electrical (power distribution,
motor control centers, power
All Codes
clear Search Type
help
Title Content monitoring, etc.).
Legend Information
☑ Building automation systems,
CODE SECTIONS MY NOTES diagrams, points and
Chapter 5 Commissioning Provider
Qualifications and Selection
sequences.
☑ Specification formats.
APPENDICES The following ☑ Commissioned systems and
appendices provide information for equipment.
arrow_right the application of the commissioning
☑ Construction submittals.
process.
☑ Installation requirements of
APPENDIX A Building mechanical, electrical and
arrow_right Commissioning Documentation plumbing (MEP) equipment and
systems.
arrow_right APPENDIX B Checklists ☑ O&M requirements.
☑ Equipment manufacturer’s start-
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
up procedures.
☑ Mechanical/electrical equipment

APPENDIX D Commissioning and system operation.


arrow_right Process in the I-Codes ☑ BAS control diagrams, points,
sequences and configuration.
arrow_right APPENDIX E Resources ☑ TAB process and procedures.
☑ O&M documentation.
☑ System manual components
and assembly.
☑ Delivery of training.
☑ The CxP should also record test
date and results, develop
trending and analysis trend
reports, and facilitate the FTP
process.
The Building Official, in evaluating the CxP,
may consider one or more of the
qualifications in this list:

☑ Licensed Engineer.
☑ An independent third-party
commissioning certification
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 147/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
program.
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In apps
C1.4 Lighting
All Codes
clear SearchThe
Type
CxP
help
should have knowledge of:
Title Content
Legend Information ☑ Skills and abilities to verify that the
systems listed are designed,
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider installed and operate as intended.
Qualifications and Selection ☑ Lighting control systems
☑ IEEE and IES standards.
APPENDICES The following
☑ NFPA 70.
appendices provide information for
arrow_right the application of the commissioning ☑ Arc flash safety requirements.
process. ☑ Lockout tag-out procedures and
medium-voltage power distribution
APPENDIX A Building
equipment and controls.
arrow_right Commissioning Documentation
☑ Motors, starters and VFDs.
☑ Generator systems and their
arrow_right APPENDIX B Checklists associated subsystems [battery
APPENDIX C Sample Skills, charging and starting; lubrication;
arrow_right Knowledge and Abilities fuel; ignition; cooling; prime-mover
engine (diesel/turbine); reduction
APPENDIX D Commissioning gear; exciter; and generator] of UPS
arrow_right Process in the I-Codes systems and their associated
subsystems (back-up generator;
arrow_right APPENDIX E Resources input/output switch gear; battery and
charging).
The Building official, in evaluating the CxP, may
consider one or more of the qualifications in this
list:

☑ Licensed Engineer.
☑ Third-party certification acceptable
to the AHJ.

C1.5 Water
The CxP should have knowledge of:

☑ Verification that the systems listed


are designed, installed and operate
as intended.
☑ Plumbing Codes.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 148/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

☑ Plumbing system design.


!
A󰍝
☑ Plumbingsearch fixture
Search acr…
menu
Menu supervised_user_circle performance
personSign In apps
criteria and testing.
All Codes
clear The Building official, when evaluating the CxP,
Search Type
help
Title mayContent
consider one or more of the qualifications
Legend Information
in this list:
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider ☑ Licensed Engineer.
Qualifications and Selection ☑ Third-party certification acceptable
to the AHJ.
APPENDICES The following
appendices provide information for
arrow_right the application of the commissioning
C1.6 Indoor Environmental Quality
process. See corresponding subsections regarding
HVAC, lighting and materials.
APPENDIX A Building
arrow_right Commissioning Documentation
C1.7 Fire Suppression Systems

arrow_right APPENDIX B Checklists The CxP should have knowledge of the


following as required for specific system
APPENDIX C Sample Skills, designed and installed:
arrow_right Knowledge and Abilities
☑ NFPA 3, Standard for
APPENDIX D Commissioning
Commissioning of Fire Protection
arrow_right Process in the I-Codes and Life Safety Systems.
☑ NFPA 4, Standard for Integrated Fire

