Professional Documents
Culture Documents
TABLE OF CONTENT
BOOK II
4.3.13 TRAINING...................................................................................................................... 1
4.3.13.1 GENERAL.................................................................................................. 1
4.3.13.2 DEFINITIONS............................................................................................ 3
4.3.13.2.1 OVERVIEW.........................................................................3
4.3.13.2.2 MAINTAIN AND REPAIR...................................................3
4.3.13.2.3 TROUBLE SHOOT............................................................3
4.3.13.3 DETAILED REQUIREMENTS.................................................................3
4.3.13 TRAINING
4.3.13.1 GENERAL
The Bidder shall provide training for the Owner's operating and
maintenance personnel in the operation and maintenance of the
equipment furnished by the Bidder.
The Bidder shall ensure that the number of on site trainees and duration of
training shall be sufficient to meet the requirements specified herein.
TABLE 1
TRAINING AT SITE
(OPERATION AND MAINTENANCE)
1.5 Substation - 2 2
TOTAL 16 21 25
4.3.13.2 DEFINITIONS
4.3.13.2.1 Overview
The Bidder shall include in his Bid Proposal the proposed number of
trainees, the duration of training and the type of training to be conducted
by the Bidder on the Site. Numbers of trainees noted on Table-1 are
estimated only for bidding purposes.
The cost of the trainees travel and living expenses including medical
insurance, training facility etc. when assigned to a manufacturer’s works
shall be borne by the Bidder.
The Bidder shall provide, from date of Full Commercial Load through to
the end of Warranty Period two mechanical engineers, one electrical
engineer and one instrument engineer to provide supervision of and
advice to the Owner's operation and maintenance personnel. These
engineers shall have been qualified and approved by the equipment
manufacturers. Full details of the duties of these engineers will be finalized
after Contract Award.
Owner will provide rooms for on-site training, furniture and all visual aids
Bidder shall provide well organized training manuals for the trainees.