Item Description Unit Qty Unit price

Mt.Furi, Ethiopia Inferastructure up gradees


Task List 2021

1.Tunnel Structure

Contractor shall remove the overburden at


the entrence, seal and install memberane to
divert rain water and to seal any cracks or
fissuers found.
This is to stop rain water from
percolating through the over burden in to
cracks and fissuers above the first section of
the tunnel near the entry.

Provide proper scaffolding and form work to


excute the maintainance work above the first
1.1 L.S 1.00 108,000.00
section near the entrance to the level of
overburden surface.

Remove all the overburden material at the


1,2 enterance until the rock surface found clean and M3 125.00 1,344.00
make ready sealant material.

Seal the cracks on the surface of the rock with


1.3 M2 60.00 1,880.00
proper chemical.

Supply and cover the sealed rock surface with


1.4 water proof memberaneat on the first section top M2 60.00 2,100.00
of the tunnel near the entry.

Maintain the first section of internal floor surface


1.5 M2 38.00 3,500.00
with special concrete and bonding agent.

Maintain the first section of internal wall surface


1.6 M2 120.00 1,200.00
with special mortar and bonding agent.
Clean all the surface of the road and ditch from
1.7 tunnel entrance to main gate and maintain the M 20.00 2,000.00
joint with mortar.

Maintain the fence re fixing the exiting pole with


concrete and painting with anti rust and steel
1.8 m2 243.00 1,200.00
paint.Replace the wire mesh and barbed wire
with new one.

Supply and fix shade at the entrance of the


1.9 tunnel made of aluminum and plastic frame with L.S 1.00 45,000.00
aluminum composite panel cover.

Maintain the rust for the first section tunnel


1.10 L.S 1.00 6,500.00
entrance steel door.

Total Carried to Summary


Amount

108,000.00

168,000.00

112,800.00

126,000.00

133,000.00

144,000.00

-
40,000.00

291,600.00

45,000.00

6,500.00

-
1,174,900.00