arrow_right APPENDIX E Resources Protection and Life Safety System


Testing.
☑ NFPA 12, Standard on Carbon
Dioxide Extinguishing Systems.
☑ NFPA 12A, Standard on Halon 1301
Fire Extinguishing Systems.
☑ NFPA 13, Standard for the
Installation of Sprinkler Systems.
☑ NFPA 13D, Standard for Installation
of Sprinkler Systems in One- and
Two family Dwellings.
☑ NFPA 13R, Standard for the
Installation of Sprinkler Systems in
Group R Occupancies Four or
Fewer Stories.
☑ NFPA 14, Standard for the

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 149/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
Installation of Standpipes and Hose
A󰍝
menu
Menu Systems. search
Search acr…
supervised_user_circle
Sign In person apps
☑ NFPA 15, Standard for Water Spray
Fixed Systems for Fire Protection
All Codes
clear Search Type
help
Title ☑
Content NFPA 16, Standard for the
Legend Information
Installation of Foam-Water Sprinkler
CODE SECTIONS MY NOTES and Foam-Water Spray Systems.
Chapter 5 Commissioning Provider
Qualifications and Selection ☑ NFPA 17, Standard for Dry Chemical
Extinguishing Systems.
APPENDICES The following ☑ NFPA 17A, Standard for Wet
appendices provide information for Chemical Extinguishing Systems.
arrow_right the application of the commissioning
☑ NFPA 20, Standard for the
process.
Installation of Stationary Pumps for
APPENDIX A Building Fire Protection.
arrow_right Commissioning Documentation ☑ NFPA 22, Standard for Water Tanks
for Private Fire Protection.
arrow_right APPENDIX B Checklists ☑ NFPA 24, Standard for the
Installation of Private Fire Service
APPENDIX C Sample Skills,
Mains and their Appurtenances.
arrow_right Knowledge and Abilities
☑ NFPA 25, Standard for the
APPENDIX D Commissioning
Inspection, Testing, Maintenance of
arrow_right Process in the I-Codes Waterbased Fire Protection
Systems.
arrow_right APPENDIX E Resources ☑ NFPA 30, Flammable and
Combustible Liquids Code.
☑ NFPA 30B, Code for the
Manufacturing and Storage of
Aerosol Products.
☑ NFPA 33, Standard for Spray
Application Using Flammable or
Combustible Materials.
☑ NFPA 45, Fire Protection for
Laboratories.
☑ NFPA 54, ANSI Z223.1-2018
National Fuel Gas Code.
☑ NFPA 90A, Standard for the
Installation of Air-conditioning and
Ventilation Systems.
☑ NFPA 90B, Standard for the

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 150/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Installation of Warm Air-heating and


A󰍝
menu
Menu
Search acr… search Systems.
Airconditioning supervised_user_circle personSign In apps
☑ NFPA 92, Standard for Smoke
Control Systems.
All Codes
clear Search Type
help
Title ☑
Content NFPA 96, Standard for Ventilation
Legend Information
Control and Fire Protection of
CODE SECTIONS MY NOTES Commercial Cooking Operations.
Chapter 5 Commissioning Provider
Qualifications and Selection ☑ NFPA 211, Standard for Chimneys,
Fireplaces, Vents and Solid
APPENDICES The following Fuelburning Appliances.
appendices provide information for ☑ NFPA 214, Standard on Water-
arrow_right the application of the commissioning
cooling Towers.
process.
☑ NFPA 307, Standard for the
APPENDIX A Building Construction and Fire Protection of
arrow_right Commissioning Documentation Marine Terminals, Piers, and
Wharves.
arrow_right APPENDIX B Checklists ☑ NFPA 409, Standard on Aircraft
Hangars.
APPENDIX C Sample Skills,
☑ NFPA 750, Standard on Water Mist
arrow_right Knowledge and Abilities
Fire Protection Systems.
☑ NFPA 853, Standard for the
APPENDIX D Commissioning
arrow_right Process in the I-Codes Installation of Stationary Fuel Cell
Power Systems.
arrow_right APPENDIX E Resources ☑ NFPA 2001, Standard on Clean
Agent Fire Extinguishing Systems.
The Building Official, when evaluating the CxP,
may consider one or more of the qualifications
in this list:

☑ Licensed fire sprinkler contractor.


