SUMMARY OF CONTRACT SPECIFIED TRAINING REQUIREMENTS


Sec. Para. No. of Scheduled Completed
Section Title Paragraph Title Summary Contractor
No. No Hours (Yes/No) (Yes/No)
Packaged rooftop
Demonstration and
15781 Gas/Electric Air 3.4/A Instruction for 4 people 5 1
personnel instruction
Conditioning Unit
Demonstration and
15784 Unitary Air Conditioners 3.2/A Instruction for 2 people 4 1
personnel instruction
Demonstration and
15860 Centrifugal Fans 3.3/A Instruction for 5 people 5 1
personnel instruction
Power ventilators, relief Demonstration and
15870 3.3/A Instruction for 5 people 5 1
and intake hoods. personnel instruction
Demonstration and
15875 Air Curtains 3.02/A Instruction for 2 people 2 1
personnel instruction
Demonstration and
15885 Air Cleaning 3.2/A Instruction for 5 people 5 1
personnel instruction
Demonstration and
15930 Air Terminal Units 3.3/A Instruction for 5 people 5 1
personnel instruction
Subtotal 31
Demonstration and
15540 HVAC Pumps 3.3B Instruction for 8 people 5 2
personnel instruction
Chemical Water Demonstration and
15545 3.5A See Div. 1 2
treatment personnel instruction
Packaged Steel Flexible Training by Manuf. Rep.
15560 Water Tube Boilers-Hot 3.1/A.1 Start-up In Operation and ? 2
Water Maintenance
Subtotal 5
Demonstration and
15970 Controls 3.5/A Instruction for 4 people 5 3
personnel instruction
see spec. sect. 15975-
Direct Digital Control Manufacturer's Field
15975 3.2/F 3.2/F for detailed 24 3
Systems Services
requirements.

1 - HVAC Air Side Contractor; 2 - HVAC Water Side Contractor; 3 - Controls Contractor; 4 - Plumbing Contractor. 1 of 2
Sec. Para. No. of Scheduled Completed
Section Title Paragraph Title Summary Contractor
No. No Hours (Yes/No) (Yes/No)
see spec. sect. 15975-
Direct Digital Control Manufacturer's Field 3.2/G for detailed
15975 3.2/G 40 3
Systems Services requirements.
Instruction for 3 people
see Spec. sect. 15975-
3.4 for detailed
Direct Digital Control
15975 3.4/A Training requirements. 16 3
Systems
Training on Functional
operation of systems

see Spec. sect. 15975-


3.4 for detailed
requirements.
Direct Digital Control
15975 3.4/A Training Training on Functional 8 3
Systems
operation of systems
After 6 months of
operation.
Subtotal 93
Demonstration and
15440 Plumbing Fixtures 3.7/B Instruction for 8 people 40 4
personnel instruction
Demonstration and
15450 Plumbing Equipment 3.4/B Instruction for 8 people 40 4
personnel instruction
80
Demonstration and
15310 Fire Protection Piping 3.4/C Instruction for 8 people 8 5
personnel instruction
Demonstration and
15325 Sprinkler Systems 3.3/C Instruction for 8 people 8 5
personnel instruction
Subtotal 16

Total 225

1 - HVAC Air Side Contractor; 2 - HVAC Water Side Contractor; 3 - Controls Contractor; 4 - Plumbing Contractor. 2 of 2