☑ Registered or licensed Professional
engineer in other disciplines with
knowledge of the applicable fire
protection or life safety systems
included as part of the
commissioning process.
☑ Registered or licensed Fire
Protection Engineer with knowledge
of the applicable fire protection or

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 151/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! life safety systems included as part


A󰍝
menu
Menu
Search acr… search supervised_user_circleprocess.
of the commissioning personSign In apps
☑ Third-party certification acceptable
to the AHJ.
All Codes
clear Search Type
help
Title Content
Legend Information
C1.8 Fire Alarms
CODE SECTIONS MY NOTES The CxP should have knowledge of:
Chapter 5 Commissioning Provider
Qualifications and Selection ☑ NFPA 72.
☑ NFPA 70.
APPENDICES The following
appendices provide information for
The Building Official, in evaluating the CxP, may
arrow_right the application of the commissioning consider one or more of the qualifications in this
process. list:

☑ Licensed Fire Alarm contractor.


APPENDIX A Building
arrow_right Commissioning Documentation ☑ Registered or licensed professional
engineer in other disciplines with
knowledge of the applicable fire
arrow_right APPENDIX B Checklists
protection or life safety systems
APPENDIX C Sample Skills, included as part of the
arrow_right Knowledge and Abilities commissioning process.
☑ Registered or licensed professional
APPENDIX D Commissioning
arrow_right Process in the I-Codes
Fire Protection Engineer with
knowledge of the applicable fire
protection or life safety systems
arrow_right APPENDIX E Resources included as part of the
commissioning process.

C1.9 Vertical Conveyance Systems

C1.9.1 Elevators:

The CxP should have knowledge of:


☑ ASME A17.1.
☑ ASME A17.2.
☑ ASME A17.3.
The following is a list of qualifications that
the building official may use when
evaluating the CxP:

☑ Qualified Elevator Inspector


(QEI) certification.
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 152/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

☑ Third-party license.
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In apps
C1.9.2 Escalators:
All Codes
clear The
Search Type
help
CxP should have knowledge of:
Title Content
Legend Information ☑ ASME A17.1.
☑ ASME A17.2.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider ☑ ASME A17.3.
Qualifications and Selection
☑ Speed measurements as
related to escalators.
APPENDICES The following
appendices provide information for The Building Official, when evaluating the
arrow_right the application of the commissioning CxP, may consider one or more of the
process. qualifications in this list:

☑ QEI certification.
APPENDIX A Building
arrow_right Commissioning Documentation ☑ State licensing, if applicable.

arrow_right APPENDIX B Checklists


APPENDIX D
APPENDIX C Sample Skills, Commissioning Process in the I-Codes
arrow_right Knowledge and Abilities
APPENDIX D Commissioning
arrow_right Process in the I-Codes

arrow_right APPENDIX E Resources

D1.0 ICC CODE COMMISSIONING


REQUIREMENTS

The following is a summary of the requirements


for or references to the commissioning process
in the International Codes®(I-Codes®). See the
current codes for updates and details.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 153/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

D1.1 2018 International Building Code®


!
A󰍝
menu
Menu
Search acr…
☑ The 2018 search IBC supervised_user_circle
includes personSign In
Special apps
Inspector Requirements “to verify
proper commissioning of Smoke
All Codes
clear Search Type
help
Title Content Control Systems” in Section 909.3.
Legend Information
☑ Commissioning shall be by accepted
CODE SECTIONS MY NOTES engineering practice and published
Chapter 5 Commissioning Provider
Qualifications and Selection
standards.
☑ Section 1703 notes that approved
APPENDICES The following agency qualifications include:
appendices provide information for independence, adequate calibrated
arrow_right the application of the commissioning equipment and experienced
process.
personnel.
☑ No ASHRAE Standards are
APPENDIX A Building
arrow_right Commissioning Documentation referenced.

arrow_right APPENDIX B Checklists D1.2 2018 International Mechanical Code®


☑ Section 513.3 notes that smoke
APPENDIX C Sample Skills, control systems subject to IBC
arrow_right Knowledge and Abilities
Section 909 shall undergo special
inspection to verify proper
APPENDIX D Commissioning
arrow_right Process in the I-Codes commissioning of smoke control
systems.
☑ Commissioning
arrow_right APPENDIX E Resources shall be IAW
generally accepted engineering
practice and published standards.
ASHRAE Standards referenced: 15,
34, 62.1, 170, 180.

D1.3 2018 International Fire Code®

Sections addressing acceptance testing (not full


commissioning) include:

Cx—Emergency responder radio


☑ 510.5.3
coverage system.
Re-Cx annual—Emergency
☑ 510.6.1 responder radio coverage
system.
☑ 603.1.6 Cx—Oil-burning equipment.
☑ 604.5 Cx—Emergency power systems.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 154/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

☑ 604.6.1 FRe-Cx—Emergency lighting


!
A󰍝
menu
Menu
Search acr… search supervised_user_circle
systems (monthly). Sign In person apps
☑ 606.6 Cx—Refrigeration systems.
Re-Cx—Refrigeration systems:
All Codes
clear ☑ 606.6.1
Search Type
help emergency systems.
Title Content
Legend Information ☑ 703.4 Re-Cx annual—Fire doors.
☑ 901.6.1 FCx—Carbon dioxide systems,
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider Halon 1301 systems, Dry-
Qualifications and Selection chemical fire extinguishing
systems, Wet-chemical fire
APPENDICES The following extinguishing systems, Water-
appendices provide information for based fire protection systems,
arrow_right the application of the commissioning Smoke and heat vents, Fire alarm
process. and detection systems, Water
mist systems, Clean-agent
APPENDIX A Building extinguishing systems, Stationary
arrow_right Commissioning Documentation fire pumps.
☑ 904.4.2 FCx—Fire alarm systems.
arrow_right APPENDIX B Checklists ☑ 904.4.3
FCx—Fire alarm system
monitoring service connections.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities ☑ 904.5.1
FRe-Cx—Wet chemical systems
(6-month).
FRe-Cx—Dry chemical systems
APPENDIX D Commissioning ☑ 904.6
arrow_right Process in the I-Codes
(6-month).
FRe-Cx—Foam suppression
☑ 904.7
systems (per NFPA 25).
arrow_right APPENDIX E Resources
FRe-Cx—Carbon dioxide
☑ 904.8
systems (per NFPA 12 annual).
FRe-Cx—Halon systems (per
☑ 904.9
NFPA 12A annual).
FRe-Cx—Clean agent systems
☑ 904.10
(per NFPA 2001 annual).
FRe-Cx—Water mist per
☑ 904.11.3 manufacturer’s requirements and
IFC 901.6.1.
FRe-Cx—Commercial cooking
☑ 904.12.6
systems.
☑ 905.2 FCx—Standpipes per NFPA 14.
FRe-Cx—Standpipes per NFPA
☑ 905.2
25.
FCx—Fire alarm systems per
☑ 907.7
NFPA 72.
☑ 907.8.2 FRE-Cx—Fire alarm systems per

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 155/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

NFPA 72.
!
A󰍝
menu
Menu
Search acr…
☑ 909.3 search supervised_user_circle
Sign In
FCx—Smoke control systems. person apps
☑ 909.18 FCx—Smoke control systems.
☑ 909.19 FCx—Smoke control systems.
All Codes
clear Search Type
help
FCx—Mechanical smoke removal
Title ☑ Content
910.5.2.2
Legend Information systems.

CODE SECTIONS MY NOTES FRe-Cx—Fire pumps per NFPA


Chapter 5 Commissioning Provider ☑ 915.5
25.
Qualifications and Selection
☑ 913.5.1 FCx—Fire pumps per NFPA 20.
FCx—Fuel dispenser impact
APPENDICES The following ☑ 2306.7.4
valves.
appendices provide information for
arrow_right the application of the commissioning ☑ 2306.7.4
FRe-Cx—Fuel dispenser impact
process. valves (annual).
Cx—Organic coating manufacture
☑ 2907.5
APPENDIX A Building process piping.
arrow_right Commissioning Documentation Cx—Tent, air-supported, air-
☑ 3103.7 inflated or tension membrane

arrow_right APPENDIX B Checklists structures.


☑ 3105.6 Cx—Temporary stage canopies.
APPENDIX C Sample Skills, ☑ 5003.2.9.1 Cx—Hazardous materials
arrow_right Knowledge and Abilities equipment: gas detection,
automatic shutoff valves, limit
APPENDIX D Commissioning control valves, emergency alarm
arrow_right Process in the I-Codes systems.
☑ 5003.2.9.2 ReCx—Previous list (annual).
arrow_right APPENDIX E Resources
☑ 5703.6.3
Cx—Flammable and combustible
liquid pipe systems.
Cx—Flammable and combustible
☑ 5704.2.12
liquid tanks.

D1.4 2018 International Energy Conservation


Code®
☑ Building Commissioning: A process
that verifies and documents that the
selected building systems have
been designed, have been installed,
and function according to the
owner’s project requirements and
construction documents, and to
minimum code requirements.
☑ Section C408.2 Mechanical and

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 156/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
Service Water Heating System
A󰍝
menu
Menu
Search acr… search
Commissioning supervised_user_circle Completion.
and personSign In apps
Prior to final mechanical and
plumbing inspections, the registered
All Codes
clear Search Type
help
design professional or approved
Title Content
Legend Information agency shall provide evidence of
CODE SECTIONS MY NOTES mechanical system commissioning
Chapter 5 Commissioning Provider
and completion.
Qualifications and Selection
• Excludes air conditioning
APPENDICES The following
systems less than 40 tons.
appendices provide information for • Excludes hotel room and
arrow_right the application of the commissioning apartments.
process.
☑ Construction documents must
include commissioning
APPENDIX A Building
arrow_right Commissioning Documentation
requirements.
☑ Section C408.2.1 Mechanical
Systems Commissioning.
arrow_right APPENDIX B Checklists
Commissioning Plan developed by
APPENDIX C Sample Skills, registered design professional or
arrow_right Knowledge and Abilities approved agency.
• Narrative of activities and
APPENDIX D Commissioning
arrow_right Process in the I-Codes
personnel included.
• Listing of equipment and
systems.
arrow_right APPENDIX E Resources
• Functions to be tested.
• Test conditions.
• Measurable criteria.
☑ Section C408.2.2 HVAC Systems
Test and Balance.
• Test and balance required to
accepted engineering
standards.
• Air and water flow rates
measured and adjusted to
tolerances provided in product
specifications.
• Air supply outlets and zone
terminal devices shall be

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 157/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
equipped with means for
A󰍝
menu
Menu
Search acr… search
balancing. supervised_user_circle personSign In apps
• Hydronic heating and cooling
coils shall be equipped with
All Codes
clear Search Type
help
Title Content
means for balancing and
Legend Information measuring flow.
CODE SECTIONS MY NOTES • Written test and balance report
Chapter 5 Commissioning Provider
required and:
Qualifications and Selection
♦ Should be reviewed by
APPENDICES The following Commissioning Provider.
appendices provide information for ♦ Should be included in
arrow_right the application of the commissioning Systems Manual.
process.
♦ Should be available for
review by Building
APPENDIX A Building
arrow_right Commissioning Documentation Official.
☑ Section C405.2.3 Mechanical
arrow_right APPENDIX B Checklists Systems Commissioning
• Functional Performance
APPENDIX C Sample Skills, Testing – Equipment.
arrow_right Knowledge and Abilities
♦ Installation and
operation.
APPENDIX D Commissioning
arrow_right Process in the I-Codes ♦ Sequence of operation.
♦ Maintenance

arrow_right APPENDIX E Resources serviceability.


• Controls and Economizers.
♦ Calibrated.
♦ Adjusted.
♦ Operate to approved
plans and specifications.
♦ Section C408.2.4
Preliminary
Commissioning Report
• Preliminary Commissioning
Report (by design professional
or approved agency) with
deficiencies, deferred testing
and conditions required.
• Owner shall certify receipt of
the preliminary report prior to

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 158/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
final inspection
A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In
• Code official can request a person apps
copy
☑ Section C408.2.5 Documentation
All Codes
clear Search Type
help
Title Content • Construction documents shall
Legend Information
require delivery to owner within
CODE SECTIONS MY NOTES 90 days of Certificate of
Chapter 5 Commissioning Provider
Qualifications and Selection Occupancy and shall include:
♦ Record Drawings with
APPENDICES The following performance data.
appendices provide information for ♦ Systems Manual with
arrow_right the application of the commissioning
submittals, O&M
process.
manuals, control system
APPENDIX A Building
data with sequence of
arrow_right Commissioning Documentation operation, service and
maintenance data and
arrow_right APPENDIX B Checklists schedules.
♦ Systems balancing
APPENDIX C Sample Skills, report.
arrow_right Knowledge and Abilities
♦ Final Commissioning
Report with functional
APPENDIX D Commissioning
arrow_right Process in the I-Codes and performance testing
procedures, final results,
and open issues.
arrow_right APPENDIX E Resources
☑ Section C408.3 Lighting
Commissioning
• Prior to final inspection, the
registered design professional
shall provide evidence of
lighting control system testing
including hardware and
software programming and
adjustment.
♦ Occupant sensor
controls.
♦ Time switch controls.
♦ Daylight responsive
controls.
• This evidence shall be

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 159/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

!
provided to the building official.
A󰍝
menu
Menu
Search acr… search supervised_user_circle
Sign In
• Lighting system construction person apps
documents shall require a final
report to owner within 90 days
All Codes
clear Search Type
help
Title Content
of CO (note: This report does
Legend Information not need to be presented to
CODE SECTIONS MY NOTES the building official unless
Chapter 5 Commissioning Provider
requested).
Qualifications and Selection
☑ Section C502 Additions shall comply

APPENDICES The following with new construction requirements.


appendices provide information for ☑ Section C503 Alterations shall
arrow_right the application of the commissioning comply with new construction
process.
requirements with some variations.
☑ Section C504 Repairs not normally
APPENDIX A Building
arrow_right Commissioning Documentation required to comply.
☑ Section C505 Change in Occupancy

arrow_right APPENDIX B Checklists requires IECC compliance if energy


use is increased.
APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities D1.5 2015 International Green Construction Code®
☑ Section 611: Energy System
APPENDIX D Commissioning
arrow_right Process in the I-Codes Commissioning. Prior to final
inspection, registered design

arrow_right APPENDIX E Resources professional or approved agency


shall provide evidence of system
Commissioning per IECC including:
• Construction documents
include commissioning.
• Commissioning Plan by
registered design professional
or approved agency.
• Air & hydronic systems
balancing and reports.
• Functional and performance
testing.
• Documentation – O&M.
• Preliminary commissioning
report with written owner letter
acknowledging receipt.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 160/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

• Lighting and building enclosure


!
A󰍝
menu
Menu
Search acr… search supervised_user_circle
commissioning included.Sign In person apps
• Final Commissioning Report at
project completion.
All Codes
clear Search Type
help
Title ☑
Content Section 902 – Special Inspection
Legend Information
and Commissioning.
CODE SECTIONS MY NOTES • The registered design
Chapter 5 Commissioning Provider
Qualifications and Selection professional in responsible
charge or approved agency
APPENDICES The following shall perform commissioning
appendices provide information for during construction and after
arrow_right the application of the commissioning occupancy per Table 902.1.
process.
• Approved agency (AHJ to
approve qualifications):
APPENDIX A Building
arrow_right Commissioning Documentation ♦ Objective, competent
and independent from
arrow_right APPENDIX B Checklists contractor.
♦ Adequate, calibrated
APPENDIX C Sample Skills, cquipment.
arrow_right Knowledge and Abilities
♦ Experienced, educated
personnel.
APPENDIX D Commissioning
arrow_right Process in the I-Codes ☑ Section 902 – Special inspection
and Commissioning includes detail

arrow_right APPENDIX E Resources requirements on:


• Commissioning plan.
• Pre-certificate of Occupancy
Report.
• Commissioning performance
requirements.
• Final commissioning report.
• Systems Manual.
• Record documents.
☑ Table 902.1 Commissioning Plan
includes:
• List of construction or systems
requiring inspection,
verification and commissioning
of all the building systems in
IgCC plus other items.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 161/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

• Methods and
!
A󰍝
menu
Menu
Search acr… search supervised_user_circle personSign In
occurrence/scheduling. apps

All Codes
clear Search Type
help
Title Content APPENDIX E

Legend Information
Resources
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider
Qualifications and Selection

APPENDICES The following


appendices provide information for
arrow_right the application of the commissioning
process.

APPENDIX A Building
arrow_right Commissioning Documentation

arrow_right APPENDIX B Checklists


APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
E1.0 INDUSTRY COMMISSIONING
APPENDIX D Commissioning RESOURCES (Reference ASHRAE
arrow_right Process in the I-Codes Standard 202)

arrow_right APPENDIX E Resources The following publications and organizations


can provide additional guidance on the
commissioning process:

Publications

ASHRAE Standard 202-2013, The


Commissioning Process for Buildings and
Systems.

ASHRAE Guideline 0-2013, The Commissioning


Process. Atlanta:
ASHRAE Guideline 0.2-2016, Commissioning
Process for Existing Buildings and Systems.
Atlanta:

ASHRAE Guideline 1.1-2007, HVAC&R


Technical Requirements for The Commissioning
Process.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 162/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! ASHRAE Guideline 1.2-2018, Commissioning


A󰍝
menu
Menu
Search acr… search
Process for Existing HVAC&R supervised_user_circle
Systems. personAtlanta:
Sign In apps
ASHRAE
All Codes
clear SearchASHRAE
Type
help Guideline 1.3-2018, Building
Title Operation
Content and Maintenance Training for the
Legend Information
HVAC&R Commissioning Process.
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider ASHRAE Guideline 1.4-2014, Preparing
Qualifications and Selection Systems Manuals for Facilities.

ASHRAE Guideline 1.5-2017, The


APPENDICES The following
appendices provide information for Commissioning Process for Smoke Control
arrow_right the application of the commissioning Systems.
process.
ASHRAE 2015. ASHRAE Handbook—HVAC
Applications, Chapter 43, HVAC
APPENDIX A Building
arrow_right Commissioning Documentation Commissioning.

Organizations
arrow_right APPENDIX B Checklists The following organization and agencies have
APPENDIX C Sample Skills,
produced publications and resources relating to
arrow_right Knowledge and Abilities the Commissioning Process that are available
from the publishing organization. These
APPENDIX D Commissioning publications and resources may or may not
arrow_right Process in the I-Codes conform to the requirements of ASHRAE
Standard 202-2013. This list is provided as a
arrow_right APPENDIX E Resources resource for those using and providing
commissioning services. Since publications can
change frequently, the organization websites
are the best source of current documents.

AABC Commissioning Group (ACG), 1220 19th


Street, NW, Suite 410, Washington DC, 20036
http://www.commissioning.org/commissioningguideline.
ASTM International, 100 Bar Harbor Drive, PO
Box C700, West Conshohocken, PA, 19428-
2959 E2813-12,
http://www.astm.org/DIGITAL_LIBRARY/index.
Building Commissioning Association (BCA),
1600 NW Compton Drive, Suite 200, Beaverton,
OR 97006, http://www.bcxa.org/knowledge-
center

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 163/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Energy Systems Laboratory, TAMU, College


A󰍝
menu
Menu
Search acr…
Station, search supervised_user_circle personSign In
Texas, apps
http://www.esl.tamu.edu/continuous-
commissioning.
All Codes
clear Search Type
help
Title Illuminating
Content Engineering Society of North
Legend Information
America (IESNA) 120 Wall Street, 17th floor,
CODE SECTIONS MY NOTES New York, NY 10005,
Chapter 5 Commissioning Provider
Qualifications and Selection https://www.ies.org/product/thecommissioning-
process-applied-to-lighting-and-control-systems/
APPENDICES The following
International Code Council (ICC), 500 New
appendices provide information for
arrow_right the application of the commissioning
Jersey Ave. NW, 6th Floor, Washington, DC
process. 20001, http://www.shop.iccsafe.org/icc-G4-
2012-guideline-for-commissioning-1.html.
APPENDIX A Building International Energy Agency (IES), Energy
arrow_right Commissioning Documentation
Conservation in Buildings and Community
Systems (ECBCS) Programme, 9, rue de la
arrow_right APPENDIX B Checklists Federation, 75739 Paris Cedex 15, France,
APPENDIX C Sample Skills,
http://www.buildup.eu/en/explore/links/ieaecbcs-
arrow_right Knowledge and Abilities annex-40-commissioning-building-hvac-
systems-improving-energyperformance
APPENDIX D Commissioning
National Environmental Balance Bureau
arrow_right Process in the I-Codes
(NEBB), 8575 Grovemont Circle, Gaithersburg,
MD 20877,
arrow_right APPENDIX E Resources http://www.nebb.org/resources/specifications/.

National Fire Protection Association (NFPA), 1


Batterymarch Park, Quincy, MA 82169,
http://nfpa.org/codes.

National Institute of Building Science


(NIBS)1090 Vermont Ave, Suite 700,
Washington, DC, 20005, http://www.nibs.org
and
http://www.wbdg.org/project/buildingcomm.php

Sheet Metal and Air Conditioning Contractors


National Association (SMACNA) 4201 Lafayette
Center Drive, Chantilly, VA, 20151,
http://www.smacna.org/technical.

The State of Minnesota, Sustainable Building


Guidelines, Design & Construction Phase
https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 164/165
7/3/2021 APPENDICES The following appendices provide information for the application of the commissioning process., 2018 ICC G4 Guideline for…

! Commissioning Plan Template,


A󰍝
menu
Menu
Search acr… search
http://www.msbg.umn.edu. supervised_user_circle personSign In apps
University of Wisconsin – Madison,
All Codes
clear Searchhttps://epd.wisc.edu
Type
help
Title Content
Legend Information United States Department of Veterans Affairs
(VA), https://www.cfm.va.gov/til/cx-
CODE SECTIONS MY NOTES
Chapter 5 Commissioning Provider rcx/cxmanual.pdf
Qualifications and Selection
United States Army Corps of Engineers,
www.wbdg.org/project/buildingcomm.php
APPENDICES The following
appendices provide information for United States Department of Energy (USDOE),
arrow_right the application of the commissioning https://www.eere.energy.gov/femp/reconstructionguide/com
process.
United States General Services Administration,
APPENDIX A Building (GSA),
arrow_right Commissioning Documentation http://www.gsa.gov/portal/category/21064.

arrow_right APPENDIX B Checklists


APPENDIX C Sample Skills,
arrow_right Knowledge and Abilities
About Contact Us Subscribe
APPENDIX D Commissioning
arrow_right Process in the I-Codes ICC Family of Solutions

arrow_right APPENDIX E Resources

Connect With Us

    

Quick Links
󰐕

COPYRIGHT © 2021 INTERNATIONAL CODE COUNCIL, INC. ALL RIGHTS


RESERVED.

https://codes.iccsafe.org/content/ICCG42018/appendices-the-following-appendices-provide-information-for-the-application-of-the-commissioning-… 165/165

You might also like